KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL
DIREKTORAT JENDERAL MINYAK DAN GAS BUMI
KEMAMPUAN USAHA PENUNJANG MIGAS
PT. JGC INDONESIA
STATUS PERUSAHAAN: NASIONAL
Akta Pendirian Perusahaan No. 4 tanggal 6 September 1974 oleh Notaris Tan Thong kie, SH. di Jakarta
dan Akta perubahan terakhir No.14 tanggal 17 Desember 2013 oleh Siti Safarijah, SH. di Jakarta,
sebagai berikut:
- Organisasi Perusahaan :
- KepemilikanSaham :
o Presiden Komisaris
: Masayuki Sato(WNA)
o Indonesia
:
1
%
o Presiden Direktur
: Nurdin Haris (WNA)
o Asing
:
99
%
o Direktur
: Eiji Shimo (WNA)
Shohei Miyauchi (WNA)
Husin Soleh (WNI)
Soeryadi (WNI)
Yoshikatsu Kutsumi (WNA)
SuratIjin Usaha JasaKonstruksi No:141/1/IU/II/PMA/PU/2012 oleh Badan Koordinasi Penanaman
Modal tanggal 4 Juli 2012 di Jakarta
Surat KeteranganTerdaftar (SKT) Migas No: 334/SKT-01/DMT/2013 tanggal 8 November 2013
Surat Kemampuan Usaha Penunjang Migas No.
4507/19.07/DMB/2014 tanggal 16 April2014
SISTEM MANAJEMEN :
Sistem Manajemen Mutu : ISO 9001 : 2008 Nomor: JKT0939638 tanggal 1 Desember 2012 olehLRQA
berlaku sampai dengan 30 November 2015
Sistem Manajemen Lingkungan: Lingkungan ISO 14001 : 2004 Nomor : JKT6001228 tanggal 23 Januari
2011 oleh LRQA berlaku sampai dengan 22 Januari 2017
Sistem Manajemen Keselamatan Kerja : OHSAS 18001 : 2007 Nomor : JKT6008916 tanggal 23 Juli
2010 oleh LRQA berlaku sampai dengan 22 Juli 2016
KEMAMPUAN PRODUKSI JASA:
JENIS
JASA BIDANG JASA KEMAMPUAN JASA
TENAGA KERJA KUALIFIKASI JUMLAH WNI WNA Konstruksi Terintegrasi Perencana Konstruksi Rancang design:
- Bangunan Gedung dan Pabrik - Jaringan, distribusi
danTransmisi
- Pembangkit Tenaga listrik - Perencanaan Umum
Pembuatan Kilang Minyak - Perencanaan Teknis
Pembuatan Kilang Minyak
TenagaAhli : Ahli Utama (WNI) - Manajemen Konstruksi - Teknik Mekanikal - Teknik Sipil - Teknik Elektrikal Ahli Madya (WNI) - Teknik Mekanikal - Teknik Elektrikal - Teknik Sipil - Manajemen Ahli Muda (WNI) - Manajemen Proyek - Tata Lingkungan - Teknik Elektrikal 1 1 2 1 5 4 3 6 10 1 1 - - - - - - - - - - - Pelaksana Konstruksi Sipil :
- Fasilitas Produksi Darat - Jalur Pipa dan Fasilitas
Pendukungnya - Gedung dan Pabrik - Bangunan pengolahan Air
Bersih dan Limbah - Dermaga, Penahan
Gelombang dan Penahan Tanah
Mekanikal/Elektrikal : - Tata Udara - Pembangkitan dan
JaringanTransmisiListrik - Instalasi kelistrikan dan Jasa
Kelistrikan
- Radio, Telekomunikasi, Sarana bantu navigasi laut/udara, rambu sungai dan peralatan SAR
- Pemasangan Jaringan
54 -
JENIS
JASA BIDANG JASA KEMAMPUAN JASA
TENAGA KERJA KUALIFIKASI JUMLAH WNI WNA Konstruksi Terintegrasi Pelaksana Konstruksi
Teknologi Informasi dan Telekomunikasi - Pemasangan dan Pemeliharaan Instrumentasi. Pengawas Konstruksi Pengawasan Manajemen Pembuatan Kilang Minyak Non
Konstruksi
Pengoperasian dan Pemeliharaan -
Perawatan Fasilitas Produksi Minyak dan Gas Bumi Penelitian dan
Pengembangan
Jasa Konsultasi :
- Studi Kelayakan Pembuatan Kilang Minyak
DAFTAR PERALATAN DAN PENGALAMAN TERLAMPIR
Kantor Pusat(status :miliksendiri) :
JI. TB Simatupang 7-B, Jakarta 12430 Telepon : (021) 2997 6500
Fax : (021) 2997 6599
E-Mail : info@jgc-indonesia.com
PenanggungJawab : Nurdin Haris (Direktur Utama) Contact Person : Ina Lestari
Daftar Peralatan JGC Indonesia, PT
NO. NAMA ALAT MERK/TYPE JUMLAH PEMBUATAN TAHUN KONDISI ALAT KEPEMILIKAN STATUS
1 Laser Range Meter - PD40 Hilti 1 unit - Baik MilikSendiri
2 GPSMAP 60CSX Garmin 1 unit - Baik MilikSendiri
3 Welding Gauge MG8 / KW06-521 4 unit - Baik MilikSendiri
4 Taper Gauge Sinwa 4 unit - Baik MilikSendiri
5 Inspection Mirror LSH 141 - 1" 4 unit - Baik MilikSendiri
6 Water Pass OPT 12" Air Raksa 1 unit - Baik MilikSendiri
7 Hi - Lo Gauge - Walding GAGE - 1 unit - Baik MilikSendiri
8 Infrared Thermometer Krisbow / Fluke 3 unit - Baik MilikSendiri
9 Hardness Tester TH170 - Lime Ins 1 unit - Baik MilikSendiri
10 Gas Detector MX4 Ventis 2 unit - Baik MilikSendiri
11 Vibration Meter, Marlin Quick CMVL360 - SKF 1 unit - Baik MilikSendiri 12 Tachometer & Reflection Mark Compact A2109/LS 1 unit - Baik MilikSendiri 13 Dial Gauge with 2 Dial Indicator
1040S - 1 unit
- Baik MilikSendiri
14 Tachometer Krisbow KW06-563 2 unit - Baik MilikSendiri
15 Vibration Meter Smart Sensor
AR63A 1 unit
- Baik MilikSendiri
16 Sound Level Meter Krisbow KW06-290 2 unit - Baik MilikSendiri
17 Temperature & Humidity meter Krisbow KW06-561 1 unit - Baik MilikSendiri
18 Megger - 1000V Yokogawa 1 unit - Baik MilikSendiri
19 Insulation resistance tester Yokogawa 1 unit - Baik MilikSendiri
20 Grounding Tester Yokogawa 1 unit - Baik MilikSendiri
21 Lux Meter - 1 unit - Baik MilikSendiri
22 Insulation Checker Hammond 1 unit - Baik MilikSendiri
23 High-Voltage Insulation
resistance Musashi 1 unit - Baik MilikSendiri
24 Stick Ground Volt - 1 unit - Baik MilikSendiri
25 Theodolite Topcon 2 unit - Baik MilikSendiri
26 Autolevel Topcon 2 unit - Baik MilikSendiri
Daftar Peralatan Software JGC Indonesia, PT
NO. SOFTWARE NAME VER SOFT FUNGSI JUMLAH KEPEMILIKAN
1. Intergraph Smartsketch v.07.01 Engineering application 2 PT. JGC Indonesia 2 Intergraph SmartPlant Plant Design System v.7.2, v.2007, v.10 (2009), v.11 (2010),
v.12 (2011)
1 3 Intergraph PDS Plus (Isogen) v.7.2, v.2007, v.10 1 4 Plant Design System (Frameworks Plus) v.7.2, v.2007, v.10 1 5 Intergraph SmartPlant Review v.5, v.2008, v.2010 1 6 Intergraph SmartPlant 3D v.2009.1 HF8 0023
7 HTRI Exchanger v.6 1
8 Autodesk AutoCAD v.2011, v.2013 60
9 Autodesk Naviswork Manage v.2010, v.2011, v.2012, v.2013 3
10 Bentley Microstation v.8i 17
11 Bentley StaadPro v.2007, v.8i 4 series 15
12 Bentley US Std Design codes v.2007, v.8i 4 series 15 13 Bentley British Std Design Codes v.2007, v.8i 4 series 2 14 Bentley Eurozone Design Codes v.2007, v.8i 4 series 1
15 Nozzle/Pro v. 8.5 .80 1
16 Codeware Compress Build 7200, Build 7300, Build 7320 2
17 COADE PVElite v.2011, v.2012, v.2013 1
18 COADE Tank v.2011 (3.30), v.2012 (4.00) 1
19
ASME VIII-2 Vessel design Software
(Includes FEA-Nozzles)
1
20 COADE CAESAR II v.5.10 5
21 COADE CAESAR II v.6.2 (Upgrade from 5.2) 5
22 Tekla Structure v.19 1
23 ETAP Powestation v.7.2.0 1
24 e-DPP v.4.00 1
25 ZWCAD Professional v.2009 10
26 InstruCalc v.5.1 1
27 Microsoft Project 2003, 2007, 2010, 2013 Project Scheduling application 28 Microsoft Visual Studio 2005, 2008,2010 programming Developer
application 29 Microsoft Windows Server 2003, 2008 Server Operating System 30 Microsoft Threat Management Gateway 2010 Internet management application 31 Microsoft sharepoint 2010 Developer Software 32 Microsoft SQL Server 2008 Management Database 33 SQL Server CAL's 2008 Database connection license
34 Lotus Domino Lotus Mail 400
35 Primavera 6 v.7.0, v. 8.2 Project Scheduling 7
36 EndPoint Protection v .11.0 Anti Virus 500
37 IMSS 7.0 v. 7.0 Anti Spam Mail 51
38 KBOX Inventoy management 500
39 Filemaker Pro 10.0 v .10.0 File maker 1
40 Adobe In Design v . CS.5 Design Tools 1
41 Flaresym 3 flare simulation/design application 1
42 Pipenet 1.5 Fluid Flow Analysis 1
43 Cost X v. 3.51 project costing tool 1
44 Intergraph SmartPlant P&ID v.4.1 SP4 v.2007 SP5 HF4 Engineering application 14 Leased 45 Intergraph SmartPlant Review v.5 v.2008 Engineering application 24 Leased
NO. SOFTWARE NAME VER SOFT FUNGSI JUMLAH KEPEMILIKAN
v.2010
46 Intergraph SmartPlant 3D v.2009.1 HF8 0023 Engineering application 26 Leased 47 Intergraph SmartPlant Electrical V. 2009 SP 4 Engineering application 1 Leased 48 Bentley SACS Offshore Enterprise v.5.5 i Offshore Structural Analysis Methods 1 Leased 49 Bentley SACS Offshore Standard v. 5.5 i Offshore Structural Analysis Methods 4 Leased 50 Bentley SACS Fatigue v. 5.5 i Fatigue Analysis 1 Leased 51 COADE CAESAR II v.6.1 Engineering application 5 Leased
Daftar Pengalaman JGC Indonesia, PT
NO. NAMA PROYEK LINGKUP PEKERJAAN LOKASI PERIODE PELANGGAN TKDN
1. EPC Tuban Aromatics Plant Project EPC Tuban Aromatics Plant Project jawaTimur Tuban, 15 Dec 03 – 29 May 06 Corporation JGC - 2.
Tangguh LNG Project (Consortium with KBR & JGC Corporation)
Tangguh LNG Project (Consortium with KBR & JGC Corporation) Tanah Merah, Papua 6 Mar 05 – Bec 08 BP Berau Ltd - 3. Onshore Development Study LNG Plant Onshore Development Study LNG Plant
P. Tanibar, Indonesia Timur 9 Jun 06 – 30 Nov 06 InpexMasela Ltd -
4. Engineering Services LPG Recovery Project Engineering Services LPG Recovery Project JawaTimur Tuban, 2 Jul 07 – 20 Aug 07 Group Pte.Ltd Java Energy - 5. Balongan Revamping Phase-II (Consortium with PT. RekayasaIndustri) Balongan Revamping Phase-II (Consortium with PT. RekayasaIndustri)
Balongan,
Jawa Barat 1 Jul 07 – 31 Jan 09 PT. Pertamina RU-VI -
6. FEED Minas Surfactant FEED Minas Surfactant Minas, Riau, Sumatra 9 May 07 – 30 Oct 07
PT. Chevron Pacific Indonesia - 7. MLNG Dua De-Bottlenecking (MDD Project) MLNG Dua De-Bottlenecking (MDD Project) Bintulu, Sarawak 1 Feb 08 – 31 Jul 08 Malaysia LNG Sdn.Bhd. - 8. Eng, Proc& Construction Services LPG Recovery Eng, Proc& Construction Services LPG Recovery JawaTimur Tuban, 1 May 08 – Jun 09 LPG Indonesia PT. Tuban - 9.
Chevron Engineering Services for Company's Field Facility Dev.
Chevron Engineering Services for Company's Field Facility Dev.
Duri, Riau, Sumatra 4 Dec 09 – 3 Jan 12 PT. Chevron Pacific Indonesia -
10. Upgrade of PFD, P&ID for Onshore Operation Upgrade of PFD, P&ID for Onshore Operation
Grissik, Sumatra Selatan 19 Sep 08 – 18 Mar 09 Conoco Phillips Indonesia Inc.Ltd. -
11. FEED for LOBP Expansion Plant FEED for LOBP Expansion Plant Jawa Barat Kerawang, 24 Nov 08 – 1 Apr 10
PT. Idemitsu Lube Techno Indonesia
- 12. Dry Gas Manifold (Melor Phase-II) Dry Gas Manifold (Melor Phase-II) Sarawak Bintulu, 25 Nov 08 – 30 Apr 09 Malaysia LNG Sdn.Bhd. - 13. Feasibility Study for Sulphur Stack 25-SK-101 Feasibility Study for Sulphur Stack 25-SK-101 Jawa Barat Balongan, 21 Apr 09 – 31 Jul 09 PT. Pertamina RU-VI - 14. Pit Stop FCCU Pit Stop FCCU
Palembang, Sumatra Selatan 15 Jun 09 – 10 Jul 09 PT. Pertamina RU-III - 15. Floating Roof Tank Repair Floating Roof Tank Repair Jawa Barat Balongan, 9 Jul 09 – 15 Nov 09 Pertamina RU-VI - 16. FCCU Mechanical Issue TA2010 FCCU Mechanical Issue TA2010
Palembang, Sumatra
Selatan
5 Nov 09 – 4
Apr 10 Pertamina RU-III -
17.
Dry Gas Treater FCCU & Revamp Stab CAB unit for N-Hexan Production FEED PJ
Dry Gas Treater FCCU & Revamp Stab CAB unit for N-Hexan Production FEED PJ
Palembang, Sumatra
Selatan
3 Nov 09 – 27
Feb 10 Pertamina RU-III -
18.
Technical Assessment for Constructability of Temporary Stack F-2-02 HVU-II & HCU A&B
Technical Assessment for Constructability of Temporary Stack F-2-02 HVU-II & HCU A&B
Balikpapan, Kalimantan Timur 25 Jan 10 – 20 Feb 10 Pertamina RU-V - 19.
Engineering Services & Construction Advisor for Temporary Stack Furnace HCU
Engineering Services & Construction Advisor for Temporary Stack Furnace HCU Balikpapan, Kalimantan Timur 31 jan 10 – 20 Feb 10 Pertamina RU-V -
NO. NAMA PROYEK LINGKUP PEKERJAAN LOKASI PERIODE PELANGGAN TKDN
20. Vibration Analysis Piping Outlet 11-F-101 Vibration Analysis Piping Outlet 11-F-101 Jawa Barat Balongan, 28 Apr 10 – 26 May 10 Pertamina RU-VI -
21.
EPC Penanbahan Unit Sour Water Stripper di Refinery Unit V Balikpapan
EPC Penanbahan Unit Sour Water Stripper di Refinery Unit V Balikpapan Balikpapan, Kalimantan Timur 2 Sep 10 –
Feb 12 Pertamina RU-V -
22. Vapour Return By Pass Vapour Return By Pass
Tanah Merah, Papua
30 Oct 10 – 5
Oct 11 BP Berau, Ltd - 23. Support Services for LNG Trains Gorgon Support Services for LNG Trains Gorgon Australia Perth, 1 Oct 09 – 31 Mar 12
Kellog Joint Venture -
Gorgon
- 24. JCF Demo Plant Project JCF Demo Plant Project Karawang, Bekasi 1 Nov 09 – 31 Oct 11 Corporation JGC - 25. ASC Phase V Expansion Project ASC Phase V Expansion Project Jawa Barat Cilegon, 31 May 11 – 30 Nov 12 PT. Asahimas Chemical - 26.
EPCI Contract for Specific Works on LNG Facilities
EPCI Contract for Specific Works on LNG Facilities Tanah Merah, Papua 15 Feb 11 – 14 Aug 11 BP Berau Ltd. - 27.
EPCI Contract for Specific Works on LNG Facilities
EPCI Contract for Specific Works on LNG Facilities Tanah Merah, Papua 28 Jul 11 – 27 Jan 12 BP Berau Ltd. - 28. Provision of Consultancy Services For Detail Engineering Works for Dry Gas Diverter Manifold (DGDM) Project
Provision of Consultancy Services For Detail Engineering Works for Dry Gas Diverter Manifold (DGDM) Project
Malaysia 27 May 11 – 31 Jan 12 Malaysia LNG Sdn. Bhd. -
29. EPC DonggiSenoro LNG Project EPC DonggiSenoro LNG Project Sulawaesi Senoro, 31 Jan 11 – On going
PT. DonggiSenoro
LNG -
30.
Construction of Indonesia Lube Plant Project
Construction of Indonesia Lube Plant Project
Cikarang, Bekasi, Jawa Barat 16 Aug 10 – Mar 12 PT. JX Nippon Oil & Energy
Lubricant Indonesia - 31. PenggantianJalurPipaPe nerimaandanPenyaluran Avtur Di DPPU NgurahRai PenggantianJalurPipaPen erimaandanPenyaluranAvt ur Di DPPU NgurahRai Denpasar,
Bali On going Pertamina - 32.
FEED &Constructibility Project Revamping FCCU RU-III
FEED &Constructibility Project Revamping FCCU RU-III Plaju, Sumatera 8 April 11 – 21 Oct 11 Pertamina RU III - Plaju - 33.
EPCI Contract for Specific Works on LNG Facilities
EPCI Contract for Specific Works on LNG Facilities Tanah Merah, Papua 28 Jan 12 – 27 Jul 12 BP Berau Ltd. - 34.
EPCI Contract for Specific Works on LNG Facilities
EPCI Contract for Specific Works on LNG Facilities Tanah Merah, Papua 28 Jul 12 – 27 Jan 13 BP Berau Ltd. -