CADANGAN PEMBINAAN

KOMPLEKS PANGKALAN KASTAM

BAHAGIAN PENCEGAHAN DAN

PERUMAHAN DI TG. DAWAI,

MERBOK, KEDAH

25 OKTOBER 2011

JABATAN KERJA RAYA MALAYSIA

(2)

MAKLUMAT KONTRAK

STATUS KEMAJUAN FIZIKAL & KEWANGAN - SEHINGGA 25

OKTOBER 2011

S-CURVE FIZIKAL

S-CURVE KEWANGAN

KEMAJUAN KERJA SEHINGGA 25 OKTOBER 2011

KEMAJUAN KERJA SEHINGGA AKHIR OKTOBER 2011

BUTIRAN BAYARAN KEMAJUAN KEPADA KONTRAKTOR

ISU / MASALAH & CADANGAN TINDAKAN PENYELESAIAN

KOS KERUGIAN & BAYARAN TAMBAHAN DISEBABKAN LANJUTAN

MASA (EOT)

GAMBAR KEMAJUAN

(3)

MAKLUMAT KONTRAK

NAMA KONTRAKTOR

:

WIDAD BUILDERS SDN. BHD.

KELAS KONTRAKTOR

:

KELAS ‘A’ (BUMIPUTERA)

HARGA KONTRAK ASAL

:

RM 12,137,667.00

HARGA KONTRAK TERKINI :

RM 11,853,377.70

TARIKH MILIK TAPAK

:

12 APRIL 2010

TARIKH SIAP KERJA

:

06 JUN 2011

TARIKH SIAP SEMASA

:

04 MAC 2012

TEMPOH LM NO. 2

:

13 MINGGU (90 hari)

[Klausa 43.1 (e) Kelewatan memberi

sebahagian milik Tapak Bina kepada

kontraktor]

TEMPOH KONTRAK

:

99 MINGGU

TEMPOH LIABILITI

(4)

STATUS KEMAJUAN SEHINGGA 25 OKTOBER 2011

(Berdasarkan Revised CPM-EOT No.2)

KEMAJUAN FIZIKAL (KONTRAKTOR)

Jadual

52 %

Sebenar

55%

(5)

S-CURVE FIZIKAL

April Mei Jun Julai Ogos Sep Okt Nov Dis Jan Feb Mac April Mei Jun Julai Ogos Sept Okt Nov Dis Jan Feb March Kemajuan Jadual 0% 2% 4% 6% 8% 11% 13% 14% 16% 19% 21% 24% 26% 30% 33% 37% 42% 47% 54% 63% 78% 93% 99% 100% Kemajuan Sebenar 0% 1% 2% 3% 3% 4% 6% 8% 11% 12% 16% 17% 20% 23% 27% 36% 43% 53%

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

P

e

rc

e

ntag

e

(

%)

Time/Month

PEMBINAAN KOMPLEKS PENGKALAN KASTAM, TANJUNG DAWAI

Physical S - Curve

(6)

S-CURVE KEWANGAN

4

5

6

7

8

9

10

11

12

1

2

3

4

5

6

7

8

9

10

11

12

1

2

3

Kemajuan

Jadual

-

91,59 264,8 481,8 923,5 1,513 2,047 2,257 2,398 2,461 2,518 2,575 2,633 2,766 2,962 3,994 4,768 5,172 5,954 6,645 8,409 10,79 12,12 12,13

Kemajuan

Sebenar

85,82 159,4 227,9 462,3 649,3 1,042 1,802 1,815 1,821 1,829 1,835 1,862 2,137 3,224 4,030 4,752 5,568

- 91,594.59

264,891.44

481,844.47

923,532.07

1,513,170.25

2,047,837.68

2,257,141.23

2,398,950.63

2,461,613.70

2,518,587.60

2,575,800.78

2,633,381.01

2,766,522.86

2,962,872.50

3,994,612.86

4,768,216.07

5,172,354.58

5,954,523.99

6,645,541.76

8,409,877.32

10,793,524.97

12,124,029.20

12,137,667.00

85,820.00

159,420.30

227,920.00

462,320.00

649,320.30

1,042,220.30

1,802,420.30

1,815,020.30

1,821,920.30

1,829,220.30

1,835,070.30

1,862,070.30

2,137,380.30

3,224,489.49

4,030,559.49

4,752,397.79

5,568,215.08

2,000,000.00

4,000,000.00

6,000,000.00

8,000,000.00

10,000,000.00

12,000,000.00

14,000,000.00

C

OST

(R

M

)

TIME (MONTHS)

PEMBINAAN KOMPLEKS PANGKALAN KASTAM , TANJUNG DAWAI

FINANCIAL S-CURVE

(7)

KEMAJUAN KERJA SEHINGGA 27 OKTOBER 2011

Aktiviti

% Jadual

(CPM)

% Sebenar

52%

55%

Kerja Cerucuk (Bangunan)

Bangunan Pentadbiran

TNB ‘Sub – station’

Rumah Pam

Pondok Keselamatan

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

Kerja Bangunan

Bangunan Pentadbiran

TNB ‘Sub – station’

Rumah Pam

Pondok Keselamatan

26%

21%

64%

30%

0%

25%

20%

62%

34%

1%

Jeti

Jambatan Penghubung

Kepala Jeti

Production of Precast Component

69%

46%

26%

100%

71%

65%

22%

100%

(8)

KEMAJUAN KERJA SEHINGGA 27 OKTOBER 2011

Aktiviti

% Jadual

(CPM)

% Sebenar

55%

52%

Revetment

22%

30%

Kerja Luar

Surface water drainage

Sewerage

External Water Reticulation

Roads and Car Park

Underground Fuel Tank

Turfing

Fencing and Gates

6%

14%

0%

0%

0%

17%

0%

8%

18%

32%

27%

0%

0%

13%

15%

25%

Provisional Sum

Prime Cost Sum

0%

(9)

KEMAJUAN KERJA SEHINGGA 31 OKTOBER 2011

Aktiviti

% Jadual

(CPM)

% Sasaran

54%

56%

Kerja Cerucuk (Bangunan)

Bangunan Pentadbiran

TNB ‘Sub – station’

Rumah Pam

Pondok Keselamatan

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

Kerja Bangunan

Bangunan Pentadbiran

TNB ‘Sub – station’

Rumah Pam

Pondok Keselamatan

29%

22%

76%

34%

4%

35%

22%

80%

50%

9%

Jeti

Jambatan Penghubung

Kepala Jeti

Production of Precast Component

71%

51%

28%

100%

75%

70%

36%

100%

(10)

KEMAJUAN KERJA SEHINGGA 31 OKTOBER 2011

Aktiviti

% Jadual

(CPM)

% Sasaran

54%

56%

Revetment

25%

50%

Kerja Luar

Surface water drainage

Sewerage

External Water Reticulation

Roads and Car Park

Underground Fuel Tank

Turfing

Fencing and Gates

8%

14%

0%

0%

0%

30%

0%

12%

19%

30%

27%

0%

0%

55%

13%

23%

Provisional Sum

Prime Cost Sum

0%

(11)

BUTIRAN BAYARAN KEMAJUAN KEPADA KONTRAKTOR

No Tarikh Nilai Kerja Yang Dilaksanakan (RM) Bayaran Pendahuluan

LAD Bayaran Amaun Yang Diperakui Bayaran Bayaran Date & Bayaran Interim Penilaian Nilai Kerja % Nilai Kerja Disyorkan Wang Tahanan 10% Kontraktor NSC etc. Yang Diperakukan Voucher No Diterima

Dilaksanakan Dilaksanakan Semasa Kumulatif Diperakukan (Kumulatif)

Yang Perlu Dibayar Semasa Kumulatif

(RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM) 1 27.5.2010 85,820.30 0.41% 85,820.30 85,820.30 8,582.03 8,582.03 77,238.27 85,820.30 85,820.30 14.7.2010 77,238.27 2 21.6.2010 159,516.00 0.77% 82,277.73 73,695.70 7,360.00 15,942.03 66,240.00 73,600.00 159,420.30 17.7.2010 66,240.00 3 27.7.2010 227,957.90 1.10% 84,479.63 68,537.60 6,850.00 22,792.03 61,650.00 68,500.00 227,920.30 4.3.2010 61,650.00 4 9.8.2010 338,247.26 1.63% 133,118.99 110,326.96 11,030.00 33,822.03 99,270.00 110,300.00 338,220.30 1.9.2010 99,270.00 5 23.8.2010 473,404.01 2.29% 157,975.74 124,153.71 12,410.00 46,232.03 111,690.00 124,100.00 462,320.30 7.9.2010 111,690.00 6 27.9.2010 672,859.70 3.25% 245,741.43 199,509.40 18,700.00 64,932.03 168,300.00 187,000.00 649,320.30 15.10.2010 168,300.00 7 25.10.2010 1,053,329.14 5.09% 468,940.87 404,008.84 39,290.00 104,222.03 353,610.00 392,900.00 1,042,220.30 18.11.2010 353,610.00 8 14.11.2010 1,473,580.58 7.12% 535,582.31 431,360.28 43,130.00 147,352.03 388,170.00 431,300.00 1,473,520.30 1.12.2010 388,170.00 9 24.11.2010 1,802,512.58 8.71% 476,344.31 328,992.28 32,890.00 180,242.03 296,010.00 328,900.00 1,802,420.30 9.12.2010 296,010.00 10 22.12.2010 1,815,084.02 8.77% 192,905.75 12,663.72 1,260.00 181,502.03 11,340.00 12,600.00 1,815,020.30 26.1.2011 11,340.00 11 24.1.2011 1,821,985.46 8.80% 188,467.19 6,965.16 690.00 182,192.03 6,210.00 6,900.00 1,821,920.30 17.03.2011 6,210.00 12 22.2.2011 1,829,306.90 8.84% 189,578.63 7,386.60 730.00 182,922.03 6,570.00 7,300.00 1,829,220.30 17.3.2011 6,570.00 13 25.3.2011 1,881,590.09 9.09% 235,291.82 52,369.79 650.00 183,572.03 5,850.00 6,500.00 1,835,720.30 25.4.2011 5,850.00 14 21.4.2011 1,996,032.59 9.64% 343,884.32 160,312.29 3,000.00 186,572.03 27,000.00 30,000.00 1,865,720.30 04.05.2011 27,000.00 15 23.5.2011 2,171,669.35 10.49% 492,521.08 305,949.05 30,590.00 217,162.03 275,310.00 305,900.00 2,171,620.30 15.04.2011 275,310.00 16 20.06.2011 2,557,403.90 12.35% 602,945.63 385,783.60 38,570.00 255,732.03 347,130.00 385,700.00 2,557,320.30 11.07.2011 347,130.00 17 06.07.2011 3,229,962.88 15.60% 928,374.61 672,642.58 67,260.00 322,992.03 605,340.00 672,600.00 3,229,920.30 19.07.2011 605,340.00 18 27.07.2011 4,036,071.09 19.50% 1,129,142.82 806,150.79 80,610.00 403,602.03 725,490.00 806,100.00 4,036,020.30 08.08.2011 725,490.00 19 15.08.2011 4,752,397.79 22.96% 1,119,979.52 716,377.49 71,630.00 475,232.03 644,670.00 716,300.00 4,752,320.30 25.08.2011 644,670.00 20 26.09.2011 5,568,215.08 26.90% 1,291,126.81 815,894.78 81,580.00 556,812.03 734,220.00 815,800.00 5,568,120.30 12.10.2011 734,220.00

(12)

ISU & MASALAH

• Terdapat sembilan (9) buah jeti

nelayan sedia ada di tapak

cadangan jeti yang menghalang

kerja pembinaan

• Pembayaran Pampasan kepada

pemilik jeti nelayan diselesaikan

pada bulan April 2011. Namun

terdapat sebuah jeti yang tetap

tidak memindahkan operasi.

• Pemindahan

sepenuhnya

jeti

nelayan hanya berlaku dalam bulan

Jun 2011.

• Kerja – kerja jeti dan ‘revetment’

hanya dapat dimulakan pada bulan

Jun 2011. Jadual sebenar (LM 01)

kerja tersebut bermula pada 24 Feb.

2011

Kelewatan Pemilikan Sepenuhnya

Tapak Bina (Pemindahan Jeti

Nelayan)

TINDAKAN/

PENYELESAIAN

• Lanjutan masa 01 telah diberikan

selama 182 hari dan lanjutan

masa 02 selama 90 hari

berdasarkan klausa 43.1(e).

Perakuan Kelambatan dan

Lanjutan Masa

(13)

 JKR Kedah (P.P) telah terima Notis Niat Menuntut

Kos Kerugian dan Bayaran (Claim for Loss and

Expenses) dari pihak kontraktor dan tuntutan

tersebut di dalam semakan Bahagian Kontrak dan

Ukur Bahan JKR Negeri Kedah.

KOS KERUGIAN & BAYARAN TAMBAHAN DISEBABKAN

LANJUTAN MASA (EOT)

(14)

GAMBAR KEMAJUAN

BANGUNAN

PENTADBIRAN

12 OKTOBER 2011

(15)

GAMBAR KEMAJUAN

TNB SUB -

STATION

07 SEPTEMBER 2011

(16)

GAMBAR KEMAJUAN

13 OKTOBER 2011

25 OKTOBER 2011

(17)

GAMBAR KEMAJUAN

10 SEPTEMBER 2011

25 OKTOBER 2011

(18)

GAMBAR KEMAJUAN

01 OKTOBER 2011

25 OKTOBER 2011

(19)

GAMBAR KEMAJUAN

12 OKTOBER 2011

DETENTION

PONDS

(20)

GAMBAR KEMAJUAN

12 OKTOBER 2011

SEWERAGE

(21)

GAMBAR KEMAJUAN

12 OKTOBER 2011

FENCING

& GATES

(22)

GAMBAR KEMAJUAN