• Tidak ada hasil yang ditemukan

Beasiswa Kuliah S2 dan S3 Jerman oleh DAAD Epos | INDBeasiswa

N/A
N/A
Protected

Academic year: 2017

Membagikan "Beasiswa Kuliah S2 dan S3 Jerman oleh DAAD Epos | INDBeasiswa"

Copied!
2
0
0

Teks penuh

(1)

List of Application Deadlines

DAAD Scholarship

Self-financing * Intake every two years - next intake 2018

Geography and Environmental Sciences

NEW!

The Geography of Environmental Risks and Human Security U Bonn/United Nations University English MSc 24 months 15.01.2017

http://ehs.unu.edu/education/masters/international-joint-msc-programme-geography-of-environmental-risks-and-human-security.html#overview

Economic Sciences/Business Administration/Political Economics

Master's Programme in International and Development Economics - MIDE HTW Berlin English MA 18 months 30.09.2016 30.09.2016 Small Enterprise Promotion and Training - SEPT U Leipzig English MBA 22 months 01.10.2016 15.03.2017

Development Co-operation

Development Management* RU Bochum English MA 18 months 30.09.2017 30.09.2017

ZEF Doctoral Studies Program U Bonn English PhD 38 months 31.08.2016 throughout

the year

Engineering and Related Sciences

Tropical Hydrogeology and Environmental Engineering - M.Sc. TropHEE

TU Darmstadt English MSc 24 months 15.10.2016 31.03.2017

Hydro Science an Engineering TU Dresden English MSc 24 months 15.10.2016 15.10.2016

Textile Machinery and High Performance Material Technology TU Dresden German MSc 24 months 10.10.2016 10.10.2016 Engineering in Energy and Environmental Management in Developing

Countries

U Flensburg English MEng 18 months 15.09.2016 15.04.2016

Water Resources and Environmental Management - WATENV U Hannover English MSc 24 months 30.09.2016 15.01.2017 Postgraduate Programme Renewable Energy U Oldenburg English MSc 18 months 15.10.2016 15.01.2017

Photogrammetry and Geoinformatics HfT Stuttgart English MSc 18 months 15.10.2016 15.10.2016

Master's Programme Infrastructure Planning U Stuttgart English MSc 24 months 30.09.2016 15.02.2017 Natural Hazards and Risks in Structural Engineering - NHRE BHU Weimar English MSc 24 months 15.10.2016 15.10.2016

Mathematics

PhD Programme Mathematics in Industry and Commerce - MIC TU Kaiserslautern English PhD 36 months 15.01.2017 15.01.2017

Regional Planning

Urban Management - UM TU Berlin English MSc 18 months 31.08.2016 30.04.2017

SPRING - Regional Development Planning and Management TU Dortmund English MSc 24 months 15.10.2016 15.05.2017

Regional Science/Spatial Planning KIT Karlsruhe German MSc 24 months 30.10.2016 15.07.2017

Land Management and Land Tenure TU München English MSc 18 months 30.11.2016 31.05.2017

Master of Science Integrated Urbanism and Sustainable Design – MSc. IUSD U Stuttgart English MSc 24 months 15.02.2017 31.05.2017 Agricultural and Forest Sciences

Agricultural Sciences and Resource Management in the Tropics and Subtropics - ARTS

U Bonn English MSc 24 months 15.09.2016 15.03.2017 (if visa needed) 30.06.2017 (if visa not needed)

Tropical Forestry TU Dresden English MSc 24 months 30.10.2016 30.05.2017 (Non

EU)/

15.07.2017 (EU)

Agricultural Economics, Bioeconomy and Rural Development U Giessen/ U Hohenheim

English PhD 38 months 15.12.2016 15.12.2016

Agricultural Economics - AgEcon U Hohenheim English MSc 24 months 01.12.2016 15.03.2017

(Non-EU)/

15.07.2017 (EU)

International Agribusiness and Rural Development - IARD U Göttingen/ U Talca

English/Spanish MSc 21 months 31.08.2016 31.08.2016

International Agribusiness and Rural Development - IARD U Göttingen/ U Bogor

English/ possibly Bahasa Indonesia

MSc 24 months 15.04.2017 15.04.2017

Tropical and International Forestry U Göttingen English MSc 24 months 15.10.2016 15.03.2017 (Non-EU)

Master of Science in International Horticulture U Hannover English MSc 24 months 01.10.2016 01.06.2017

Environmental Sciences

International Studies in Aquatic Tropical Ecology - ISATEC U Bremen English MSc 24 months 15.10.2016 30.04.2017

Environmental Governance - MEG U Freiburg English MSc 24 months 15.10.2016 15.10.2016

Landscape Ecology and Nature Conservation - LENC U Greifswald English MSc 24 months 15.12.2016 01.07.2017 Natural Resources Management and Development (NRM)/

Integrated Water Resources Management (IWRM)/

Renewable Energy Management (REM) (formerly known as TERMA)

TH Köln English MSc 24 months 30.09.2016 31.03.2017 (Germans and Foreigners)

Integrated Water Resources Management (IWRM) TH Köln/ U of Jordan

English MSc 24 months 30.09.2016 31.07.2017 (Germansand Foreigners)/ 30.06.2017 at uni-assist (Foreigners) Environment and Resources Management (ENREM)

– Focus Latin America

TH Köln/

U San Luis Potosi

English/Spanish MSc 24 months 28.02.2017 28.02.2017 Application Deadlines

for Intake 2017/18 Development-Related Postgraduate Courses

https://www.daad.de/entwicklung Institution Language Degree

Duration without German language

(2)

List of Application Deadlines

Medicine/Public Health

Master of Science in International Health (Berlin) Charité Berlin/ FU Berlin/

Humboldt University

English MSc 12 months (applicants who gathered work

experience)/ 24 months (applicants who need to gather work

experience as part of programme)

15.10.2016 31.03.2017

Master of Science in International Health (Heidelberg) U Heidelberg English MSc 12 months 15.10.2016 30.04.2017

Social and Political Sciences and Education and Law

Vocational Education and Personnel Capacity Building TU Dresden German MA 24 months 15.09.2016 15.09.2016

Peace and Conflict Studies U Magdeburg English/German MA 24 months 15.09.2016 15.07.2017

Master of Laws in Intellectual Property and Competition Law Munich Intellectual Property Law Center (MIPLC)

English LL.M. 12 months 15.10.2016 30.04.2017

Media Studies

International Media Studies HS

Bonn-Rhein-Sieg/DW Akademie

English (70%)/ German (30%)

Referensi

Dokumen terkait

Walaupun pertanggung jawaban tidak dilakukan langsung kepada masyarakat maka dalam hal ini sangat diperlukan kontrol dan pengawasan dari pimpinan sehingga tugas dan

Pokja Pengadaan Jasa Lainnya Unit Layanan Pengadaan Barang/Jasa Pemerintah di Lingkungan Pemerintah Provinsi Bali akan melaksanakan Pelelangan Umum dengan

Panitia Pengadaan Barang/Jasa Kegiatan Pembangunan Sarana dan Prasarana Perbatasan (DAK + DAU) Tahun Anggaran 2012Dinas Pekerjaan Umum Kab.. Sanggau akan melaksanakan Pelelangan

Selain permasalahan asumsi sebaran dan banyaknya data, kendala lain yang dihadapi pemodelan structural menggunakan LISREL adalah indikator (variabel manifest) penelitian

(1) Hak-hak atas tanah yang memberi wewenang sebagaimana atau mirip dengan hak yang dimaksud dalam pasal 20 ayat 1 seperti yang disebut dengan nama sebagai di bawah, yang ada

anger management, anger class management, anger management technique, anger management teen, anger management program, anger management teenager, adolescent anger management,

2 Kantor Pengelolaan Asel Daerah Kola (Jakarta Pusat,Jakarta Barat, i Pejabat Pengeloia 1/. Jakarta Selalan, Jakarta Timur.Jakarta Ulara) Operator Kepegawaian 3

Selama proses perendaman , biji mengalami proses hidrasi, sehingga kadar air biji naik sebesar kira-kira dua kali kadar air semula, yaitu mencapai 62-65%. Proses perendaman