• Tidak ada hasil yang ditemukan

Badinjan sia ( egg plant)

N/A
N/A
Protected

Academic year: 2017

Membagikan "Badinjan sia ( egg plant)"

Copied!
1
0
0

Teks penuh

(1)

Egg plant

Ingredients

 2 onion

 Half whole garlic

 4 tomato if small 3

 1 and a half chilli

 Less than full olive oil in small bowl

 3 egg plant Method (cut the egg plant in half and then cut the

semi-half in three and then cut it horizontally).

 1 and a half dawaydek  1 spoon of salt

 2 spoon of tomato paste

Method:

1. Cut the 2onion

2. Cut the 1 and a half chilli 3. Cut the half whole garlic 4. Cut the 4 or 3 tomatoes 5. Cut the 3 egg plants

6. Put the half bowl of olive oil in the pan 7. Put the onion and garlic at the same time 8. Put the tomatoes after the onion is fried 9. Put the chilli in the pan

10. Stir it and pour water if it is dry and is about to burn 11. Put the egg plant

12. When the eggplant is fried you put the tomato paste 13. Stir when required

14. Put dawaydek and salt

Referensi

Dokumen terkait

Untuk dapat menjawab pokok permasalahan tentang motivasi wisatawan menggunakan teori motivasi dari Mc. Sharpley, 1994) dalam Pitana dan Gayatri (2005: 58), serta

Penggunaan Perjanjian ini oleh PIHAK KEDUA adalah untuk ditampilkan oleh PIHAK PERTAMA dalam suatu acara pertujukan musik sebagaimana tersebut pada Pasal 1

Diharapkan saudara membawa semua dokumen kualifikasi yang “ASLI” (Untuk diperlihatkan) beserta lampiran – lampirannya untuk ditunjukkan dan diperiksa oleh Pokja

report the results of the proposed probabilistic active trading strategy for both the Deep-Learning model. and the SVM model., as well as the buy-and-hold investing strategy are

Manusia memiliki dua kelenjar adrenal. Kelenjar tersebut berada di atas ginjal. Setiap kelenjar adrenal tersusun atas dua bagian. Bagian dalam disebut bagian medula dan bagian

In this research, teachers’ performance means teaching activities which contribute to student satisfaction including integration of ICT in learning and.. these

Proses manufaktur alat las potong portable meliputi proses pembuatan rangka meja kerja, rangka dudukan tabung gas, rail cutting torch, tuas pemutar dan pengikat tabung

Sedangkan untuk nilai AVE (Average Variance Extrated) untuk seluruh indikator > 0,5 maka hal ini menunjukan bahwa seluruh indikator mampu menjelaskan masing – masing