PLANNING & EARTHMOVING

MATERIALS AND CONSTRUCTION

Ferdinand Fassa TSP-308 MPK

(2)

OUTLINE

PREPARATION WORK

INTRODUCTION TO EARTHMOVING

EARTHMOVING MATERIALS

GRAPHICAL PRESENTATION OF EARTHWORK

SOIL VOLUME-CHANGE CHARACTERISTICS

EARTHWORK QUANTITIES

MASS DIAGRAM

PROBLEMS

(3)

3

Objectives

Prepare the site ready for construction activities

Scope of Works

(Surface &) Sub-surface Exploration

Site Clearing

(Unhook utilities)

(Demolition)

Staking Out

Grading

Earth work

(4)

4

PREPARATION WORK (2)

Surface & Subsurface Exploration

Visual inspection

identification of major obstacle, location of utilities, etc.)

(sometimes reliance to as built drawing just is not

adequate)

Rough measurement

Soil test

(5)

5

PREPARATION WORK (3)

Site Clearing

Unhook utility lines (electricity, gas, water, telephone)

Demolition of Existing Buildings

Hand (manual) dismantling

Tractor w/ grapple

Dozing

Explosive

Wrecking balls

Remove Tress

(6)

6

PREPARATION WORK (4)

(7)

7

(8)

8

(9)

9

(10)

10

(11)

11

(12)

12

(13)

13

(14)

14

PREPARATION WORK (5)

Coordinate Geometry

(COGO)

Geo-Satellite

Digital Surveying with GPS

Digital Geodetic Surveying, Mapping, and Planning:

(15)

INTRODUCTION TO EARTHMOVING (1)

Earthmoving process is the process of moving soil or rock from one

location to another and processing it so that it meets construction

requirements of location, elevation, density and moisture content.

Activities involved in this process include:

Excavating

Loading

Hauling

Placing (dumping and spreading)

Compacting

Grading and finishing

(16)

INTRODUCTION TO EARTHMOVING (2)

16

(17)

GRAPHICAL PRESENTATION OF EARTHWORK (1)

17

Plan View

Profile View (Potongan Memanjang)

(18)

GRAPHICAL PRESENTATION OF EARTHWORK (2)

(19)

SOIL VOLUME-CHANGE CHARACTERISTICS (1)

19

Three Principal Soil Conditions:

 Bank: Called “In –Place” Material in its natural state before disturbance unit

volume  Bank Cubic Yard (BCY) or Bank Cubic Meter (BCM)

 Loose: Material that has been excavated or loaded  Loose Cubic Yard (LCY) or Loose Cubic Meter (LCM)

 Compacted: Material after compaction  Compacted Cubic Yard (CCY) or Compacted Cubic Meter (CCM)

Swell: Soil increase in volume when it is excavated (soil grains loose an air fills the void spaces created)

Shrinkage

(20)

Soil’s Volumetric Changes

BANK

LOOSE COMPACTED

Swell (%) = bank unit weight loose unit weight

(

- 1

)

x 100%

SWELL

SHRINK

Swell Factor (SwF) = loose dry unit weight

(21)

Shrinkage Factor (ShF) =

compacted dry unit weight bank dry unit weight

Shrinkage (%) = (compacted dry unit weight) – (bank unit weight)

compacted unit weight x 100%

(22)

Example

(23)

Example

(24)
(25)

25

Earth Work Calculation

Excavate/dig or (back) fill actual ground level to

desired Level

Average End Method (

ditch/trench excavation

)

Vol. = (A

1

+ A

2

) / 2 x L

Large Area

Ave. Depth = [

S

depth x weight] /

S

weight

(26)

26

Ditch / Trench Excavations

Average End Method

L

A

2

A

1

(27)

27

(28)

28

Find the volume of excavation required for the area shown in

figure below. The figure at each grid inter-section represents the

depth of cut at that location

(29)
(30)

30

Gambar

figure below. The figure at each grid inter-section represents the Find the volume of excavation required for the area shown in depth of cut at that location

Referensi

Dokumen terkait

Bersama ini kami sampaikan undangan Pembuktian Kualifikasi dan klarifikasi teknis paket Pengadaan pakaian dinas beserta perlengkapannya, yang akan dilaksanakan

masuk dalam kategori sedang dengan persentase 73,68%, dan 8 siswa masuk dalam kategori tinggi dengan persentase 21,05%.. Terjadi kenaikan literasi sains rata-rata

Metode Penelitian Pendidikan : Pendekatan Kuantitatif, Kualitatif dan R&D Bandung: Alfabeta.. Suwarsono dan So,

Melakukan proses yang sama dengan tanaman C3 pada siang hari yaitu daur Calvin. Melakukan proses yang sama dengan tanaman C4 pada malam hari yaitu daur Hatch

Setelah proses pengerjaan, hasil yang didapat berupa ketercapaian gagasan, kemudian dari segi teknik yang digunakan adalah teknik konvensional drawing, yaitu dry

Konselor memberikan beberapa pertanyaan secara terbuka kepada siswa berkaitan dengan materi yang disampaikan.. Kegiatan Konselor

[r]

PENGARUH METODE SIMA’I TERHADAP KEMAMPUAN MENGHAFAL SURAT-SURAT PENDEK AL-QUR’AN PADA SISWA TUNANETRA DI SLB.. NEGERI A KOTA BANDUNG