NO KONTRAK SISA LELANG NAMA REKANAN KET
DANA ( RUPIAH ) (RUPIAH) ( % ) ( RUPIAH )
1 5 6 7 8 9 11 12 13 14
DPID
Honor Tim Pelaksana Kegiatan 29,325,000 27,925,000 95.23 1,400,000
Belanja Alat Tulis Kantor 1,625,000 1,625,000 100.00
-Belanja Makan dan Minum Rapat 3,000,000 3,000,000
Belanja Penggandaan 8,500,000 8,500,000
-Perencanaan Teknis
-Perencanaan Teknis Paket I 50,000,000 49,538,000 462,000 PT. AMT CONS. 49,538,000 100.00 462,000
Perencanaan Teknis Paket II 50,000,000 49,615,000 385,000 PT. FIRAMA CITRA UTAMA 49,615,000 100.00 385,000
Perencanaan Teknis Paket III 50,000,000 49,670,000 330,000 CV. POLA PRAKARYA 49,670,000 100.00 330,000
Perencanaan Teknis Paket IV (ABT) 12,000,000 11,770,000 230,000 CV. AGUNG KONS 11,770,000 100.00
Pengawasan Teknis
-Pengawasan Teknis Paket I 40,000,000 39,732,000 268,000 CV. TRIPILAR UTAMA CONS 39,732,000 100.00 268,000
Pengawasan Teknis Paket II 40,000,000 39,710,000 290,000 CV. GRACONA CONS 39,710,000 100.00 290,000
Pengawasan Teknis Paket III 40,000,000 39,699,000 301,000 CV. POLA PEMBANGUNAN 39,699,000 100.00 301,000
Pengawasan Teknis Paket IV (ABT) 10,000,000 9,784,000 216,000 CV. MULTI VISI KARYA 9,784,000 100.00 216,000
Pembangunan Jalan Lingkungan 15.51 Km
-1 Paket I Belakang kecamatan menuju SMA Dlingo Kec. Dlingo 0.50 Km DPID 252,200,000 246,127,000 6,073,000 CV. KARYA DWI PUTRA 246,127,000 100.00 6,073,000 2 Paket II Gampingan Sitimulyo Kec. Piyungan 0.60 Km DPID 605,040,000 603,190,000 1,850,000 PB. TANJUNG 603,190,000 100.00 1,850,000 3 Paket III Kanggotan - Bedukan (menuju Ponpes) Kec. Pleret 0.50 Km DPID 504,200,000 501,529,000 2,671,000 CV. AWAN PELANGI 501,529,000 100.00 2,671,000
4 Paket IV Jombor Sitimulyo Kec. Piyungan 0.50 Km DPID 504,200,000 502,926,000 1,274,000 PB. MULYO 502,926,000 100.00 1,274,000
5 Paket V Selopamioro - Kedungjati Kec. Imogiri 2.00 Km DPID 310,010,516 308,081,000 1,929,516 PB. DUTA PEMBANGUNAN 308,081,000 100.00 1,929,516 6 Paket VI Jl. Siluk I, Kajor, Selopamioro Kec. Imogiri 0.60 Km DPID 605,040,000 578,835,000 26,205,000 CV. MEGA PUTRA 578,835,000 100.00 26,205,000 7 Paket VII Jalan menuju panti Amanah (jetis) Kec. Jetis 0.50 Km DPID 504,200,000 502,557,000 1,643,000 CV. SASMITA 502,557,000 100.00 1,643,000
8 Paket VIII -
-1 Plumbon RT -14 RW -15 Banguntapan Kec. Banguntapan 0.50 Km DPID 252,200,000 668,679,000 4,007,000 PB. POLA TEHNIKA 668,679,000 100.00 4,007,000
2 Menuju Monumen Ngoto 0.50 Km 252,200,000
3 Jl. Lingkungan Baturetno 0.20 Km 168,286,000
9 Paket IX Wonokromo Kec. Pleret 0.50 Km DPID 252,200,000 250,200,000 2,000,000 CV. MUTIARA TIMUR 250,200,000 100.00 2,000,000
10 Paket X Menang Srihardono Kec. Pundong 0.50 Km DPID 504,200,000 504,200,000 - PB. SEKAR WIJAYA 504,200,000 100.00 -11 Paket XI Jalur evakuasi Donotirto-Tirtosari-Tirtomulyo Kec. Kretek 0.70 Km DPID 705,880,000 703,920,000 1,960,000 PB. SARANA JAYA 703,920,000 100.00 1,960,000 12 Paket XII Jembatan Penataan Parangtritis Kec. Kretek 4x6 M DPID 231,714,000 219,089,000 12,625,000 PB. ATNAWIJAYA 219,089,000 100.00 12,625,000
13 Paket XIII - -
-Bontitan (menuju Sidorejo) Kec. Kasihan 0.50 Km DPID 252,200,000 403,203,000 317,000 CV. KARISQA SARANA M 403,203,000 100.00 317,000
Glondong Ludirohusodo ke barat 0.30 Km 151,320,000
14 Paket XIV Kanutan RT4 Sb. Mulyo Kec. Bb.lipuro 0.50 Km DPID 504,200,000 503,330,000 870,000 CV. SRIKANDI MATARAM 503,330,000 100.00 870,000
15 Paket XV - -
-Jln masuk terminal wisata PSG (paving) Kec. Sewon 250 m2 DPID 67,843,084 294,499,000 3,350,484 CV. TRIAS CIPTA M 294,499,000 100.00 3,350,484
Glugo - Lapangan Krapyak Panggungharjo 0.456 Km 230,006,400
16 Paket XVI DPID - -
-Gudang SRG Niten Kec. Sewon 0.35 Km 176,540,000 325,900,000 1,960,000 CV. MULTI TEKNIK CORP 325,900,000 100.00 1,960,000
Bangunharjo 0.30 Km 151,320,000
17 Paket XVII -
-Peciro Murtigading Kec. Sanden 0.75 Km DPID 378,300,000 703,930,000 1,570,000 PB. GS AANEMER 703,930,000 100.00 1,570,000
Kwaru-Poncosari Kec. Srandakan 0.50 Km 327,200,000
18 Paket XVIII Menuju Goa Slarong Kec. Pajangan 0.30 Km DPID 151,320,000 151,320,000 - CV. PERDANA KARYA 151,320,000 100.00
-19 Paket XIX SMK 1 - Bajang Kec. Pandak 0.50 Km DPID 504,200,000 502,834,000 1,366,000 CV. CANDISARI 502,834,000 100.00 1,366,000
20 Paket XX Komplek Rumah Dinas Trirenggo Kec. Bantul 0.60 Km DPID 302,640,000 301,005,000 1,635,000 PB. WIJAYA 301,005,000 100.00 1,635,000 21 Paket XXI SMA Pangudiluhur Kec. Sedayu 0.75 Km DPID 756,300,000 754,254,000 2,046,000 PB. ATNAWIJAYA 754,254,000 100.00 2,046,000
22 Paket XXII -
-VOLUME
2 3 4
PEMBANGUNAN INFRASTRUKTUR PEDESAAN PEMBANGUNAN JALAN DAN JEMBATAN PEDESAAN 2011
TARGET / SUMBER ANGGARAN SISA
ANGGARAN
Sukoharjo Argodadi Sedayu Kec. Sedayu 0.50 Km DPID 504,200,000 804,492,000 2,348,000 PB. RIZEKY KARYA S 804,492,000 100.00 2,348,000
Tonalan Argosari 0.60 Km 302,640,000
23 Paket XXIII Kalipakis / Ngestiharjo Kasihan Kec. Kasihan 0.50 Km DPID 252,200,000 250,978,000 1,222,000 CV. TRISNA MUKTI K 250,978,000 100.00 1,222,000 24 Jalan Lingkungan SPN Kec. Imogiri 0.10 Km 50,000,000 49,500,000 500,000 CV. TRISNA MUKTI KARYA 49,500,000 100.00 500,000 25 Jalan Lingkungan Manasik Haji Kretek Kec. Kretek 0.10 Km 50,000,000 49,635,000 365,000 CV. RIZKY BANGUN SARANA 49,635,000 100.00 365,000 26 Jalan Lingkungan Sawit (Belakang Niten Baru) Kec. Sewon 0.40 Km 225,000,000 191,937,000 33,063,000 CV. KARISQA SARANA MANDIRI 191,937,000 100.00 33,063,000 27 Jalan Lingkungan Menuju Lapangan GE-ES Kec. Jetis 0.50 Km 200,000,000 200,000,000 - PB. GS AANEMER 200,000,000 100.00 -28 Jalan Lingkungan Malangjiwan-Mriyan Kec. Kretek 0.50 Km 200,000,000 200,000,000 - PB. WIDJAYA 200,000,000 100.00 -29 Jalan Lingkungan Kwaru (Pelebaran Jembatan dan Talud) Kec. Srandakan 1.00 Ls 75,000,000 74,492,000 508,000 PB. HATI SAMUDRA 74,492,000 100.00 508,000
11,798,450,000