• Tidak ada hasil yang ditemukan

Livermore 12 11 17.

N/A
N/A
Protected

Academic year: 2018

Membagikan "Livermore 12 11 17."

Copied!
12
0
0

Teks penuh

(1)

RI DEM Division of Marine Fisheries 

Involvement with BIWF Fish Science

Southern New England Offshore Wind Energy Science Forum 

12/11/2017 

Julia Livermore 

Principal Marine Biologist 

(2)

RI DEM Mission

To protect, restore, manage and promote Rhode 

Island’s environment and natural resources to 

(3)

BIWF Permits through RI DEM

BIWF ‐ Water Quality CerGficate File Number 12‐037 condiGons: 

Anchoring plan that minimizes anchoring‐related impacts to hard boSom habitat 

during construcGon 

•  Hard boSom habitat monitoring (if impacts not successfully avoided) 

Jet plowing Gmelines that minimize impacts to winter flounder 

•  No acGvity between February 1 and March 31 

Long‐term monitoring of inter‐array transmission cables 

•  Post‐construcGon survey using mulG‐beam survey and shallow sub‐boSom profiler to ensure that  target cable depths were achieved 

•  EMF survey to address potenGal effects on the composiGon, life cycle funcGons, uses, processes  and acGviGes of fish and wildlife 

Noise miGgaGng measures 

•  So[‐start procedures to give marine species the opportunity to evacuate the area 

(4)

BIWF Permits through RI DEM

BIWF ‐ Water Quality CerGficate File Number 12‐037 condiGons: 

Ventless lobster trap survey (BACI Design) 

•  2 years pre‐construcGon, 1 year during construcGon, and 2 years post‐construcGon surveys 

BoSom trawl survey (BACI Design) 

•  2 years pre‐construcGon, 1 year during construcGon, and 2 years post‐construcGon surveys 

MiGgaGon requirements (if necessary) 

(5)

BITS (Sea2Shore) Permits through RI DEM

Water Quality CerGficate File Number 12‐039 and Dredge 

Permit ApplicaGon Number DP‐12‐120 condiGons: 

Cofferdam, jet plowing, and pile driving Gme windows 

Long‐term monitoring transmission cable 

•  Post‐construcGon survey using mulG‐beam survey and shallow sub‐ boSom profiler to ensure that target cable depths were achieved 

•  EMF survey along the full length of the transmission cable to address  potenGal effects on the composiGon, life cycle funcGons, uses, processes  and acGviGes of fish and wildlife 

MiGgaGon requirements (if necessary) 

(6)

Agreement between Deepwater and RI DEM

DWW agreed to “make payments, to support, protect 

and enhance public resources, including the evaluaGon 

of any impacts to marine fisheries and marine habitats 

associated with the [BIWF and BITS]. The payments 

shall be made to RIDEM to enable RIDEM to contract 

services, overseen and supervised by RIDEM, to 

evaluate and respond to project‐related impacts.” 

(7)
(8)

DEM VMS Analysis

Low  Low‐Med  Med  Med‐High  High 

(9)

DEM Expanded VMS Analysis

Covers the Statoil lease area, Deepwater 

Wind lease area, Bay State Wind lease area, 

Vineyard Wind lease area, and two WEAs 

yet to be leased 

Includes landings from NH, MA, RI, CT, NY, & 

NJ 

Looks at VMS data and landings from 

2011‐2016 

(10)
(11)
(12)

Referensi

Garis besar

Dokumen terkait

Hasil penelitian menunjukkan bahwa terdapat 7 (tujuh) faktor baru yang terbentuk yaitu lingkungan apartemen, motivasi pribadi, peran dan status sosial, additional

RIDA

Sehubungan Pengadaan Langsung pada Kegiatan Dinas Kesehatan Kota Pekanbaru Tahun Anggaran 2013 dan berdasarkan Berita Acara Hasil Pengadaan Langsung (BAHPL) Nomor

Bahwa dalam rangka proses Evaluasi Dokumen Kualifikasi dan Pembuktian Kualifikasi perusahaan untuk pekerjaan jasa konsultansi Pekerjaan Penyusunan Rencana Detail Tata Ruang

Untuk menggambarkan proses yang dapat dilakukan pengguna dalam aplikasi kamus dan aksara karo yang dimulai dari proses input sampai hasil output, penulis

Setelah menganalisis data penelitian, langkah selanjutnya adalah mendeskripsikan hasil penelitian tersebut dalam bentuk tabel yang menggambarkan perbedaan

Gedung H, Kampus Sekaran-Gunungpati, Semarang 50229 Telepon: (024)

No Hari & Tanggal Waktu Mata Pelajaran. 1