A. Introduction
The practical test is included 2 parts: part 1and part 2 - Part 1 Bricklaying and finishing joint,no plastering :
+ Bricklaying :
Bricklaying complex - structure with clay bricks of 60 x 100 x 215 mm, and concrete block no plastering.
Time: 9 hours. - Part 2 are included 2 works:
+ Bricklaying :
Bricklaying complex - structure with clay bricks of 60 x 100 x 215 mm, and concrete blocks 100 x 200 x 440 mm.
Time: 6 hours. + Plastering:
Plastering complex - structure Time: 1 hour.
Time allowed for 2 parts is 16 hours over the 3 days of competition.
B. Project information
Projects have designed to incorporate the following technical skills: 1. Excution of drawings.
2. Measurement and marking out. 3. Leveling and plumbing.
4. Cutting and shaping bricks using traditional hand tool and masonry saws. 5. Building walls in accordance to plans including all decorative work. 6. Joints finishing.
7. Work cleanliness.
8. Bricklaying of part 1 commences on day one and second day. 9. Part 2 commences on the second day and third day.
10. Plastering of part 2 commences on the third day.
11. Marking for bricklaying of the part 1 will commence on the first evening or the second morning and evening.
12. Marking for bricklaying of the part 2 will commence on the third afternoon and evening.
13. The plastering of the part 2 will be marked on the third afternoon or morning. 14. Final marks may not be known until the end of the competition.
15. Final marking will be at the end of day 3 and be completed the day following the competition.
C. Specification
1. All brickwork to be set out and constructed to dimensions, bonds and angles as specified on the drawings.
2. All decorative and practical details to be constructed to projections, angles, radii and overhangs as shown on drawings.
3. All cut bricks to be produced accurately to shape required whilst maintaining 10 mm perpend joints.
4. All bricks to be laid showing best face and arises.
5. All brickwork to be taken up maintaining plumb level in alignment and to the correct angles.
6. Brickwork to be taken up to a vertical gauge.
7. Cut faces where possible to be concealed in wall, not shown on back. 8. All details to be built as per instructions available on the drawings. 9. Bricklaying mortar :
Cement - sand mortar (1 PC : 3 Sand) or Drymix (MU or SIKA Plastermix Produk) 10. Plastering Mortar :
Cement - sand mortar (1 PC : 2,5 Sand) or Drymix (MU or SIKA Plastermix Produk).
D. Instruction to competitors
1. Time allowed is 16 hours finishing 2 parts. 2. Requirement for competitors
It is 10 minutes prior to the commencement of competition, competitors will be provided materials, and know the position as they drow lots.
Competitors are not allowed to ask about the drawing and method of construction during the competition.
Competitors are not allowed to mark any symbols on their products .If they do so, their products will not be marked.
When the time is over, competitors must announce to the expert about their products.
Materials are available at site and competitors will be helped to do cleaning.
Competitors to check the measuring tools.
Competitors to wear safety clothes suitable with their work.
If there’s any problem, competitors to speak to the expert for help.
Competitors are not allowed to leave the competition without permission. 3. Materials
Clay Brick (Batu bata pres) 60 x 100 x 215 mm.
Light Brick (Bata ringan) 100 x 200 x 440 mm.
Drymix/SIKA/MU (adukan kering siap pakai).
4. Tools and means of production
a. The competitor must bring the remaining tools in a toolbox (Peralatan yang harus dibawa peserta) :
Brick trowel (cetok pasang bata)
Plastering trowel (cetok plesteran)
Pointing trowel (cetok lidah/lancip)
Wooden float (roskam kayu)
Measuring (meteran)
Hammer (palu)
Leveling (Waterpass 50 cm)
Leveling (waterpass) 100 or 120 mm
Square (siku baja)
Line bobbins (penahan benang)
Plumb line (unting-unting)
Jointer (pembentuk nat)
Hand saw (gergaji tangan)
Helmed (helm)
Safety footwear (sepatu kerja)
Safety clothes (pakaian kerja)
Eye protection (kacamata pengaman)
Masker (penutup debu)
b. The committee must be prepare the remaining tools for competitors (peralatan yang disediakan panitia) :
Folding rule (Jidar aluminium 200 cm)
Hoe (cangkul)
Mortar box (kotak adukan)
Pail (ember)
Tub stock water (bak tandon air)
Electric cutting brick machine (mesin pemotong bata)
Water hose (selang air)
Wood (papan kayu 10 x 100 x 1000 mm)
E. Test Project marking
The experts will decide together on the marking criteria and the dimensional tolerances.
1. Marking Criteria Building the part 1 and 2 :
Basic dimension
Structure
Joint thickness
Vertically
Flatness
Perpendicular
Leveling
Solid of joint
Cutting
Working productivity
2. Marking Criteria Plastering :
Vertically
Flatness
Smoothness
Productivity
The experts with every competitors the best during the competition.
“Good luck”
LEMBAR INFORMASI
LKS TINGKAT NASIONAL KE XXV TAHUN 2017
BIDANG LOMBA BRICKLAYING
1. PEBIMBING :
Mengikuti Teknikel Meeting sebelum pelaksanaan lomba dengan waktu dan tempat ditentukan kemudian.
Diperkenankan membantu kompetitor dalam penyiapan peralatan sebelum pelaksanaan perlombaan.
Diperkenankan membantu kompetitor dalam pembersihan lokasi dan perapihan bahan serta peralatan setelah selesai lomba.
Dilarang membantu dalam bentuk apapun kepada kompetitor ketika lomba berlangsung, kecuali seijin Juri.
Diperkenankan melihat prosesi penilaian dengan tidak mengganggu atau intervensi terhadap keputusan Juri.
Membantu menciptakan suasana meriah dan kekeluargaan diantara sesama Pebimbing, Kompetitor, Juri dan semua yang terlibat dalam pelaksanaan lomba dengan tidak mengganggu kompetitor.
2. KOMPETITOR :
Mengikuti Teknikel Meeting sebelum pelaksanaan lomba dengan waktu dan tempat ditentukan kemudian.
Datang 15 menit sebelum lomba dimulai.
Mempersiapkan peralatan dan bahan dengan atau tanpa bantuan Pebimbing.
Mengikuti lomba dengan tertib dan tidak mengganggu sesama kompetitor pada waktu berjalannya lomba.
Menggunakan alat pelindung diri (APD) : kacamata, masker, dan penutup telinga pada waktu memotong batu bata/bata ringan.
Jika menemui masalah harus melapor kepada Juri.
Tidak diperkenankan berbicara dengan Juri kecuali pada waktu istirahat dan Ishoma.
Wajib membersihkan lokasi lomba, menata bahan dan peralatan setiap lomba telah selesai.
JADWAL KOMPETISI BIDANG LOMBA BRICKLAYING
LKS TINGKAT NASIONAL KE XXV TAHUN 2017
TGL ...
NO
HARI/TGL
JAM
KEGIATAN
KETERANGAN/
WAKTU
1
1
13.00-17.00
Technical meeting
dilanjutkan
pesiapan dan
pemotongan bata
2
2
08.15-10.15
Kompetisi
2 jam
10.15-10.30
istirahat
10.30-12.00
Kompetisi
1jam 30 menit
12.00-13.00
Isoma
13.00-15.00
Kompetisi
2 jam
15.00-15.15
istirahat
15.15-16.45
Kompetisi
1 jam 30 menit
Jumlah 7 jam
3
3
08.15-10.15
Kompetisi
2 jam
10.15-10.30
istirahat
10.30-12.00
Kompetisi
1jam 30 menit
12.00-13.00
Isoma
13.00-15.30
Kompetisi
2 jam
15.00-15.15
istirahat
15.15-16.45
Kompetisi
1 jam 30 menit
Jumlah 7 jam
4
4
08.15-10.15
Kompetisi
2 jam
11.00-17.00
Penilaian
Juri
DAFTAR KEBUTUHAN ALAT
LKS NASIONAL KE XXV TAHUN 2017
(ESTIMASI PESERTA 24 ORANG)
BIDANG LOMBA: BRICKLAYING
No. Nama Bahan Spesifikasi Jumlah Satuan Harga Satuan Jumlah Harga Keterangan
1 Cangkul Umum/biasa 24 buah Rp 35.000,00 Rp 840.000,00 2 Kotak adukan Kayu/plastik uk.40 x 60 cm 24 buah Rp 40.000,00 Rp 960.000,00 3 Ember Plastik/karet 30 buah Rp 7.500,00 Rp 225.000,00 4 Tandon air Kapasitas 250 liter 1 buah Rp 300.000,00 Rp 300.000,00 5 Selang air Plastik 20 meter Rp 10.000,00 Rp 200.000,00 6 Jidar aluminium 20 x 60 x 2000 mm 24 buah Rp 40.000,00 Rp 960.000,00 7 Mesin Pemotong bata Elektrik 12 buah Rp 10.000.000,00 Rp 120.000.000,00 8 Papan kayu 20 x 100 x 1500 mm 48 buah Rp 15.000,00 Rp 720.000,00
Jumlah Total : Rp 124.205.000,00
Bandung, 18 Oktober 2016
DAFTAR KEBUTUHAN BAHAN
LKS NASIONAL KE XXV TAHUN 2017
(ESTIMASI PESERTA 24 ORANG)
BIDANG LOMBA: BRICKLAYING
No. Nama Bahan Spesifikasi Jumlah Satuan Harga Satuan Jumlah Harga Keterangan
1 Batu bata (Warna merah) Bata pres 60 x100 x 215 mm 5160 buah Rp 6.500.00 Rp 33.540.000,00
Batu bata kuning dengan cat Bata pres 60 x100 x 215 mm 2100 buah Rp 7.000.00 Rp 14.700.000,0 0
2 Bata ringan (Hebel) 100 x 200 x 600 mm 12 m3 Rp 800.000,00 Rp 9.600.000,00
3 Drymix/SIKA/MU Untuk pasangan bata dan plester 290 zak Rp 65.000,00 Rp 18.850.000,00
Jumlah Total : Rp 76.690.000,00
Bandung, 18 Oktober 2016
LOMBA KOMPETENSI SISWA (LKS)
SEKOLAH MENENGAH KEJURUAN
TINGKAT NASIOANAL KE XXV TAHUN 2017
Penilaian obyektif : KETEPATAN Trade : BRICKLAYING (Part 1)
Nama/No:
Piece
Position Marking Aspek
Interval of deviasion (mm) Value @ deviasion Score Total deviasion Calculation
1 Ukuran tinggi pasangan bata 140 cm
1s/d10 0,15 1,5 1,5 2 Ukuran panjang keseluruhan 170
cm
1s/d10 0,15 1,5 1,5 3 Ukuran tinggi 50 cm 1s/d10 0,15 1,5 1,5 4 Ukuran panjang 60 cm 1s/d10 0,15 1,5 1,5 5 Ukuran panjang 55 cm 1s/d10 0,15 1,5 1,5 6 Kesikuan luar samping kanan 1s/d10 0,15 1,5 1,5 7 Kesikuan dalam samping kanan 1s/d10 0,15 1,5 1,5 8 Kesikuan luar samping kiri 1s/d10 0,15 1,5 1,5 9 Kesikuan dalam samping kiri 1s/d10 0,15 1,5 1,5 10 Ketegakan samping kanan 1s/d10 0,15 1,5 1,5 11 Ketegakan samping kanan depan 1s/d10 0,15 1,5 1,5 12 Ketegakan tengah depan kanan 1s/d10 0,15 1,5 1,5 13 Ketegakan tengah samping
kanan depan
1s/d10 0,15 1,5 1,5 14 ketegakan tengah samping kanan
belakang
1s/d10 0,15 1,5 1,5 15 Ketegakan samping kiri 1s/d10 0,15 1,5 1,5 16 Ketegakan samping kiri depan 1s/d10 0,15 1,5 1,5 17 Ketegakan tengah depan kiri 1s/d10 0,15 1,5 1,5 18 Ketegakan tengah samping kiri
depan
1s/d10 0,15 1,5 1,5 19 Ketegakan tengah samping kiri
belakang
1s/d10 0,15 1,5 1,5 20 Kedataran puncak pasangan bata
ringan
1s/d10 0,1 1 1 21 Kedataran pasangan bata lapis
1 samping kanan
1s/d10 0,1 1 1 22 Kedataran pasangan bata lapis
1 samping kiri
1s/d10 0,1 1 1 23 Kerataan lapis 1 1s/d10 0,1 1 1 24 Kerataan diagonal 1 1s/d10 0,1 1 1 25 Kerataan diagonal 2 1s/d10 0,1 1 1 26 Kerataan diagonal 3 1s/d10 0,1 1 1 27 Kerataan diagonal 4 1s/d10 0,1 1 1 28 Kerataan rolag samping kanan 1s/d10 0,1 1 1 29 Kerataan rolag samping kiri 1s/d10 0,1 1 1 30 Kerataan bata ringan lapis 21 1s/d10 0,1 1 1
LOMBA KOMPETENSI SISWA (LKS)
SEKOLAH MENENGAH KEJURUAN
TINGKAT NASIOANAL KE XXV TAHUN 2017
Peniaian subyektif : PENDUKUNG VISUAL Trade : BRICKLAYING (Part 1)
Nama /No:
Piece
Position Marking Aspek
Interval of deviasion
(mm)
Value @
deviasion Score
Total
deviasion Calculation
1 Potongan bata miring samping kiri 1s/d10 0,15 1,5 1,5 2 Potongan bata miring samping
kanan
1s/d10 0,15 1,5 1,5 3 Potongan beton ringan puncak
sesuai gambar
1s/d10 0,15 1,5 1,5 4 Pasangan bata rolag miring 1s/d10 0,15 1,5 1,5 5 Angka 1 sesuai gambar
terpasang tegak dan menonjol 2 cm
1s/d10 0,15 1,5 1,5 6 Angka 7 sesuai gambar
terpasang tegak dan menonjol 2 cm
1s/d10 0,15 1,5 1,5 7 Siar padat, tidak ada lubang
termasuk pada bagian belakang
1s/d10 0,15 1,5 1,5 8 Semua ukuran nat sama 1s/d10 0,15 1,5 1,5 9 Bentuk nat sesuai gambar 1s/d10 0,15 1,5 1,5 10 Kebersihan pasangan 1s/d10 0,15 1,5 1,5
LOMBA KOMPETENSI SISWA (LKS)
SEKOLAH MENENGAH KEJURUAN
TINGKAT NASIOANAL KE XXV TAHUN 2017
Penilaian obyektif : KETEPATAN Trade : BRICKLAYING (Part 2)
Nama/No:
Piece
Position Marking Aspek
Interval of deviasion Value @ deviasion Score Total deviasion Calculation
1 Ukuran tinggi keseluruan pasangan 154 cm
1s/d10 0,15 1,5 1,5 2 Ukuran tinggi pasangan bata
merah 70 cm kanan
1s/d10 0,15 1,5 1,5 3 Ukuran panjang keseluruhan 190
cm
1s/d10 0,15 1,5 1,5 4 Kesikuan 1s/d10 0,15 1,5 1,5 5 Ketegakan samping kanan 1s/d10 0,15 1,5 1,5 6 Ketegakan depan kanan 1s/d10 0,15 1,5 1,5 7 Ketegakan depan kiri 1s/d10 0,15 1,5 1,5 8 Ketegakan samping kiri depan 1s/d10 0,15 1,5 1,5 9 Ketegakan samping kiri belakang 1s/d10 0,15 1,5 1,5 10 Kedataran bata menonjol lapis 5 1s/d10 0,1 1 1 11 Kedataran atas huruf LKS 1s/d10 0,1 1 1 12 Kedataran puncak lapis 14 1s/d10 0,1 1 1 13 Kedataran puncak bata ringan
samping kanan
1s/d10 0,1 1 1 14 Kerataan bata menonjol lapis 5 1s/d10 0,1 1 1 15 Kerataan bawah depan huruf LKS 1s/d10 0,1 1 1 16 Kerataan diagonal 1 huruf LKS 1s/d10 0,1 1 1 17 Kerataan diagonal 2 huruf LKS 1s/d10 0,1 1 1 18 Kerataan depan puncak lapis 14 1s/d10 0,1 1 1 19 Kerataan diagonal 1 bata ringan
samping kanan dari bawah belakang keatas depan
1s/d10 0,1 1 1 20 Kerataan diagonal 2 bata ringan
samping kanan dari bawah depan keatas belakang
1s/d10 0,1 1 1
LOMBA KOMPETENSI SISWA (LKS)
SEKOLAH MENENGAH KEJURUAN
TINGKAT NASIOANAL KE XXV TAHUN 2017
Peniaian subyektif : PENDUKUNG VISUAL Trade : BRICKLAYING (Part 2)
Nama /No:
Piece
Position Marking Aspek
Interval of deviasion
Value @
deviasion Score
Total
deviasion Calculation
1 Huruf L sesuai gambar terpasang tegak dan menonjol 2 cm
1s/d10 0,15 1,5 1,5 2 Huruf K sesuai gambar terpasang
tegak dan menonjol 2 cm
1s/d10 0,15 1,5 1,5 3 Huruf S sesuai gambar terpasang
tegak dan menonjol 2 cm
1s/d10 0,15 1,5 1,5 4 Siar padat, tidak ada lubang
termasuk pada bagian belakang
1s/d10 0,15 1,5 1,5 5 Semua ukuran nat sama 1s/d10 0,15 1,5 1,5 6 Bentuk nat sesuai gambar 1s/d10 0,15 1,5 1,5 7 Kebersihan pasangan 1s/d10 0,15 1,5 1,5
LOMBA KOMPETENSI SISWA (LKS)
SEKOLAH MENENGAH KEJURUAN
TINGKAT NASIOANAL KE XXV TAHUN 2017
Penilaian obyektif : KETEPATAN Trade : PLASTERING
Nama/No:
Piece
Position Marking Aspek
Interval of deviasion
Value @
deviasion Score
Total
deviasion Calculation
1 Ketegakan samping kanan 1s/d10 0,2 2 2 2 Ketegakan samping kiri 1s/d10 0,2 2 2 3 Kerataaan diagonal 1 dari bawah
kiri ke kanan atas
1s/d10 0,15 1,5 1,5 4 Kerataan diagonal 2 dari kanan
bawah ke kiri atas
1s/d10 0,15 1,5 1,5 5 Kerataan bawah 1s/d10 0,15 1,5 1,5 6 Kesan plesteran 1s/d10 0,2 2 2
L
-
CIK, ..,
, ..,
f
LAY OUT COMPETI TI ON PLACE
LOI•'-'ICICll
···-·XllV
1 2 8 4
•
•
7•
I 10,,
12'IEMPAT lBFAT 'IEMPAT
MATERIAL MA'IERIAL JIR
18 14 11 11 17 11 11 20 21 22 28 24
llWlllLOI•• BRICKLAYINC3
LaNI
f
M iiii
'90INT TYPE :--'r<
B
A•Rw
1811111B
B.AllMlllllBRICK llZE:
N
i
r
;
:::>iii
CONCREIE BLOCICll llZEl..
I
I
!
{
I
I
I
l
.
L.
Mm rL- '<
I
I
i
L tmm ,. •llli.I,
.
L.
Mm rLMODULE1
LAY OUT
.
LllOW.
lm...
N
18-20 OKTOBER 2018
L
L 21.m L
LaNI
L 21.m L m m
"
"
17DJDRIGHT SI DE VIEW FRONT VIEW
MODULE 1
"
"
LEFT SI DE VIEW
L
.
.
O.
.
lm.
.
A.
o.
I.
CIDli EIL. ICBXKVLaNI
I
I I
DD
.Mm 1 mm
I
II
DD
H M
RIGKT SIDE VIEW FRONTVIEW LEFT SIDEVIEW
MODULE 2
L
.
.
O.
.
lm.
.
A.
o.
I.
CIDli EIL. ICBXKV