• Tidak ada hasil yang ditemukan

Environmental Infrastructure development use of

N/A
N/A
Protected

Academic year: 2018

Membagikan "Environmental Infrastructure development use of"

Copied!
42
0
0

Teks penuh

(1)

BRIEFING FOR

Project Steering Committee 28

FEB 2012

Regional Development Project- Phase II –

Environmental Infrastructure and

Management

(2)

introduction

AIM:

To increase the standard of living in the central region.

Objective:

To improve land management through a community based approach

Main Components of RDP - II

Improving environmental infrastructure

Strengthening planning and environmental management Building management and implementation capacity

Focus Islands:

(3)

Expected Out put:

Improved Institutions and Infrastructure

Environmental Sustainability & Landmangment

Improved Quality of Life & Community Empowerment

In the Region.

Total Loan Amount- 7.5 M USD

Gov – 1.5 M

AB Loan – 6.0 M

Consultants – International Consultants and Technocrats

Pvt. Ltd

(4)
(5)

I MPORTANT MI LESTONES

RDP I I LOAN AGREEMENT SI GNED ON : 20.09.2005

LOAN WAS MADE EFFECTI VE ON : 20.04.2006

ESTI MATED PROJECT COMPLETI ON DATE : 30.09.2010

PERI OD OF UTI LI ZATI ON OF LOAN : 31.03.2011

MANAGEMENT & I MPLEMENTATI ON

CONSULTANTS (MI C) MOBI LI ZED ON : 24.02.2007

(6)

MAJOR COMPONENTS OF RDP I I

I MPROVI NG ENVI RONMENTAL I NFRASTRUCTURE

STRENGHTENI NG PLANNI NG & ENVI RONMENTAL

MANAGEMENT

(7)

Descriptions of Project Components

1.

Sanitation and Sewage Treatment for the Focus

Islands Improved

2.

Increase Water Supply

3.

Development of Integrated solid waste

management system

4.

Land Use Planning

5.

Economic Development Planning

6.

Environmental Awareness Program Development

7.

Environmental Monitoring Enhancement

(8)

PROJECT AREA AND FOCUS I SLANDS

PROJECT AREA : CENTRAL REGI ON

FOCUS I SLANDS

1. NAI FARU I N LHAVI YANI ATOLL

2. MAHI BADHOO I N ALI F DHAAL ATOLL

(9)
(10)
(11)

RDP2: ACTIVITIES

1. Socio economic Survey of Fonadhoo, Mahibadho & Naifaru 2. Regional Economic Development Study Report,

3. Hydo-geological Study Report,

4. Guidelines for Corporative formations;

5. Tender documents for procurement of monitoring equipments,

6. Tender documents for procurement of solid waste equipment, Tender Documents for construction of sewerage schemes of Fonadhoo & Mahibadhoo,

7. Concept designs and detailed designs and tender documents for Fonadhoo, Mahibadhoo and Detailed design Naifaru respectively.

8. Quality Assurance Plan

9. Baseline Water Quality Survey of Fonadhoo, Mahibadhoo & Naifaru

(12)

11 . LAND USE PLANNING ASSESSMENT

12. MONITORING AND EVALUATION

13. FINANCIAL MANAGEMENT STUDIES

14. INTERACTION WITH ISLAND COMMUNITIES & COMMUNITY MOBILISATION

15. EIA ON SEWERAGE SCHEMES OF MAHIBADHOO AND FONADHOO

16. INSTITUTIONAL STRENGTHNING STUDIES

17. STRATEGY FOR SOLID WASTE MANAGEMENT IN ISLAND AND REGIONAL CONTEXT

(13)

SALIENT FEATURES OF FOCUS ISLANDS

MAHIBADHOO ( ALIF DHAAL ATOLL)

(14)
(15)
(16)

ENVIRONMENTAL INFRASTRUCTURE STATUS

PERCENTAGE OF HOUSEHOLDS HAVING PRIVATE STORAGE TANKS:

83%

( ABOVE DATA WILL BE RECONFIRMED AND UPDATED DURING SOCIO-ECONOMIC SURVEY )

NUMBER OF PRIVATE WELLS : 378 (PIU) NUMBER OF HOUSEHOLD WITH MOTORISED PUMPING :

(17)

SANITATION AND SEWERAGE

 TOTAL NUMBER OF HOUSEHOLDS : 319 (PPTA)

 TOTAL NUMBER OF HOUSES : 229 (PIU)

 TOTAL NUMBER OF SEPTIC TANKS : 215 (PIU)

EFFLUENT FROM SEPTIC TANKS BEING DISCHARGED TO SEA

SOLID WASTE MANAGEMENT

(18)
(19)

ENVIRONMENTAL INFRASTRUCTURE STATUS

IN FOCUS ISLANDS

FONADHOO WATER SUPPLY

 NUMBER OF HOUSEHOLDS :363 (PPTA)

 NUMBER OF HOUSES :342 (PIU)

 NUMBER OF HOUSES WITH PRIVATE STORAGE TANKS :215(PPTA)

 PERCENTAGE OF HOUSEHOLDS HAVING PRIVATE STORAGE TANKS: 59%

(20)

SANITATION AND SEWERAGE

 TOTAL NUMBER OF HOUSEHOLDS : 363 (PPTA)

 TOTAL NUMBER OF HOUSES : 342 (PIU)

EFFLUENT FROM SEPTIC TANKS BEING DISCHARGED TO SEA

SOLID WASTE MANAGEMENT

TOTAL POPULATION 1762 ( YEAR 2006 )

 SOLID WASTE GENERATED/DAY 1057 KG = 1MT ( ABOUT ) ( PIU )

(21)
(22)

ENVIRONMENTAL INFRASTRUCTURE STATUS

 PERCENTAGE OF HOUSEHOLDS HAVING PRIVATE STORAGE TANKS: 52%

( ABOVE DATA WILL BE RECONFIRMED AND UPDATED DURING SOCIO-ECONOMIC SURVEY )

 NUMBER OF PRIVATE WELLS : 149 (PIU)

(23)
(24)

SANITATION AND SEWERAGE

TOTAL NUMBER OF HOUSEHOLDS : 741 (PPTA)

TOTAL NUMBER OF HOUSES : 525 (PIU) RAW SEWAGE DISCHARGED INTO SEA.

SOLID WASTE MANAGEMENT

TOTAL POPULATION 3687 ( YEAR 2006 )

SOLID WASTE GENERATED/DAY 2000 KG = 2.00MT ( PIU )

NO ORGANISED COLLECTION, TRANSPORTATION AND

(25)

STATUS OF ENVIRONMENTAL INFRASTRUCTURE SANITATION AND SEWERAGE

FRESH WATER LENS ON ALL THE FOCUS ISLANDS POLLUTED WITH PARTIALLY TREATED SEWAGE ( MAHIBADHOO AND FONADHOO ) AND RAW SEWAGE ( NAIFARU )

THERE IS NEED OF COHERENT AND CONSISTENT NATIONAL POLICY

AND MINIMUM STANDARDS FOR TREATMENT OF SEWAGE AND DISPOSAL FOR INHABITATED ISLANDS BASED ON

- DEVELOPMENT OF WASTEWATER QUALITY TARGETS RELEVANT FOR

OCEANIC ENVIRONMENT SPECIFIC TO SAMLL CORAL ISLANDS (CURRENTLY WE REFER TO GENERAL WHO QUALITY PARAMETERS)

(26)

SOLID WASTE MANAGEMENT

 WASTE MANAGEMENT CENTRES HAVE BEEN CREATED IN NAIFAARU AND FONADHOO. DEVELOPEMNT OF WMC MAHIBADHOO PLANNED.

 STUDIES HAVE BEEN TAKEN UP BY UNDP, WB/EU CONSULTANTS FOR FRAMING NATIONAL POLICY AND STUDY FOR REGIONAL WASTE MANAGEMENT CENTRE FOR A PORTION OF CENTRAL REGION

 REVIEWED REPORTS AND INITIATIVES IN SWM AND PREPARED A STRATEGY AFTER TAKING INTO ACCOUNT RECOMMENDATIONS OF VARIOUS STUDIES AND STRUCTURES ALREADY CREATED

(27)

WATER SUPPLY

SOCIO-ECONOMIC AND ENVIRONMENTAL STATUS

(28)

ENVIRONMENTAL MONITORING

GROUND WATER SAMPLING CONDUCTED IN

MAHIBADHOO, FONADHOO AND NAIFARU FOR

DEVELOPING BASELINE QUALITY STATUS OF GW.

PROCUREMNT OF WATER QUALITY MONITORING

(29)

REGIONAL ECONOMIC DEVELOPMENT

(30)

COMMUNITY MOBILIZATION

PROCESS OF COMMUNITY MOBILIZATION

STARTED DURING SITE VISITS OF FOCUS

ISLANDS

(31)

LAND USE PLANNING

(32)

INSTITUTIONAL STRENGTHENING

(33)

Progress of procurement activities

Sewerage Contracts

Environmental Infrastructure and Management ( Regional

Development Project Phase II) Sewerage System In Adh. Mahibadhoo

Island ( 14TH September 2009)

USD 1,568,546.00

MVR 1,429,459.00

Environmental Infrastructure and Management ( Regional

Development Project Phase II) Sewerage System System L. Fonadhoo

Island ( 13TH September 2009)

USD 2,398,426.00

MVR 2,324,353.00

(34)

Progress cont…

Solid Waste Management Contract Signed

Procurement of Equipments for Solid Waste Management - RDP II

with Sirius Enterprises Private Limited ( 02nd November 2010) – Lot 3.0 – Item Supply and Delivery of 1.5 Tonne Trucks, Including

Registration.

MVR 2,772,900.00

Procurement of Equipments for Solid Waste Management - RDP II

with GTS Maldives Private Limited ( 02nd November 2010) – Lot 2.0 –

Plastic Shredders

MVR 210,740.00

(35)

Progress cont…

Training :

Mr. Sofwan, 2006

Bachelors of Business Management Ministry of Atoll Development

Mr.Shaan Ahmed

Diploma on Geodetic Engineering Environment Protection Agency

Amir Hassan

(36)

PROGRESS OF ACTIVITIES

Project Administration

Recruitment and retention of PMU and PIU staff was a challenge for MHE

Training Component

Training of PIU staff on Practical Surveying ( 2007)

Management Tools for Climate Change Training (APRIL 2011)

Management and Information Settlement Regulation (APRIL 2011)

Training on Cooperate Management (PIU and Officials from region )

Training on Financial Management / Account Training for PMU and PIU Staff ( MARCH 2012)

Training on Project Management

Diploma in Environmental / Waste Management ( MARCH 2011)

Community Training

Training on Rainwater Tank Maintenance Training ( MARCH 2012)

Training on Water Catchment improvements

Training on Plumbing (DEC 2011)

(37)

STATUS OF SEWERAGE SCHEME

SEWERAGE SCHEME COMMISSIONING STAGE

- TRAINING

- HOUSEHOLD CONNECTION

- EQUIPMENT PERFORMANCE TESTING

- TAKEOVER/ OPERATOR HANDOVER

- DEFECTS REMEDIATION

(38)

PROJECTED ACTIVITIES

Procurement of Solid Waste Equipments Lot. 1.0 , 4.0, 5.0, 6.0, 7.0, 8.0

Can Crusher Reusable Bags Batch Composter Wheelie Bins 240 L Commercial Bins 660 L Chipper

(39)

Project Delay

Change of Concept of Sewerage Scheme

Community needs assessment

 Environmental and livelihood assessment

 Technical assessment

 ADB protocol of approval for concept and of adjustment of funds to meet financing shortfalls.

Change of Implementing agency and Dynamism of Provincial, Island Administration Mechanisms

(40)

CHALLANGES & LESSONS

Project transfer from Ministry of Atolls to Ministry of Environment

Change of Office From Fen building to New Location,

Strengthening of PMU and PIU

Formation of Regional project Advisory committee

Solid waste management- Project Consolidation and setting up facilities,

Integration with other related projects for seamless Operation and maintenance

- Systems Approach and Institutionalization :

Project Development

Project Procurement, Administration and Contract Management System Operation, Management and Public Service Delivery system

Setting up, institutionalization and strengthening of a Project Management System

for Environmental Infrastructure Development (linkages with other related arms of GOM such Tender section of MOF, Attorney General/ other legal

(41)
(42)

Referensi

Dokumen terkait

• Suatu graf terhubung berarah G merupakan graf semi Euler (memiliki lintasan Euler) jika dan hanya jika G terhubung setiap simpul pada graf tersebut memiliki derajat masuk

sodomi yang dilakukan tidak jauh berbeda dengan jenis-jenis perilaku seks bebas.. pada anak jalanan dengan orang-orang yang pernah merasakan

3.KOLON SIGMOID 4.KOLON DESENDENS 5.KOLON TRANSVERSUM 6.KOLON ASENDENS

Pastikan aktiviti dan karya yang dihasilkan telah meliputi unsur seni dan prinsip rekaan yang telah ditetapkan di dalam Dokumen Standard Kurikulum

KEPALA BKP PROVINSI JAWA BARAT SELAKU PENGGUNA

6 Tentang Kesimpulan Majelis Komisi --- Menimbang bahwa berdasarkan pertimbangan dan uraian di atas, Majelis Komisi sampai pada kesimpulan sebagai berikut: --- 6.1 Bahwa

old-fashioned marketing tools aren´t going to keep your business a growing and prosperous entity in today´s marketplace.. Hey, this month´s hottest techniques and information will

RINCIAN RANCANGAN APBD MENURUT URUSAN PEMERINTAHAN DAERAH, ORGANISASI, PENDAPATAN, BELANJA DAN PEMBIAYAAN. TAHUN