JAKARTA BAY :
CILIWUNG RIVER
Backgrond & Problems (Jakarta Bay & Ciliwung River)
Backgrond & Problems (Jakarta Bay & Ciliwung River)
Jakarta Bay stretches from 106
o20’ and 107
o03’ east longitude, and from 5
o10’ to 6
o10’
south latitude.
Administratively
within 3
provinces, i.e.,
Banten Province, the Capital City of Jakarta,
and West Java Province
Jakarta Bay has multifunction i.e., Sources of
sea resources, recreation area, etc.
Jakarta Bay has been polluted
One major river flowing into Jakarta Bay is
Ciliwung river
Sources: The MOE, Republic of Indonesia, 2004Jakarta Bay
C
IL
IW
U
N
G
R
IV
E
R
B
A
S
IN
C
IL
IW
U
N
G
R
IV
E
R
B
A
S
IN
C
IL
IW
U
N
G
R
IV
E
R
B
A
S
IN
Ciliwung River
Ciliwung River
Total area : 52,169 hectare Population in 2005: 1.892.980
people with population density 5100 people / Km2
In the last eigth years the
population number has been increased very rapid
Ciliwung riverbasin is located in 2 provinces :
1. West Java Province (Bogor
Regency, Bogor City, and Depok City)
2. Capital City Jakarta Province (South Jakarta, East Jakarta,
Center Jakarta, West Jakarta, and North Jakarta
Riverbasin
Katulampa Sempur : Km 66
Kedung Halang : Km 59 Pondok Rajeg : Km 49
Jembatan Panus : Km 44 Jemb. Kelapa Dua :
Km 33 Condet : Km 25 PA. Manggarai : Km 11 Kwitang : Km 6 G. Sahari : Km 2 PI. Kapuk R. Kopo 15 Km R. Kedung Jaya 16 Km R. Bojong Gede 13 Km R. Depok 10 Km R. L. Agung 8 Km R. Pejaten Timur 14 Km HiLir Hulu Teluk Jakarta N Ciliwung River Mainstream ± 119 Km
Lokasi pemantauan kualitas air sungai Sumber Sarpedal Tahun 2005
Km 88 Km 73 Km 59 Km 44 Km 33 Km 25 Km 11 Atta Awun Cisampai : Km 84.5 Cilember : Km 81.5 Jembatan Gadog : Km 76.5 Km 2 R. Kwitang 11 Km Km 0 Based on monitoring station at Katulampa
that daily average discharge flow in 1990 – 1997 are Q max 21 m3/s and Q min 8,9 m3/s. Year in 2000 – 2006 that Q max 80,1 and Q min 0,15 m3/det. Ratio Q max and Q min more than 100.
Total water volume from the Ciliwung river to Jakarta bay is 500 million m3 / year.
Ciliwung river has multifunction (Irrigation, water source of industrial, household of utilization, transportation).
Ciliwung stream is threatned by solid waste household dumping, sedimentation from upperstream, livestock waste, industrial waste.
Ciliwung Stream
The Problem of Water
The Problem of Water
Quality
Quality
and Land Degradation
and Land Degradation
•Lack of recharges area
•Industrial waste •Domestic waste •Sampah sungai •Banjir •Domestic Waste •Recharges System •Industrial Waste
Erosion and Sedimentation Spatial Utilization/Zoning Domestic Waste Livestock Waste •Domestic Waste •Recharges system •Industrial Waste •Livestock Waste Domestic Waste Industrial Waste Livestock Waste •Recharges system •Industrial waste •Domestic waste •Solid Waste •Flood
Land Use Changes in Ciliwung Riverbasin
Land Use Changes in Ciliwung Riverbasin
(Year of 2000
(Year of 2000
-
-
2008)
2008)
2000 (%) 2005 (%) 2007 (%) 2008 (%) Forest 4.918 9,43 4.162 7,98 1.665 3,19 1.265 2,42 Mix Crop 6.502 12,46 10.791 20,69 12.350 23,67 8.994 17,24 Mangrove 0 0,00 0 0,00 0 0,00 43 0,08 Estate Plantation 0 0,00 0 0,00 2.186 4,19 4.185 8,02 Settlement 24.833 47,60 31.580 60,53 33.395 64,01 35.750 68,53 Swamp 71 0,14 128 0,25 7 0,01 25 0,05 Paddy Field 1.781 3,41 1.799 3,45 1.681 3,22 1.502 2,88 Bush 723 1,39 534 1,02 144 0,28 104 0,20 Fish pond 0 0,00 0 0,00 7 0,01 1 0,00 Bare land 4.550 8,72 423 0,81 20 0,04 14 0,03 Dry land 8.010 15,35 2.422 4,64 385 0,74 233 0,45 Water body 782 1,50 330 0,63 328 0,63 54 0,10 TOTAL 52.169 100,00 52.169 100,00 52.169 100,00 52.169 100,00 Landcover Area (Ha)No. Station Location Temp. oC pH BOD COD DO 1 Atta Awun UPSTREAM 22,08 7,08 8,46 23,99 5,89 2 Ciburial, Cisampai 22,96 7,09 5,83 24,47 6,34 3 Cilember 25,72 7,30 4,32 11,85 5,90 4 Jembatan Gadog 25,99 7,24 3,96 16,60 5,96 5 Katulampa 26,41 7,19 5,03 24,81 5,66 6 Sempur MIDSTREAM 27,04 6,97 7,40 27,20 5,95 7 Kedung Halang 27,46 7,01 6,42 17,69 6,17 8 Pondok Rajek 28,11 7,25 7,02 20,55 5,49 9 Jembatan Panus 27,66 6,91 7,46 25,68 5,11 10 Kelapa Dua 27,33 7,11 10,70 27,07 3,33 11 Condet DOWNSTREAM 28,58 6,86 11,07 33,08 3,12 12 Manggarai 28,08 7,00 11,50 26,16 1,97 13 Kwitang 30,16 7,08 15,04 41,42 1,26 14 Gunung Sahari 30,23 7,26 26,61 65,00 1,08
Water Quality Data
Water Quality Data
2007
MONITORING STATION at JAKARTA BAY
M1 : Muara Kamal
M2 : Muara Cengkareng
M3 : Muara Angke
M4 : Muara Karang
M5 : Muara Ancol
M6 : Muara Sunter
M7 : Muara Cakung
M8 : Muara Marunda
M9 : Muara Gembong
8106.7 106.75 106.8 106.85 106.9 106.95 107 106.7 106.75 106.8 106.85 106.9 106.95 107 -6 .1 5 -6 .1 -6 .0 5 -6 -5 .9 5 -6 .1 5 -6 .1 -6 .0 5 -6 -5 .9 5 6 13 20 27 34 41 48 55
BOD distribution
April 2009
(Transition season
West-East)
BOD at all estuaries are more than
10 mg/L
106.7 106.75 106.8 106.85 106.9 106.95 107 106.7 106.75 106.8 106.85 106.9 106.95 107 -6 .1 5 -6 .1 -6 .0 5 -6 -5 .9 5 -6 .1 5 -6 .1 -6 .0 5 -6 -5 .9 5
A
10 16 22 28 34 40 46 52 58 64BOD (mg/L) distribution at west season (Agt) 2008
106.7 106.75 106.8 106.85 106.9 106.95 107 106.7 106.75 106.8 106.85 106.9 106.95 107 -6 .1 5 -6 .1 -6 .0 5 -6 -5 .9 5 -6 .1 5 -6 .1 -6 .0 5 -6 -5 .9 5 40 47 54 61 68 75 82 89 96 103 110
COD distribution
April 2009
COD at all estuaries are more than
40 mg/L
106.7 106.75 106.8 106.85 106.9 106.95 107 106.7 106.75 106.8 106.85 106.9 106.95 107 -6 .1 5 -6 .1 -6 .0 5 -6 -5 .9 5 -6 .1 5 -6 .1 -6 .0 5 -6 -5 .9 5
B
40 50 60 70 80 90 100 110106.7 106.75 106.8 106.85 106.9 106.95 107 106.7 106.75 106.8 106.85 106.9 106.95 107 -6 .1 5 -6 .1 -6 .0 5 -6 -5 .9 5 -6 .1 5 -6 .1 -6 .0 5 -6 -5 .9 5
A
50 65 80 95 110 125 140 155 170 185Policies :
Policies :
4 Classes of Water Utilization
National Water Quality Standard (Chemical, Physical and
Biological)
Water Quality Current and Target in Ciliwung River
–
6 Segment in 2 Provinces (West Java and Capital City of
Jakarta)
–
Each segment related administration district boundaries
National and Local Government Responsibilities mentioned on
the Ciliwung Water Quality Management and Water Pollution
Controll Presidencial Decree Draft, contains:
–
Roles and responsibilities of each sector and local
Government
–
Master Plan of Ciliwung River Water Quality and Water
Pollution Control
Class 4
Class 3
Class 2
Class 1
(gardening)
(fishery, livestock,
agriculture)
(recreation, fishery, livestock,
agriculture)
(drinking water, recreation, fishery, livestock,
agriculture)
Water Utilization Classes
Water Utilization Classes
Water Quality
Water Utilization :
Present
Future
GR No.82 Year 2001
GR No.82 Year 2001
PARAMETER Unit Class I II III IV Physical TDS mg/ L 1000 1000 1000 2000 TSS mg/L 50 50 400 400 Organics Chemical BOD mg/L 2 3 6 12 COD mg/L 10 25 50 100 DO mg/L 6 4 3 0 Total Phospat as P mg/L 0,2 0,2 1 5 NO 3 as N mg/L 10 10 20 25 Microbiologi Fecal coliform jml/100 ml 100 1000 2000 2000 Total coliform jml/100 ml 1000 5000 10000 10000
(Goverment Regulation Number
(Goverment Regulation Number 82 82 //20012001))
Water Quality Standard
ESTIMATION OF TMDL OF
Phospat, Nitrat, TSS,TDS, BOD,COD based on population number
-10,000 20,000 30,000 40,000 50,000 60,000 70,000 80,000
Bogor Kota Bogor Kota Depok Jakarta Selatan
Jakarta Timur Phospat (kg/hari) Nitrat (kg/hari) TDS (kg/hari)
Water Quality Categories of
Water Quality Categories of
Ciliwung
Ciliwung
River
River
District
District
Current
Current
Water
Water
Quality
Quality
Target
Target
Water
Water
Quality
Quality
DKI
Jakarta
No Class
III
Depok
IV
II
DKI
Jakarta
No Class
II
Kab. Bogor
IV
II
Kota Bogor
IV
II
Kab. Bogor
IV
I
TMDL of Ciliwung River for BOD and COD
No.No. SEGMENTSEGMENT CLASSCLASS TMDL TMDL (kg/(kg/hourhour) )
SUB DISTRICT
SUB DISTRICT
BOD
BOD COD COD
1.
1. 11 II 693,79693,79 2.727,862.727,86 Ciawi, Cisarua, MegamendungCiawi, Cisarua, Megamendung
2.
2. 22 IIII 780,52780,52 3.468,963.468,96 Kota Bogor Selatan, Kota Bogor Timur, Kota Bogor Kota Bogor Selatan, Kota Bogor Timur, Kota Bogor Utara, Kota Bogor Tengah, Tanah Sereal
Utara, Kota Bogor Tengah, Tanah Sereal
3.
3. 33 IIII 157,68157,68 315,36315,36 Sukaraja, Babakan Madang, Cibinong, BojonggedeSukaraja, Babakan Madang, Cibinong, Bojonggede
4.
4. 44 IIII 599,18599,18 2.995,922.995,92 Beji, Limo, Beji, Limo, CimanggisCimanggis, , SukmaSukmaJayaJaya, , PancoranPancoranMasMas
5.
5. 55 IIII 693,79693,79 2.522,882.522,88
Jagakarsa, Pasar Minggu, Mampang Prapatan, Jagakarsa, Pasar Minggu, Mampang Prapatan, Pancoran, Tebet, Setia Budi, Kebayoran Baru
Pancoran, Tebet, Setia Budi, Kebayoran Baru, , Pasar Pasar Rebo, Ciracas, Kramat Jati, Jatinegara
Rebo, Ciracas, Kramat Jati, Jatinegara
6.
6. 66 IIIIII 1.750,251.750,25 10.059,9810.059,98
Pulo Gadung, Matraman, Menteng, Senen, Tanah Pulo Gadung, Matraman, Menteng, Senen, Tanah Abang, Johar Baru, Cempaka Putih, Kemayoran,Sawah Abang, Johar Baru, Cempaka Putih, Kemayoran,Sawah Besar, Gambir, Tambora, Taman Sari,
Besar, Gambir, Tambora, Taman Sari, Koja, Penjaringan, Koja, Penjaringan, Pademangan, Tanjung Priok, Kelapa Gading
Pademangan, Tanjung Priok, Kelapa Gading
Total
PROGRAM ON MASTERPLAN
PROGRAM ON MASTERPLAN
1.
WATER POLLUTION CONTROL
2.
ENVIRONMENT DEGRADATION CONTROL
3.
SPATIAL PLANNING
4.
LAW ENFORCEMENT
Water Pollution Control
Water Pollution Control
Program
Program
1) Domestic waste control
2) Livestock waste control
3) Industrial waste control
Environment Degradation Control
Environment Degradation Control
Program
Program
1) Control on erosion and sedimentation
2) Control on Critical land
Spatial Planning
Spatial Planning
Program
Program
Revised of zoning regulation of upstream and
downstream riverbasin, Socialization, Evaluation
Law Enforcement
Law Enforcement
Program
Program
Law
Enforcement
(spatial
utilizing,
Environmental degradation and pollution),
Socialization
of
regulation
related
to
Environmental Management
Community Empowerment
Community Empowerment
Program
Program
a.Training (Composs, biogas, waste management)
b.Socialitation
and
Disemination
Information
Activities
c.Development of River Forum
d.Community development
INVESMENT PROGRAM
INVESMENT PROGRAM
TYPE OF ACTIVITY:
1. Water Pollution Control
a)Sewerage system for the 1.831.600 household.
b)5.340 unit of Biogas intallation for Livestock and
other potential sources.
2. Environmental Degradation Control
a)60.109 unit of Artificial recharge well
b)151 unit of Gullyplug.
c) 94 unit of trapping dam.
d)9 unit of controlling dam.
INVESMENT PROGRAM
INVESMENT PROGRAM
INSTITUTION:
1. Ministry of Environment
2. Ministry of Public Work
3. Ministry of Agriculture
4. Ministry of Forestry
5. Ministry of National Development Planning
(BAPPENAS)
INVESMENT PROGRAM
INVESMENT PROGRAM
•
Duration of Implementation estimated 20 years.
•
Estimated cost for the implementation is
Status BOD (mg/l) Biogas (Unit) Septictank/ Comunal WC (Unit)
1
VI
DKI
IV
Hight Polluted
38,0
30,0
260
1900
2
V
DKI
IV
Hight Polluted
12,8
10,2
400
5700
3
IV
Depok
IV
Moderate Polluted
11,1
9,0
350
860
4
III
Bogor Distric
IV
Moderate Polluted
5,9
5,2
35
125
5
II
Bogor City
IV
Moderate Polluted
8,0
6,8
90
300
6
I
Bogor Distric
IV
Moderate Polluted
12,4
9,8
260
550
WATER QUALITY REHABILITATION PLANNING OF CILIWUNG RIVER
(1st 5 Years) FROM BOD PARAMETER
No. Segment Region Target of Water Quality
Existing of Water Quality BOD Target 1st 5 Years
(mg/l)
BIODIGESTER
Instalasi
InstalasiInstalasiBio GasBio Gas InstalasiInstalasiBio GasBio Gas InstalasiInstalasiBio GasBio Gas
InstalasiBio GasBio Gas
BOGOR REGENCY
(UPSTREAM OF
CILIWUNG RIVER BASIN)
Kel. Tani Kaliwung-Kalimuncar
Demplot Sediment Trap
BOGOR REGENCY
(UPSTREAM OF
CILIWUNG RIVER BASIN)
KEMENTERIAN NEGARA LINGKUNGAN HIDUP
APRIL 2007
SHALLOW WELL ARTIFICIAL RECHARGE
kerakal
pasir
ijuk
tebal
50 cm
Pipa PVC 4” dari
Talang atap
Muka tanah
2 m
Muka air tanah musim hujan
2 m
Penutup sumurplat beton bertulang
Dinding sumur bagian atas
pasangan ½ bata merah, batako
DEEPWELL ARTIFICIAL RECHARGE
( confined aquifer )
kerakal
pasir
ijuk
tebal
50 cm
Muka tanah
Lempung
1 m
1 m
Ukuran sumur
1m x1m,
atau lingkaran
Diameter 80-120cm
Pipa PVC 4”
Dari talang atap
1 m
saringan
Sumur pantek
PVC 2” atau 2¾”
15 m
2-10 m tergantung jenis dan lapisan tanah bak kontrol sedimen pasangan batu kosong dan ijuk sedimen mengendap di bagian bawah 50 cm 2-10 m tergantung jenis dan lapisan tanah bak kontrol sedimen pasangan batu kosong dan ijuk sedimen mengendap di bagian bawah 50 cm 2-10 m tergantung jenis dan lapisan tanah bak kontrol sedimen pasangan batu kosong dan ijuk sedimen
mengendap di bagian bawah
50 cm
Sumur
Sumur
resapan
resapan
air
air
hujan
hujan
konstruksi
konstruksi
sederhana
sederhana
Shallow Well Model
Shallow Well Model
for Household
for Household
Scale
Scale
Pembuatan
Pembuatan
sumur
sumur
resapan
resapan
air
air
hujan
hujan
di
di
DAS
DAS
Ciliwung
Ciliwung
Hulu
Hulu
(
Membuat lubang dengan bor tanah
Hole diameter 10
Hole diameter 10
-
-
30
30
cm. in <100 cm depth
cm. in <100 cm depth
with content organic
with content organic
matters
matters
Biopore
Biopore
Biopore
Biopore
Hole in
Hole in
MoE
MoE
Office and
Office and
Campus of
Campus of
Bogor
Bogor
Agriculture
Agriculture
University
University
BOD (mg/L)
Sempur
jembatan panus kedunghalang
Katulampa
Intake PAM Condet (Kp. Gedong) Jl. MT. Haryono
Sebelum Pintu air Manggarai Kelapa dua
(Srengseng Saw ah)
Pondok Rajeg Bendung gadog Cisarua Cisampai Attaaw un 0 5 10 15 20 25 20 juni 2007 13 juli 2009 3
Below Standard
Above standard
Standard: GR 82 tahun 2001 Class II
BOD MONITORING DATA
COD (mg/L)
jembatan panus kedunghalang
Sempur Katulampa
Intake PAM Condet (Kp. Gedong)
Jl. MT. Haryono
Sebelum Pintu air Manggarai
Kelapa dua (Srengseng Saw ah)
Pondok Rajeg Bendung gadog Cisarua Cisampai Attaaw un 0 10 20 30 40 50 60 70 20 Juni 2007 13 Juli 2009
Below Standard
Above standard
Standard : GR 82 tahun 2001 Class II
COD MONITORING DATA
25
PO4 (mg/L) jembatan panus A ttaawun Cisampai Cisarua B endung gado g P o ndo k Rajeg Kelapa dua (Srengseng Sawah) Sebelum P intu air M anggarai Jl. M T. Haryo no Intake P A M Co ndet (Kp. Gedo ng) kedunghalang Katulampa Sempur 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 20 juni 2007 13 juli 2009
Below standard
Above standard
Standard : GR 82 tahun 2001 Class II
PO4 MONITORING DATA
NO3 (mg/L) Sempur Katulampa kedunghalang Intake P A M Co ndet (Kp. Gedo ng) Jl. M T. Haryo no Sebelum P intu air M anggarai Kelapa dua (Srengseng Sawah) P o ndo k Rajeg B endung gado g Cisarua Cisampai A ttaawun jembatan panus 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 20 juni 2007 13 juli 2009
Below standard
Above standard
Standard : GR 82 tahun 2001 Class II
NO3 AT ALL MONITORING STATION MEET THE STANDARD
PLANNING OF WATER QUALITY REHABILITATION OF CILIWUNG RIVER
Time/Target Rehabilitation for 20 Years
Water Pollution Controll Programs
WC komunal 9.435 unit 11.680 unit 12.170 unit 12.505 unit Sewerage system 377.400 KK 467.200 KK 486.800 KK 500.200 KK Solid Waste Management (3-R) 10.470 ton/hari 10.790 ton/day 10.680 ton/day 11.340 ton/day Biogas 1.335 unit 1.200 unit 1.255 unit 1.550 unit
Environment Degradation Controll Program Increasing function of catchment area:
Artificial Recharges Well 15.639 unit 15.639 unit 13.192 unit 15.639 unit Gully Plug 43 unit 43 unit 33 unit 32 unit Trapping DAM 29 unit 25 unit 25 unit 15 unit Controlling DAM 9 unit - unit - unit - unit
Land Rehabilitation:
Reboisation/Reforestation 209 Ha - Ha - Ha - Ha Agroforestry 926 Ha 925 Ha 925 Ha 577 Ha Replanting in Riparian (on the right and left side)
River
400 Ha 300 Ha 400 Ha 400 Ha
Activities 1st 5 Years 2nd 5 Years 3rd 5 Years 4th 5 Years
Cost (1st 5 Years) Cost (2nd 5 Years) Cost (3rd 5 Years) Cost (4th 5 Years)
Water Pollution Controll Program
WC komunal 10.000.000 94.350.000.000 116.800.000.000 121.700.000.000 125.050.000.000
Sewerage System 2.500.000 943.500.000.000 1.168.000.000.000 1.217.000.000.000 1.250.500.000.000
Solid Waste Management (3-R) 10.000.000 104.700.000.000 107.900.000.000 106.800.000.000 113.400.000.000
Biogas 12.000.000 16.020.000.000 14.400.000.000 15.060.000.000 18.600.000.000
Environment Degradation Controll Program Increasing Function of Catchment Area:
Artificial Recharges Well 3.500.000 54.736.500.000 54.736.500.000 46.172.000.000 54.736.500.000
Gully Plug 3.000.000 129.000.000 129.000.000 99.000.000 96.000.000 Trapping DAM 25.000.000 725.000.000 625.000.000 625.000.000 375.000.000 Controlling DAM 250.000.000 2.250.000.000 Land Rehabilitation: Reboisation/Reforestation 8.000.000 1.672.000.000 Agroforestry 4.000.000 3.704.000.000 3.700.000.000 3.700.000.000 2.309.600.000
Replanting in Riparian (on the right and left
side) River 8.000.000 3.200.000.000 2.400.000.000 3.200.000.000 3.200.000.000
Rp.
Activities Price