• Tidak ada hasil yang ditemukan

WINS take delivery of SMS Steady amidst challenging times for the industry

N/A
N/A
Protected

Academic year: 2017

Membagikan "WINS take delivery of SMS Steady amidst challenging times for the industry"

Copied!
2
0
0

Teks penuh

(1)

PT ratio i

WINTERMAR

Kebayoran Lam karta 11560 Ind

: 62 21 530 x : 62 21 530 ww.wintermar.c

NS takes

dst cha

ustry

ermar group h esian built An is chartered ng in the Natu ed through a cing from a for

ness conditio e late 2015 the y low base. year, like H mina. Howev ared to the p r pressure du ok for oil. S ctation of bette

ook

e short term, t considerati uction; the pos of business; down in econo

donesia, gove ove terms for th

donesia, there opment projec starting activ ated an increa 15, with projec 18-2019 under

egy

will continue se ok loss, to rais at end Dece yment between

s approximate

R OFFSHORE

ma No 155 donesia 0 5201 / 2

0 5203 com

s deliver

allenging

as taken deliv nchor Handlin to a multina una area for a

combination reign bank.

ons

ere has been a Some project Husky CNOO ver, activity peak in 2013.

e to oversup So far the 1st

er utilization b

there is a lack ons: OPEC’ ssibility of mo Iran’s ramp omic growth a ernment regu he oil contract

e are glimmer cts which were vity again. SK ase in upstrea ctions for som rpinning activi

elective vesse se cash for re

mber 2015 w n 2016 and 2 ely 63%. We

E MARINE Tbk

ry of SM

g times

very of SMS S ng Tug (AHT) ational oil an a 5 year contra n of internal

a pick up in a ts have starte OC, Santos,

is still at a Rates have ply of vessels

t Quarter has

ut at lower rat

k of visibility b s unwillingn ore high cost up in oil pro and how long ulation and th

tors to attract

rs of optimism e put on hold KK Migas and m spending in e new output ity.

l sales where eserves. The was US$ 121 2021, and the have secured

k

NEW

3 F

MS Stea

for t

Steady, our la ) with 4400 B nd gas comp act. The vess

cash and b

ctivity, albeit f ed or are star , Petronas very low l e continued to

s and a nega s started with tes.

because there ness to red producers go oduction; Chi

that will last; he willingness investment in

m as some of since 2014 se d Pertamina h

n 2016 compa coming onstre

possible, eve outstanding b million, due Group’s Gea a working ca

WSLETTER

February 2

ady

NS terim

uasi indu

up Wintermar

dling Tug (AH

0 BHP. Kapa yak dan gas gan kontrak s binasi kas inte

disi Bisnis k akhir 2015, gat rendah. Be n ini, seper amina. Namu ah dibandingk h terus mene ai kapal dan

rtal I telah dim pi dengan tarif

ook

am jangka p yaknya pertim

uksi; adanya ar dari bis ambatnya per angsungnya;

ginan untuk k menarik inve

ndonesia, ter ek pengemba ah mulai bera

gindikasikan a 6 dibandingka yak dalam per

tegi mi akan mela

ungkinkan, m mperoleh kas s nasi pada akh n jatuh tempo

ma SMS

ustri yang

r telah mener

HT) terbaru k al ini disewa multinasiona elama 5 tahu ernal dan pinja

, telah terjadi eberapa proye rti Husky C un, aktivitas kan dengan p erus dalam t prospek nega mulai dengan

f yang lebih re

pendek, kura bangan: keen kemungkinan nis; menanj rtumbuhan ek

dan di Indon memperbaiki estasi.

rdapat secerc angan yang d aktivitas lagi.

adanya pening an 2015, deng iode 2018-201

njutkan menj meskipun ru sebagai cadan

ir Desember 2 o antara 201

NO

S Steady

g sedang

rima SMS Ste kami, buatan akan kepada al yang beke n. Kapal terse aman dari ban

peningkatan ek telah dimul

NOOC, Sant masih pada puncaknya pad tekanan deng atif dari minya perkiraan utili endah.

ang dapat ngganan OPEC

n pelaku prod aknya produ konomi China nesia, peratur persyaratan

cah optimisme ditunda sejak

SKK Migas d gkatan penge gan proyeksi 19 yang mend

ual kapal-kap gi secara ngan. Pinjama 2015 sebesar 6-2021, dan

. 47/NL/II/2

y di ten

menanta

eady, kapal A

Indonesia, d suatu perus rja di area N ebut didanai m nk asing.

aktivitas, me ai atau dimula tos, Petrona

level yang da tahun 2013 gan memblud ak. Sampai sa isasi yang leb

diramalkan C untuk meng duksi berbiaya uksi minyak a dan berapa ran pemerinta kontraktor m

e karena be k 2014 keliha dan Pertamina

luaran sektor untuk mengha dorong aktivita

pal tertentu a nilai buku, an bank yang r US$ 121 juta

rasio Gearing 2016

ngah

ang

Anchor

dengan sahaan Natuna melalui

eskipun ai pada s dan sangat 3. Tarif daknya aat ini, bih baik

karena gurangi a tinggi Iran; a lama ah dan minyak

berapa atannya a telah hulu di

asilkan as.

(2)

PT

Jl K Jak Tel Fax ww

financ 2015 50 mi

At the totale

For fu

DISCL

Certain relating stateme future e makes n offering securitie Compan

WINTERMAR

Kebayoran Lam karta 11560 Ind

: 62 21 530 x : 62 21 530 ww.wintermar.c

cing line for u was reduced llion and we e

e end of De d USD 190 m

urther informat

AIMER

statements made to business and op ents are not guaran events that may not no commitment, an of securities in a es legislation of an ny.

R OFFSHORE

ma No 155 donesia 0 5201 / 2

0 5203 com

up to US$ 10 to US$ 13 mi expect to spen

cember 2015 illion.

tion, please co

in this publication perations of PT Wi ntees of future perfo

t prove to be accur nd disclaims any du

ny jurisdiction. The ny jurisdiction appl

E MARINE Tbk million. Our llion from an i nd US$ 6 millio

5 our total co

ontact:

involve a number ntermar Offshore M ormance and involv rate. Therefore, act uty, to update or re e information cont icable to the Com

k

r Capex spen initial plan of U on in 2016.

ontracts on h

Ms P

In

PT Winter Tel (62-Email: investo

of risks and unce Marine Tbk and Sub ve risks, uncertaint

tual outcomes and evise any of these ained in this publi pany and should n

d in US$

sekit kerja 2015 US$ selam

hand Sam diper

Untu

Pek Swan Lay

nvestor Relatio

mar Offshore -21) 530 5201 or_relations@

rtainties that could bsidiaries (the Com ies and assumption results may differ statements. This p cation is not inten not be relied upon

tar 63%. Kam a sampai den 5 dikurangi m 50 juta dan k ma tahun 201

mpai dengan a roleh adalah s

uk informasi ta

yanto

ons

Marine Tbk Ext 401 wintermar.com

d cause actual resu mpany) are based o ns that are difficult materially from wh publication is for inf nded to qualify, su for the purpose o

mi telah mem gan US$ 10 enjadi US$ 1 kami perkiraka

6.

akhir Decemb sebesar USD

ambahan, silah

m

ults to differ mater on management’s e to predict. Certain hat is expressed or formational purpos pplement or amen of making investme

NO

peroleh fasilit juta. Pengelu 3 juta dari ren an akan meng

er 2015, total 190juta.

hkan hubungi

rially from those pr expectations, estim statements are bas forecasted in such es only and is not nd information disc ent decisions conce

. 47/NL/II/2

tas pinjaman uaran modal s

ncana awal s habiskan US$

l kontrak yang

:

rojected. Certain st mates and projection sed upon assumpti h statements. The C

intended as a solic closed under corpo erning any securiti

2016

modal selama ebesar $ 6 juta

g telah

Referensi

Dokumen terkait

Penggunaan logam sebagai bahan struktural diawali dengan besi tuang untuk bentang lengkungan ( arch ) sepanjang 100 ft (30 m) yang dibangun di Inggris pada tahun 1777 – 1779,

Sejarah enam desa tidak dapat dipisahkan dengan rangkaian kejadian, seperti: kebijakan transmigrasi tahun 1975, konflik kekerasan di Maluku Utara tahun 1999- 2000,

ingin tahu, objektif, jujur, teliti, cermat, tekun, hati-hati, bertanggung jawab, terbuka, kritis, kreatif, inovatif dan peduli lingkungan) dalam aktivitas sehari-hari

Bukti kontrak pengalaman paling sedikit 1 (satu) pekerjaan sebagai Penyedia dalam kurun waktu 4 (empat) tahun terakhir, baik di lingkungan pemerintah maupun swasta termasuk

According to them, there are still much low- income families (MBR) who need help from the government regarding meeting the needs of houses. Some suggestions from respondents

accelerometer berupa data axis yang memiliki 3 data axis, yaitu axis X, axis Y, dan axis Z. Nilai dari axis X akan digunakan untuk masukkan nilai variabel yang

Bahwa Penilaian meliputi Pembuatan Program melalui Master dengan bobot Cam 20% , Pembuatan Produk melalui Mesin CNC dengan bobot 75% dan Keselamatan kerja bobotnya sebesar

“Mengenai pembinaan atau pembentukan karakter religius banyak sekali hal-hal yangperlu dilakukan baik perencanaan maupun pelaksanaannya.UntukPondok pesantren