REKAPITULASI RENCANA ANGGARAN BIAYA

NAMA PEKERJAAN : STUDI PENYUSUNAN DED PERLUASAN KANTOR KSOP KELAS II GRESIK LOKASI : Jl. YOS SUDARSO No. 36, GRESIK

TAHUN ANGGARAN : 2017

JUMLAH HARGA (Rp)

1 3

A. BANGUNAN KANTOR BARU

I. PEKERJAAN LANTAI 1 Rp 238,206,317.89

II. PEKERJAAN LANTAI 2 Rp 98,162,196.86

III. PEKERJAAN ATAP Rp 39,931,348.85

376,299,863.60 Rp

B. PERLUASAN GUDANG ARSIP

I. PEKERJAAN LANTAI 1 Rp 191,255,903.34

II. PEKERJAAN LANTAI 2 Rp 127,814,310.72

319,070,214.06 Rp

C. PERLUASAN AREA PELAYANAN

I. PEKERJAAN PERLUASAN LOKET PELAYANAN Rp 93,724,096.36

II. PEKERJAAN PERLUASAN RUANG TUNGGU DEPAN Rp

-III. PEKERJAAN PENUTUPAN VOID LANTAI 2 Rp

-93,724,096.36 Rp

789,094,174.02 Rp

DIBULATKAN Rp 789,094,100.00 SUB TOTAL PEKERJAAN STRUKTUR

NO

2 JENIS PEKERJAAN

JUMLAH - A

JUMLAH - B

JUMLAH - C

Sidoarjo, Maret 2017

Konsultan Perencana

CV. Matra Cipta

(2)

RENCANA ANGGARAN BIAYA

NAMA PEKERJAAN : STUDI PENYUSUNAN DED PERLUASAN KANTOR KSOP KELAS II GRESIK LOKASI : Jl. YOS SUDARSO No. 36, GRESIK

TAHUN ANGGARAN : 2017

HSPK JUMLAH

(Rp) (Rp)

1 3 4 5 6 = 3 x 5

A.

I. PEKERJAAN LANTAI 1

1 Bor Pondasi Strauss Pile dia. 30 cm 64.00 m1 67,078.00 4,292,992.00

2 Galian Tanah 12.07 m3 106,177.50 1,281,112.23

3 Urugan Pasir Padat Bawah Pondasi tb. 5 cm 0.86 m3 295,487.50 254,662.95

4 Urugan Tanah Kembali Pondasi 7.31 m3 28,776.00 210,460.76

5 Urugan Sirtu (Perataan site) 14.03 m3 288,557.50 4,047,018.94

6 Pembuangan Tanah 68.75 m3 37,895.00 2,605,357.04

7 Lantai Kerja tb. 5 cm 1.19 m3 1,041,115.90 1,240,031.50

8 Pondasi PC-2 165 x 90 cm 4.75 m3 4,461,540.00 21,201,238.08

9 Pelapisan Anti Rayap Pondasi 13.92 m2 42,721.80 594,687.46

10 Sloof elv. - 0.70 TB-1 20 x 40 cm 2.63 m3 5,737,106.00 15,106,488.55

11 Kolom Lantai 1 C-1 30 x 40 cm 4.66 m3 7,483,857.00 34,844,838.19

12 Balok elv. + 3.95 B-1 30 x 60 cm 5.43 m3 6,369,673.00 34,568,215.37

13 Balok elv. + 3.95 B-2 K 20 x 45 cm 0.85 m3 9,674,902.00 8,243,016.50

14 Balok elv. + 3.95 B-3 20 x 40 cm 0.23 m3 8,347,887.00 1,916,674.86

15 Balok elv. + 3.95 B-4 20 x 35 cm 3.65 m3 7,880,523.00 28,751,300.11

16 Plat Lantai elv. + 3.95 S-2 Tb. 12 cm 11.11 m3 7,113,771.00 79,048,223.35

238,206,317.89 Rp

I. PEKERJAAN LANTAI 2

1 Kolom Lantai 2 C-1 30 x 40 cm 1.76 m3 7,483,857.00 13,201,523.75

2 Kolom Lantai 2 C-2 25 x 35 cm 0.64 m3 8,118,141.00 5,220,979.43

3 Kolom Lantai 2 C-3 20 x 20 cm 0.44 m3 9,682,342.00 4,269,912.82

4 Balok elv. + 7.45 B-1 30 x 60 cm 2.90 m3 6,369,673.00 18,459,312.35

5 Balok elv. + 7.45 B-2 K 20 x 45 cm 0.41 m3 9,674,902.00 4,009,279.39

6 Balok elv. + 7.45 B-3 20 x 40 cm 0.54 m3 8,347,887.00 4,521,215.60

7 Balok elv. + 7.45 B-4 20 x 35 cm 2.45 m3 7,880,523.00 19,279,699.52

8 Plat Atap elv. + 7.45 S-1 Tb. 10 cm 3.63 m3 8,055,248.00 29,200,274.00

98,162,196.86 Rp

Jumlah - I

Jumlah - II NO

BANGUNAN KANTOR BARU 2

JENIS PEKERJAAN VOLUME SATUAN

(3)

HSPK JUMLAH

(Rp) (Rp)

1 3 4 5 6 = 3 x 5

NO

2

JENIS PEKERJAAN VOLUME SATUAN

III. PEKERJAAN ATAP

1 Rangka Atap Profil Double C.125.50.20.2,3 mm 357.91 kg 32,181.60 11,518,232.31

2 Double Base Plate uk. 20 x 30 cm - tb. 10 mm 75.36 kg 46,424.40 3,498,542.78

3 Angker dia. 16 mm - P. 40 cm 20.19 kg 23,691.80 478,395.74

4 Cat Meni Profil Double C.125.50.20.2,3 mm 4.91 m2 59,026.00 289,841.27

5 Ikatan Angin dia. 12 mm 42.12 m1 19,542.60 823,068.33

6 Plat Sambung Ikatan Angin tb. 5 mm 11.78 kg 46,424.40 546,647.31

7 Baut Tumpuan Ikatan Angin dia. 8 mm 24.00 bh 14,375.00 345,000.00

8 Turnbuckle Ikatan Angin dia. 12 mm 6.00 bh 48,125.00 288,750.00

9 Gording Profil C.125.50.20.2.3 mm 308.48 kg 32,181.60 9,927,508.69

10 Penyangga Gording L.50.50.5 mm 12.06 kg 46,424.40 560,063.96

11 Baut Penyangga Gording dia. 8 mm 64.00 bh 14,375.00 920,000.00

12 Cat Meni Gording Profil C.125.50.20.2.3 mm 28.01 m2 59,026.00 1,653,306.45

13 Sagrod dia. 10 mm 33.85 m1 15,174.50 513,687.17

14 Baut Sagrod dia. 10 mm 56.00 bh 15,000.00 840,000.00

15 Penutup Atap Metalsheet Tb. 0.4 mm 68.91 m2 55,055.00 3,794,005.22

16 Papan Lisplank Tb. 9 mm 17.96 m1 219,120.00 3,934,299.60

39,931,348.85 Rp

Jumlah - III

(4)

HSPK JUMLAH

(Rp) (Rp)

1 3 4 5 6 = 3 x 5

NO

2

JENIS PEKERJAAN VOLUME SATUAN

B.

I. PEKERJAAN LANTAI 1

1 Bor Pondasi Strauss Pile dia. 30 cm 44.00 m1 67,078.00 2,951,432.00

2 Galian Tanah 9.60 m3 106,177.50 1,019,580.06

3 Urugan Pasir Padat Bawah Pondasi tb. 5 cm 2.71 m3 295,487.50 800,032.41

4 Urugan Tanah Kembali Pondasi 6.18 m3 28,776.00 177,910.50

5 Urugan Sirtu (Perataan site) 16.74 m3 288,557.50 4,829,586.88

6 Urugan Pasir Padat tb. 10 cm 4.78 m3 295,487.50 1,413,021.23

7 Pembuangan Tanah 47.42 m3 37,895.00 1,796,980.90

8 Lantai Kerja tb. 5 cm 0.95 m3 1,041,115.90 990,777.95

9 Pondasi PC-1 90 x 90 cm 2.92 m3 4,472,171.00 13,040,850.64

10 Pondasi PC-1 A 70 x 90 cm 0.50 m3 3,954,679.00 1,993,158.22

11 Pelapisan Anti Rayap Pondasi 10.49 m2 42,721.80 448,151.68

12 Sloof elv. - 0.70 TB-2 20 x 30 cm 1.59 m3 5,493,653.00 8,759,629.71

13 Kolom Pedestal Lantai 1 C-2 25 x 35 cm 1.83 m3 8,118,141.00 14,846,050.35

14 Kolom Lantai 1 C-4 WF.200.100.5,5.8 mm 663.07 kg 32,181.60 21,338,621.33

15 Balok elv. + 3.83 B-5 WF.200.100.5,5.8 mm 946.79 kg 32,181.60 30,469,056.16

16 Balok elv. + 3.83 B-6 Double C.125.50.20.2,3 267.56 kg 32,181.60 8,610,372.12

17 Plat Stiffener & Voute tb. 5 mm 160.99 kg 32,181.60 5,180,767.75

18 Double Base Plate uk. 25 x 30 cm - tb. 10 mm 129.53 kg 46,424.40 6,013,120.41

19 End Plate uk. 10 x 39 cm - tb. 10 mm 119.40 kg 46,424.40 5,543,003.72

20 End Plate uk. 11 x 17.4 cm - tb. 5 mm 1.50 kg 46,424.40 69,752.20

21 End Plate uk. L.10.5 x 17.4 cm - tb. 5 mm 2.85 kg 46,424.40 132,529.17

22 Angker dia. 16 mm - P. 40 cm 41.65 kg 23,691.80 986,691.22

23 Angker Chemical dia. 16 mm - P. 40 cm 90.00 titik 128,518.50 11,566,665.00

24 Baut HTB dia. 12 mm 238.00 bh 15,000.00 3,570,000.00

25 Shear Connector dia. 16 mm 221.00 bh 23,702.80 5,238,318.80

26 Cat Meni Rangka Profil Baja 79.58 m2 59,026.00 4,697,267.36

27 Plat Lantai elv. + 3.95 S-4 Tb. 12 cm 4.54 m3 7,661,478.00 34,772,575.59

191,255,903.34 Rp

PERLUASAN GUDANG ARSIP

Jumlah - I

(5)

HSPK JUMLAH

(Rp) (Rp)

1 3 4 5 6 = 3 x 5

NO

2

JENIS PEKERJAAN VOLUME SATUAN

II. PEKERJAAN LANTAI 2

1 Kolom Lantai 2 C-4 WF.200.100.5,5.8 mm 695.87 kg 32,181.60 22,394,242.17

Balok elv. + 6.70 B-5 WF.200.100.5,5.8 mm 946.79 kg 32,181.60 30,469,056.16

Balok elv. + 6.70 B-6 Double C.125.50.20.2,3 267.56 kg 32,181.60 8,610,372.12

Plat Stiffener & Voute tb. 5 mm 164.27 kg 32,181.60 5,286,329.83

End Plate uk. 10 x 39 cm - tb. 10 mm 119.40 kg 46,424.40 5,543,003.72

End Plate uk. 11 x 17.4 cm - tb. 5 mm 1.50 kg 46,424.40 69,752.20

End Plate uk. L.10.5 x 17.4 cm - tb. 5 mm 2.85 kg 46,424.40 132,529.17

Angker dia. 16 mm - P. 40 cm 41.65 kg 23,691.80 986,691.22

Angker Chemical dia. 16 mm - P. 40 cm 90.00 titik 128,518.50 11,566,665.00

Baut HTB dia. 12 mm 238.00 bh 15,000.00 3,570,000.00

Shear Connector dia. 16 mm 221.00 bh 23,702.80 5,238,318.80

Cat Meni Rangka Profil Baja 80.92 m2 59,026.00 4,776,159.50

Plat Atap elv. + 6.80 S-3 Tb. 10 cm 3.61 m3 8,085,982.00 29,171,190.81

127,814,310.72 Rp

C.

I. PEKERJAAN PERLUASAN LOKET PELAYANAN

Bor Pondasi Strauss Pile dia. 30 cm 24.00 m1 67,078.00 1,609,872.00

Galian Tanah 5.46 m3 106,177.50 579,550.77

Urugan Pasir Padat Bawah Pondasi tb. 5 cm 0.39 m3 295,487.50 115,204.67

Urugan Tanah Kembali Pondasi 3.51 m3 28,776.00 101,128.07

Urugan Sirtu (Perataan site) 5.51 m3 288,557.50 1,590,673.22

Urugan Pasir Padat tb. 10 cm 1.58 m3 295,487.50 465,392.81

Pembuangan Tanah 25.94 m3 37,895.00 983,147.88

Lantai Kerja tb. 5 cm 0.52 m3 1,041,115.90 541,255.33

Pondasi PC-1 90 x 90 cm 1.94 m3 4,472,171.00 8,693,900.42

Pelapisan Anti Rayap Pondasi 5.94 m2 42,721.80 253,767.49

Sloof elv. - 0.70 TB-2 20 x 30 cm 0.78 m3 5,493,653.00 4,285,049.34

Kolom Pedestal Lantai 1 C-2 25 x 35 cm 1.00 m3 8,118,141.00 8,097,845.65

Kolom Lantai 1 C-4 WF.200.100.5,5.8 mm 361.67 kg 32,181.60 11,639,248.00

Balok elv. + 3.83 B-5 WF.200.100.5,5.8 mm 423.87 kg 32,181.60 13,640,814.79

Balok elv. + 3.83 B-6 Double C.125.50.20.2,3 154.38 kg 32,181.60 4,968,108.52

Plat Stiffener & Voute tb. 5 mm 78.55 kg 32,181.60 2,528,006.28

Double Base Plate uk. 25 x 30 cm - tb. 10 mm 70.65 kg 46,424.40 3,279,883.86

End Plate uk. 10 x 39 cm - tb. 10 mm 61.23 kg 46,424.40 2,842,566.01

Angker dia. 16 mm - P. 40 cm 22.72 kg 23,691.80 538,195.21

Angker Chemical dia. 16 mm - P. 40 cm 60.00 titik 128,518.50 7,711,110.00

Baut HTB dia. 12 mm 120.00 bh 15,000.00 1,800,000.00

Shear Connector dia. 16 mm 115.00 bh 23,702.80 2,725,822.00

Cat Meni Rangka Profil Baja 40.08 m2 59,026.00 2,365,564.46

Plat Atap elv. + 3.95 S-3 Tb. 10 cm 1.53 m3 8,085,982.00 12,367,989.57

93,724,096.36 Rp

Jumlah - I PERLUASAN AREA PELAYANAN

Jumlah - II

(6)

ANALISA HARGA SATUAN PEKERJAAN BETON BERTULANG

NAMA PEKERJAAN : STUDI PENYUSUNAN DED PERLUASAN KANTOR KSOP KELAS II GRESIK LOKASI : Jl. YOS SUDARSO No. 36, GRESIK

TAHUN ANGGARAN : 2017

HARGA SAT. HSPK

(Rp.) (Rp.)

1 3 4 5 6 = 4 x 5

1 1 m3 - Pekerjaan Pondasi Strauss Pile dia. 30 cm

Campuran beton K-300 m3 1.0000 1,370,290.90 1,370,290.90

Bekisting Poer m2 - 158,436.30

-Pembongkaran Bekisting m2 - 9,487.50

-Besi BJTP-24 kg 22.2788 13,083.40 291,482.82

Besi BJTD-39 kg 88.4433 13,660.90 1,208,215.53

Besi Wiremesh BJTD-50 kg - 15,103.00

-2,869,989.00 Rp

2 1 m3 - Pekerjaan Pondasi PC-1 90 x 90 cm

Campuran beton K-300 m3 1.0000 1,370,290.90 1,370,290.90

Bekisting Poer m2 6.9444 158,436.30 1,100,252.08

Pembongkaran Bekisting m2 6.9444 9,487.50 65,885.42

Besi BJTP-24 kg - 13,083.40

-Besi BJTD-39 kg 141.6995 13,660.90 1,935,742.86

Besi Wiremesh BJTD-50 kg - 15,103.00

-4,472,171.00 Rp

3 1 m3 - Pekerjaan Pondasi PC-1 A 70 x 90 cm

Campuran beton K-300 m3 1.0000 1,370,290.90 1,370,290.90

Bekisting Poer m2 7.5794 158,436.30 1,200,846.56

Pembongkaran Bekisting m2 7.5794 9,487.50 71,909.23

Besi BJTP-24 kg - 13,083.40

-Besi BJTD-39 kg 96.0136 13,660.90 1,311,632.49

Besi Wiremesh BJTD-50 kg - 15,103.00

-3,954,679.00 Rp

4 1 m3 - Pekerjaan Pilecap PC-2 165 x 90 cm

Campuran beton K-300 m3 1.0000 1,370,290.90 1,370,290.90

Bekisting Poer m2 5.9343 158,436.30 940,215.42

Pembongkaran Bekisting m2 5.9343 9,487.50 56,302.08

Besi BJTP-24 kg - 13,083.40

-Besi BJTD-39 kg 153.3377 13,660.90 2,094,731.65

Besi Wiremesh BJTD-50 kg - 15,103.00

-4,461,540.00

(7)

HARGA SAT. HSPK

(Rp.) (Rp.)

1 2 3 4 5 6 = 4 x 5

NO. U R A I A N SAT. VOLUME

5 1 m3 - Pekerjaan Sloof TB-1 20 x 40 cm

Campuran beton K-300 m3 1.0000 1,370,290.90 1,370,290.90

Bekisting Sloof m2 12.5000 164,395.00 2,054,937.50

Pembongkaran Bekisting m2 12.5000 9,487.50 118,593.75

Besi BJTP-24 kg 44.0384 13,083.40 576,171.96

Besi BJTD-39 kg 118.3752 13,660.90 1,617,111.92

Besi Wiremesh BJTD-50 kg - 15,103.00

-5,737,106.00 Rp

6 1 m3 - Pekerjaan Sloof TB-2 20 x 30 cm

Campuran beton K-300 m3 1.0000 1,370,290.90 1,370,290.90

Bekisting Sloof m2 13.3333 164,395.00 2,191,933.33

Pembongkaran Bekisting m2 13.3333 9,487.50 126,500.00

Besi BJTP-24 kg 29.1616 13,083.40 381,533.39

Besi BJTD-39 kg 104.1948 13,660.90 1,423,395.39

Besi Wiremesh BJTD-50 kg - 15,103.00

-5,493,653.00 Rp

7 1 m3 - Pekerjaan Kolom C-1 30 x 40 cm

Campuran beton K-300 m3 1.0000 1,370,290.90 1,370,290.90

Bekisting Kolom m2 11.6667 305,209.30 3,560,775.17

Pembongkaran Bekisting m2 11.6667 9,487.50 110,687.50

Besi BJTP-24 kg 49.3230 13,083.40 645,312.60

Besi BJTD-39 kg 131.5280 13,660.90 1,796,791.03

Besi Wiremesh BJTD-50 kg - 15,103.00

-7,483,857.00 Rp

8 1 m3 - Pekerjaan Kolom C-2 25 x 35 cm

Campuran beton K-300 m3 1.0000 1,370,290.90 1,370,290.90

Bekisting Kolom m2 13.7143 305,209.30 4,185,727.54

Pembongkaran Bekisting m2 13.7143 9,487.50 130,114.29

Besi BJTP-24 kg 35.2104 13,083.40 460,672.07

Besi BJTD-39 kg 144.3050 13,660.90 1,971,336.44

Besi Wiremesh BJTD-50 kg - 15,103.00

-8,118,141.00 Rp

9 1 m3 - Pekerjaan Kolom C-3 20 x 20 cm

Campuran beton K-300 m3 1.0000 1,370,290.90 1,370,290.90

Bekisting Kolom m2 20.0000 305,209.30 6,104,186.00

Pembongkaran Bekisting m2 20.0000 9,487.50 189,750.00

Besi BJTP-24 kg 45.4561 13,083.40 594,720.09

Besi BJTD-39 kg 104.1948 13,660.90 1,423,395.39

Besi Wiremesh BJTD-50 kg - 15,103.00

-9,682,342.00

(8)

HARGA SAT. HSPK

(Rp.) (Rp.)

1 2 3 4 5 6 = 4 x 5

NO. U R A I A N SAT. VOLUME

10 1 m3 - Pekerjaan Balok B-1 30 x 60 cm

Campuran beton K-300 m3 1.0000 1,370,290.90 1,370,290.90

Bekisting Balok m2 8.3333 373,257.50 3,110,479.17

Pembongkaran Bekisting m2 8.3333 9,487.50 79,062.50

Besi BJTP-24 kg 43.8427 13,083.40 573,611.20

Besi BJTD-39 kg 90.4940 13,660.90 1,236,229.66

Besi Wiremesh BJTD-50 kg - 15,103.00

-6,369,673.00 Rp

11 1 m3 - Pekerjaan Balok B-2 K 20 x 45 cm

Campuran beton K-300 m3 1.0000 1,370,290.90 1,370,290.90

Bekisting Balok m2 12.5000 373,257.50 4,665,718.75

Pembongkaran Bekisting m2 12.5000 9,487.50 118,593.75

Besi BJTP-24 kg 77.0672 13,083.40 1,008,300.94

Besi BJTD-39 kg 183.8823 13,660.90 2,511,998.08

Besi Wiremesh BJTD-50 kg - 15,103.00

-9,674,902.00 Rp

12 1 m3 - Pekerjaan Balok B-3 20 x 40 cm

Campuran beton K-300 m3 1.0000 1,370,290.90 1,370,290.90

Bekisting Balok m2 12.5000 373,257.50 4,665,718.75

Pembongkaran Bekisting m2 12.5000 9,487.50 118,593.75

Besi BJTP-24 kg 44.0384 13,083.40 576,171.96

Besi BJTD-39 kg 118.3752 13,660.90 1,617,111.92

Besi Wiremesh BJTD-50 kg - 15,103.00

-8,347,887.00 Rp

13 1 m3 - Pekerjaan Balok B-4 20 x35 cm

Campuran beton K-300 m3 1.0000 1,370,290.90 1,370,290.90

Bekisting Balok m2 12.8571 373,257.50 4,799,025.00

Pembongkaran Bekisting m2 12.8571 9,487.50 121,982.14

Besi BJTP-24 kg 28.2168 13,083.40 369,171.49

Besi BJTD-39 kg 89.3099 13,660.90 1,220,053.19

Besi Wiremesh BJTD-50 kg - 15,103.00

-7,880,523.00 Rp

14 1 m3 - Pekerjaan Plat S-1 Tb. 10 cm

Campuran beton K-300 m3 1.0000 1,370,290.90 1,370,290.90

Bekisting Plat m2 11.4331 468,270.00 5,353,768.75

Pembongkaran Bekisting m2 11.4331 9,487.50 108,471.35

Besi BJTP-24 kg 93.4556 13,083.40 1,222,717.45

Besi BJTD-39 kg - 13,660.90

-Besi Wiremesh BJTD-50 kg - 15,103.00

-8,055,248.00

(9)

HARGA SAT. HSPK

(Rp.) (Rp.)

1 2 3 4 5 6 = 4 x 5

NO. U R A I A N SAT. VOLUME

15 1 m3 - Pekerjaan Plat S-2 Tb. 12 cm

Campuran beton K-300 m3 1.0000 1,370,290.90 1,370,290.90

Bekisting Plat m2 9.4762 468,270.00 4,437,415.71

Pembongkaran Bekisting m2 9.4762 9,487.50 89,905.36

Besi BJTP-24 kg 92.9543 13,083.40 1,216,158.76

Besi BJTD-39 kg - 13,660.90

-Besi Wiremesh BJTD-50 kg - 15,103.00

-7,113,771.00 Rp

16 1 m3 - Pekerjaan Plat S-3 Tb. 10 cm

Campuran beton K-300 m3 1.0000 1,370,290.90 1,370,290.90

Bekisting Plat Metaldeck m2 14.9763 402,950.90 6,034,719.81

Pembongkaran Bekisting m2 7.4882 9,487.50 71,043.90

Besi BJTP-24 kg - 13,083.40

-Besi BJTD-39 kg - 13,660.90

-Besi Wiremesh BJTD-50 kg 40.3845 15,103.00 609,927.08

8,085,982.00 Rp

17 1 m3 - Pekerjaan Plat S-4 Tb. 12 cm

Campuran beton K-300 m3 1.0000 1,370,290.90 1,370,290.90

Bekisting Plat Metaldeck m2 12.3295 402,950.90 4,968,183.10

Pembongkaran Bekisting m2 6.1647 9,487.50 58,488.07

Besi BJTP-24 kg - 13,083.40

-Besi BJTD-39 kg - 13,660.90

-Besi Wiremesh BJTD-50 kg 83.7262 15,103.00 1,264,516.32

7,661,478.00 Rp

Jumlah HSPK Jumlah HSPK

Jumlah HSPK

(10)

ANALISA HARGA SATUAN DASAR PEKERJAAN

NAMA PEKERJAAN : STUDI PENYUSUNAN DED PERLUASAN KANTOR KSOP KELAS II GRESIK LOKASI : Jl. YOS SUDARSO No. 36, GRESIK

TAHUN ANGGARAN : 2017

HARGA SAT. JUMLAH

(Rp.) (Rp.)

1 3 4 5 6 = 4 x 5 7

A PEKERJAAN TANAH

1 1 m1 - Pengukuran dan pemasangan bouwplank

a. Bahan : Kayu Hutan Balok Meranti m3 0.0120 6,225,000.00 74,700.00

Paku kg 0.0200 26,000.00 520.00

Kayu Hutan Papan Meranti m3 0.0070 6,500,000.00 45,500.00 Rp 120,720.00

b. Tenaga : Pekerja OH 0.1000 100,000.00 10,000.00

Tukang Kayu OH 0.1000 125,000.00 12,500.00

Kepala Tukang OH 0.0100 130,000.00 1,300.00

Mandor OH 0.0045 145,000.00 652.50 Rp 24,452.50

159,690.30 Rp

2 1 m2 - Pembersihan

a. Tenaga : Pekerja OH 0.1000 100,000.00 10,000.00

Mandor OH 0.0500 145,000.00 7,250.00

18,975.00 Rp

3 1 m3 - Galian tanah biasa, sedalam 1 meter

a. Tenaga : Pekerja OH 0.7500 100,000.00 75,000.00

Mandor OH 0.0250 145,000.00 3,625.00

86,487.50 Rp

4 1 m3 - Galian tanah biasa, sedalam 2 meter

a. Tenaga : Pekerja OH 0.9000 100,000.00 90,000.00

Mandor OH 0.0450 145,000.00 6,525.00

106,177.50 Rp

5 1 m3 - Galian tanah dengan alat berat

a. Tenaga : Pekerja OH 0.2260 100,000.00 22,600.00

Mandor OH 0.0070 145,000.00 1,015.00 Rp 23,615.00

b. Sewa Alat : Sewa Excavator 0.9 m3 jam 0.0670 307,500.00 20,602.50

Sewa Dump Truck 8 - 10 m3 10 T jam 0.0700 430,000.00 30,100.00 Rp 50,702.50

81,749.80 Rp

Jumlah HSPK + 10%

Jumlah HSPK + 10%

Jumlah HSPK + 10%

Jumlah HSPK + 10%

Jumlah HSPK + 10%

HSPK

2

NO. U R A I A N SAT. INDEKS

(11)

HARGA SAT. JUMLAH

a. Bahan : Pasir urug m3 1.2000 200,000.00 240,000.00 Rp 240,000.00

b. Tenaga : Pekerja OH 0.2500 100,000.00 25,000.00

Mandor OH 0.0250 145,000.00 3,625.00 Rp 28,625.00

295,487.50 Rp

7 1 m3 - Urugan tanah Sirtu

a. Bahan : Tanah urug m3 1.2000 194,750.00 233,700.00 Rp 233,700.00

b. Tenaga : Pekerja OH 0.2500 100,000.00 25,000.00

Mandor OH 0.0250 145,000.00 3,625.00 Rp 28,625.00

288,557.50 Rp

8 1 m3 - Urugan tanah kembali

a. Tenaga : Pekerja OH 0.2500 100,000.00 25,000.00

Mandor OH 0.0080 145,000.00 1,160.00

28,776.00 Rp

9 1 m3 - Urugan Sirtu dengan alat berat

a. Bahan : Sirtu m3 1.2000 194,750.00 233,700.00 Rp 233,700.00

b. Tenaga : Pekerja OH 0.2500 100,000.00 25,000.00

Mandor OH 0.0250 145,000.00 3,625.00 Rp 28,625.00

c. Sewa Alat : Sewa Stamper jam 0.0080 60,000.00 480.00 Rp 480.00 289,085.50 Rp

10 1 m1 - Pembuatan Lubang Strauss Pile

a. Tenaga : Pekerja OH 0.4800 100,000.00 48,000.00

Mandor OH 0.0240 145,000.00 3,480.00 Rp 51,480.00

b. Sewa Alat : Sewa Alat Bantu Strouss bh 0.4000 100,000.00 9,500.00 Rp 9,500.00 67,078.00 Rp

11 1 m3 - Pembuangan tanah

a. Tenaga : Pekerja OH 0.3300 100,000.00 33,000.00

Mandor OH 0.0100 145,000.00 1,450.00

37,895.00 Rp

Jumlah HSPK + 10% Jumlah HSPK + 10%

Jumlah HSPK + 10%

Jumlah HSPK + 10%

Jumlah HSPK + 10%

Jumlah HSPK + 10%

(12)

HARGA SAT. JUMLAH

B PEKERJAAN BETON BERTULANG

1 1 m3 - Pondasi Bata Rollag

a. Bahan : Batu Bata Merah bh 755.0000 750.00 566,250.00

Semen / PC (50 kg) zak 0.5310 60,000.00 31,860.00

Pasir pasang m3 0.0930 240,000.00 22,320.00 Rp 620,430.00

b. Tenaga : Pekerja OH 0.6000 100,000.00 60,000.00

Tukang batu OH 0.2000 125,000.00 25,000.00

Kepala tukang OH 0.0200 130,000.00 2,600.00

Mandor OH 0.0300 145,000.00 4,350.00 Rp 91,950.00

783,618.00 Rp

2 1 m3 - Campuran beton K-100

a. Bahan : Semen / PC (50 kg) zak 4.9400 60,000.00 296,400.00

Pasir beton m3 0.5431 240,000.00 130,344.00

Koral beton m3 0.5258 375,000.00 197,175.00

Air ltr 215.0000 500.00 107,500.00 Rp 731,419.00

b. Tenaga : Pekerja OH 1.6500 100,000.00 165,000.00

Tukang batu OH 0.2750 125,000.00 34,375.00

Kepala tukang OH 0.0280 130,000.00 3,640.00

Mandor OH 0.0830 145,000.00 12,035.00 Rp 215,050.00

1,041,115.90 Rp

3 1 m3 - Campuran beton K-175

a. Bahan : Semen / PC (50 kg) zak 6.5200 60,000.00 391,200.00

Pasir beton m3 0.4806 240,000.00 115,344.00

Koral beton m3 0.5416 375,000.00 203,100.00

Air ltr 215.0000 500.00 107,500.00 Rp 817,144.00

b. Tenaga : Pekerja OH 1.6500 100,000.00 165,000.00

Tukang batu OH 0.2750 125,000.00 34,375.00

Kepala tukang OH 0.0280 130,000.00 3,640.00

Mandor OH 0.0830 145,000.00 12,035.00 Rp 215,050.00

1,135,413.40 Rp

4 1 m3 - Campuran beton K-250

a. Bahan : Semen / PC (50 kg) zak 9.6000 60,000.00 576,000.00

Pasir beton m3 0.4325 240,000.00 103,800.00

Koral beton m3 0.5468 375,000.00 205,050.00

Air ltr 215.0000 500.00 107,500.00 Rp 992,350.00

b. Tenaga : Pekerja OH 1.6500 100,000.00 165,000.00

Tukang batu OH 0.2750 125,000.00 34,375.00

Kepala tukang OH 0.0280 130,000.00 3,640.00

Mandor OH 0.0830 145,000.00 12,035.00 Rp 215,050.00

1,328,140.00 Rp

Jumlah HSPK + 10%

Jumlah HSPK + 10%

Jumlah HSPK + 10%

Jumlah HSPK + 10%

(13)

HARGA SAT. JUMLAH

5 1 m3 - Campuran beton K-300

a. Bahan : Semen / PC (50 kg) zak 10.3250 60,000.00 619,500.00

Pasir beton m3 0.4256 240,000.00 102,144.00

Koral beton m3 0.5374 375,000.00 201,525.00

Air ltr 215.0000 500.00 107,500.00 Rp 1,030,669.00

b. Tenaga : Pekerja OH 1.6500 100,000.00 165,000.00

Tukang batu OH 0.2750 125,000.00 34,375.00

Kepala tukang OH 0.0280 130,000.00 3,640.00

Mandor OH 0.0830 145,000.00 12,035.00 Rp 215,050.00

1,370,290.90 Rp

6 1 m3 - Campuran beton K-250 (Ready Mix)

a. Bahan : Beton Ready Mix K-250 m3 1.0000 1,500,000.00 1,500,000.00 Rp 1,500,000.00

b. Tenaga : Pekerja OH 0.6885 100,000.00 68,850.00

Tukang batu OH 0.1377 125,000.00 17,212.50

Mandor OH 0.0688 145,000.00 9,976.00 Rp 96,038.50

b. Sewa Alat : Sewa alat concrete vibrator bh 0.4819 26,500.00 12,770.35

Sewa Alat bantu ( 1 set @ 3 alat ) jam 2.5000 950.00 2,375.00 Rp 15,145.35

1,755,642.90 Rp

7 1 m3 - Campuran beton K-300 (Ready Mix)

a. Bahan : Beton Ready Mix K-300 m3 1.0000 1,500,000.00 1,500,000.00 Rp 1,500,000.00

b. Tenaga : Pekerja OH 0.6885 100,000.00 68,850.00

Tukang batu OH 0.1377 125,000.00 17,212.50

Mandor OH 0.0688 145,000.00 9,976.00 Rp 96,038.50

b. Sewa Alat : Sewa alat concrete vibrator bh 0.4819 26,500.00 12,770.35

Sewa Alat bantu ( 1 set @ 3 alat ) jam 2.5000 950.00 2,375.00 Rp 15,145.35

1,755,642.90 Rp

8 1 kg - Pembesian Beton, Besi BJTP-24

a. Bahan : Besi beton polos / Besi BJTP-24 kg 1.0500 9,500.00 9,975.00

Bendrat kg 0.0150 13,000.00 195.00 Rp 10,170.00

b. Tenaga : Pekerja OH 0.0070 100,000.00 700.00

Tukang besi OH 0.0070 125,000.00 875.00

Kepala tukang OH 0.0007 130,000.00 91.00

Mandor OH 0.0004 145,000.00 58.00 Rp 1,724.00

13,083.40 Rp

Jumlah HSPK + 10%

Jumlah HSPK + 10%

Jumlah HSPK + 10%

Jumlah HSPK + 10%

(14)

HARGA SAT. JUMLAH

9 1 kg - Pembesian Beton, Besi BJTD-39

a. Bahan : Besi beton ulir / Besi BJTD-39 kg 1.0500 10,000.00 10,500.00

Bendrat kg 0.0150 13,000.00 195.00 Rp 10,695.00

b. Tenaga : Pekerja OH 0.0070 100,000.00 700.00

Tukang besi OH 0.0070 125,000.00 875.00

Kepala tukang OH 0.0007 130,000.00 91.00

Mandor OH 0.0004 145,000.00 58.00 Rp 1,724.00

13,660.90 Rp

10 1 kg - Pembesian Wiremesh BJTD-50

a. Bahan : Wiremesh kg 1.0200 11,132.97 11,355.63

Bendrat kg 0.0500 13,000.00 650.00 Rp 12,005.63

b. Tenaga : Pekerja OH 0.0070 100,000.00 700.00

Tukang besi OH 0.0070 125,000.00 875.00

Kepala tukang OH 0.0007 130,000.00 91.00

Mandor OH 0.0004 145,000.00 58.00 Rp 1,724.00

15,103.00 Rp

11 1 m2 - Bekisting poer (3x Pakai)

a. Bahan : Kayu acuan (meranti) m3 0.0133 3,250,000.00 43,333.33

Paku kg 0.3000 26,000.00 7,800.00

Minyak bekisting ltr 0.1000 12,500.00 1,250.00 Rp 52,383.33

b. Tenaga : Pekerja OH 0.5200 100,000.00 52,000.00

Tukang kayu OH 0.2600 125,000.00 32,500.00

Kepala tukang OH 0.0260 130,000.00 3,380.00

Mandor OH 0.0260 145,000.00 3,770.00 Rp 91,650.00

158,436.30 Rp

12 1 m2 - Bekisting sloof (3x Pakai)

a. Bahan : Kayu acuan (meranti) m3 0.0150 3,250,000.00 48,750.00

Paku kg 0.3000 26,000.00 7,800.00

Minyak bekisting ltr 0.1000 12,500.00 1,250.00 Rp 57,800.00

b. Tenaga : Pekerja OH 0.5200 100,000.00 52,000.00

Tukang kayu OH 0.2600 125,000.00 32,500.00

Kepala tukang OH 0.0260 130,000.00 3,380.00

Mandor OH 0.0260 145,000.00 3,770.00 Rp 91,650.00

164,395.00 Rp

Jumlah HSPK + 10%

Jumlah HSPK + 10%

Jumlah HSPK + 10% Jumlah HSPK + 10%

(15)

HARGA SAT. JUMLAH

13 1 m2 - Bekisting kolom (2x Pakai)

a. Bahan : Kayu acuan (meranti) m3 0.0200 3,250,000.00 65,000.00

Kayu balok meranti m3 0.0075 6,225,000.00 46,687.50

Paku kg 0.4000 26,000.00 10,400.00

Plywood lbr 0.1750 170,000.00 29,750.00

Minyak bekisting ltr 0.2000 12,500.00 2,500.00

Dolken kayu gelam btg 1.0000 6,800.00 6,800.00 Rp 161,137.50

b. Tenaga : Pekerja OH 0.6600 100,000.00 66,000.00

Tukang kayu OH 0.3300 125,000.00 41,250.00

Kepala tukang OH 0.0330 130,000.00 4,290.00

Mandor OH 0.0330 145,000.00 4,785.00 Rp 116,325.00

305,209.30 Rp

14 1 m2 - Bekisting balok (1,5x Pakai)

a. Bahan : Kayu acuan (meranti) m3 0.0267 3,250,000.00 86,666.67

Kayu balok meranti m3 0.0120 6,225,000.00 74,700.00

Paku kg 0.4000 26,000.00 10,400.00

Plywood lbr 0.2333 170,000.00 39,666.67

Minyak bekisting ltr 0.2000 12,500.00 2,500.00

Dolken kayu gelam btg 1.3333 6,800.00 9,066.67 Rp 223,000.00

b. Tenaga : Pekerja OH 0.6600 100,000.00 66,000.00

Tukang kayu OH 0.3300 125,000.00 41,250.00

Kepala tukang OH 0.0330 130,000.00 4,290.00

Mandor OH 0.0330 145,000.00 4,785.00 Rp 116,325.00

373,257.50 Rp

15 1 m2 - Bekisting plat lantai

a. Bahan : Kayu acuan (meranti) m3 0.0400 3,250,000.00 130,000.00

Kayu balok meranti m3 0.0150 6,225,000.00 93,375.00

Paku kg 0.4000 26,000.00 10,400.00

Plywood lbr 0.3500 170,000.00 59,500.00

Minyak bekisting ltr 0.2000 12,500.00 2,500.00

Dolken kayu gelam btg 2.0000 6,800.00 13,600.00 Rp 309,375.00

b. Tenaga : Pekerja OH 0.6600 100,000.00 66,000.00

Tukang kayu OH 0.3300 125,000.00 41,250.00

Kepala tukang OH 0.0330 130,000.00 4,290.00

Mandor OH 0.0330 145,000.00 4,785.00 Rp 116,325.00

468,270.00 Rp

Jumlah HSPK + 10% Jumlah HSPK + 10%

Jumlah HSPK + 10%

(16)

HARGA SAT. JUMLAH

16 1 m2 - Bekisting plat lantai metaldeck

a. Bahan : Plat galvanis tb. 0.75 mm m2 1.0300 150,000.00 154,500.00

Kayu acuan (meranti) m3 0.0400 3,250,000.00 130,000.00

Kayu balok meranti m3 0.0038 6,225,000.00 23,343.75

Paku kg 0.1000 26,000.00 2,600.00

Plywood lbr 0.0900 170,000.00 15,300.00

Minyak bekisting ltr 0.0500 12,500.00 625.00

Dolken kayu gelam btg 1.5000 6,800.00 10,200.00 Rp 336,568.75

b. Tenaga : Pekerja OH 0.1700 100,000.00 17,000.00

Tukang kayu OH 0.0800 125,000.00 10,000.00

Kepala tukang OH 0.0100 130,000.00 1,300.00

Mandor OH 0.0100 145,000.00 1,450.00 Rp 29,750.00

402,950.90 Rp

17 1 m2 - Bekisting plat dinding

a. Bahan : Kayu acuan (meranti) m3 0.0300 3,250,000.00 97,500.00

Kayu balok meranti m3 0.0200 6,225,000.00 124,500.00

Paku kg 0.4000 26,000.00 10,400.00

Plywood lbr 0.3500 170,000.00 59,500.00

Minyak bekisting ltr 0.2000 12,500.00 2,500.00

Dolken kayu gelam btg 3.0000 6,800.00 20,400.00 Rp 314,800.00

b. Tenaga : Pekerja OH 0.6600 100,000.00 66,000.00

Tukang kayu OH 0.3300 125,000.00 41,250.00

Kepala tukang OH 0.0330 130,000.00 4,290.00

Mandor OH 0.0330 145,000.00 4,785.00 Rp 116,325.00

474,237.50 Rp

18 1 m2 - Bekisting tangga

a. Bahan : Kayu acuan (meranti) m3 0.0300 3,250,000.00 97,500.00

Kayu balok meranti m3 0.0150 6,225,000.00 93,375.00

Paku kg 0.4000 26,000.00 10,400.00

Plywood lbr 0.3500 170,000.00 59,500.00

Minyak bekisting ltr 0.1500 12,500.00 1,875.00

Dolken kayu gelam btg 2.0000 6,800.00 13,600.00 Rp 276,250.00

b. Tenaga : Pekerja OH 0.6600 100,000.00 66,000.00

Tukang kayu OH 0.3300 125,000.00 41,250.00

Kepala tukang OH 0.0330 130,000.00 4,290.00

Mandor OH 0.0330 145,000.00 4,785.00 Rp 116,325.00

431,832.50 Rp

Jumlah HSPK + 10%

Jumlah HSPK + 10%

Jumlah HSPK + 10%

(17)

HARGA SAT. JUMLAH

(Rp.) (Rp.)

1 3 4 5 6 = 4 x 5 7

HSPK

2

NO. U R A I A N SAT. INDEKS

19 1 m2 - Pembongkaran cetakan

a. Tenaga : Pekerja OH 0.0500 100,000.00 5,000.00

Mandor OH 0.0250 145,000.00 3,625.00 Rp 8,625.00

9,487.50 Rp

20 1 m3 - Pondasi Batu Belah, Campuran 1 PC : 3 PP

a. Bahan : Batu Belah 15 cm / 20 cm m3 1.2000 660,000.00 792,000.00

Semen / PC (40 kg) kg 202.0000 1,200.00 242,400.00

Pasir pasang m3 0.4850 240,000.00 116,400.00 Rp 1,150,800.00

b. Tenaga : Pekerja OH 1.5000 100,000.00 150,000.00

Tukang batu OH 0.7500 125,000.00 93,750.00

Kepala tukang OH 0.0750 130,000.00 9,750.00

Mandor OH 0.0750 145,000.00 10,875.00 Rp 264,375.00

1,556,692.50 Rp

Jumlah HSPK + 10% Jumlah HSPK + 10%

(18)

HARGA SAT. JUMLAH

C PEKERJAAN BESI & BAJA

1 1 kg - Besi profil kuda - kuda baja

a. Bahan : Besi baja profil WF kg 1.150 10,500.00 12,075.00

Elektrode baja kg 0.040 61,656.25 2,466.25 Rp 14,541.25

b. Tenaga : Pekerja OH 0.060 100,000.00 6,000.00

Tukang las OH 0.060 125,000.00 7,500.00

Kepala tukang OH 0.006 130,000.00 780.00

Mandor OH 0.003 145,000.00 435.00 Rp 14,715.00

32,181.60 Rp

2 1 kg - Besi baja profil gording atap

a. Bahan : Besi baja profil kanal C kg 1.150 10,500.00 12,075.00

Elektrode baja kg 0.040 61,656.25 2,466.25 Rp 14,541.25

b. Tenaga : Pekerja OH 0.060 100,000.00 6,000.00

Tukang las OH 0.060 125,000.00 7,500.00

Kepala tukang OH 0.006 130,000.00 780.00

Mandor OH 0.003 145,000.00 435.00 Rp 14,715.00

32,181.60 Rp

3 1 kg - Besi baja siku

a. Bahan : Besi baja siku 70.70.7 kg 1.150 10,500.00 12,075.00

Elektrode baja kg 0.250 61,656.25 15,414.06 Rp 27,489.06

b. Tenaga : Pekerja OH 0.060 100,000.00 6,000.00

Tukang las OH 0.060 125,000.00 7,500.00

Kepala tukang OH 0.006 130,000.00 780.00

Mandor OH 0.003 145,000.00 435.00 Rp 14,715.00

46,424.40 Rp

4 1 kg - Besi plat landasan / simpul

a. Bahan : Besi plat landasan / simpul kg 1.150 10,500.00 12,075.00

Elektrode baja kg 0.250 61,656.25 15,414.06 Rp 27,489.06

b. Tenaga : Pekerja OH 0.060 100,000.00 6,000.00

Tukang las OH 0.060 125,000.00 7,500.00

Kepala tukang OH 0.006 130,000.00 780.00

Mandor OH 0.003 145,000.00 435.00 Rp 14,715.00

46,424.40 Rp

Jumlah HSPK + 10%

Jumlah HSPK + 10%

Jumlah HSPK + 10%

Jumlah HSPK + 10%

(19)

HARGA SAT. JUMLAH

a. Bahan : Besi beton kg 0.670 9,500.00 6,365.00 Rp 6,365.00

b. Tenaga : Pekerja OH 0.030 100,000.00 3,000.00

Tukang besi OH 0.030 125,000.00 3,750.00

Kepala tukang OH 0.003 130,000.00 390.00

Mandor OH 0.002 145,000.00 290.00 Rp 7,430.00

15,174.50 Rp

6 1 m1 - Trackstank / Ikatan batang tarik

a. Bahan : Besi beton kg 0.670 9,500.00 6,365.00 Rp 6,365.00

b. Tenaga : Pekerja OH 0.030 100,000.00 3,000.00

Tukang besi OH 0.030 125,000.00 3,750.00

Kepala tukang OH 0.003 130,000.00 390.00

Mandor OH 0.002 145,000.00 290.00 Rp 7,430.00

15,174.50 Rp

7 1 m1 - Ikatan angin

a. Bahan : Besi beton kg 1.088 9,500.00 10,336.00 Rp 10,336.00

b. Tenaga : Pekerja OH 0.030 100,000.00 3,000.00

Tukang besi OH 0.030 125,000.00 3,750.00

Kepala tukang OH 0.003 130,000.00 390.00

Mandor OH 0.002 145,000.00 290.00 Rp 7,430.00

19,542.60 Rp

8 1 kg - Pemasangan angkur

a. Bahan : Besi beton kg 1.100 9,500.00 10,450.00

Fitting + Material bantu kg 0.350 10,450.00 3,657.50 Rp 14,107.50

b. Tenaga : Pekerja OH 0.030 100,000.00 3,000.00

Tukang besi OH 0.030 125,000.00 3,750.00

Kepala tukang OH 0.003 130,000.00 390.00

Mandor OH 0.002 145,000.00 290.00 Rp 7,430.00

23,691.80 Rp

9 1 bh - Pemasangan shear connector Ø 13 mm

a. Bahan : Shear connector Ø13 mm bh 1.100 1,015.90 1,117.49

b. Tenaga : Pengelasan dengan las listrik cm1 4.084 3,950.10 16,132.49

18,975.00 Rp

10 1 bh - Pemasangan shear connector Ø 16 mm

a. Bahan : Shear connector Ø16 mm bh 1.100 1,538.88 1,692.77

b. Tenaga : Pengelasan dengan las listrik cm1 5.027 3,950.10 19,855.37

23,702.80 Rp

Jumlah HSPK + 10% Jumlah HSPK + 10%

Jumlah HSPK + 10%

Jumlah HSPK + 10%

Jumlah HSPK + 10%

Jumlah HSPK + 10%

(20)

HARGA SAT. JUMLAH

11 1 bh - Pemasangan shear connector Ø 19 mm

a. Bahan : Shear connector Ø19 mm bh 1.100 2,170.06 2,387.06

b. Tenaga : Pengelasan dengan las listrik cm1 5.969 3,950.10 23,578.25

28,561.50 Rp

12 1 bh - Pemasangan shear connector Ø 22 mm

a. Bahan : Shear connector Ø22 mm bh 1.100 2,909.44 3,200.38

b. Tenaga : Pengelasan dengan las listrik cm1 5.969 3,950.10 23,578.25

29,456.90 Rp

13 1 titik - Pemasangan chemical anchor dia. 13 mm, P. 40 cm

a. Bahan : Chemical anchor liter 0.053 825,000.00 43,801.66

Angkur besi kg 0.417 23,691.80 9,874.25 Rp 53,675.91

b. Tenaga : Tukang besi OH 0.050 125,000.00 6,250.00

Mandor OH 0.010 145,000.00 1,450.00 Rp 7,700.00

c. Sewa Alat : Sewa alat bantu chemical anchor jam 0.250 30,000.00 7,500.00 Rp 7,500.00 75,763.60 Rp

14 1 titik - Pemasangan chemical anchor dia. 16 mm, P. 50 cm

a. Bahan : Chemical anchor liter 0.101 825,000.00 82,938.05

Angkur besi kg 0.789 23,691.80 18,696.81 Rp 101,634.86

b. Tenaga : Tukang besi OH 0.050 125,000.00 6,250.00

Mandor OH 0.010 145,000.00 1,450.00 Rp 7,700.00

c. Sewa Alat : Sewa alat bantu chemical anchor jam 0.250 30,000.00 7,500.00 Rp 7,500.00 128,518.50 Rp

15 1 titik - Pemasangan chemical anchor dia. 19 mm, P. 60 cm

a. Bahan : Chemical anchor liter 0.170 825,000.00 140,346.72

Angkur besi kg 1.335 23,691.80 31,638.51 Rp 171,985.24

b. Tenaga : Tukang besi OH 0.050 125,000.00 6,250.00

Mandor OH 0.010 145,000.00 1,450.00 Rp 7,700.00

c. Sewa Alat : Sewa alat bantu chemical anchor jam 0.250 30,000.00 7,500.00 Rp 7,500.00 205,903.50 Rp

16 1 titik - Pemasangan chemical anchor dia. 22 mm, P. 70 cm

a. Bahan : Chemical anchor liter 0.266 825,000.00 219,526.64

Angkur besi kg 2.089 23,691.80 49,488.12 Rp 269,014.77

b. Tenaga : Tukang besi OH 0.050 125,000.00 6,250.00

Mandor OH 0.010 145,000.00 1,450.00 Rp 7,700.00

c. Sewa Alat : Sewa alat bantu chemical anchor jam 0.250 30,000.00 7,500.00 Rp 7,500.00 312,636.50 Rp

Jumlah HSPK + 10%

Jumlah HSPK + 10% Jumlah HSPK + 10%

Jumlah HSPK + 10%

Jumlah HSPK + 10%

Jumlah HSPK + 10%

(21)

HARGA SAT. JUMLAH

(Rp.) (Rp.)

1 3 4 5 6 = 4 x 5 7

HSPK

2

NO. U R A I A N SAT. INDEKS

17 1 bh - Pemasangan jarum keras / Turnbuckle

a. Bahan : Jarum keras / Turnbuckle bh 1.000 43,750.00 43,750.00

48,125.00 Rp

18 1 cm1 - Pengelasan dengan las listrik

a. Bahan : Electrode las kg 0.040 61,656.25 2,466.25

Solar ltr 0.030 8,000.00 240.00

Minyak pelumas las ltr 0.004 45,000.00 180.00 Rp 2,886.25

b. Tenaga : Pekerja OH 0.0040 100,000.00 400.00

Tukang besi OH 0.0020 125,000.00 250.00

Kepala tukang OH 0.0002 130,000.00 26.00

Mandor OH 0.0002 145,000.00 29.00 Rp 705.00

3,950.10 Rp

19 1 m2 - Pemasangan rangka atap baja ringan

a. Bahan : Rangka baja ringan + asesoris kg 1.100 345,000.00 379,500.00 Rp 379,500.00

b. Tenaga : Pekerja OH 0.400 100,000.00 40,000.00

Tukang besi OH 0.100 125,000.00 12,500.00

Kepala tukang OH 0.010 130,000.00 1,300.00

Mandor OH 0.005 145,000.00 725.00 Rp 54,525.00

477,427.50 Rp

20 1 m2 - Pemasangan usuk + reng baja ringan

a. Bahan : Usuk baja ringan uk. 40x40 mm m2 1.100 93,750.00 103,125.00

Reng baja ringan profile Ω - 40 mm m2 1.100 68,750.00 75,625.00 Rp 178,750.00

b. Tenaga : Pekerja OH 0.200 100,000.00 20,000.00

Tukang besi OH 0.050 125,000.00 6,250.00

Kepala tukang OH 0.005 130,000.00 650.00

Mandor OH 0.003 145,000.00 362.50 Rp 27,262.50

226,614.30 Rp

Jumlah HSPK + 10% Jumlah HSPK + 10%

Jumlah HSPK + 10%

Jumlah HSPK + 10%

(22)

HARGA SAT. JUMLAH

(Rp.) (Rp.)

1 3 4 5 6 = 4 x 5 7

HSPK

2

NO. U R A I A N SAT. INDEKS

21 1 m2 - Pemasangan Penutup Atap Metalsheet

a. Bahan : Genteng Metal Tb. 0.4 mm lbr 3.320 -

-Paku kg 0.033 10,500.00 349.65 Rp 349.65

b. Tenaga : Pekerja OH 0.200 100,000.00 20,000.00

Tukang kayu OH 0.200 125,000.00 25,000.00

Kepala tukang OH 0.025 130,000.00 3,250.00

Mandor OH 0.010 145,000.00 1,450.00 Rp 49,700.00

55,055.00 Rp

22 1 m1 - Pemasangan Bubungan Atap Metalsheet

a. Bahan : Nok Genteng Metal Tb. 0.4 mm bh 3.077 -

-Paku kg 0.033 10,500.00 349.65 Rp 349.65

b. Tenaga : Pekerja OH 0.400 100,000.00 40,000.00

Tukang batu OH 0.200 125,000.00 25,000.00

Kepala tukang OH 0.020 130,000.00 2,600.00

Mandor OH 0.002 145,000.00 290.00 Rp 67,890.00

75,064.00 Rp

25 1 m1 - Pemasangan Lisplank

a. Bahan : Woodplank 1.2 x 20 x 400 cm m1 1.100 77,500.00 85,250.00

Rangka galvalume kg 1.100 68,750.00 75,625.00 Rp 160,875.00

b. Tenaga : Pekerja OH 0.100 100,000.00 10,000.00

Tukang kayu OH 0.200 125,000.00 25,000.00

Kepala tukang OH 0.020 130,000.00 2,600.00

Mandor OH 0.005 145,000.00 725.00 Rp 38,325.00

219,120.00 Rp

Jumlah HSPK + 10% Jumlah HSPK + 10%

Jumlah HSPK + 10%

(23)

HARGA SAT. JUMLAH

26 1 m1 - Pemasangan Papan Ruiter

a. Bahan : Woodplank 1.2 x 20 x 400 cm m1 1.100 77,500.00 85,250.00

Rangka galvalume kg 1.100 68,750.00 75,625.00 Rp 160,875.00

b. Tenaga : Pekerja OH 0.100 100,000.00 10,000.00

Tukang kayu OH 0.200 125,000.00 25,000.00

Kepala tukang OH 0.020 130,000.00 2,600.00

Mandor OH 0.005 145,000.00 725.00 Rp 38,325.00

219,120.00 Rp

27 1 m1 - Pemasangan Talang Seng Datar

a. Bahan : Plat seng lbr 0.500 40,000.00 20,000.00

Paku kg 0.015 26,000.00 390.00

Hollow besi 30/30 kg 7.050 38,281.25 269,882.81

Meni besi kg 0.250 60,000.00 15,000.00 Rp 305,272.81

b. Tenaga : Pekerja OH 0.150 100,000.00 15,000.00

Tukang kayu OH 0.400 125,000.00 50,000.00

Kepala tukang OH 0.025 130,000.00 3,250.00

Mandor OH 0.013 145,000.00 1,885.00 Rp 70,135.00

412,948.80 Rp

D PEKERJAAN PASANGAN BATA

1 1 m2 - Bata Merah, 1 PC : 3 PP (tebal 1/2 BT)

a. Bahan : Bata merah 5 x 11 x 22 cm Bh 70.0000 750.00 52,500.00

Semen portland Kg 14.3700 1,200.00 17,244.00

Pasir pasang M³ 0.0400 240,000.00 9,600.00 Rp 79,344.00

b. Tenaga : Pekerja OH 0.3000 100,000.00 30,000.00

Tukang batu OH 0.1000 125,000.00 12,500.00

Kepala tukang OH 0.0100 130,000.00 1,300.00

Mandor OH 0.0150 145,000.00 2,175.00 Rp 45,975.00

137,850.90 Rp

2 1 m2 - Bata Merah, 1 PC : 5 PP (tebal 1/2 BT)

a. Bahan : Bata merah 5 x 11 x 22 cm Bh 70.0000 750.00 52,500.00

Semen portland Kg 9.6800 1,200.00 11,616.00

Pasir pasang M³ 0.0450 240,000.00 10,800.00 Rp 74,916.00

b. Tenaga : Pekerja OH 0.3000 100,000.00 30,000.00

Tukang batu OH 0.1000 125,000.00 12,500.00

Kepala tukang OH 0.0100 130,000.00 1,300.00

Mandor OH 0.0150 145,000.00 2,175.00 Rp 45,975.00

132,980.10 Rp

Jumlah HSPK + 10%

Jumlah HSPK + 10%

Jumlah HSPK + 10% Jumlah HSPK + 10%

(24)

HARGA SAT. JUMLAH

E PEKERJAAN PLESTERAN, ACIAN, & BENANGAN

1 1 m2 - Plesteran, 1 PC : 3 PP (t= 15 mm)

a. Bahan : Semen / PC (40 kg) zak 0.1940 48,000.00 9,312.00

Pasir pasang m3 0.0230 240,000.00 5,520.00 Rp 14,832.00

b. Tenaga : Pekerja OH 0.3000 100,000.00 30,000.00

Tukang batu OH 0.1500 125,000.00 18,750.00

Kepala tukang OH 0.0150 130,000.00 1,950.00

Mandor OH 0.0150 145,000.00 2,175.00 Rp 52,875.00

74,477.70 Rp

2 1 m2 - Plesteran, 1 PC : 5 PP (t= 15 mm)

a. Bahan : Semen / PC (40 kg) zak 0.1300 48,000.00 6,240.00

Pasir pasang m3 0.0260 240,000.00 6,240.00 Rp 12,480.00

b. Tenaga : Pekerja OH 0.3000 100,000.00 30,000.00

Tukang batu OH 0.1500 125,000.00 18,750.00

Kepala tukang OH 0.0150 130,000.00 1,950.00

Mandor OH 0.0150 145,000.00 2,175.00 Rp 52,875.00

71,890.50 Rp

3 1 m2 - Acian

a. Bahan : Semen / PC (40 kg) zak 0.0810 48,000.00 3,888.00 Rp 3,888.00

b. Tenaga : Pekerja OH 0.2000 100,000.00 20,000.00

Tukang batu OH 0.1000 125,000.00 12,500.00

Kepala tukang OH 0.0100 130,000.00 1,300.00

Mandor OH 0.0100 145,000.00 1,450.00 Rp 35,250.00

43,051.80 Rp

4 1 m1 - Benangan atau Tali Air, 1 PC : 2 PP

a. Bahan : Semen / PC (40 kg) zak 0.0130 48,000.00 624.00

Pasir pasang m3 0.0130 240,000.00 3,120.00 Rp 3,744.00

b. Tenaga : Pekerja OH 0.0750 100,000.00 7,500.00

Tukang batu OH 0.0500 125,000.00 6,250.00

Kepala tukang OH 0.0050 130,000.00 650.00

Mandor OH 0.0040 145,000.00 580.00 Rp 14,980.00

20,596.40 Rp

Jumlah HSPK + 10%

Jumlah HSPK + 10% Jumlah HSPK + 10%

Jumlah HSPK + 10%

(25)

HARGA SAT. JUMLAH

(Rp.) (Rp.)

1 3 4 5 6 = 4 x 5 7

HSPK

2

NO. U R A I A N SAT. INDEKS

5 1 m2 - Pelapisan Waterprofing

a. Bahan : Waterprofing Kg 0.3500 50,000.00 17,500.00

Serat Fiber m2 1.0000 5,625.00 5,625.00 Rp 23,125.00

b. Tenaga : Pekerja OH 0.0500 100,000.00 5,000.00

Tukang Cat OH 0.0750 125,000.00 9,375.00

Kepala tukang OH 0.0075 130,000.00 975.00

Mandor OH 0.0025 145,000.00 362.50 Rp 15,712.50

42,721.80 Rp

F PEKERJAAN PENGECATAN

1 1 m2 - Meni besi

a. Bahan : Cat meni besi kg 0.200 60,000.00 12,000.00

Kuas cat uk. 4" bh 0.200 10,000.00 2,000.00

Minyak cat / Thinner A ltr 0.100 28,000.00 2,800.00 Rp 16,800.00

b. Tenaga : Pekerja OH 0.150 100,000.00 15,000.00

Tukang cat OH 0.150 125,000.00 18,750.00

Kepala tukang OH 0.015 130,000.00 1,950.00

Mandor OH 0.008 145,000.00 1,160.00 Rp 36,860.00

59,026.00 Rp

2 1 m2 - Cat besi

a. Bahan : Cat besi kg 0.100 55,000.00 5,500.00

kuas bh 0.010 10,000.00 100.00 Rp 5,600.00

b. Tenaga : Pekerja OH 0.020 100,000.00 2,000.00

Tukang cat OH 0.200 125,000.00 25,000.00

Kepala tukang OH 0.020 130,000.00 2,600.00

Mandor OH 0.010 145,000.00 1,450.00 Rp 31,050.00

40,315.00 Rp

Jumlah HSPK + 10%

Jumlah HSPK + 10%

Jumlah HSPK + 10%

Referensi

Dokumen terkait

Dari hasil observasi terhadap dataset trafik jaringan dan melalui proses perhitungan menggunakan Algoritma K-NN didapatkan sebuah hasil bahwa nilai yang dihasilkan oleh

Badan Pengendali Bimas mempunyai tugas, wewenang, dan tanggung jawab dalam : a.menyiapkan rencana program penyelenggaraan Bimas berdasarkan kebijaksanaan umum di bidang

Red Cross and Red Crescent National Societies use a community-based health and first-aid approach to improve maternal, new- born and child health.. Whether delivering home-based

Tidak kalah pentingnya dalam konsep pacak adalah pemilihlah peran (casting) penari yang bisa mendukung karakter, yang mampu bergerak untuk mewujudkan interpretasi dan

Aktivitas siswa dalam proses pembelajaran IPA pada tema organ tubuh manusia dan hewan melalui penerapan pendekatan contextual teaching and learning pada siswa kelas

Hasil penelitian ini menunjukkan bahwa terdapat perbedaan kemampuan pemecahan masalah matematis siswa antara kelas akselerasi dengan kelas reguler, dimana nilai

Klik tombol [Pr [Pr [Pr [Pr [Proper oper oper oper operties] ties] ties] ties] ties], lalu atur ukuran kertas dan jenis printer yang akan Anda gunakan pada boks Printer Setup

[r]