I. BIAYA LANGSUNG PERSONIL
1.1 TENAGA AHLI
1 Site Engineer OB 1.00 3.00 3.00
2 Chief Insfector OB 1.00 3.00 3.00
1.2 TENAGA TEKNIS
1 Inspector OB 1.00 3.00 3.00
2 Surveyor OB 1.00 3.00 3.00
3 Teknisi Laboratorium OB 1.00 3.00 3.00
1.3 TENAGA PENUNJANG
1 Operator Komputer/Typist OB 1.00 3.00 3.00
2 CAD Operator OB 1.00 3.00 3.00
Volume Harga Satuan Jumlah Harga
(Rp) (Rp)
KUANTITAS DAN HARGA
No. P o s i s i Sat Kuantitas Waktu
-Sub Total 1.1
-Sub Total 1.3
-Sub Total 1.2
-II. BIAYA LANGSUNG NON PERSONIL
2.1 SEWA KENDARAAN
1 Kendaraan Roda 2 (Dua) + BBM Bln/Unit 2.00 3.00 6.00
2.2 PERJALANAN DINAS (OSA)
1 Biaya Perjalanan Dinas Tenaga Ahli Bln/Trip 2.00 3.00 6.00 2 Biaya Perjalanan Dinas Tenaga Teknis Bln/Trip 2.00 3.00 6.00
2.3
1 Alat Tulis Kantor Ls - - 1.00
2 Ls - - 1.00
3 Unit - - 1.00
2.4 BIAYA PERALATAN SURVEY
3 Sewa Komputer + Printer A3 Unit 1.00 3.00 3.00
2.5 BIAYA LAPORAN
1 Laporan Mingguan Expl 5.00 12.00 60.00
2 Laporan Bulanan Expl 5.00 3.00 15.00
3 Laporan Akhir Expl 5.00 1.00 5.00
4 Dokumentasi Expl 1.00 1.00 1.00
Jumlah Harga
(Rp) (Rp)
-KUANTITAS DAN HARGA
No. Uraian Kegiatan Sat Kuantitas Waktu Volume Harga Satuan
-Sub Total 2.2
-BIAYA KANTOR & PERLENGKAPAN
-Sub Total 2.1
-Sub Total 2.3
-Sub Total 2.4
-Alat Komunikasi Kantor -
-Peralatan Laboratorium -
-Sub Total 2.5
-Jumlah Biaya Langsung Non Personil