• Tidak ada hasil yang ditemukan

Supply Chain Management

N/A
N/A
Protected

Academic year: 2017

Membagikan "Supply Chain Management"

Copied!
6
0
0

Teks penuh

(1)

ROUTING

ROUTING &

& SCHEDULING ISSUES

SCHEDULING ISSUES

ROUTING

ROUTING &

& SCHEDULING ISSUES

SCHEDULING ISSUES

Setijadi

[email protected]

(2)

Flow of Logistics

Flow of Logistics

3

Fungsi

(3)

Supply Chain

Supply Chain

Modified from Russell & Taylor (2006)

Six

Six Economic Development Corridors

Economic Development Corridors

as the Backbone of MP3EI

as the Backbone of MP3EI

(4)

ROUTING

ROUTING

What’s Factors Affect Routing

What’s Factors Affect Routing & Scheduling

& Scheduling

Processes

Processes

Distance

Lead times

Materials/goods

Types (expired dates,

DG/non-Destination

Number of destination

Accessibility

Variation of goods ordered

Types (expired dates,

DG/non-DG, perishable/non-perishable,

etc.)

Volume

Value

Infrastructures

Traffic jam

Safety

Variation of goods ordered

Volume of order

Inventory stock (capacity)

(5)

Problems and Solution

Problems and Solution

in

in Routing

Routing & Scheduling

& Scheduling Processes

Processes

No. Problems Solutions

1 Poor infrastructure Change routes

Change types of mode/vehicle Use multimode transportation

2 Traffic jam Shipping time

2 Traffic jam Shipping time

Change of routes

Change of types of mode/vehicle

Change receiving time (overnight shipping)

3 Regulation

- Limitation of weight - New design of vehicle

- Change routes

- Change types of mode/vehicle

- Use multimode transportation

4 “Pungli” Law enforcement

Use “safety” mode of transportation

5 High transportation costs (high

frequency, low capacity of vehicle)

Use more capacity of vehicle

Build/use more DC (number, capacity)

6 Traffic jam, complicated order,

etc.

Use IT for: scheduling, routing, and consolidation

Problems and Solution

Problems and Solution

in

in Routing

Routing & Scheduling

& Scheduling Processes

Processes

(6)

Criterias

Criterias for Successful Routing &

for Successful Routing & Schedulling

Schedulling

General criteria:

Right time, right goods, right place, right condition, right cost

Specific KPI:

Specific KPI:

On-time delivery

Order fulfillment

Low cost (efficiency)

!" # $"!$ %&' % ()$ & *&&& '&+& ) &, ' ' ' + + -. / 0 !11 2 ( $ $")$ / 3).

4 /

Referensi

Dokumen terkait

This paper has provided a framework of iDSS for SCM that use of fuzzy non linear regression as a tool to obtain constant values of the risk utility function

Oleh karena penelitian ini juga menggunakan studi kasus terhadap ponsel, tetapi pada pengguna ponsel di Surabaya, dan pada saat yang bersamaan dengan meningkatnya volume penjualan

Changes in the prices according to the subsidy rate variation Figure 19 Changes in the net prices according to the tax rate rising Figure 20 Changes in the final prices according to

Journal of Surveying, Construction and Property JSCP ISSN: 1985-7527 Volume 14, 2023 Issue 1 Received: 3 December 2021; Revised:6 September 2022; Accepted: 19 October 2022 1

Zarqa Journal for Research and Studies in Humanities Volume 22, No.2, 2022 380 Role of Strategic Orientation Dimensions of Green Supply Chain Management Practices in Jordanian

1,034,856,779 January-May 2018 Cost Efficiency 5 Accoord of non-routine requests Decreased lead time from 484 minutes to 38 minutes Time Table 2 informs that the lean management