• Tidak ada hasil yang ditemukan

TEST PROJECT 3 ( MANUFACTURING ) (1)

N/A
N/A
Protected

Academic year: 2017

Membagikan "TEST PROJECT 3 ( MANUFACTURING ) (1)"

Copied!
1
0
0

Teks penuh

(1)

SECTION B-B

SECTION A-A

B

B

Test Project for the XXV National Skills Competition 2017

Copyright 2017 National Competition.

All Rights Reserved.

Skill: Mould Making

Date: 18-10-2016 Scale: 2 : 1

Rev: -Draw / Design By : Khumarudin

Description: Test Project 3 : Manufacturing

Drawing No :

Sign: Appd:

Page: -Paper: A3

Ensure That;

1) The molding compound is polystyrene ( shrinkage approx. 0.5% ).

2) Unspesific dimension rounds and fillters are 0,1 mm

3) Wall thicknes plastic product is 1,5 mm

4) Quantity and position of ejectore pin will be determinated in technical meeting .

5) Steps of ejector pin marks are within 0.1 mm ( prostrusion are not allowed )

Referensi

Dokumen terkait

Pembatasan masalah bertujuan agar dalam penelitian tidak mengalami penafsiran yang berbeda dan tidak menyimpang dari masalah yang ada, maka peneliti membatasi

menjelaskan bagiannya masing – masing kepada teman – teman satu kelompoknya, mereka mulai bersip untuk diuji secara individu (biasanya dengan kuis). Guru memberikan

Menurut hasil wawancara yang dilakukan dengan pihak perusahaan, perusahaan melakukan pembelian bahan baku setiap tiga bulan sekali karena ingin menjaga agar bahan

Hasil penelitian menunjukan bahwa kinerja Dinas Pertanian Perkebunan dan Kehutanan Kabupaten Banyumas dari seluruh kegiatan pada tahun 2014 sampai dengan tahun 2016 menunjukan

[r]

RENCANA UMUM PENGADAAN BARANG/JASA UPT BALAI LATIHAN KESENIAN JAKARTA BARAT.. TAHUN

[r]

Sehubungan dengan Pemilihan Langsung Kegiatan Pembangunan Prasarana Pengaman Pantai Tanjung Ru telah memasuki proses klarifikasi dan pembuktian kualifikasi terhadap