• Tidak ada hasil yang ditemukan

Directory UMM :Data Elmu:jurnal:I:Insurance Mathematics And Economics:Vol26.Issue2-3.2000:

N/A
N/A
Protected

Academic year: 2017

Membagikan "Directory UMM :Data Elmu:jurnal:I:Insurance Mathematics And Economics:Vol26.Issue2-3.2000:"

Copied!
17
0
0

Teks penuh

Loading

Gambar

Fig. 1. Effect of initial reserve ratio (IRR).
Fig. 3. Effect of inter-claim revenue variability (SCV).
Fig. 5. Effect of relative security loading (RSL).
Table 1A comparison of the algebraic (1), and the numerical (2) approaches

Referensi

Dokumen terkait

Paket pengadaan ini terbuka untuk penyedia barang/jasa yang terigistrasi pada Layanan Pengadaan Secara Elektronik (LPSE) dan memenuhi persyaratan memiliki SIUP yang masih

KEMENTERIAN RISET, TEKNOLOGI, DAN PENDIDIKAN TINGGI UNIVERSITAS SEBELAS MARET-. FAKULTAS ILMU SOSIAL

Moreover, the result of the data processing from the questionnaires can also be concluded that the students' response to t argīb and t arhīb methods is very well and it can

(dalam hal kelulusan USAP telah melewati 2 tahun, maka wajib menyerahkan bukti telah mengikuti PPL paling sedikit 60 SKP dalam 2 tahun terakhir).. Bukti telah

Sehubungan dengan tahap evaluasi dan pembuktian kualifikasi dalam proses pengadaan paket Pengadaan Buku Referensi Pendidikan SD Negeri , dengan ini kami mengundang

Input pelaksanaan program Pengendalian Kusta di Puskesmas Lompentodea belum berjalan dengan baik, hal tersebut dapat dilihat dari belum tersedianya fasilitas khusus

Pada Tanggal 24 Agustus 2011, panitia Pengadaan diminta untuk memaparkan hasil pelelangan Jasa Konsultan Perencanaan Teknik Pembangunan gedung dan Proses Pelelangan Pembangunan

pagar dengan langkah menghitung jarak data uji terhadap data latih kemudian hasil jarak yang didapatkan diurutkan dari yang terkecil hingga terbesar lalu diambil data