• Tidak ada hasil yang ditemukan

Investor Newsletter 3M17

N/A
N/A
Protected

Academic year: 2017

Membagikan "Investor Newsletter 3M17"

Copied!
2
0
0

Teks penuh

(1)

PT DHARMA SATYA NUSANTARA TBK (DSNG)

INVESTOR NEWSLETTER

Number 21| April 2017

3M-17

3M-16

% Δ FY2016

Plantation, Performance

FFB Production (ton) 388,964 253,592 53.4 1,092,937

- FFB Nucleus (ton) 345,690 227,161 52.2 977,629

- FFB Plasma (ton) 43,274 26,431 63.7 115,308

Mill Performance

FFB Processed (ton) 452,794 300,678 50.6 1,306,365

CPO Production(ton) 99,160 72,287 37.2 311,952

PK Production (ton) 15,280 11,939 28.0 51,127

PKO Production (ton) 4,816 4,372 10.1 17,259

CPO OER (%) 21.90 24.04 (8.9) 23.88

FFA (%) 3.30 2.27 45.3 2.60

Sales Performance

CPO (ton) 97,750 74,641 31.0 348,391

PK (ton) 2,859 2,628 8.8 11,067

PKO (ton) 7,001 3,500 100.0 17,451

Our FFB production in the first three months of 2017 has shown a significant improvement as the rainfall has normalized following the El-Nino. Through March 2017, our FFB production reached 389.0 thousand tons, or 53.4% higher compare to the first quarter of 2016.

Mill productivity also rose as well, with FFB processed reaching 452.8 thousand tons, for an increase of 50.6% compared to same period last year, while CPO production also rose by 37.2% to 99.2 thousand tons in 2017. The company's CPO sales volume was 97.8 thousand tons, an increase of 31.0%, with the average selling price of Rp 8.8 million per ton in first three months of 2017.

2

CPO PRODUCTION (TONS) 2016 2017

9

FFB PRODUCTION (TONS) 2016 2017

5,977

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

AVERAGE SELLING PRICE (Rp

‘000/tons)

KPB Medan 2016 KPB Medan 2017

(2)

PT DHARMA SATYA NUSANTARA TBK (DSNG)

INVESTOR NEWSLETTER

3M-17 3M-16 % Δ FY2016

Sales Volume

Engineered flooring (m2) 334,232 303,877 10.0 1,254,642

Engineered doors (Pcs) 8,991 15,271 (41.1) 59,447

Panel (m3) 17,490 28,395 (38.4) 92,235

Average Selling Price (Rp 'million)

Engineered flooring (per

m2) 0.37 0.39 (4.9) 0.37

Engineered doors

(per pcs) 1.06 1.02 4.2 1.06

Panel (per m3) 5.04 4.79 5.0 4.86

In the first three months of 2017, our engineered flooring sales volume increased by 10.0% to 334.2 thousand m2, despite the average selling price (ASP) for engineered flooring declined by 4.9%.

Meanwhile, our wood panel and engineered door sales volume declined due to restructuring in our wood product manufacturing. However The ASP for

both product rose by 4.2% and 5.0% respectively.

DSNG Investor Newsletter —For further information, contact Investor Relations ([email protected])

PT Dharma Satya Nusantara Tbk. Jl. Rawa Gelam V Kav OR/3B Kawasan Industri Pulogadung, Jakarta 13930 Indonesia

DISCLAIMER: The views expressed here contain information derived from publicly available sources that have not been independently verified. No representation or warranty is made as to the accuracy, completeness or reliability of the information. Any forward looking information in this presentation has been prepared on the basis of a number of assumptions which may prove to be incorrect. This presentation should not be relied upon as a recommendation or forecast by PT. Dharma Satya Nusantara Tbk. Nothing in this release should be construed as either an offer to buy or sell or a solicitation of an offer to buy or sell shares in any jurisdiction.

WOOD PRODUCTS BUSINESS

Mature Area (ha) Total Planted (ha)

Nucleus 9.5 60,527 69,368

Plasma 5.3 11,818 20,920

Total 8.6 72,345 90,288

PLANTED AREA

As of the end of March 2017, our mature area has reached 72,345 hectares, with an average age of 8.6 years. As of March 2017, we have not proceeded with any organic expansion, as we continue to review our available land bank in light of our sustainability policy.

FINANCIAL SUMMARY

In the first quarter of 2017, the Company generated revenue of Rp 1.26 trillion, 61.7% higher compared to the same period last year due to the increase in CPO production as well as higher ASPs compared to the same period last year.

Gross profit rose by 124.4% to Rp 407.0 billion and operating profit also rose by 238.9% to Rp 247.0 billion. The Company posted a three-month EBITDA of Rp 331.1 billion, or 116.2% higher compared to the same period last year. Our EBITDA margin increased from 19.6% in 2016 to 26.3% in 2017.

The co pa y’s et profilt (attributable to owners of the Company) for the period reached Rp 119.7 billion, up from Rp 14.1 billion last year as a result of higher revenue.

In Million Rupiah

31 March 2017 31 March2016

Revenue 1,260,915 779,955

Cost of Revenue (853,892) (598,598)

Gross Profit 407,023 181,357

% margin 32.3 23.3

Operating Profit 247,022 72,890

% margin 19.6 9.3

Profit Before Income Tax 186,358 25,991

% margin 14.8 3.3

EBITDA 331,095 153,128

% margin 26.3 19.6

Profit attributable to owners of the

Company 119,661 14,103

Referensi

Dokumen terkait

Total operating expenses increased 8% YoY to Rp 3.9 trillion, a modest increase compared to the revenue growth of 35%.. COGS and Interconnection Charges increased by

During฀ the฀ last฀ quarter,฀ the฀ Grassroots฀ Project฀ team฀ in฀ Lao฀ PDR฀ focused฀on฀capacity฀building฀for฀gender฀mainstreaming฀in฀Sustainable฀

Indonesia ended the first month of the year with a lower budget deficit compared with the same period last year, as windfall revenue from higher oil prices and

from Infobank Magazine for property company with assets Rp 5-10 trillion Lippo Cikarang received award. The winner of Indonesia most innovative business

OVERSEAS STUDENTS Quarterly update at a glance 55% decrease in complaints received this quarter compared with same time last year Fee and refund disputes continue as the most

TOTAL DIVIDEND DISTRIBUTIONS FOR THE REPORTING QUARTER SAR 0.00 TOTAL DIVIDEND DISTRIBUTIONS FOR THE LAST SEMI-ANNUAL PERIOD SAR 0.00 DIVIDEND DISTRIBUTIONS FOR THE LAST SEMI-ANNUAL

The exceptional increase in revenue collections led to the revenue effort rising from 13.84% last year to 15.49%, a 1.66 percentage point rise, the highest first quarter revenue effort

Strategic Projects The total Pelindo’s strategic project investments in 1stSemester of 2022 are Rp 1.78 trillion KIJING TERMINAL, WEST KALIMANTAN Initial Capacity: 500,000 TEUS