-BADAN PEMERIKSA

KEUANGAN--REPUBLIK INDONESIA

LAPORAN HASIL PEMERIKSAAN

ATAS

LAPORAN KEUANGAN

JAKARTA URGENT FLOOD MITIGATION PRO ECT

/

JAKARTA EMERGENCY DREDGING INITIA

[VE

(IBRD LOAN NO. 8121-ID)

AUDITORAT UTAMA KEUANGAN NEGA

IV

Public Disclosure Authorized

Public Disclosure Authorized

Public Disclosure Authorized

(2)

BADAN PEMERIKSA KEUANGAN

REPUBLIK INDONESIA

LAPORAN HASIL PEMERIKSAAN BPK RI

ATAS

LAPORAN KEUANGAN

LOANWORLD BANK IBRD NO.8121-rn

PADA

JAKARTA URGENT FLOOD MITIGATION PROJECT

(JUFMP)/JAKAR TA EMERGENCY DREDGING INITIATIVE (JEDI)

DIREKTORAT JENDERAL SUMBER DAYA AIR

KEMENTERIAN PEKERJAAN UMUM

TAHUN 2014

Nomor

: 18.AILHP/XVII/06/2015

Tanggal

: 25 Juni 2015

BADAN PEMERIKSA KEUANGAN REPUBLIK INDONESIA

JL Gatot Subroto No.31 Jakarta Pusat 10210

Telp/Faks (021) 5738770

(3)

DAFTAR ISI

DAFTAR ISI...

...

DAFTAR S[NGKATAN ...

...

SISTEMATIKA HASIL PEMERIKSAAN ATAS LAPORAN KEUANGAN

LOAN IBRD 8121-ID JUFMP/JEDI TAHUN 2014 ...

¡...¡i

LAPORAN HASIL PEMERIKSAAN ATAS LAPORAN KEUANGAN... 1

LAPORAN KEUANGAN KONSOLIDASI LOANIBRD 8121-ID JUFMP/JEDI

TARUN 2014

-

INTERIMFINANCIAL REPORT (IFR)

GAMBARAN UMUM PEMERIKSAAN...3....

...

3

1. Dasar

Hukum

Pemeriksaan ...

..

...

3

2. Tujuan Peneriksaan ...

.

... . 3

3. Sasaran Pemeriksaan ...

...

...

.... 3

4. Standar Pemeriksaan ...

.... 3

5. Metodologi Pemeriksaan...

.

...

3

3...

6. Jangka Waktu Pemeriksaan...

. .

... 4

7. Obyek Pemeriksaan...

...

4

(4)

DAFTAR SINGKATAN

I .

A WP

Anual Working Plan

2.

BBWS

Balai Besar Wilayah Sungai

3.

Cilicis

Ciliwang-Cisadane

4.

CPIU

Central Project Implementation Unit

5.

CPMU:

Central Project Management Unit

6.

FMR

Financial

Management Report

7.

IBRD

International

Bank for Reconstruction and Development

8.

ICB

International Competitive Bidding

9.

IFR

:Interim Financial

Report

10. JEDI

Jakarta Emergency Dredging Initiative

11. JUFMP

Jakarta Urgent Flood Mitigation Project

12. LARAP

Land Acquisition and Resettlement Action Plan

13. NOL

No Objection Letters

14. PIU

Project Implementation Unit

15. PLP

Direktorat Penychatan Lingkungan Permukiman

16. POM

Project Operation Manual

17. SPI

Sistem Pengendalian Intern

18. SPKN

Standar Pemeriksaan Keuangan Negara

19. SPM-LS

Surat Perintah Membayar Langsung

20. SPM-LS

Surat Perintaht Pencairan Dana Langsung

(5)

SISTEMATIKA HASIL PEMERIKSAAN

ATAS LAPORAN KEUANGAN LOANIBRD 8121-ID JUFMP/JEDI TAHUN 2014

Hasil pemeriksaan atas Laporan Keuangan Loan IBRD 8121-ID Jakarta Urgent

Flood Mitigation Project (JUFMP)/Jakarta

Emergency Dredging Initiative (JED]) Tahun

2014 terdiri dari tiga laporan sebagai berikut:

1. Hasil Pemeriksaan atas Laporan Keuangan

Laporan ini berisi: (a) Hasil pemeriksaan yang memuat opini BPK atas kewajaran

Laporan Keuangan Tahun 2014; (b) Laporan Keuangan berupa Consolidation Interim

Financial Report (IFR); dan (c) Gambaran Umum Perneriksaan yang berisi dasar

hukum pemeriksaan, tujuan pemeriksaan, sasaran pemeriksaan, standar pemeriksaan,

metodologi pemeriksaan, waktu pemeriksaan, obyek pemeriksaan, dan batasan

pemeriksaan.

2. Hasil Pemeriksaan atas Sistem Pengendalian Intern

Laporan ini berisi: (a) Resume Laporan atas Sistem Pengendalian Intern (SPI); (b)

Hasil Pemeriksaan SPI; dan (c) Tindak Lanjut Temuan Pemeriksaan sebelumnya.

3. Hasil Pemeriksaan atas Kepatuhan Terhadap Peraturan Perundang-undangan

Laporan ini berisi: (a) Resume Laporan atas Kepatuhan Terhadap Peraturan

Perundang-undangan;

(b) Hasil Pemeriksaan Kepatuhan Terhadap Peraturan

Perundang-undangan; dan (c) Tindak Lanjut Temuan Pemeriksaan sebelumnya.

(6)

BADAN PEMERIKSA KEUANGAN

REPUBLIK INDONESIA

LAPORAN HASIL PEMERIKSAAN ATAS LAPORAN KEUANGAN

Berdasarkan Undang-undang (UU) Nomor 15 Tahun 2004 tentang Pemeriksaan

Pengelolaan dan Tanggung Jawab Keuangan Negara, UU Nomor 15 Tahun 2006 tentang

Badan Pemeriksa Keuangan (BPK), BPK telah mermeriksa Laporan Keuangan Jakarta

Urgent Flood Mitigation Project (JUFMP)/Jakarta Emergency Dredging Initiative

(JEDI) berupa Consolidation Interin Financial Report (JFR) untuk tahun yang berakhir

tanggal 31 Desember 2014. Laporan Keuangan adalah tanggung jawab manajemen

JUFMP/JEDI. Tanggung jawab BPK terletak pada pernyataan pendapat atas laporan

keuangan berdasarkan pemeriksaan yang dilakukan.

Kecuali terhadap hal yang diuraikan dalam paragraf berikut ini, BPK

melaksanakan pemeriksaan berdasarkan Standar Pemeriksaan Keuangan Negara (SPKN).

Standar tersebut mengharuskan BPK merencanakan dan melaksanakan pemeriksaan agar

memperoleh keyakinan yang memadai bahwa laporan keuangan bebas dari salah saji

material. Suatu pemeriksaan meliputi pengujian bukti-bukti yang mendukung

jumlah-jumlah dan pengungkapan dalam laporan keuangan. Pemeriksaan juga meliputi penilaian

atas penerapan prinsip akuntansi yang digunakan dan estimasi signifikan, yangtdibuat

oleh manajemen JUFILP/JEDI, penilaian atas kepatuhan terhadap ketentuan peraturan

perundang-undangan,

penilaian atas keandalan sistem pengendalian intern yang

berdampak material terhadap laporan keuangan, serta penilaian terhadap penyajian atas

laporan keuangan secara keseluruhan. BPK yakin bahwa pemeriksaan tersebut

memberikan dasar memadai untuk menyatakan opini.

Sebagaimana disajikan dalam Form J-B poin (la) atas IFR Tahun 2014,

manajemen JUFMP/JEDI melaporkan realisasi pembayaran atas Project JUFMP/JEDI

Package No.

2A

dan 2B

masing-masing

sebesar

Rp92.283.141.927,00

dan

Rp18.345.476.172,00.

Dalam

realisasi

pembayaran

tersebut, terdapat

kelebihan

pembayaran atas pelaksanaan pekerjaan sebesar Rp8.629.023.146,43. Selain itu, sistem

pengendalian intern dalam rangka pelaksanaan pembayaran, belum sepenuhnya menjamin

penerapan metode pengukuran pekerjaan sesuai dengan yang disyaratkan dan persetujuan

Addendum Kontrak belum sepenuhnya mempedomani dokumen pelelangan dan belum

didasarkan pada perhitungan yang akurat.

Menurut pendapat BPK, kecuali untuk dampak penyesuaian, jika ada, atas

indikasi kelebihan pembayaran dan kelemahan pengendalian intern; (1) Laporan

(7)

keuangan terlampir menyajikan secara wajar dalam semua hal yang material, posisi

keuangan JUFMP/JEDI per 31 Desember 2014, dan hasil kegiatan untuk tahun yang

berakhir 31 Desember 2014, sesuai dengan Project Operation Manual dan Terms of

Reference yang relevan dengan penyusunan laporan keuangan tersebµt; (2) Executing

Agency telah menggunakan dana pinjaman sesuai dengan tujuan yang ditetapkan dalam

Loan Agreetnent antara Republik Indonesia dengan International Bankfor Reconstruction

and Development (1BRD) tanggal 17 Februari 2012; dan (3) Laporan keuangan telah

disusun sesuai dengan kebijakan, prosedur dan ketentuan pembiayaan serta inplen2enting

agency telah memiliki kerangka pengendalian intern yang efektif.

Sebagai bagian perolehan keyakinan yang menadai atas kewajaran laporan

keuangan tersebut, BPK juga melakukan pemeriksaan terhadap Sistem Pengendalian

Intern dan Kepatuhan terhadap Ketentuan Perundang-undangan. Laporan Hasil

Pemeriksaan atas Sistem Pengendalian Intern dan Kepatuhan terhadap Peraturan

Perundang-undangan disajikan dalam Laporan Nomor 18.B/LHP/XVIJ/06/2015 dan

Nomor 18.C/LUP/XVII/06/2015 tanggal 25 Juni 2015, yang merupakan bagian tidak

terpisalkan dari laporan ini.

Jakarta, 25 Juni 2015

BADAN PEMERIKSA KEUANGAN

REPUBLIK INDONESIA

WakiL Penangguna Jawab Pemeriksaan,

i

A-Aklis'anukKuFKhØ IBA., Ak., CFE., CMA.

(8)

CENTRAL PROJECT MANAGEMENT UNIT:

DIRECTORATE OF PLANNING AND PROGRAMMING

JAKARTA URGENT FLOOD MITIGATION PROJECT (JUFMP)/

JAKARTA EMERGENCY DREDGING INITIATIVE (JEDI)

The World Bank

-40

Af . ...

IAPORAN IASIL KONDOLIDASI

PERIODE 31 DESEMBER

2014

AUDITED

Prepared by:

Secretary: CPMU

-

Directorate of Planning and Programming

-

DGWS

Jakarta Urgent Flood Mitigation Project (JUFMP)

/

Jakarta Emergency Dredging Initiative (JEDI)

(9)

DAFTAR ISI

DAFTAR ISI...

DAFTAR TABEL...

DAFTAR GAMBAR

...

DAFTAR

LAMPIRAN

...

IV

LAPORAN KEUANGAN KONSOLIDASI LOAN IBRD 8121-ID

JUFMP/IJEDI TAHUN 2014

-

INTERIM FINANCIAL REPORT (1R)

... 1

FORM 1-A (Project Sources and Used ofFunds)

...

1

FORM 1-B (Cummulative Uses of Funds by Project Activity)

...

2

FORM 1-C (Project Cash Forecash) ...

... 3

FORM 1 -D (Special Account Activity Statement)...

4

FORM 1-E (Disbursement and Expenditures Status). ...

5

FORM 1-F (Summary Statement)

...

7

FORM 2 (Consultants Supervisi & Good, Non Consultant Expenditure) ... 12

FORM 3 (Contract Expenditure Report

-

Civil Works) ...

...

13

PENJELASAN UMUM

...

... 17

1.

Gambaran Umum ...

... ... 17

2.

Kebijakan Akuntansi

...

... 22

3.

Penjelasan atas Laporan Keuangan Konsolidasi...

...

23

4.

Struktur Organisasi JUFMP/JED

...

26

5.

Informasi Tambahan...

... 27

2...

(10)

DAFTAR TABEL

Tabel 1. Kategori dan Porsi Dana Pinjaman International Bank Reconstruction

and Development Nomor 8121

-

ID JUFMP/JEDI...

...

21

Tabel 2.

Batasan (threshold) Nilai Kontrak Penerapan Prior Review untuk

Pengadaan Jasa Konsultan, Pengadaan Barang dan Pekerjaan

Konstruksi

...

...

21

Tabel 3

Realisasi Pencairan sampai dengan 31 Desember 2014...23

Tabel 4.

Perincian Expenditures per Kategori

...

...

23

Tabel 5.

Realisasi Pencairan Dana Category 1 sampai dengan 31 Desember

2014

...

24

Tabel 6.

Perincian Civil Works (Category 1)...

24

Tabel 7.

Realisasi Pencairan Dana Category 2 sampai dengan 31 Desember

2014...

24

Tabel 8.

Perincian Consultants Supervisi & Good, Non Consultant (Category

2) ...

...

25

Tabel 9.

Realisasi Pencairan Dana Panel Expert sampai dengan 31 Desember

2014...25

(11)

DAFTAR GAMBAR

(12)

DAFTAR LAMPIRAN

(13)

FORM1I-A

IBRD Loan No. 8121-ID

Jakarta Urgent Flood

Mitigation Project (Jakarta Emergency Dredging Initiative)

Project Sources & Uses of Funds

for the quarter ending December 31, 2014

Currency: IDR

CONSOLIDATION REPORT

Actual I I Planned' Variance in

%

Current Year-To Cumulative Current Year-To Cumulative Current Year-To Cumulative

Quarter lv

Date

To-Date

Quarterliv

Date

To-Date

Quarterliv

Date

To-Dateliv

1 2 3 4 5 6 7 8=2t5 9=316 10=417

Sources of Funds

GOt (Counterpart; RP Murni; SBUN) 14.531.689.084 36.004.874.092 88,194.225.422 73.680.000.000 85.300.000.000 117.400.000,000 20% 42% 31%

The World Bank 208.481.074.081 257.992.603.236 321.401.596.573 199.320.000.000 249.950.000.000 348.600.000.000 105% 103% 74%

Total Sources of Fund 223.012.763.165 293.997.277.328 409.595.821.995 273.000.000.000 336.250.000,000 466.000.000.000 82% 88% 63%

Uses of Funds (by Category)

(la)

Works under Part 1 of the project

65.231.055.499

110.628.618,09

178.850.905.982

75.500.000.000

124.000.000.000

175.000.000.000

86%

89%

63%

for the DGWR Project sites

(1b)

Works under Part 1 of the project

31.673.140.900

42.770.662.183

47.290.859.567

35.500.000.000

55.000.000.000

65,500.000.000

89%

78%

72%

for the DGHS Project sites

(Ic)

Works under Part 1 of the project

120.308.375.049

134.797,765,329

171.297.785.329

156.030.000.000

150.000.000.000

210,000,000.000

77%

90%

82%

for the

DKI

Project sites

(2) Consultants Services, Goods and 5.800.191.717 5.800.191.717 12.156.271.117 6.000.000.000 6,250.000.000 15.500.000.000 97% 93% 78%

Non Consulting Services under

parts 2(a), 2(d)

and

part 2(e) of the

projects

Subtotal 223.012.763.165 293.997.277.328 409.595.821.995,02 273.000.000.000 335.250.000.000 466.000.000.000 82% 88% 63%

Non Bank Financed (Rupiah Murni) - - 0% 0% 0%

(14)

Form 1-97

LBRD Loan No. 8121-ID

Jakarta Urgent Flood Mitigation Project (Jakarta Emergency Dredging Initiative) Cummulative Uses of Funds by Project Activity

for the quarter ending December 31, 2014 Currency: IDR

CONSOLIDATION REPORT

Current Quarter Year to Date Cummulative to Date

Project Activities GOI GOI GOI

APBN

WB

TOTAL

APBN

WB

TOTAL

APBN

WB

TOTAL

1 2 3 4 5 6 7 8 9 10

(18) Works under Part I of 850839854300 56.722.656.956,00 65.231.056.499,00 14.429.819.751,00 96.198.798.348,00 110.628.618.099,00 29.144.430.862,00 149.706.475.12000 178.850.905.982,00

the project

for the DGWR Project sites

1 Cengkareng Floodway 6,995.404.582,00 48,635.030.550,00 53.631.435.132,00 12.036.931.555,00 80.246.210.372,00 92.283.141927,00 23957.266.030,00 123.592.888.464,00 147550.156.494,00

(P2A)

2 Lower Sunier 1.512.993.961.00 10.088.626.406,00 11.599.620.367,00 2.392.888.196,00 15.952.587.976,00 18.345.476.172,00 5.1 87.162.832,00 26.113.586.656,00 31.300.749.4688,00 Floodway ( P 2 8 )

(1b) Works under Part 1 of 6.023.290.541,00 25.649.850.359,00 31.673.140.900,00 7.085.444.060,00 35.685.238.123,00 42.770.682.183,00 8.060.384.280,00 39.230.475.287,00 47.290.859.567,00

the project

for the DGHS Project sites

1 Cideng Thiamrin Drain 1.236.501.968,00 8.243.346.454,00 9.479.848.422,00 2.298.655.487,00 18.278.734,218,00 20.577.389.705,00 3.273.595.707,00 21.823.971.382,00 25.097.567.089,00

(P3)

2 TjuDan( P 5))

2 Tanjung Drain ( P ) 4.786.788.573,00 17.406.503.905.00 22.193.292.478,00 4.786.7.88.573,00 17.406.503.905.0'0 22.193.292.478,00 4.786.788.573,00 17.406.503.905,00 22.193.292.478,00

(1c) Works under Part 1 of 120.308.375.049,00 120.308.375.049,00 14.489.410.281,00 120.308.375.048,00 134.797.785.329,00 50.989.410.280,00 120.308.376.049,00 171.297.785.329,00

the project for the DKI Project sites 1 Ciliwung-Gununig Sahii Floodway,ng 120.308.375.049,00 120.308.375.049,00 14.489.410.281,00 120.308.375.048,00 134.797.785.329,00 50.989.410.280,00 120.308.375.049,00 171.297.785.329,00 Sahari Floodway, Waduk Melati ( P 1) (2) Consultants Services, 5.800.191.717,02 5.800.191.717,02 5.800.191.717,02 5.800.191.717,02 12.156.271.117,02 12.186.271.117,02 Goods and Non Consulting Services under parts 2(a), 2(d) and part 2(e) of the projects

1 Construction

Supervision for JUFMP 5.681.908.770,22 5.881.908.770,22 5.681,908,770,22 5.681.908.770,22 12.037.988.170,22 12.037.988.170,22

2 Secretariate of CPMU- - 118.282.946,80 118.282.946,80 118.282.948,80 118.282.946,80 - 1282.94680 118.282.946,80

JUFMP ________ ________________________

Total 14.531.689.084,00 208.481.074.081,02 223.012.763.165,02 36.004.678,7,00 257.40603.236,02 22.193.27 78,02 8194.225.4223,00 321.401.596.573,02 409.595.294,00

(15)

Form 1-C

IBRD Loan No. 8121-ID

Jakarta Urgent Flood Mitigation Project (Jakarta Emergency Dredging Initiative)

Project Cash Forecash forthe quarter ending December 31, 2014

Currency: IDR

(a)

(b)

{c)=(a)(b)

(d)

(e)

(f)

Cash Requirement

Cash Requirement

Total Cash

GOI

WB

WB

Disbursement Category

for

for

Requirement for

Cash Requirement

Cash Requirement

Cash Requirement

Quarter ending

Quarter ending

six mos. Ending

for six mos. Ending

for six mos. Ending

for six

mos.

Ending

31-Mar-15

30-Jun-15

30-Jun-15

30-Jun-15

30-Jun-1S

30-Jun-IS

(IDR) (IDR)

(IDR)

(IDR) (IDR) (USD)

(Ia) Works under Part 1 of the project 56.586.915.427,15 28.165.841.790,52 84.7S2.757.217,67 16.950.551.443,53 67.802.205.774,13 7,306.272,18

for the DGWR Project sites

1 Cengkareng Floodway 44.180.131.257,62 16.171.693.168,92 60.351.824.425,54 12.070.364,885,31 48.281.459.541.23 5.202.743,49

2 Lower Sunter Floodway 12.406.784.169,53 11.994.148.621,60 24.400,932.791,13 4.880.186.558,23 19.$20.746.232,90 2.103.528,69

(Ib)

Works under Part I of the project

28.527.088.295,00

33.333.704.906,00

61.860.793.201,00

12.372.158.640,20

49.488.634.560,80

5.332.827,00

for the DGHS Project sites

1 Cideng Thamrin Drain 18.831.905.172,00 9.584.697.256,00 28.416.602.428,00 5.683.320.485,60 22.733.281.942,40 2.449.707.11

2 Tanjung Drain Project 9,695.183,123,00 23.749.007.650,00 33.444.190.773,00 6.688.838.154,60 26.755.352.618,40 2.883,119,89

(Ic) Works under Part 1 of the project 48.367.436.000,00 6.607.185.000,00 54.974.621.000,00 18.141.624.930,00 36.832.996.070,00 4.739,191,47 for the DKI Project sites

Ciliwung-Gunung Sahari Floodway,

Waduk Melati 48.367.436.000,00 6.607.185.000,00 54.974.621.000,00 18.141.624.930,00 36.832.996.070,00 4.739.191,47

(2) Consultants Services, Goods and 2.816.690.500,00 2.816.690.500,00 5.633.381.000,00 0,00 5.633.381.000,00 485.636,29

Non Consulting Services under

parts 2(a), 2(d) and part 2(e) of the

projects

Construction Supervision for JUFMP 2.816.690.500,00 2.816.690.500 .00 5.633.381.000,00 0,00 5.633.381.000,00 485,636,29

(16)

Form 1-D

IBRD Loan No. 8121-ID

Jakarta Urgent Flood Mitigation Project (Jakarta Emergency Dredging Initiative)

Special Account Activity Statement

for the quarter ending December 31, 2014 Currency: US0

Bank Indonesia Account No: 601.316.411.980

Part I

1. Cummulative advances to end of current reporting period

5207240,00

2. Cummulative expenditures to end of last reporting period

518,440,41

3. Outstanding advances to be accounted (1-2)

4.688.799,59

Part

11

4. Opening SA balance at beginning of reporting period (as of October 1, 2014)

4,688.79q,59

5. Add/Substract:Cummulative adjustments (if any) 000

6,

Advances from the World Bank during reporting period

0.00

7. add S and 6 0.00

8. Outstanding advances to be accounted for (4+7)

4.688.799.59 9. Closing SA balance at end of current reporting (as of December 28, 2014) 4.226.580,54 10. Add/substract; cummulative adjusment (if any) )0,00

11. Expenditures for current reporting period 462.219,05

12. Add 10+11

462.219,05

13. Add 9+12

4.688.799,59

14. Difference (if any) 8-13 )000

Part III

15. Total Forecasted amount to be paid by World Bank

6.466.295,75

16. Less: Closing SA balance after adjustment 4.226.580454

17. Cumulatif adjuament (if any)

..

18. Add 165 17

4.226.580,54

19. Cash requirement from WB for next six months (15-18)

2.239.715,21

20. Amount requested for advance to SA (rounding)

773.41 9,40

*

Explanation for item 5 (if not zero):

Amount (+I-)

Remarks

Reclaim from the previous WA

Explanation for item 10 (if not Zero):

Amount (+/-)

Remarks

Explanation for item 14 (if not Zero):

Amount (+/-)

Remarks

Explanation for item 17 (i* not Zero): Amount (+/-)

Remarks

(17)

.

Form1E

IBRD

Loan No. 8121-ID

Jakarta Urgent Flood Mitigation Project (Jakarta Emergency Dredging Initiative)

Disbursement and Expenditures Status

for the quarter ending December 31, 2014

Currency: USD

CONSOLIDATION REPORT

Loan

Expenditure

Cat

Detail of Category

Loan Allocation

Contracted

Cummulative to

Expenditure not yet

Remaining amount of

Remaining Loan

Current Quarter

Date

replenish

Contract

Allocation

1 2 3 4 5 6 7 8=4-6 9=3-4

(la) Works under Part 1 of the project 42.400.000,00 23.071.945,02 4.596.823,12 12.329.637,29 - 10.742.307,73 23.942.443,99

for the

DGWR

Project sites

1 Cengkareng Floodway (P 2A) 17.901.913,07 3.783.904,90 10.187.139,46 7,714.773,61

2

Lower Sunter Floodway ( P 2

B)

5.170.031,95

812.918,22

2.142.497,83

3.027.534,12

(Ib)

Works under Part I of the project

17.800.000,00

14.289.539,17

2.041,754,13

3.178.343,40

-

11.111.195,77

6.368.368,66

for the DGHS Project sites

1

Cideng Thamrin Drain (P 3)

4,655,025.38

666.398,26

1.802.987,53

2.852.037,85

2 Tanjung Drain (P 5) 9.634.513,79 1.375.355,87 1.375.355,87 8.259.157,92

(1c) Works under Part 1 of the project 69.340.000,00 16.413.844,83 9.730.734,43 9.730.734,43 - 6.683.110,40 58.342.723,97

for the DKI Project sites

Ciliwung-Gunung Sahari Floodway, 16.413.844,83 9.730.734,43 9.730.734,43 6.683.110,40

1 Waduk Melai

(2)

Consultants Services, Goods and

10.100.000,00

5.102.814,66

462.239,05

980.659,46

4.122.155,20

4.997.185,34

Non Consulting Services under parts 2(a), 2(d) and part 2(e) of the

projects

I

Construction Supervision for JUFMP

2

Secretariate of CPMU - JUFMP

(18)

Form 1-E IBRD Loan No. 8121-ID

Jakarta Urgent Flood Mitigation Project (Jakarta Emergency Dredging Initiative)

Disbursement and Expenditures Status

forthe quarter ending December 31, 2014

Currency:

IDR

CONSOLIDATION REPORT

Loan

Expenditure

Loan Allocation Cummulative to Remaining amount of Remaining Loan

Cat

Detail of Category

contarcted

Contracted

Current Quarter

ate

Expenditure not yet

Contract

Allocation

1 2

Date

replenish

2 3 4 6 7

8

9 10

(la) Works under Part I of the project 491.840.000.000 334.643.202.729 56.722.656.956 178.850.905.982 156.692.296.747 224.205.437.817

for the DGWR Project sites

1 Cengkareng Floodway ( P 2A)

259.577.739.469

46.636.030.550

147.550.156.494

112.027.582.975

2 Lower Sunter Floodway

( P

2 B)

74.965.463.260

10.066.628.406

31.300.749.488

43.664.713.772

(Ib) Works under Part I of the project 206.480.000.000 207.197.913.000 25.649.850.359 47.290.859.667 159.907.053.433 40.721,669.600

for the DGHS Project sites

1 Cideng Thamrin Drain (P 3) - 67.497.868.000 8,243.346,454 25.097.567.089 42.400.300.911

2 Tanjung Drain (P 5) - 139,700.045.000 17.406.503.905 22.193.292.478 117,506,752.522

(Ic) Works under Part 1 of the project 804.344.000.000 284.180.000.000 120.308.375.049 171.297.785.329 142.882.214.671 813.943.400,000 for the DKI Project sites

1 Ciliwung-Gunung Sahari Floodway. - 284.180.000.000 120.308.375.049 171,297,785.329 112.882.214.671

Waduk Melati ( P 1 )

(2) Consultants Services, Goods and 117.160.000.000 59.310.932.900

6.918.474.617

12.156.271.070 47,154.661.830 57.849.067.100

Non Consulting Services under

parts 2(a), 2(d) and part 2(e) of the

projects

I Contrction Supervision for JUFMP 59.192.650.000 5,800.191.717 12,037.988.170 47.154.661.830

2 Secretariate of CPMU- JUFMP 118.282.900 118.282.900 116.282.900

-Total 1,619.824.000.000 885.232.048.629 208.599.356.981 409.595.821.948,22 . 475.636.226,681 936.719.674.517

Note

1

Kurs APBN 2014 1 USD = Rpl1.600

2

Contract Consultants Services:

USD 1.784.300 Rp20.697.880.000

Rp38.494.770.000 Ro38.494.770.000

(19)

Form 1-F

IBRD Loan No. 8121-ID

Jakarta Urgent Flood Mitigation Project (Jakarta Emergency Dredging Initiative) Summary Statement

Expenditures for Contracts Subject to Prior Review

for the quarter ending December 31, 2014

Disbursement Category:

(Ie)

Works under Part 1 of the project for the

DGWR

Project sites

Reference Contract

SP2D GO

SP2D PLN

Charge to WB

Total Invoice

No.

Comp

SPM

USD

SPM

IDR

Datel

Amount

Number/Date

Amount (IDR)

Name

Number! Date

Amount (IDR)

Number!

Amount

Amount

Pagel

USD

IDR

USD

Date IDR Number/Date ID No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14=7+11 15

1 1 HK.02.03/PPK 74.965,463.260,00 PT. 141401302000254 617.554.123,00 00278T/498128/2014 4.117.027.489.00 335.426,71 4.734.581.612,00

SP-SNVT PJSA HUTAMA 26 Nov 2014 25 Nov 2014

CC/XI/315A KARYA 11 Nov 2013 (Persero) (Package 2B) 141401302000287 895.439.838,00 141401302000287 5.969.598.917,00 477.491,51 6.865.038.755,00 9 Des 2014 31 Des 2014 1.512.993.961,00 10.086.626.406,00 812.918,22 11.599.620.367,00 2 1 HK.02.03/PPKSP- 259.577.739.469.00 ADHI-HK- 141401302000228 2.681.792.737,00 141401302000761 17.878.618.248,00 1.469.314,45 20.560.410.985,00

SNVT JAYA 2 Okt 2014 22 Desember 2014

PJSACCIXIl315.3 KONSTRU 11 Nov 2013 KSI JV (Package 2A) 141401302000318 1.561.734.669,00 141401302000926 10.411.564.457,00 847.157,40 11.973.299.126,00 27 Nov 2014 31 Desember 2014 141401302000365 2.751.877.176,00 141402402000948 18.345.847.845,00 1.467.433,05 21.097.725.021,00 9 Des 2014 31 Desember 2014 6.995.404.582,00 - .

46.636.030.550,00

3.783.904,90 53.631.435.132.00 Total 334.543.202.729,00 8.508.398.543,00 - - 56.722.656.956,00 4.596.823,12 65.231.055.499,00

(20)

Form 1-F

IBRD Loan No. 8121-ID

Jakarta Urgent Flood Mitigation Project (Jakarta Emergency Dredging Initiative)

Summary Statement

Expenditures for Contracts Subject to Prior Review

forthe quarter ending December 31. 2014

Disbursement Category:

(1 b)

Works under Part 1 of the project

for

the

DGHS Project sites

Reference Contract

SP2D GOI

SP2D PLN

Charge to

WB

Total Invoice

SPM

USD

SPM

IDR

Date

Amount

No Comp Number/Date Amount (IOR) Name Number) Amount (IDR) Numbed Amount Amount Page USD IDR USD

DateDate DR Number/Date IDR INo.

1 2 3 4 5 6 7 8 9 10 11 12 13 14=7+11 15

1 HK.02.03/JUFMP- 67.497.868.000,00 PT. Dutaraya 141401301 1.236.501.968,00 1414034020008 8.243.346.454 666.398,2$ 9,479.848.422,00

FSKIXIll 15 Nov 2013

Dinametro

000631

82

(Package 3) IgI 29 Tgl. 31 Des

Agustus

2014

2014

Jumlah...1. 1.236.501.968,00 8.243.346.454 666.398,26 9.479.848.422,00 2 HK.02.03/JUFMP- 139.700.045.000,00 PT. 141401301 2.794.000,899,00 1414034020008 10.160.003.272 802.781,55 12.954.004.171,00 FSK/IX/2 SAC.Nusantar 000660 84

a

03-Sep-14

PT. Penata

Tgl. 9 Des

Tgl. 31 Des

Karya

2014

2014

(Package 5) Keluarga

Utama. JO

141401301 1.992.787.674,00 1414034020008 7.246.500.633 572.574,32 9.239.288,307,00

000656 85

TgI. 9 Des

Tgl. 31 Des

2014 2014

Jumlah...2. 4.786.788.573,00 1 17.406.503.905

1.375.355,87

22.193.292.478,00

(21)

Form I-F

IBRD Loan No. 8121-ID

-Jakarta Urgent Flood Mitigation Project (-Jakarta Emergency Dredging Initiative) Summary Statement

Expenditures for Contracts Subject to Prior Review

for the quarter ending December 31, 2014

Disbursement Category4

(1c)

Works under Part 1 of the project for the DKI

Project sites

Reference Contract

SP2D GOI

SP2D PLN

Charge to WB

Total Invoice

SPM USD SPM IDR

IAmount

No. Comp Number/Date Amount (IDR) Name Date Amoun

Dt (IR Nubr

Numberl Amount

Amut

Number) Date

Amount

AmNo.

DateN Page! ADR U

iJSD

[DRUS

USD

Date

IDR

IDR

1 2 3 4 5 6 7 8 9 10 11 12 13 14=7+11 15 1 15380- 284.180.000.000,00 PT. 141403402001424 1,793,2 Brantas 15-Des-13 Abipraya 31/12/2014 13.866.354.561 1.136.307.02 13.866.354.561.00

(Persero)

(Package 1) 1401071628/PL.2/1114 18/11/2014 39.173.780.078 3.210.176,19 39.173.780.078,00 1401202567/PL.21214 04/12/2014 18.694.086.216 1.511.243,83 18.694.056.216,00 141403402001425 31/12/2014 13.173.320.993 1.064.941,07 13.173.320.993,00 141403402001426 31/12/2014 15.892.059,829 1.255.693,73 15.892.059.829,00 141403402000940 31/12/2014 11.207.483.825 896.455,27 11.207,483,825,00 141403402000883 31/12/2014 8.301.289.547 655.917,32 8.301.289.547,00 Total 284.180.000.000,00 120.308.375.049 9.730.734,43 120.308.375.049,00

(22)

Form I-F

JBRD Loan No. 8121-ID

Jakarta Urgent Flood Mitigation Project (Jakarta Emergency Dredging Initiative)

Summary Statement

Expenditures for Contracts Subject to Prior Review

for the quarter ending December31, 2014

Disbursement Category:

(2)

Consulting Services, Goods and Non

Consulting Services under parts (2a), (2d) and

(2e) of the project

Reference Contract SP2D GOI SP21) PLN Reference SA (RKBI) Total Invoice

SP2D

USD

SP2D IDR

Amount

No.

Comp

Numbe r)

AmountSP1USDP2IRDaePg/

AmountNoUS

Number/Date

Amount ([DR)

Name

Date

(IDR)

Numbed Date

Amount

Number/ Date

Amount

DateNPage

USD

]DR

USD

IDR JDR

1 2 3 4 5 6 7 8 9 10 A1 12 13 14=7+11 15

1 06/KTR/PPK- 38.153.170.000 KECC 141401302000249 312.674.504,34 2811112014 25.793,97 312.674.504,34 25.793,97

Ad.Satker/X/2013 20.697.880.000 JV with 28 October 2014 hal.1& 3

11 Oct2013 PT Puser 141401302000272 246.810708,32 28/11/2014 20.360,56 246,810.708,32 20.360,56 Dumi Mekon 19 November 2014 hal,l& 4 141401302000298 372.570.039,76 28/11/2014 30.735,08 372.570.639,76 30.735,08

19 November 2014

hal.1& 1

141401302000299 173,753.638,72 28/11/2014 14.333,76 173.753.838,72 14.333,76 19 November 2014 hal.1& 5 141401302002607/1 157.833.532,78 28/11/2014 12.973,33 157.833.532,78 12.973,33 09/11/2014 hal.1& 7 1414013020026081 33,740.2112 28/11/2014 2.773,32 33.740.211,12 2.773.32 09/11/2014 hal.1& 8 141401302002609/1 721.444.043,32 28/11/2014 69.300,02 721.444.043,32 59.300,02 09/11/2014 hal.1& 9 14140130200038111 1.161.703.142,02 28/11/2014 92.205,98 1.161.703.142,02 92.205,98 05112/2014 hal.1 & 6 141401302000381/1 156.116.224.84 28/11/2014 12.391,16 158.116.224,84 12.391,16

05/12/2014

hal.1 &

5

141401103003045/1 657.986.043,00 15/12/2014 51.006,67 657.986.043,00 51.008,67 05/12/2014 hal.12 141401103003046/1 1.196.559.882,00 15/12/2014 92,756,58 1,196.559.882,00 92,756,58 05/12/2014 11al.13

(23)

Reference Contract

SP2D GOI

SP2D PLN

Reference SA (RKBI)

Total Invoice

SP2D USD

SP2D

IDR

Amount

No. Comp Numbed Amount Amount No. USD

Number/Date Amount (IDR) Name Date (IDR) Number! Date Number Date Amount No. USD DR

IDR IDR 1 2 3 4 5 6 7 8 9 10 11 12 13 14=7+11 15 141401103003047/1 490.716.000,00 15/12/2014 38.040,00 490.716,000,00 38.040,00 05/12/2014 hai&1 71/AP/PPKlKLN- 64.370.200.00 141391302027071 64.370.244,40 28/11/2014 5,310,20 64.370.244,40 5.310,20 WISMP2/2014 12-Agust-14 1003/2014 1 & 2 24(11/2014 20.912.700,00 141391302042854 20.912.697,60 23/12/2014 1.664,08 20.912.697,60 1.664,08 23/09/2014 33.000.000,00 141.391.303.023.277 33,000.004.80 23/12/2014 2.594,34 33.000.004,80 2.594,34 12106/2014 1 & 5 Total 58,969.332.900 3.258.279.712,22 2.541.912.004,80 462.239,05 5.800.191.717,02 462.239,05

(24)

FORM2

Jakarta Urgent Flood Mitigation Project (Jakarta Emergency Dredging Initiative)

Expenditure Ending December 31, 2014

In USD

Amount I

Equivalen

Special Account

No

No

SP2D/ SP3

Date

Description

Credit

Exchange

Debet

Iv

Specialacc

Rate

inUS

In IDR

Balance

mn USD

Transfer From WB PB 01, Sept 20, 2013

5.000.000,00

1

255880Y

23-Dec-1 3

KECC JV With PT Puser Bumi Mekon

12.260,00

207.240,00

2.540.762400,00

1

255879Y

23-Dec-1 3

KECC JV With PT

Puser

Bumi Mekon

12.260,00

311.200,41

3.815.317.000,00

TAHUN 2013

5.000.000,00

618.440,41

6.356.079.400,00

4.481.559,59

1

18-Jun-14

Transfer From WB PB 02, June 18, 2014

207.240,00

2

141401302000249

8-Oct-14

KECC JV With PT Puser Bumi Mekon

-

12,122,00

25.793,97

312.674,504,34

3

141401302000272

27-Oct-14

KECC

JV

With PT Puser Bumi Mekon

12.122,00

20.360,56

246.810,708,32

4

141401302000298

19-Nov-14

KECC JV With PT Puser Bumi Mekon

12.122,00

30.735,08

372.570.639,76

5

141401302000299

19-Nov-14

KECC JV With PT Puser Bumi Mekon

12.122,00

14.333,76

173.753.838,72

6

141401302002607

19-Nov-14

KECC JV With PT Puser Bumi Mekon

12.166,00

12.973,33

157.833.532,78

7

141401302002608

19-Nov-14

KECC JV With PT Puser Bumi Mekon

12.166,00

2.773,32

33.740.211,12

8

141401302002609

19-Nov-14

KECC JV With PT Puser Bumi Mekon

12.166,00

59.300,02

721.444,043,32

9

141401302000381

15-Dec-14

KECC JV With PT Puser Bumi Mekon

12.599,00

92.205,98

1.161.703.142,02

10

141401302000382

15-Dec-14

KECC JV With PT Puser Bumi Mekon

12.599,00

12.391,16

156.116.224,84

11

141401302003045

15-Dec-14

KECC JV With PT Puser Bumi Mekon

12.900,00

51.006,67

657.986.043,00

12

141401302003046

15-Dec-14

KECC JV With PT Puser Bumi Mekon

12.900,00

92.756,58

1.196.559.882,00

13

141401302003047

15-Dec-14

KECC JV With PT Puser Bumi Mekon

12.900,00

38.040,00

490.716.000,00

14

141391302027071

3-Oct-14

CV Tialista Wibowo

12.122,00

5.310,20

64370.244,40

15

141391302042854

16-Dec-14

CV Tialista Wibowo

12.720,00

1.644,08

20.912.697,60

16

141391303023277

16-Dec-14

PT

Dwi

Mukti Mitra Wisata

12.720,00

2.594,34

33.000.004,80

(25)

FORM 3 IBRD Loan No. 8121-ID

-Jakarta Urgent Flood Mitigation Project (-Jakarta Emergency Dredging initiative) Contract Expenditure Report (Civil Works)

for the quarter ending December 31, 2014

Disbursement Contract Amount Payment realization Remaining amount Of Contr.

Category Contract Procurement Supplier/ Contract Contract Code

Description Method

/iH

Number Contractor Nationality Currency Value Invoiced No. SP2D/WA AmonaRp A(R.US Cat. Note

No Description tilto date No.1 Data) ofRp.j AmPuDt(Rp (U~SP camp.

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

la. Works under Part I of the Project for the DGWR Project Sites

WORKS Cengkareng Floodway IOR 259.577.739.469,00

HK.02.03/PPLSP-SNVF PJSACC1XIr31 5.3 25435DY/140/1 11 0911212013 4.196.160000,00 255.381.579.469,00

Tengga 11 November 2013 CI0JUFMP-2A 09/1212013 1S.258.763.63500 240.122.815.833,00

PTAdhi Karya 254351YI1401111 09/112013 7.724.176,475,00 232.398.639.358,00

02/JUFMP-2A

0911212013 28.087.914.456,00 204.310.724.902,00 141401302000191 09/0912014 5.041.526.973,00 199,289.197.929,00 03/JUFMP-2A 0410912014 33,610.179.822,00 165.659.018.107,00 141401302000228 02110/2014 2,681.792.737,00 162,977,225.370,00 141401302000318 27/11/2014 1.561,734.669,00 161.415.490.701,00 141401302000365 09/12/2014 2.751.877.176,00 158.663,613.525,00 141401302000761 22/1212014 17.878.618.248,00 140.784.995.277,00 141401302000926 31112/2014 10.411.564.457,00 130,373.430.820,00 141401302000948 3111212014 18.345.847.845,00 112.027.5B2.975,00 Total 259.577.739.469,00 147.550.156.494,00 112.027.582.975,00

(26)

Disbrsemnt Cntrct

II

AmuntPayment reatatIon Remaining amount Cd

Category Contract Procurement Contract Supplied Contract Contract Amount am o Contrr Cat.

Description Method l Number Contract Nationality Currency Value Invoiced Date of Amou Comp Note

No Description to date No. SP2DIWA SP2D Amount Rp) nt tRp.) (LIS$)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

2 WORKS Lower Sunter Floodway IOR 74.955.463.260,00

HK.02.03/PPLSP-SNVT PJSACC/XI/315.4 254349Y1l40/111 09112/2013 1.305.109,551 73.660.293.709,00

Tanggal 11 November 2013 01/JUFMP-2B 0911212013 4.746.071.096 68.914.222.613,00

254352Y140111 0/1212013 1.469.105.085 67.425.117.528,00

PT Hutama Karya 021JUFMP-2B 09/12/2013 5.414.927.584 62.010.189.944,00

031JUFMP-2B 04/09/2014 5.865.961.570 56.144.228.374,CO 141401303000140 05/09/2014 879.894.235 55.284.334,139,00 141401303000254 26111/2014 817.554.123 54.646.780.016,00 14011285311pl.2/114 26/11/2014 4.117.027.489 50.529.752.527,00 141401303000287 09112/2014 895.439.638 49.634.312.689,00 141401303000938 3111212014 5,969.598,917 43.664.713.772,00 Total 74.965.463.260,00 31.300.749.488,00 * 43.664.713.772,00

(27)

Disbursement Contract Amount Payment realization Remaining amount Of Contr. Code

Category Contract Procurement Supplierd Contract Contract

4

Cat.

j

Description Method lil Number Contractor Value No.SP2DIWA DRnt (Rp) (USS) Comp etCurrency

1 2 3 1 5 6 7 6 9 10 11 12 13 14 15 16 17 18

lb. Works under Part 1 of the Project for the DGHS Project Sites

1 WORKS Cideng Thamrin Drai lDR 67.497.668.000,00

Tanggal 15 November 2013 JOBXI1

HK02031UFMPFSKXUI254422Y 09/12/2013 974.940,220 66.522.927.780

-Tanggl 15 ovemer 2001/JJUFMP/PPLP- 05112/2014 3.545,237,164 62.977.690.616

PT. Dutaraya Dutametro 141401301000172 11/06/2014 324.926.137 62.652.764.479 011JUFMPIPPLP- 13/0612014 6.120.538.552 57.532.225.927 JBDTBV-14 141401301000336 2910812013 737.227.382 56,794.998,6545 02/JUFMPIPPLP- 19/0812014 4,914.849.212 51.880.119.333 JBDTB/Vllt-14 141401301000631 03/1212014 1.236.501.968 50.643.647.366 141401301000882 3111212014 8.243.346.454 42.400.300.911 Total 67.497.688.000,00 25.097.567.089,00 42.400.300.911,00

2 WORKS Tanjung Drain IR 139.700.045.000,00

01-26/04-WINRIP-WPIICE/A18043111-13 141401301000660 09-Des-14 2,794.000.899 136.906.044.101,00

Tanggal 14 November2013 141401301000658 09-Des-14 1.992.787.674 134.913.2S6.427,00

PT. SAC Nusantara 141403402000884 31-Des-14 10.160.003.272 124.753.253.155,00

141403402000885 31-Des-14 7.246.500.633 117.506,752.522,00

Total 139.700.045.000,00 22.193.292.478,00 0.00 117.606.752.522,00

(28)

Disbursement Payment realization Remaining amount Of Contr.

Category Contract Procurement Contract Supplier/ COntract Contract Amount No. SP2D1WA Code

Description Method lii Number liii Contractor Nationality Currency Value Invoiced NoAA Date of Amount(Rp) A Cat. Note

No Descript[o to date

SP20

(US$) (Rp-) (US$ Comp.

1 2 3 4 5

6

7 8 9 10 11 12 13 14 15 16 17 18

Ic. Works under Part 1 of the Project for the DKI Project Sites

I WORKS Cilwung-Gunung Saharl Floodway tDR 284.180.000.000,00

Waduk Melati 00127222013 06-Des-13 28.418.000.000 255.782,.000,00000

PT Brantas AbIpraya ( Persera) 00161042013 23-Des-13 3.100.063,309 252.661.935.691.00

153801-1.793.2 00185922013 31-Des-13 4.981.936.690 247.660.000.001,00

Tanggal 15 December 2013 00037022014 02-Jul-14 14.489.410.281 233.190.589.720,00

141403402000683 31-Des-14 8,301.289.547 224.889.300.173,00 141403402000940 31-Des-14 11.207.483.825 213.681.816.348,00 141403402001426 31-Des-14 15.892.059.829 197.789,756.519,00 141403402001425 31-Des-14 13.173.320.993 184.616.435.526,00 1401202567PL.211214 04-Des-14 18.694.086.216 165.922.349.310,00 1401071628/PL.2/1114 18-Nop-14 39.173.780.078 126.748.569.232,00 141403402001424 31-Des-14 13.866.354.51 112.882.214.671,00 Total Ic. 284.180.000.000,00 171.297.785.32900 - 112.882.214.671,00 Grand Total 825.921.11S.729,0D 397.439.850.878,00 0,00 428.481.564.851.00 NOTES:

VAT for Loan portion is not collected

li: This Report provides procurement information for the project from inceplion to the latest reporting date,

lii: Each method in Procurement Guidelines should be shown separately

ICB: International Competitive Bidding

NCB: National Competitive Bidding

NS: National Shoping

(29)

PENJELASAN UMUM

1.

Gambaran Umum

Gambaran umum Jakarta Urgent Flood Mitigation Project/Jakarta

Emergency

Dredging Initiative (JUFMP/JEDI), yaitu:

a.

Data Pinjaman

Nomor dan Tanggal Pinjaman

Loan IBRD No. 8121-ID tanggal 17 Februari

2012

Pemberi Pinjaman/Hibah

World

Bank/

International

Bank

for

Reconstruction and Development (IBRD)

Nomor Register

10845701

Peminjam/Penerima Hibah

Pemerintah Republik Indonesia dan Pemerintah

Provinsi Daerah Khusus Ibu Kota Jakarta

Executing Agency

Ditjen Sumber Daya Air Kementerian Pekerjaan

Umum dan Perumahan Rakyat

Jumlah Pinjaman

US $ 139,000,000.00

Effective Date

18 Juli 2012

Closing Date

31 Maret 2017

Nomor Rekening Khusus

601.316.411.980 pada Bank Indonesia

b.

Tujuan Pinjaman

Tujuan Pinjaman dari Proyek JUFMP/JEDI adalah untuk mengeruk (saluran

banjir, kanal dan waduk utama dari sistem pengelolaan banjir Jakarta) dan membuang

lumpur endapan ke fasilitas yang tepat dengan menggunakan cara yang berkelanjutan

(menitikberatkan pada koordinasi antar instansi dan keberlanjutan lingkungan dan

sosial). Tujuan dari JUFMP/JEDI adalah untuk memperkenalkan cara-cara

pengoperasian dan pemeliharaan yang lebih baik di empat kawasan percontohan: (1)

Pengerukan

-

teknologi modern dan praktik terbaik; (2) Lingkungan

-

pembuangan

lumpur secara bertanggung jawab; (3) Sosial

-

praktik pemukiman kembali yang adil;

dan (4) Kelembagaan

-

praktik dan perencanaan pemeliharaan rutin yang

terkoordinasi.

c.

Latar Belakang

Kawasan Jabodetabek merupakan pusat perekonomian di Indonesia. Dengan

perkiraan jumlah penduduk lebih dari 28 juta, kawasan im memegang seperempat

PDB non migas nasional. Daerah Khusus Ibukota Jakarta, dengan penduduk sekitar 9

juta, dikepalai oleh seorang Gubernur, berada pada delta Sungai Ciliwung dimana

sekitar 40% areanya berada di bawah permukaan laut. Setiap tahunnya, sebagian besar

(30)

menyebabkan 70 orang meninggal dunia dan 340.000 penduduk harus mengungsi.

Banjir tersebut juga mengakibatkan wabah demam berdarah dan diare. Bappenas

memperkirakan kerugian finansial akibat 2007 sebesar US$ 900 juta; biaya ekonomi

menjadi tinggi, yang termasuk hilangnya nyawa, biaya kesehatan, pekerja dan

pendidikan. Banjir pada Februari 2008 menyebabkan 30 orang meninggal dunia dan

menutup bandara Sukarno-Hatta selama 3 hari.

Kanal dan saluran didesain untuk tingkat proteksi selama 25 tahun, yang

artinya Jakarta seharusnya dapat bertahan terhadap ancaman banjir .dalam 25 tahun

jika sistem pengendalian banjir berfungsi sesuai desain. Dikarenakan beberapa sebab,

kapasitas aktual dari sistem pengendalian banjir turun terhadap kapasitas desain awal,

yaitu:

1) Tekanan penduduk.

Dalam kurun waktu 1980-2005, populasi penduduk Jabodetabek berlipat ganda

dari 11,9 juta menjadi 23,7 juta. Setiap tahunnya, diperkirakan 250.000 orang

bermigrasi ke Jakarta. Tekanan penduduk telah mengkonversi setengah dari

danau-danau

kecil

menjadi perumahan

atau

daerah

komersial,

yang

mengakibatkan sangat berkurangnya kapasitas penyimpanan dan naiknya

limpasan pada saat puneak. Sistem pengendalian banjir DKI Jakarta juga

terpengaruh akibat lemahnya pelaksanaan rencana tata ruang dan regulasi

bangunan dan tidak terkendalinya abstraksi air tanah.

2)

Pemeliharaan dan operasi yang tidak lavak pada sistem pengendalian banjir.

Kementerian Pekerjaan Umum dan Pemerintah Provinsi DKI Jakarta diharuskan

memelihara infrastruktur pengendali banjir, namun alokasi anggaran yang ada

sangatlah minim dibandingkan dengan kebutuhan pemeliharaan sistem. Hal ini

mengakibatkan besarnya endapan pada kanal dan saluran, dan mengurangi.

tingkat proteksi dari 25 tahun menjadi kurang dari 5 tahun.

3) Terbatasnya cakupan pelayanan sampah.

Cepatnya pertumbuhan penduduk mengakibatkan kenaikan jumlah sampah. DKI

Jakarta saat ini mengangkut kurang dari 40% jumlah sampah yang dihasilkan,

dimana 15% dari jumlah total sampah Jakarta (sekitar 1.000 ton) dibuang ke

sungai, kanal dan saluran. Air limbah yang dibuang ke sungai, kanal dan saluran

juga sangat mengganggu kualitas air dan berkontribusi pada penyakit yang

berasal dari air.

4)

Kurangnya koordinasi

antar pihak yang bertanggung

jawab

terhadap

pengendalian banjir.

Kementerian PU dan Dinas PU Provinsi DKI Jakarta adalah pihak yang

bertanggung jawab untuk mengelola sistem pengendalian banjir Jakarta.

Kementerian PU bertanggung jawab terhadap kanal yang melintasi batas

Provinsi, dimana Dinas PU Provinsi DKI Jakarta bertanggung jawab terhadap

saluran dan danau/waduk dalam cakupan daerahnya. Sejak 1990an, Dinas PU

Provinsi DKI Jakarta beranggapan bahwa tanggung jawab pemeliharaan kanal

berada di Kementerian PU, sedangkan Kementerian PU tidak menyediakan cukup

alokasi dana untuk pemeliharaan tersebut.

Komponen Proyek JUFMP/JEDI terdiri dari dua komponen: (1) tindakan

struktural (pengerukan dan penurapan); dan, (2) tindakan non-struktural (peningkatan

kemampuan dan studi). Proyek ini akan merehabilitasi beberapa sungai, kanal dan

(31)

waduk, termasuk penyaring sampah dan stasiun pompa. Pekerjaan pengerukan akan

dilakukan di 15 lokasi: 3 saluran strategis, 4 saluran banjir, 5 saluran/kanal utama dan

4 waduk. Volume lumpur galian yang memerlukan pembuangan diperkirakan sekitar

7,5 juta m

3

. Kajian awal atas kualitas sedimen yang telah dilakukan pada Agustus

2008 menunjukan bahwa sedimen tidak merupakan limbah bahan berbahaya dan

beracun (B3) dan layak dibuang ke fasilitas pembuangan laut, fasilitas pembuangan

sedimen berada di Ancol, yang akan dibangun oleh Pengelola Ancol (PT

Pembangunan Jaya Ancol), dapat menampung lumpur hasil pengerukan pada awal

2010 dengan volume total 12 juta m

d.

Lokasi Kegiatan

Lokasi Kegiatan Proyek JUFMP/JEDI meliputi 15 lokasi/kelurahan di

wilayah DKI Jakarta meliputi: 3 saluran strategis, 4 saluran banjir, 5 saluran/kanal

utama dan 4 waduk.

e.

Struktur Organisasi

Struktur organisasi Proyek JUFMP/JEDI terdiri dari CPMU, CPIU, dan PIU

dengan uraian sebagai berikut:

1) Central Project Management Unit (CPMU)

CPMU adalah unit koordinasi penyelenggaraan proyek JUFMP/JEDI yang

bertugas:

(a) mengawasi

dan mengkoordinasikan

laporan keseluruhan

pelaksanaan proyek JUFMP; (b) menjalankan fungsi perencanaan, meninjau

kembali dan mengintegrasikan laporan proyek dan program kerja tahunan (AWP),

termasuk penganggaran: (c) memberi arahan dan pembinaan kepada CPIU dan

PIU dalam penyusunan program kegiatan tahunan dan program anggaran

tahunan; (d) menerima, memeriksa dan meninjau kembali AWP dari PIU-PIU

terhadap kriteria dan pedomana pelaksanaan; (e) mengumpulkan seluruh data

pelaksanaan kegiatan dan melaksanakan konsolidasi pengelolaan keuangan untuk

seluruh PIU sebagai laporan ke Bank Dunia dan Steering Committee; (f)

membuat laporan A WP dan FMR. Tugas CPMU lainnya tertera dalam SK

Menteri Pekerjaan Umum No.105/KPTS/M/2012 tentang .pembentukan Unit

Pengelolaan Proyek Pusat (CPMU) Kegiatan Pengendalian Banjir Mendesak di

DKI Jakarta, tertanggal 22 Mei 2012.

2)

Central Project Implementation Unit (CPIU)

CPIU adalah unit pengelola penyelenggaraan proyek JUFMP/JEDI secara

keseluruhan yang bertugas melakukan monitoring, supervisi dan evaluasi proyek

secara keseluruhan. CPMU dan CPIU berkedudukan di Direktorat Jenderal

Sumber Daya Air, Kementerian Pekerjaan Umum, selaku Executing Agency.

CPIU akan berkoordinasi dengan tiga Unit Pelaksana Proyek (Project

Implementation Unit-PIU) yang berada di Balai Besar Wilayah Sungai

Ciliwung-Cisadane (BBWS Cilicis), Direktorat Penyehatan Lingkungan Permukiman

(PLP), Kementerian PU dan Dinas Pekerjaan Umum (Dinas PU) Provinsi DKI

Jakarta. CPIU sebagai pengelola proyek, baik yang berhubungan dengan Donor

(32)

berkedudukan di CPIU bekerja penuh sesuai dengan tugas dan tanggung jawab

yang

tertuang

dalam

Keputusan

Menteri

pekerjaan

Umum

No.

106/KPTS/M/2012 tentang Pembentukan Unit Pelaksana Proyek Pusat (CPIU)

Kegiatan Pengendalian Banjir Jakarta tertanggal 22 Mei 2012, tugas-tugas CPIU

dimaksud diantaranya: (a) kooordinasi atas 'pelaksanaan kegiatan seluruli PIU

yang telah dibentuk guna keterpaduan program pengendalian banjir di Provinsi

DKI Jakarta; (b) melaksanakan kegiatan persiapan pelaksanaan proyek terkait

pengadaan barang dan jasa; (c) memberikan arahan dan pembinaan teknis kepada

masing-masing PIU; (d) monitoring progress pernyiapan dan implementasi

LARAP pada subproyek yang memerlukan premukiman kembali, dan lain lain.

3)

Project Implementing Unit (PIU)

Unit Pelaksana Proyek (Project Implementing Unit-PIU) adalah unit pengelola

proyek yang bertanggung jawab atas penyelenggaraan JUFMP/JEDL Susunan

organisasi PIUterdiri atas:

a)

Ketua PIU

b) Asisten Bagian Perencanaan

c)

Asisten Bagian Monitoring dan Evaluasi

d)

Asisten Bagian Keuangan

Tugas dan tanggung jawab PIU terutama menangani manajemen pelaksanaan

proyèk dengan perincian tugas sebagai berikut:

a)

Memastikan bahwa seluruh pelaksanaan kegiatan JUFMP/JEDI dalam

lingkup tanggung jawab kegiatannya sesuai dengan Petunjuk Pelaksanaan

Proyek (Project Operation Manual, selanjutnya disingkat dengan POM)

JUFMP/JEDL

b) Bertanggung jawab dalam proses pengadaan, pengelolaan keuangan serta

pelaksanaan aspek sosial dan lingkungan (social and environmental

safeguard).

c)

Bertanggung jawab dalam perumusan disain, kajian desain dan pengawasan

pekerjaan fisik subproyek secara rutin dari tahap proses pra kontrak,

pelaksanaan konstruksi hingga masa pemeliharaan berakhir.

d) Mempersiapkan rencana pembiayaan dan kegiatan proyek (budgeting and

programming) untuk kegiatan.

e)

Menyiapkan rencana pengadaan yang diperlukan.

f)

Membuat laporan IFR (Interim Financial Report) setiap triwulan

disampaikan kepada CPMU dan CPIU sesuai dengan petunjuk pelaksanaan

dan petunjuk teknis untuk pelaksanaan proyek. IFR harus sudah diterima

CPMU dan CPIU 1 minggu setelah akhir setiap triwu lan.

g)

Membantu dan memberikan dukungan sepenuhnya dalam proses pembuatan

laporan audit setiap tahun.

h)

Mempersiapkan dan membantu kelancaran kegiatan misi Bank Dunia yang

berkaitan dengan proyek.

i)

Menciptakan

jalinan

kerja yang baik dengan PIU lain, Pemprov, CPMU dan

CPIU, dan memberikan data serta informasi untuk digunakan sebagai dasar

pertimbangan dalam melakukan koordinasi pelaksanaan antar kegiatan

proyek.

j)

Melaporkan semua pelaksanaan subproyek kepada CPIU.

k)

Merumuskan dan menyampaikan laporan "Financial Management Report"

kepada CPMU dan CPIU sesuai ketentuan yang diatur dalam POM.

Gambar

Tabel  2.  Batasan  (threshold) Nilai  Kontrak Penerapan  Prior Review untuk Pengadaan Jasa  Konsultan,  Pengadaan  Barang  dan  Pekerjaan  Konstruksi
Tabel  3.  Realisasi Pencairan  sampal  dengan 31  Desember  2014
Tabel  6. Perincian  Civil Works (Category 1)
Tabel  8. Perincian  Consultants  Supervisi & Good, Non Consultant (Category  2)
+2

Referensi

Dokumen terkait

Menurut pendapat kami, laporan keuangan yang kami sebut di atas menyajikan secara wajar, dalam semua hal yang material, posisi keuangan PT Bank Syariah Mandiri tanggal 31

Menurut opini kami, (a) laporan keuangan konsolidasian terlampir menyajikan secara wajar, dalam semua hal yang material, posisi keuangan konsolidasian Village

Keuangan telah menyajikan secara wajar, dalam semua hal yang material, Aktiva Bersih dan posisi keuangan DP PERTAMINA tanggal 31 Desember 2008, Perubahan Aktiva Bersih, Hasil

Menurut opini kami, laporan keuangan konsolidasian terlampir menyajikan secara wajar, dalam semua hal yang material, posisi keuangan konsolidasian PT Cita Mineral

Menurut opini kami, laporan keuangan konsolidasian terlampir menyajikan secara wajar, dalam semua hal yang material, posisi keuangan konsolidasian PT Bank

Menurut Opini kami, laporan keuangan tersebut menyajikan secara wajar, dalam semua hal yang material, posisi keuangan Yayasan Rama Sesana tanggal 31 Desember 2019,

Menurut pendapat kami, laporan keuangan yang kami sebut di atas menyajikan secara wajar, dalam semua hal yang material, posisi keuangan PT Bank Maspion Indonesia tanggal 31

Menurut opini kami, laporan keuangan terlampir menyajikan secara wajar, dalam semua hal yang material, posisi keuangan PT Pertamina Training & Consulting tanggal