• Tidak ada hasil yang ditemukan

Selanjutnya

N/A
N/A
Protected

Academic year: 2017

Membagikan "Selanjutnya "

Copied!
5
0
0

Teks penuh

(1)

A.I.D. PROJECT NO. 497-0347 A.I.D. LOAN NO. 497-T-092 A.I.D. LOAN NO. 497-T-092A A.I.D. LOAN NO. 497-T-092B A.I.D. LOAN NO. 497-T-092C

AMENDMENT NO. 4 TO

PROJECT LOAN AGREEMENT

BETWEEN THE

REPUBLIC OF INDONESIA

AND THE

UNITED STATES OF AMERICA

FOR

SMALL SCALE IRRIGATION MANAGEMENT

(2)

Dated: August 7, 1987

This AMENDMENT NO. 4, is entered into between the REPUBLIC OF

INDONESIA ("Borrower") and the UNITED STATES OF AMERICA, acting

through the AGENCY FOR INTERNATIONAL DEVELOPMENT ("A.I.D.").

WHEREAS, the Borrower and A.I.D. entered into a Small Scale

Irrigation Management Project Loan Agreement designated as A.I.D.

Loan No. 497-T-092 on August 28, 1985, which was amended on May 30,

1986, on August 28, 1986, and on September 25, 1986 ("Loan

Agreement"), whereby A.I.D. agreed to lend to the Borrower up to

Thirty Four Million Six Hundred Thirty Three Thousand United States

("U.S.") Dollars ($34,633,000) ("Loan"); and

WHEREAS, the Borrower and A.I.D. desire to amend the Loan

Agreement to reduce the current amount of the Loan by Seventeen

Million United States Dollars ($17,000,000);

NOW THEREFORE, the Borrower and A.I.D. hereby agree as follows:

1. The first paragraph of Section 3.1. of the Loan Agreement is

revised to read as follows:

"Section 3.1. The Loan. To assist the Borrower to meet the

costs of carrying out the Project, A.I.D., pursuant to the Foreign

Assistance Act of 1961, as amended, agrees to lend to the Borrower

under the terms of this aァイ・・ュセョエ@ not to exceed Seventeen Million

Six Hundred Thirty Three Thousand United States ("U.S.") Dollars

($17,633,000). The aggregate amount of disbursements under the Loan

is referred to as "Principal"."

2. A revised page 13 of Annex 1, Amplified Project Description,

(3)

- 2

-3. Except as amended herein, the Loan Agreement is ratified,

confirmed and continued in full force and effect in accordance with

all of its terms.

IN WITNESS WHEREOF, the Borrower and the United States of

America, each acting through its respective duly authorized

representative, have caused this Amendment No. 4 to be signed in

their names and delivered as of the day and year first above written.

REPUBLIC OF INDONESIA

Signed

Rusli Noor

Director General

for Foreign Economic Relations Department of Foreign Affairs

UNITED STATES OF AMERICA

Signed

Uavid'N: Metjrill Director

(4)

REVISED PAGE 13 OF ANNEX 1

groundwater drilling rigs and parts; survey and hydrometeorological equipment; specialized office furnishings and equipment; computers; miscellaneous groundwater supplies and commodities.

Locally procured commodities and equipment will be 50% loan financed, with the remainder from the GO!. Vehicles procured under the project will be assigned to technical assistance contractors when required.

B. Government of Indonesia Contribution

It is anticipated that the GO! will finance 50% of the

construction costs of the surf ace and groundwater systems. The GO! will finance all land compensation costs, all staff and salary costs including any increased costs for Section Office Staff, operating costs of all offices including the South Sulawesi groundwater unit and O&M costs for primary and secondary systems during and after the period of construction of the irrigation systems. The GO! will also finance any identifiable taxes associated with the project,

including any taxes on the procurement of goods and services.

With regard to training, in consideration of the GOI's current budget shortfall, USAID will finance pre-departure costs for

overseas training, including in-country per diem, domestic airfare , and English language training and international airfare. The GO! will finance the exit tax and salary of participants while in

training.

C. Illustrative Financial Plan

The attached financial plan is illustrative and changes may be made to it by representatives of the parties named in Section 9.2 of the Project Loan Agreement or Section 8.2 of the Project Grant

Agreement without fonnal amendment to the Agreement. Adjustments of up to 15% in any line may be agreed to by authorized representatives of the Parties. However, any such changes may not cause (1)

(5)

REVISED FINANCIAL PLAN

C A T E G 0 R Y

1. Construction, Surface Water

2. Construction, Ground Water 3. Equipment and Commodities 4. Training

5. Special Studies 6. Technical Assistance 7. Contingency

T 0 T A L S

)

SMALL SCALE IRRIGATION MANAGEMENT PROJECT 497-0347

SUMMARY COST ESTIMATES (U.S. $000)

セ@

'-I-

A.I.D.

I

OBLIGATIONS

I

REVISED

I

FUTURE YEARS

I

I

I

I

TO DATE

I

OBLIGATIONS

I

OBLIGATION

I

A.I.D.

I

G 0 I

I

PROJECT

I

I

I

ANTICIPATED**! TOTAL

I

TOTAL

I

TOTAL

I

GRANT

I

LOAN

I

GRANT

I

LOAN*

I

LOAN

I

GRANT

I

LOAN

I

I

,--1

21 ,335 -

I

5 ,835

I

17 ,030

I

-

I

22 ,865

I.

28 ,536***

I

51 ,401

I

I

I

I

I

.

I

I

I

I

I

I

4,ooo -

I

2,000

I

3,550

I

-

I

5,550

I

10,650***

I

16,200

I

I

I

I

I

I

I

I

I

I

l

3,333 -

I

3,333

I

-

I

-

I

3,333

I

228

I

3,561

I

I

l

I

I

I

I

l

I

I

I

900 -

I

1 ,400

I

-

I

-

I

1 ,400

I

272

I

1 ,6 72

I

I

I

I

I

955

I

400 955

I

400

I

l , 1 oo

I

955

I

1 ,500

I

-

I

2 ,455

I

I

I

I

I

6,045

I

2,783 6,045

I

2,783

I

1,617

I

6,045

I

4,400

I

-

I

10,445

I

I

I

I

I

I

1 ,882 -

I

l ,882

I

2 ,070

I

-

I

3 ,952

I

-

I

3 ,952

I

I

I

I

I

I

I

MNMMMMMMNMMMMNMMMMMMMセMMMM

I

7,ooo

I

34,633

I

7,ooo

I

17,633

I

25,367

I

7,ooo

I

43,ooo

I

39,686

I

89,686

I

I

I

I

I

I

I

I

*

Includes $17 Million reduction in current amount of loan.

** ***

Referensi

Dokumen terkait

Lessons from the Big Six – closing the immunity gap for measles elimination and rubella/CRS control [New Delhi]: World Health Organization, Regional Office for South-East

Mempromosikan kompetensi siswa SMK dalam hal Agribisnis Ayam Pedaging (Broiler) kepada dunia usaha/industri dan masyarakat pada umumnya.. Ruang

Guru harus memberikan latihan kepada siswa dan memotivasi siswa agar mereka berani tampil ke depan kelas untuk mengkomunikasikan hasil kesimpulan pada materi yang

Sehubungan dengan keikutsertaan perusahaan saudara dalam pelaksanaan Pelelangan paket Pekerjaan Pengadaan dan Pemasangan Pagar Pengaman Jalan Ruas Boso - Kao Sumber

Penjamin akan membayar kepada Penerima Jaminan sejumlah nilai jaminan tersebut di atas dalam waktu paling lambat 14 (empat belas) hari kerja tanpa syarat (Unconditional)

S1 : Bingung aku jawabnya bu, tapi justru saat aku hamil ini suami aku, jarang berkomunikasi dan jarang bertemu, karena urusan kerjaan aku padat. Hari- hari aku lewati dengan

Metode regresi dengan variabel dummy sangat umum digunakan untuk data berjenis nonmetrik maupun metrik, dimana data telah diperoleh melalui pengurutan maupun penilaian

Sekolah yang mengadakan kunjungan ke Makam RA Kartini adalah SMPN 2 Rembang b.. Siswa SMPN 2 Rembang yang mengikuti kunjungan sebanyak