PEKERJAAN : PENGADAAN MEUBELAIR UNIVERSITAS SYIAH KUALA
PAKET : USK-PP-05
LOKASI : KAMPUS UNSYIAH BANDA ACEH
TAHUN : 2012
Satuan Jumlah 1 AC SPLIT DUCT R-22 Kap. : 450.000 BTU/h ……… ……… ………… 3 Unit ………. ……….
Listrik : 380V/3Ph/50 Hz - 49,45 KW
2 AC SPLIT DUCT Kap. : 600.000 BTU/h ……… ……… ………… 3 Unit ………. ………. Listrik : 380V/3Ph/50 Hz - 66,91 KW
3 INSTALASI PIPA KONDENSOR Pipa refrigerant dia. 1 3/8" 750 Mtr ………. ………. Pipa refrigerant dia. 3/4" 750 Mtr ………. ………. Hand Valve dia. 1 3/8" 20 Buah ………. ………. Hand Valve dia. 3/4" 40 Buah ………. ………. Filter Dryer dia. 3/4" 20 Buah ………. ………. Sight Glass dia. 3/4" 20 Buah ………. ……….
Kabel tray : 600 x 10 mm 35 Mtr ………. ……….
4 INSTALASI LISTRIK Kabel Control NYY 3x2,5 mm2 800 Mtr ………. ………. Kabel power Indoor NYY 4x6 mm2 70 Mtr ………. ………. Kabel power Outdoor NYY 4x10 mm2 800 Mtr ………. ………. Panel Outdoor & Indoor Lt. 1 s/d Lt. 3 5 Buah ………. ……….
Kabel tray : 300 x 10 mm 30 Mtr ………. ……….
5 INSTALASI DUCTING Penggantian Planum R. AHU (BJLS 100) 6 Set ………. ………. Perbaikan instalasi Ducting 6 Set ………. ……….
6 BONGKAR INSTALASI EXISTING Bongkar unit AC merk YORK EWX 450 & 520 8 Buah ………. ………. & PEKERJAAN LAIN-LAIN Bongkar cooling tower LCT-250 2 Buah ………. ………. Bongkar pompa kondensor 22 KW 2 Buah ………. ………. NAMA ALAT DESKRIPSI/SPESIFIKASI MERK TYPE NEGARA
ASAL BAB XII. SPESIFIKASI TEKNIS
Bongkar Instalasi pipa kondensor 1 Lot ………. ………. Bongkar panel AC dan kabel power AC Existing 1 Lot ………. ………. Bongkar pintu + dinding R. AHU 1 Lot ………. ………. Perbaikan kembali pintu & dinding R. AHU 1 Lot ………. ……….
Pondasi Outdoor unit 21 Buah ………. ……….
7 ALAT BANTU 1 Lot ………. ……….
8 TESTING & COMMISIONING 1 Lot ………. ……….
JUMLAH DIBULATKAN