KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL
DIREKTORAT JENDERAL MINYAK DAN GAS BUMI
KEMAMPUAN USAHA PENUNJANG MIGAS
PT. WorleyParsons Indonesia
Kantor PusatMenara Batavia 12A Floor
JL. KH. Mas Mansyur Kav. 126 Jakarta 10220 Telepon / Fax : (021) 5746218/5746709 Website : www.worleyparsons.com E-Mail : jakarta@worleyparsons.com Penanggung Jawab : Denis Lucey (Presiden Direktur) ``
STATUS PERUSAHAAN : NASIONAL
Akta Pendirian Perusahaan No. 17 tanggal 6 Desember 1995 oleh Notaris H. Asmawel Amin, S.H di Bekasi dan Akta perubahan terakhir No. 17 tanggal 12 Agustus 2015 oleh Notaris Ivan Gelium Lantu, S.H., M.Kn. di Depok, sebagai berikut:
- Organisasi Perusahaan - Kepemilikan Saham :
o Presiden Komisaris : Andrew Peter Wood (WNA) Indonesia o : 5 %
o Presiden Direktur : Denis Lucey (WNA) Asing o : 95 %
o Direktur : Peter David Kingston Mellor (WNA) o
Surat izin Usaha Jasa Konsultasi Konstruksi (IUJK) Penanaman Modal Asing No. 253/1/IU/PMA/2016 tanggal 2 Maret 2016 oleh Kepala BKPM
Surat Keterangan Terdaftar (SKT) Migas No: 14/1/SKT-01/PMA/2017 tanggal 14 Februari 2017
Surat Kemampuan Usaha Penunjang (SKUP) Migas No. 1023/19.07/DMB/2017 Tanggal 23 Mei 2017 sampai dengan Tanggal 31 Mei 2019
SISTEM MANAJEMEN :
Sistem Manajemen Mutu ISO 9001:2008 No. CERT-0088361-5 oleh SAI Global tanggal 25 September 2015 berlaku sampai dengan 22 September 2018
Sistem Manajemen Lingkungan ; -
Sistem Manajemen Keselamatan dan Kesehatan Kerja : - KEMAMPUAN PRODUKSI JASA :
JENIS JASA
BIDANG
JASA KEMAMPUAN JASA
TENAGA KERJA
KUALIFIKASI JUMLAH WNI WNA Konstruksi Perencana
Konstruksi
Jasa Desain Rekayasa untuk pekerjaan teknik sipil air, jasa desain rekayasa untuk pekerjaan mekanikal dan elektrikal dalam bangunan, jasa desain rekayasa untuk proses industrial dan produksi, jasa desain rekayasa lainnya
Tenaga Ahli :
Ahli Madya Manajemen Proyek
Ahli Madya Teknik Tenaga Listrik
Ahli Madya Teknik Mekanikal
Ahli Madya Teknik Bangunan Lepas Pantai Tenaga Terampil : Instrument Control Structure Designer Piping Designer 4 1 1 2 1 2 1 - - - - - - - Pengawas Konstruksi
Jasa pengawas pekerjaan konstruksi dan instalasi proses dan fasilitas industri Konsultansi
Lainnya
Jasa manajemen proyek terkait konstruksi pekerjaan konstruksi proses dan fasilitas industrial
12 -
DAFTAR PERALATAN DAN PENGALAMAN TERLAMPIR PERINGKAT KEBERPIHAKAN DALAM NEGERI RENDAH (475)
NO. DISCIPLINE SOFTWARE NAME VER SOFT LIC. QTY
1 Drafter Autodesk AutoCAD 2008-2014 Upon request
2 Structural SACS SACS V5.3 Upon request
3 Structural GRL WEAP GRL WEAP 1
4 Electrical ETAP V11 2
5 Mechanical Caesar Caesar II Upon request
6 Instrument Instrucalc 2
7 Instrument SmartPlant-Instrumentation SPI Upon request
8 Electrical SmartPlant-SPEL Upon request
9 Instrument SmartPlant-Project Merger Upon request
10 Process Aspentech-FLARESIM Upon request
11 Process Aspentech-HYSYS Package Upon request
12 Drafter Aveva – Plant Design Management System (PDMS)
Upon request 13 Drafter Aveva – Plant Design Multi-Discipline
Supports (MDS)
Upon request
14 Drafter Aveva – Plant Design Review Upon request
15 Drafter Aveva – Plant Design Laser Model Interface (LMI)
Upon request
16 Structural TEKLA 3
17 Mechanical PV Elite Upon request
18 Project Control Primavera Upon request
19 Process PIPESIM
20 Process FLARENET Upon request
21 Pipeline AGA/PRCI Level 2
Bentley AutoPIPE SAGE Profile 3D V 3.00-00 V8i Series 5 V2.1 Upon request Upon request Upon request
22 Pipeline DNV FatFree Upon request
23 Pipeline In-house MathCAD & Excel software MathCAD 15 / Excel 2013 -
24 Pipeline CAESAR II 2011 Upon request
25 Pipeline MCS Pipelay v.2.8.1 1 (Global)
26 Project Control Incontrol V6
27 Drafter Microstation Upon request
28 Process OLGA
29 Pipeline / Designer Fledermaus V7 1
DAFTAR PERALATAN PT. WorleyParsons Indonesia
NO. NAMA MEREK / TIPE JUMLAH TAHUN PEMBUATAN
KONDISI ALAT
STATUS KEPEMILIKAN
1 Drawer Pedestal 200 2006 - 2013 Baik Milik Sendiri
2 CAD Station Intel Xeon series with a minimum spec of 16 GB RAM and 500GB Harddrive, DELL computers, each station is using 19 ”/ 21” Dual flat monitor screen. DELL Precision T3600
40 2013 Baik Milik Sendiri
3 PDMS Station Intel Xeon series with a minimum spec of 16 GB RAM and 500GB Harddrive, DELL computers, each station is using 19 ”/ 21” Dual flat monitor screen. DELL Precision T3600
40 2013 Baik Milik Sendiri
4 Specialist Engineering Work Station
Computers (Intel i5 series computers with minimum spec of 4GB RAM for administration, accounting, management and QA dept) Dell Optiplex 7010
75 2013 Baik Milik Sendiri
DAFTAR PENGALAMAN PT. WorleyParsons Indonesia
NO. NAMA PROYEK LINGKUP PEKERJAAN LOKASI PERIODE PELANGGAN CAPAIAN TKDN 1. FEED Study for
MAC Development
To provide FEED for : 1. Provide FEED Documents 2. Preparation of EPCI bid
documents for lump sum, turnkey, construction of facilities for MAC WHP including a personnel bridge, 10” export pipeline including hot tap design study for 10” export line tie-in to EJGP pipeline. Jakarta, Indonesia 15 Agustus 2016 – 15 Februari 2017 Husky-CNOOC Madura Limited (HCML) 55.65 %
NO. NAMA PROYEK LINGKUP PEKERJAAN LOKASI PERIODE PELANGGAN CAPAIAN TKDN 3. Preparation of functional
specification of facilities on lease MOPU and installation procedure for Personnel Bridge and strengthening landing on MOPU braces connecting MOPU to MAC WHP. 2. Provision of Facility Engineering Study To provide Engineering Services : 1. Debottlenecking Study 2. Design Additional Well Conductor Centralizer 3. Flowlines Design Improvement 4. Project Management Jakarta, Indonesia 20 Juni 2016 – 19 Juni 2017 Pearl Oil (Sebuku) Limited 60.32 % 3. Corrosion Under Insulation (CUI) – Real Time Radiography Services
Provide Inspection Service for Corrosion Under Insulation (CUI) – Real Time Radiography Services for Belanak Platform
Jakarta, Indonesia 18 April 2016 – 18 April 2018 ConocoPhillip s Indonesia Inc. Ltd. 33.78 % 4. EPCM – Engineering, Procurement, Construction and Management
To provide call-on basis EPCm services for Exxon Mobil oil producing facility for 3 years. The scope is mainly (90%) call-on basis engineering services to support Exxon Mobil oil operations. Covering items :
1. Project Management 2. Engineering 3. Procurement Support 4. Construction Management General Obligation (management, administration, engineering, purchasing, onshore fabrication, and offshore installation, hook-up and commissioning) Jakarta Indonesia 30 April 2015 – 29 April 2018 ExxonMobil Cepu Limited 96.83 % 5. BP - Offshore Project Management Services
Support BP through the Bidder Technical Evaluation phase for both Line Pipe Supply and EPCI bid submissions.
Prepare Execute Phase PEP draft and issue IFR (BP shall finalise document after Contractor Selection) Support to completion of remaining Quality deliverables as per EPCI Preparation MDR Review and comment to other key EPCI Preparation MDR documents as agreed Updates to Project Documents as per the Engineering Work Plan (Only applicable to non ITT documents that are not issued to bidders) PMCS Action close-out Completion of ETP Conformance Reports Jakarta, Indonesia 1 May 2015 – 31 Juli 2015 Reka Patria Ekaguna (RPE) 6. Central Information Store Application Services for Tangguh Expansion Project 4420000610
Provide CIS Managed Service for: 1. Set up Services
2. CIS Managed Services a. Document Library
Management Services which shall consist of the Central Document Library (CDL) where all documents shall be stored and managed. b. Data Management Services
Which Shall Consist the Central Tag Database (CTDB) where all Tag Data shall be stored and managed. c. Application Support Services. 3. Decommissioning and
Achieving Service.
4. People Service Management
Jakarta, Indonesia
25 Juli 2014 – 23 Juni 2020
TKDN which shall consist of the
provisions and management of experienced personnel as required by company.
In addition to above also to provide 1. Training
2. CIS Managed Service (Hosting, Maintenance, Data
management, Application Support Service)
3. Decommissioning and Archiving 4. People Service Management 5. Specific Deliverable to Contract
Exhibit B Section 8 7. Provision of
Engineering Services (High
Level)
Project for Screening & Conceptual Studies, Pre-project Study, FEED, Detailed engineering studies and EPSC Contract / Project preparation.
Concept study using MOPU for offshore minimalist Platform.
Jakarta, Indonesia 18 Agustus 2014 - 31 Agustus 2016 Total E&P Indonesie 75 % 8. Provision of QRA for ORF
Pemping System Section 1 Project (WNTS to Pemping) will be executed by Premier Oil Natuna Sea 8.V. ("Company"). The development requires connection of a new pipeline tied
to the West Natuna Transportation System (WNTS) trunk line at Subsea Tie-in 8 (SSTI-8). A subsea pipeline end manifold (PLEM) structure shall be installed adjacent to SSTI-8 to
isolate the new pipeline from the WNTS trunk line and to allow for future subsea pigging of the pipeline.
Onshore Receiving Facilities (ORF) will be constructed on Pemping Island to reduce the WNTS trunk line gas pressure and fiscally meter the gas throughput. Pemping Island is located about 30 minutes North West from 8atam Island by boat. The plot plan layout of Pemping ORF is shown in Figure 2 below. To Perform Quantitative Risk Assessment for
1. Pipeline Kilometer Post (KP 0.0 to KP 4.4 Where the pipeline will be concrete coated sitting on the seabed. 2. Onshore Receiving Facility
(ORF) to define quantitative risk of process and non-process hazard from Pemping ORF Facilities. The Report of Consultant shall identify and evaluates the potential risk associated with the ORF with Respect to the Personnel on site, asset equipment, structural Integrity and also other parties in the vicinity of the ORF. Jakarta, Indonesia 21 July 2014 - 20 November 2014 PremierOil Natuna Sea B.V. 98.75 % 9. Technical Support For Offshore Facilities EPCI Preparation
The Tangguh Expansion Project will comprise a development of new offshore facilities and onshore facilities on a brown-field site. The onshore facilities development will include one additional liquefaction train with capacity of 3.8 mtpa and is expected to include provisions for further expansion in the future, an onshore receiving facility, expanded jetty, LNG storage, utilities, boil off gas recovery, flares, infrastructure to support logistics and associated
Jakarta, Indonesia 13 Mei 2014 – 12 November 2015 BP BERAU LTD. 45 %
NO. NAMA PROYEK LINGKUP PEKERJAAN LOKASI PERIODE PELANGGAN CAPAIAN TKDN increased temporary and
permanent workforce. Significant standardization is planned, where appropriate, incorporating lessons learned from past experience in developing the Tangguh Project Phase 1, and compliance with COMPANY's Engineering Technical Practices ("ETPs").
The offshore facilities development will include additional platforms, pipelines and wells required to develop gas to fill an integrated three trains development. The offshore facilities will be developed in a number of phases, and designed to accommodate future sources of gas supply. This AGREEMENT shall focus on the first phase of offshore facilities development covering the construction of offshore Gas Production Facilities ("GPF") which will include the construction of WDA and ROA platforms, pipelines and umbilical.
This AGREEMENT is prepared with the overall objective of performing EPCI Preparation for the GPF facilities in order to provide all related matters required for preparing and processing open tender of Engineering, Procurement, Construction and Installation ("EPCI") of the offshore GPF.
Covering :
1. EPCI and Linepipe Tender Preparation Support 2. Engineering Design and
Updates(Offshore pipeline, onshore tie in)
3. Feed Design for VRB infill Modifications
4. EPCI Execution Phase Preparation(develop AVL, develop EPCI Contractor Management Strategy) 5. EPCI Tender and Evaluation
Support
6. EPCI Phase Preparation 10. Offshore Gas
Production Facilities (GPF) Follow on FEED
This is a follow on Offshore GPF FEED for the Tangguh Expansion Project
The work includes:
1. Project Management and ITT, Coordination of all interfaces which directly impact the ITT Package workscope.
2. Prepare Process Safety related drawings
3. Prepare ROA & WDA Structural Drawings Jakarta, Indonesia 09 Desember 2013 – 2 Desember 2015 BP BERAU LTD. 45 %