• Tidak ada hasil yang ditemukan

prospectus cover picture 0

N/A
N/A
Protected

Academic year: 2017

Membagikan "prospectus cover picture 0"

Copied!
2
0
0

Teks penuh

(1)

Postgraduate

prospectus 2010

faculty of science

bristol.ac.uk

Learning

Discovery

Enterprise

(2)

Subject Page number Introduction S 1

Taught Postgraduate Programmes Earth System Science S 2 Ecology and Management of the

Natural Environment S 3 Neuropsychology S 4 Palaeobiology S 5 Research Methods in Psychology S 6 Science of Natural Hazards S 7 Statistics NEW S 8 Veterinary Parasitology NEW S 9 Vision Sciences S 10

Postgraduate Research Programmes Biological Sciences S 12

Chemistry S 14

Complexity Sciences Cross-faculty S 18 Earth Sciences S 20 Geographical Sciences (Physical) S 23

Mathematics S 25

Physics S 28

Psychology (Experimental) S 31

Contents

If you need all or part of this

publication in accessible

format (eg in Braille, in larger

print or on tape), please

contact the Public Relations

Office, Communications and

Marketing Services:

Tel +44 (0)117 928 8895

Publishing details

University of Bristol

Postgraduate Prospectus 2010 ISSN 0956-2109

Printed byMWL Print Group

Compiled and edited by

the Postgraduate Recruitment and Admissions Office

Designed byPeloton Design, www.pelotondesign.co.uk

Produced bythe Public Relations Office, Communications and Marketing Services © University of Bristol 2009

Photographic credits

Cover photography by Will King. Student profile photography by Jamie Corbin. Other photographs supplied by members of University staff and students, and by: John Adler, Diane Auckland/Wates, Tamany Baker, James Barke, Paul Box, Martin Chainey, Martin Bennett, Tim Gander, Jason Ingram, Dave Pratt, Nick Smith.

Printing details

This publication is printed on Challenger Offset, an FSC-approved stock, using vegetable/mineral oil-based, environmentally friendly inks

The information in this prospectus relates primarily to the session 2010/11 and every effort has been made to ensure that it is correct at the time of going to press in July 2009. The University will use all its reasonable efforts to deliver the programmes as described.

However, the University reserves the right for any reason without notice to withdraw or change any of the programmes included in this prospectus, to alter tuition fees, entry requirements, the facilities and/or services available from or provided by or on behalf of the University. You should also note that the choice of subjects may be limited by considerations of timetable, staffing and/or available places on a programme.

If you accept an offer of a place on a programme, the relationship between you and the University will be governed by the Rules and Regulations for Students, which includes the Student Agreement.

Please see:

www.bristol.ac.uk/secretary/studentrulesregs

www.bristol.ac.uk/secretary/studentrulesreds/agreement.html

Please note that the Student Agreement acknowledges that the University must manage its resources efficiently and may change the content and/or method of delivery of programmes, and/or discontinue, not provide or combine programmes. If the University discontinues or does not provide your programme, or changes it significantly before it begins, you may withdraw your application and an appropriate refund of tuition fees will be made. Please see the Student Agreement for further information.

Prospective students should take into account when selecting a programme of study the inherent risks of their chosen career. For more information, see www.bristol.ac.uk/prosp-health-safety

For details of any changes made since publication, please refer to our online prospectus at bristol.ac.uk/prospectus/postgraduate

Referensi

Dokumen terkait

Provided that the REIT Subsidiary qualifies as a REIT, distributions made to the Master Fund out of the REIT Subsidiary’s current or accumulated earnings and profits, and not

( c) any representation or warranty confirmed or made by the Purchaser in connection with the execution and delivery of this Agreement, or in connection with any

As part of this Agreement, and without additional compensation, Contractor acknowledges and agrees that any and all tangible and intangible property and work products,

Principal Agreement Date of Agreement Date of Registration Note on Registration * General Description Listed Network Facilities and/or Services Supplemental Agreement

4.1.3 Provide evidence that show the appointment of supervisor comply with the Standard page 22 and 23 *Note: Please refer to the specific Programme Standard or/and MQA Standards:

Tempered analok sliding glass and frames 1.70m x 4.00m with complete accessories please see plan 1 lot delivery and installation BY LOT Canvassed by: JAM 11-23-2022 NOTE: Please

The IT processes covered by the Delivery and Support domain include the following: DS1 - Define and manage service levels DS2 - Manage Third-party services DS3 - Manage performance and

51 2.4.4 LOCAL ECONOMIC DEVELOPMENT PROGRAMMES / PROJECTS The details of the programmes and projects implemented by the municipality during the year under indicating the achievements