• Tidak ada hasil yang ditemukan

KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL DIREKTORAT JENDERAL MINYAK DAN GAS BUMI

N/A
N/A
Protected

Academic year: 2021

Membagikan "KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL DIREKTORAT JENDERAL MINYAK DAN GAS BUMI"

Copied!
5
0
0

Teks penuh

(1)

KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL

DIREKTORAT JENDERAL MINYAK DAN GAS BUMI

KEMAMPUAN USAHA PENUNJANG MIGAS

PT. JGC INDONESIA

STATUS PERUSAHAAN: NASIONAL

Akta Pendirian Perusahaan No. 4 tanggal 6 September 1974 oleh Notaris Tan Thong kie, SH. di Jakarta

dan Akta perubahan terakhir No.14 tanggal 17 Desember 2013 oleh Siti Safarijah, SH. di Jakarta,

sebagai berikut:

- Organisasi Perusahaan :

- KepemilikanSaham :

o Presiden Komisaris

: Masayuki Sato(WNA)

o Indonesia

:

1

%

o Presiden Direktur

: Nurdin Haris (WNA)

o Asing

:

99

%

o Direktur

: Eiji Shimo (WNA)

Shohei Miyauchi (WNA)

Husin Soleh (WNI)

Soeryadi (WNI)

Yoshikatsu Kutsumi (WNA)

SuratIjin Usaha JasaKonstruksi No:141/1/IU/II/PMA/PU/2012 oleh Badan Koordinasi Penanaman

Modal tanggal 4 Juli 2012 di Jakarta

Surat KeteranganTerdaftar (SKT) Migas No: 334/SKT-01/DMT/2013 tanggal 8 November 2013

Surat Kemampuan Usaha Penunjang Migas No.

4507/19.07/DMB/2014 tanggal 16 April2014

SISTEM MANAJEMEN :

Sistem Manajemen Mutu : ISO 9001 : 2008 Nomor: JKT0939638 tanggal 1 Desember 2012 olehLRQA

berlaku sampai dengan 30 November 2015

Sistem Manajemen Lingkungan: Lingkungan ISO 14001 : 2004 Nomor : JKT6001228 tanggal 23 Januari

2011 oleh LRQA berlaku sampai dengan 22 Januari 2017

Sistem Manajemen Keselamatan Kerja : OHSAS 18001 : 2007 Nomor : JKT6008916 tanggal 23 Juli

2010 oleh LRQA berlaku sampai dengan 22 Juli 2016

KEMAMPUAN PRODUKSI JASA:

JENIS

JASA BIDANG JASA KEMAMPUAN JASA

TENAGA KERJA KUALIFIKASI JUMLAH WNI WNA Konstruksi Terintegrasi Perencana Konstruksi Rancang design:

- Bangunan Gedung dan Pabrik - Jaringan, distribusi

danTransmisi

- Pembangkit Tenaga listrik - Perencanaan Umum

Pembuatan Kilang Minyak - Perencanaan Teknis

Pembuatan Kilang Minyak

TenagaAhli : Ahli Utama (WNI) - Manajemen Konstruksi - Teknik Mekanikal - Teknik Sipil - Teknik Elektrikal Ahli Madya (WNI) - Teknik Mekanikal - Teknik Elektrikal - Teknik Sipil - Manajemen Ahli Muda (WNI) - Manajemen Proyek - Tata Lingkungan - Teknik Elektrikal 1 1 2 1 5 4 3 6 10 1 1 - - - - - - - - - - - Pelaksana Konstruksi Sipil :

- Fasilitas Produksi Darat - Jalur Pipa dan Fasilitas

Pendukungnya - Gedung dan Pabrik - Bangunan pengolahan Air

Bersih dan Limbah - Dermaga, Penahan

Gelombang dan Penahan Tanah

Mekanikal/Elektrikal : - Tata Udara - Pembangkitan dan

JaringanTransmisiListrik - Instalasi kelistrikan dan Jasa

Kelistrikan

- Radio, Telekomunikasi, Sarana bantu navigasi laut/udara, rambu sungai dan peralatan SAR

- Pemasangan Jaringan

54 -

(2)

JENIS

JASA BIDANG JASA KEMAMPUAN JASA

TENAGA KERJA KUALIFIKASI JUMLAH WNI WNA Konstruksi Terintegrasi Pelaksana Konstruksi

Teknologi Informasi dan Telekomunikasi - Pemasangan dan Pemeliharaan Instrumentasi. Pengawas Konstruksi Pengawasan Manajemen Pembuatan Kilang Minyak Non

Konstruksi

Pengoperasian dan Pemeliharaan -

Perawatan Fasilitas Produksi Minyak dan Gas Bumi Penelitian dan

Pengembangan

Jasa Konsultasi :

- Studi Kelayakan Pembuatan Kilang Minyak

DAFTAR PERALATAN DAN PENGALAMAN TERLAMPIR

Kantor Pusat(status :miliksendiri) :

JI. TB Simatupang 7-B, Jakarta 12430 Telepon : (021) 2997 6500

Fax : (021) 2997 6599

E-Mail : info@jgc-indonesia.com

PenanggungJawab : Nurdin Haris (Direktur Utama) Contact Person : Ina Lestari

Daftar Peralatan JGC Indonesia, PT

NO. NAMA ALAT MERK/TYPE JUMLAH PEMBUATAN TAHUN KONDISI ALAT KEPEMILIKAN STATUS

1 Laser Range Meter - PD40 Hilti 1 unit - Baik MilikSendiri

2 GPSMAP 60CSX Garmin 1 unit - Baik MilikSendiri

3 Welding Gauge MG8 / KW06-521 4 unit - Baik MilikSendiri

4 Taper Gauge Sinwa 4 unit - Baik MilikSendiri

5 Inspection Mirror LSH 141 - 1" 4 unit - Baik MilikSendiri

6 Water Pass OPT 12" Air Raksa 1 unit - Baik MilikSendiri

7 Hi - Lo Gauge - Walding GAGE - 1 unit - Baik MilikSendiri

8 Infrared Thermometer Krisbow / Fluke 3 unit - Baik MilikSendiri

9 Hardness Tester TH170 - Lime Ins 1 unit - Baik MilikSendiri

10 Gas Detector MX4 Ventis 2 unit - Baik MilikSendiri

11 Vibration Meter, Marlin Quick CMVL360 - SKF 1 unit - Baik MilikSendiri 12 Tachometer & Reflection Mark Compact A2109/LS 1 unit - Baik MilikSendiri 13 Dial Gauge with 2 Dial Indicator

1040S - 1 unit

- Baik MilikSendiri

14 Tachometer Krisbow KW06-563 2 unit - Baik MilikSendiri

15 Vibration Meter Smart Sensor

AR63A 1 unit

- Baik MilikSendiri

16 Sound Level Meter Krisbow KW06-290 2 unit - Baik MilikSendiri

17 Temperature & Humidity meter Krisbow KW06-561 1 unit - Baik MilikSendiri

18 Megger - 1000V Yokogawa 1 unit - Baik MilikSendiri

19 Insulation resistance tester Yokogawa 1 unit - Baik MilikSendiri

20 Grounding Tester Yokogawa 1 unit - Baik MilikSendiri

21 Lux Meter - 1 unit - Baik MilikSendiri

22 Insulation Checker Hammond 1 unit - Baik MilikSendiri

23 High-Voltage Insulation

resistance Musashi 1 unit - Baik MilikSendiri

24 Stick Ground Volt - 1 unit - Baik MilikSendiri

25 Theodolite Topcon 2 unit - Baik MilikSendiri

26 Autolevel Topcon 2 unit - Baik MilikSendiri

(3)

Daftar Peralatan Software JGC Indonesia, PT

NO. SOFTWARE NAME VER SOFT FUNGSI JUMLAH KEPEMILIKAN

1. Intergraph Smartsketch v.07.01 Engineering application 2 PT. JGC Indonesia 2 Intergraph SmartPlant Plant Design System v.7.2, v.2007, v.10 (2009), v.11 (2010),

v.12 (2011)

1 3 Intergraph PDS Plus (Isogen) v.7.2, v.2007, v.10 1 4 Plant Design System (Frameworks Plus) v.7.2, v.2007, v.10 1 5 Intergraph SmartPlant Review v.5, v.2008, v.2010 1 6 Intergraph SmartPlant 3D v.2009.1 HF8 0023

7 HTRI Exchanger v.6 1

8 Autodesk AutoCAD v.2011, v.2013 60

9 Autodesk Naviswork Manage v.2010, v.2011, v.2012, v.2013 3

10 Bentley Microstation v.8i 17

11 Bentley StaadPro v.2007, v.8i 4 series 15

12 Bentley US Std Design codes v.2007, v.8i 4 series 15 13 Bentley British Std Design Codes v.2007, v.8i 4 series 2 14 Bentley Eurozone Design Codes v.2007, v.8i 4 series 1

15 Nozzle/Pro v. 8.5 .80 1

16 Codeware Compress Build 7200, Build 7300, Build 7320 2

17 COADE PVElite v.2011, v.2012, v.2013 1

18 COADE Tank v.2011 (3.30), v.2012 (4.00) 1

19

ASME VIII-2 Vessel design Software

(Includes FEA-Nozzles)

1

20 COADE CAESAR II v.5.10 5

21 COADE CAESAR II v.6.2 (Upgrade from 5.2) 5

22 Tekla Structure v.19 1

23 ETAP Powestation v.7.2.0 1

24 e-DPP v.4.00 1

25 ZWCAD Professional v.2009 10

26 InstruCalc v.5.1 1

27 Microsoft Project 2003, 2007, 2010, 2013 Project Scheduling application 28 Microsoft Visual Studio 2005, 2008,2010 programming Developer

application 29 Microsoft Windows Server 2003, 2008 Server Operating System 30 Microsoft Threat Management Gateway 2010 Internet management application 31 Microsoft sharepoint 2010 Developer Software 32 Microsoft SQL Server 2008 Management Database 33 SQL Server CAL's 2008 Database connection license

34 Lotus Domino Lotus Mail 400

35 Primavera 6 v.7.0, v. 8.2 Project Scheduling 7

36 EndPoint Protection v .11.0 Anti Virus 500

37 IMSS 7.0 v. 7.0 Anti Spam Mail 51

38 KBOX Inventoy management 500

39 Filemaker Pro 10.0 v .10.0 File maker 1

40 Adobe In Design v . CS.5 Design Tools 1

41 Flaresym 3 flare simulation/design application 1

42 Pipenet 1.5 Fluid Flow Analysis 1

43 Cost X v. 3.51 project costing tool 1

44 Intergraph SmartPlant P&ID v.4.1 SP4 v.2007 SP5 HF4 Engineering application 14 Leased 45 Intergraph SmartPlant Review v.5 v.2008 Engineering application 24 Leased

(4)

NO. SOFTWARE NAME VER SOFT FUNGSI JUMLAH KEPEMILIKAN

v.2010

46 Intergraph SmartPlant 3D v.2009.1 HF8 0023 Engineering application 26 Leased 47 Intergraph SmartPlant Electrical V. 2009 SP 4 Engineering application 1 Leased 48 Bentley SACS Offshore Enterprise v.5.5 i Offshore Structural Analysis Methods 1 Leased 49 Bentley SACS Offshore Standard v. 5.5 i Offshore Structural Analysis Methods 4 Leased 50 Bentley SACS Fatigue v. 5.5 i Fatigue Analysis 1 Leased 51 COADE CAESAR II v.6.1 Engineering application 5 Leased

Daftar Pengalaman JGC Indonesia, PT

NO. NAMA PROYEK LINGKUP PEKERJAAN LOKASI PERIODE PELANGGAN TKDN

1. EPC Tuban Aromatics Plant Project EPC Tuban Aromatics Plant Project jawaTimur Tuban, 15 Dec 03 – 29 May 06 Corporation JGC - 2.

Tangguh LNG Project (Consortium with KBR & JGC Corporation)

Tangguh LNG Project (Consortium with KBR & JGC Corporation) Tanah Merah, Papua 6 Mar 05 – Bec 08 BP Berau Ltd - 3. Onshore Development Study LNG Plant Onshore Development Study LNG Plant

P. Tanibar, Indonesia Timur 9 Jun 06 – 30 Nov 06 InpexMasela Ltd -

4. Engineering Services LPG Recovery Project Engineering Services LPG Recovery Project JawaTimur Tuban, 2 Jul 07 – 20 Aug 07 Group Pte.Ltd Java Energy - 5. Balongan Revamping Phase-II (Consortium with PT. RekayasaIndustri) Balongan Revamping Phase-II (Consortium with PT. RekayasaIndustri)

Balongan,

Jawa Barat 1 Jul 07 – 31 Jan 09 PT. Pertamina RU-VI -

6. FEED Minas Surfactant FEED Minas Surfactant Minas, Riau, Sumatra 9 May 07 – 30 Oct 07

PT. Chevron Pacific Indonesia - 7. MLNG Dua De-Bottlenecking (MDD Project) MLNG Dua De-Bottlenecking (MDD Project) Bintulu, Sarawak 1 Feb 08 – 31 Jul 08 Malaysia LNG Sdn.Bhd. - 8. Eng, Proc& Construction Services LPG Recovery Eng, Proc& Construction Services LPG Recovery JawaTimur Tuban, 1 May 08 – Jun 09 LPG Indonesia PT. Tuban - 9.

Chevron Engineering Services for Company's Field Facility Dev.

Chevron Engineering Services for Company's Field Facility Dev.

Duri, Riau, Sumatra 4 Dec 09 – 3 Jan 12 PT. Chevron Pacific Indonesia -

10. Upgrade of PFD, P&ID for Onshore Operation Upgrade of PFD, P&ID for Onshore Operation

Grissik, Sumatra Selatan 19 Sep 08 – 18 Mar 09 Conoco Phillips Indonesia Inc.Ltd. -

11. FEED for LOBP Expansion Plant FEED for LOBP Expansion Plant Jawa Barat Kerawang, 24 Nov 08 – 1 Apr 10

PT. Idemitsu Lube Techno Indonesia

- 12. Dry Gas Manifold (Melor Phase-II) Dry Gas Manifold (Melor Phase-II) Sarawak Bintulu, 25 Nov 08 – 30 Apr 09 Malaysia LNG Sdn.Bhd. - 13. Feasibility Study for Sulphur Stack 25-SK-101 Feasibility Study for Sulphur Stack 25-SK-101 Jawa Barat Balongan, 21 Apr 09 – 31 Jul 09 PT. Pertamina RU-VI - 14. Pit Stop FCCU Pit Stop FCCU

Palembang, Sumatra Selatan 15 Jun 09 – 10 Jul 09 PT. Pertamina RU-III - 15. Floating Roof Tank Repair Floating Roof Tank Repair Jawa Barat Balongan, 9 Jul 09 – 15 Nov 09 Pertamina RU-VI - 16. FCCU Mechanical Issue TA2010 FCCU Mechanical Issue TA2010

Palembang, Sumatra

Selatan

5 Nov 09 – 4

Apr 10 Pertamina RU-III -

17.

Dry Gas Treater FCCU & Revamp Stab CAB unit for N-Hexan Production FEED PJ

Dry Gas Treater FCCU & Revamp Stab CAB unit for N-Hexan Production FEED PJ

Palembang, Sumatra

Selatan

3 Nov 09 – 27

Feb 10 Pertamina RU-III -

18.

Technical Assessment for Constructability of Temporary Stack F-2-02 HVU-II & HCU A&B

Technical Assessment for Constructability of Temporary Stack F-2-02 HVU-II & HCU A&B

Balikpapan, Kalimantan Timur 25 Jan 10 – 20 Feb 10 Pertamina RU-V - 19.

Engineering Services & Construction Advisor for Temporary Stack Furnace HCU

Engineering Services & Construction Advisor for Temporary Stack Furnace HCU Balikpapan, Kalimantan Timur 31 jan 10 – 20 Feb 10 Pertamina RU-V -

(5)

NO. NAMA PROYEK LINGKUP PEKERJAAN LOKASI PERIODE PELANGGAN TKDN

20. Vibration Analysis Piping Outlet 11-F-101 Vibration Analysis Piping Outlet 11-F-101 Jawa Barat Balongan, 28 Apr 10 – 26 May 10 Pertamina RU-VI -

21.

EPC Penanbahan Unit Sour Water Stripper di Refinery Unit V Balikpapan

EPC Penanbahan Unit Sour Water Stripper di Refinery Unit V Balikpapan Balikpapan, Kalimantan Timur 2 Sep 10 –

Feb 12 Pertamina RU-V -

22. Vapour Return By Pass Vapour Return By Pass

Tanah Merah, Papua

30 Oct 10 – 5

Oct 11 BP Berau, Ltd - 23. Support Services for LNG Trains Gorgon Support Services for LNG Trains Gorgon Australia Perth, 1 Oct 09 – 31 Mar 12

Kellog Joint Venture -

Gorgon

- 24. JCF Demo Plant Project JCF Demo Plant Project Karawang, Bekasi 1 Nov 09 – 31 Oct 11 Corporation JGC - 25. ASC Phase V Expansion Project ASC Phase V Expansion Project Jawa Barat Cilegon, 31 May 11 – 30 Nov 12 PT. Asahimas Chemical - 26.

EPCI Contract for Specific Works on LNG Facilities

EPCI Contract for Specific Works on LNG Facilities Tanah Merah, Papua 15 Feb 11 – 14 Aug 11 BP Berau Ltd. - 27.

EPCI Contract for Specific Works on LNG Facilities

EPCI Contract for Specific Works on LNG Facilities Tanah Merah, Papua 28 Jul 11 – 27 Jan 12 BP Berau Ltd. - 28. Provision of Consultancy Services For Detail Engineering Works for Dry Gas Diverter Manifold (DGDM) Project

Provision of Consultancy Services For Detail Engineering Works for Dry Gas Diverter Manifold (DGDM) Project

Malaysia 27 May 11 – 31 Jan 12 Malaysia LNG Sdn. Bhd. -

29. EPC DonggiSenoro LNG Project EPC DonggiSenoro LNG Project Sulawaesi Senoro, 31 Jan 11 – On going

PT. DonggiSenoro

LNG -

30.

Construction of Indonesia Lube Plant Project

Construction of Indonesia Lube Plant Project

Cikarang, Bekasi, Jawa Barat 16 Aug 10 – Mar 12 PT. JX Nippon Oil & Energy

Lubricant Indonesia - 31. PenggantianJalurPipaPe nerimaandanPenyaluran Avtur Di DPPU NgurahRai PenggantianJalurPipaPen erimaandanPenyaluranAvt ur Di DPPU NgurahRai Denpasar,

Bali On going Pertamina - 32.

FEED &Constructibility Project Revamping FCCU RU-III

FEED &Constructibility Project Revamping FCCU RU-III Plaju, Sumatera 8 April 11 – 21 Oct 11 Pertamina RU III - Plaju - 33.

EPCI Contract for Specific Works on LNG Facilities

EPCI Contract for Specific Works on LNG Facilities Tanah Merah, Papua 28 Jan 12 – 27 Jul 12 BP Berau Ltd. - 34.

EPCI Contract for Specific Works on LNG Facilities

EPCI Contract for Specific Works on LNG Facilities Tanah Merah, Papua 28 Jul 12 – 27 Jan 13 BP Berau Ltd. -

Referensi

Dokumen terkait

Hal ini akan sangat memungkinkan untuk terjadinya stres, yang akhirnya dapat membuat kebugaran seseorang mudah menurun, mudah mengalami keletihan, gangguan tidur, kecemasan,

No,56 l Selasa, 10 Juni 2014 l Tahun ke-1 Kriminal Halaman 4-6-8 mobil dijual GudanG Rumah mantan IstRI PRabowo teRbakaR 2 Hal 9 Hal.. Pemulung Cari sampah temukan

tentang keterangan tentang koleksi yang dimiliki oleh perpustakaan anggota jaringan beserta keterangan keberadaanya selama lebih beberapa tahun. Selama lebih dari

Sebagai suatu kelompok kecil, dalam kelompok tani terjadi proses komunikasi antar individu anggota kelompok, dan terjadilah proses pertukaran pesan yang bersifat dyadic..

sponge Xestospongia sp2 dan Phyllospongia sp1 yang dikoleksi dari perairan Flores serta satu jenis sponge yang dikoleksi dari perairan Jepara yaitu sponge dengan kode UP8

dahulu sampai terkoneksi dengan internet sebelum memasang router wireless outdoor, nantinya salah satu wireless outdoor akan berfungsi sebagai access point master yang di

- Menunjukkan perilaku rasa ingin tahu, peduli lingkungan, kerjasama, jujur, percaya diri, dan mandiri dalam berkarya seni budaya dan prakarya - Memahami keragaman karya

(3) Kata-kata bahasa Bali yang berasal dari bahasa lainnya (bahasa daerah lain, bahasa Indonesia, bahasa asing) selain bahasa Kawi/Jawa Kuna dan Sanskerta ditulis