NO KONTRAK SISA LELANG NAMA REKANAN KET
DANA ( RUPIAH ) (RUPIAH) ( % ) ( RUPIAH )
1 5 6 7 8 9 11 12 13 14
Honor Panitia Pelaksana Kegiatan 10,775,000 - 10,775,000 100.00
-Perencanaan Teknis
-- Perencanaan Teknis Paket I 50,000,000 49,893,000 107,000 CV. POLA PRAKARYA 49,893,000 100.00 107,000 - Perencanaan Teknis Paket II 30,000,000 29,500,000 500,000 CV. DHIAN KARTIKA 29,500,000 100.00 500,000
Pengawasan Teknis
-- Pengawasan Teknis Paket I 50,000,000 49,934,000 66,000 CV. KARUNIA SEJAHTERA 49,934,000 100.00 66,000 - Pengawasan Teknis Paket II 23,000,000 22,901,000 99,000 PT. KALA PRANA CONS 22,901,000 100.00 99,000
Blj. Modal Pengadaan Konstruksi / Pembelian Pasar /Pertokoan
-- Rehabilitasi Pasar Barongan Kec. Jetis 1.00 Unit APBD 800,000,000 792,663,000 7,337,000 PB. MULYO 792,663,000 100.00 7,337,000 - Rehabilitasi Pasar Triwindu Kec. Sewon 1.00 Unit PROP 200,000,000 200,000,000 - CV. PERDANA KARYA 200,000,000 100.00 -- Pemasangan Konblok Sub Terminal Ps. Imogiri Kec. Imogiri 1.00 Unit APBD Kab. 200,000,000 199,500,000 500,000 CV. TRIAS C. MANUNGGAL 199,500,000 100.00 500,000
1,363,775,000
1,344,391,000 8,609,000 1,355,166,000 99.37 8,609,000 VOLUME
2 3 4
JUMLAH VIII =
PEMBANGUNAN INFRASTRUKTUR PEDESAAN REHABILITASI / PEMELIHARAAN PASAR PEDESAAN 2011
TARGET / SUMBER ANGGARAN SISA
ANGGARAN