• Tidak ada hasil yang ditemukan

Change Requests | OGC

N/A
N/A
Protected

Academic year: 2017

Membagikan "Change Requests | OGC"

Copied!
2
0
0

Teks penuh

(1)

All Fields marked with

*

are mandatory.

Change Request

#:

95

Assigned OGC

Document #:

10-120

Name:

*

Leif Stainsby

Organization:

*

Galdos Systems Inc.

Email:

*

lstainsby@galdosinc.com

Document

Name/Version:

*

CSW-ebRIM Registry Service - Part 1: ebRIM profile of CSW / 1.0.1

OGC Project

Document:

*

07-110r4

If this is a revision of a previous submission and you have a Change Request Number, then check here:

Enter the CR number here:

Enter the Revsion Number that you are revising here:

Title:

*

Repository Item validation

Source:

*

L. Stainsby

Work item code:

Category:

*

B (Addition of feature)

Reason for

change:

*

Add mechanism to improve integrity of registry content. Current specification does not address this capability.

This issue was raised in the Registry SWG charter (OGC 07-119r1) that identified several critical deficiencies in the current CSW-RIM 1.0.1 specification.

(2)

Summary of

change:

*

Currently, CSW-ebRIM registries must validate incoming registry content (metadata), but, no standard mechanism exists for ensuring repository content is valid.

Define an optional, declarative, mechanism for indicating to the registry how to validate repository items. The mechanism must be capable of supporting unique validation constraints for each objectType that ExtrinsicObject can assume.

Allow for different validation techniques: XML schema, RelaxNG, Schematron, arbitrary binary formats. Might help to define a new ClassificationScheme for supported techniques.

Consequences if

not approved:

If not approved, the ability for CSW-ebRIM registries to enforce repository content constraints will remain:

* non-standard and thus non-interoperable.

* difficult to rely upon if repository content is suspect. * problematic for registry client software (unable to specify repository validation constraint; or having to deal with potentially invalid content).

Clauses affected:

*

New clause anticipated.

Additional

Documents

affected:

May affect: * OGC 07-144r3, CSW-ebRIM Registry Service - Part 2: Basic

extension package * OGC 08-103, CSW-ebRIM Registry Service - Part 3: Abstract

test suite

Supporting

Documentation:

Comments:

Status:

Assigned

Disposition:

Re

f

ered

Referensi

Dokumen terkait

Oleh karena F hitung lebih besar dari F tabel atau 15,637 > 0,000, maka hipotesis nol (ho) yang ber- bunyi “Tidak terdapat hubungan yang signifikan antara komitmen dan

2005 Penguatan Membaca Fasilitas Lingkungan Sekolah dan Keterampilan Dasar Membaca Bahasa Indonesia serta Minat Baca Murid Pdf.. diakses pada tanggal 21

Apakah menurut anda pepustakaan umum layak megadakan pameran buku bagi masyarakat dalam mengembangkan minat

Karena dari uji linieritas, juga menunjukkan keadilan organisasi berpengaruh positif terhadap OCB, maka dapat disimpulkan bahwa jika tidak kontrol variabel oleh kepuasan kerja dan

Menurut teori motivasi prestasi atau Achievement Motivation Theory yang dikemukakan oleh David Mc.Clelland dalam buku Nguyen (2003), faktor-faktor motivasi kerja karyawan

agar mentt 3 jam |aten 0l(ol(- Etam tetah tasar Eran a5tn. :-akata Edisi Kedua. laftar Tabet.. )aftar ltustrasi )aftar Lampiran

Penelitian ini dilakukan di SMP Negeri 8 Depok dengan mengambil sampel anak yang mengalami kesulitan belajar ( learning Disability ) berjumlah satu orang anak

(7) Penambahan kapasitas pembangkitan pusat pembangkit tenaga listrik yang telah beroperasi di lokasi yang berbeda pada sistem setempat, dalam rangka Pembelian tenaga