Put here the project name

Project Plan

[Note: This document serves as a guideline. Format/ table of content of this guideline can be modified, as long as contents of this guideline are covered by the new modified document. In case the format of this document is altered, the reason of changes should be documented on separated document. All blue text is optional. Its value can be changed to any intended value. Change the color to black if you do.]

Prepared By

Put here full name of document author

(2)
(3)

Page: 3of 10

Table of Contents

1

Introduction...3

1.1 Objective...3

1.2 Scope...3

1.3 Reference...3

2 Stakeholder Involvement Plan...3

2.1 Team Involvement Plan...3

3 Risks and Contingencies...4

4 Project Monitoring and Control...5

4.1 Progress Tracking...5

4.2 Project Schedule...5

4.3 Critical Path...5

4.3.1 Task and Activities...5

5 Testing Methodology...5

5.1 Test Scope...5

5.2 Testing Strategy...6

5.3 Testing Tools...7

6 Implementation Methodology...7

6.1 Prerequisite...7

6.2 Data & Environment...7

7 Assumptions... 7

8 Appendices...8

8.1 Appendix A : Signatures...8

8.2 Appendix B: Other Documents & Document History...9

Put here the project name Project Plan

(4)

Introduction

Objective

The objective of this plan is to describe all project-related and organizational activities for ensuring the quality of the project.

[State the summary of Objective of the project plan]

Scope

This project plan describes the responsibilities, methodology, project quality milestones and test plan for this project.

[State the scope that covered by the project plan. What activity, time line, deliverables and responsibilities that covered by this project plan]

Reference

See Appendix B for Reference & Other related documents.

Stakeholder Involvement Plan

The roles and responsibilities involved are to controls the quality of the software and deliverables. The following lists the roles and responsibilities in

[Project Name]

project:

Team Involvement Plan

No Name Role Responsibilities Deliverables

1 <Project Manager Name>

Project Manager · Perform project planning activities

· Conduct kick off meeting and communicate the project's progress to all relevant stake-holders

· Motivate the project team and have constant personal drive to achieve the project's goals

· Perform project evaluation

· Send Deliverables to Client

· Get user acceptance & feedback from client

· Perform production test run

· Log and Analyze Problem

· Perform Problem solving activities

· Conduct External & Inter-nal closing meeting

· Perform FP Count of Deliv-ered SW

· Save all project Defect Data to Defect Database

· <Other Responsibilities>

· Project Schedule

(5)

Page 5 of 10

2 <Business Analyst

Name> Business Analyst · Requirements AnalysisPerform and/or Verify SW

· Perform requirement gathering with client

· Develop Software Requirement Specification document

· Assessing the adequacy of requirements

· Develop Mini RVM

· Perform Design & Test Script Review

· Perform UAT with client

· <Other Responsibilities>

· Software Requirement Specification

· Review Report

· Test Scenario/Test Script/ Checklist with result

3 <DBA Name> Database

Administrator ·· <Other Responsibilities>Perform Data Migration

· Migrated Data 3 <Software

Designer Name>

Software Designer · Develop Test Script

· Review Test Scenario/Test Script/Checklist

· Perform Code Review, User Interface & Unit Test Coverage Review

· Perform Product Integration

· Perform Self-Integration Test

· Review and Verify Test Result

· Produce Storage Media

· Perform Packaging and Preservation of copy

· <Other Responsibilities>

· Test Scenario

· Review Report

· Test Scenario/Test Script/ Checklist with result

· Software Architecture Design

4 <Software Tester Name>

Software Tester · Perform unit testing

· Perform software testing activities

· Perform Unit Test Coverage Review

· Review and Verify Test Result

· Produce Validation Report

· <Other Responsibilities>

· Test Scenario

· Test Script

· Review Report

· Test Scenario/Test Script/ Checklist with result

· Validation Report

5 <Software Engineer Name>

Software Engineer · Develop the software program

· Perform unit testing

· Establish Integration Baseline

· Perform Virus-Check

· <Setup Implementation Environment>

· <Other Responsibilities>

· Source Code

· Unit Test Result

· Scan Log Report

6 <Web Designer

Name> Web Designer · Perform & Verify SW Requirement Analysis

· Perform Self-Integration-Test

· Perform UI Review

· <Other Responsibilities>

· Test Scenario/Test Script/ Checklist with result

· Review Report

Risks and Contingencies

[Specified all risks to be considered in developing this project]

No RaisedDate Phase of theProject Risks Impact Mitigation Actions

1 19-Aug-05 Resource downtime (sick, accident, unprece-dented leave, etc)

Delay in project

progress e.g. 1. Make sure all leave request should be submitted 2 weeks before D-Day. 2. Get together all team members about unprecedented leave…

Put here the project name Project Plan

(6)

2

3

1 Project Monitoring and Control

The content here should be made in a tabular form for easy reading and understanding. Descriptions should be added necessarily in the Task column. Frequency of Project Tracking is by time, such as Daily, Weekly, Monthly, By weekly, Once every 2 months, and so on.

Example:

1.1 Progress Tracking

No Task Frequenc

y Stakeholder

1 Daily Project Tracking which includes : a. Today's Activity

b. Tomorrow's To Do List c. Deferred Items d. Today's Issues

Note: The daily project tracking meeting will be conducted 5-10 minutes a day for every session. Each session consists of 5 team members picked randomly

Daily PM, Team Members Clients if necessary

2 Weekly Progress Review Weekly PM, Team Members, Clients 3 End Phase Report

Note: This report includes Defect Prevention effectiveness review, Schedule Variance report, etc. Derivative measurements will be performed by the SQA, but the PM has to make sure all the data is available.

End of

Phase SQA

1.2

Project Schedule

1.3 Critical Path

[This section contains the project critical path parameters. It is divided into several sections. This is planned ahead to ensure that all critical path are covered and addressed in the project]

1.3.1 Task and Activities

[Put here who will be responsible for the task and its milestone of completion]

(7)

Page 7 of 10

2

Testing Methodology

[Describe the objective of the test plan]

2.1 Test Scope

[Describe the test scope which including items to be tested and items not to be tested.]

2.2

Testing Strategy

All written code will be reviewed and tested multiple times under different aspects. This chapter explains the different testing approaches in more detail:

System Testing

Objective: To validate the system behavior against the requirements stated

in the SRS

Entry Criteria:

Testing will commence if there is a baselined release from the developers.

Technique: “BlackBox” / functional testing, using test cases; each test case

states some interaction and input, along with the expected result/output.

Completion / Exit Criteria:

o All planned tests have been executed o All identified defects have been addressed

Related document: System Test Script

(developed and reviewed later, see overall planning).

Unit Testing

Objective: To validate the technical of units (small pieces of the software up

until method level) against its detail design specification.

Entry Criteria:

o Unit testing will be done for every method that is developed within a program

o Unit testing is done simultaneously with coding

Technique: “White Box” testing with up to method testing precision. May

also enhanced by “GlassBox” test cases, which consider the program logic; typically to achieve coverage of all statements.

Completion / Exit Criteria:

o All test cases executed with no more errors.

”No error” means, that the actual and expected system behavior is the same.

o All test cases have been signed off to QA.

o All Automated unit test code has passed execution.

Related document: Unit Test Script (optional), Unit Test Code

(developed and reviewed later, see overall planning).

Performance Testing

Objective: To validate the usability and stability of the application when

under heavy load / access from web.

Entry Criteria:

o Unit testing will be done for every method that is developed within a program

o Unit testing is done simultaneously with coding

Technique: tool-assisted multiple access of selected application

functionality, using test cases.

Completion / Exit Criteria:

Put here the project name Project Plan

(8)

o Single Transaction/single user: Successful completion of the test scripts without any failures and within the expected / required time allocation (per transaction).

o Multiple transactions / multiple users: Successful completion of the test scripts without any failures and within acceptable time

allocation..

Related document: Performance Test Script

(developed and reviewed later, see overall planning).

[State all other applicable testing types for this project accordingly. These 3 tests are mandatory for the software development cycle]

2.3 Testing Tools

[State the testing tools for testing of the system]

Implementation Methodology

Prerequisite

[Describe what is needed to be done before the Implementation is performed (e.g. the number of major errors should be 0, done before a specific date, etc

Also make sure the following items are checked 1. The latest released application is used

2. A Clean database is set up before the data migration is performed (if any) 3. Review of the Data Migration should be defined also

4. Define criteria for a good implementation phase to be able to be accepted by the client ]

Data & Environment

[Describe what is needed done before Implementation, what kind of data must be supplied by the client / , who will be conducting the Implementation, where will it be done, etc]

Assumptions

(9)

Page 9 of 10

Appendices

Appendix A : Signatures

This document has been reviewed and accepted by the undersigned. Therefore, this document will be used as the basis for doing further processing. Any addition and/or modification of this document will be subjected to approval by the undersigned.

Signature : Signature of the approved Signature :

Name : Name Name :

Title : Role/Job Title :

Date : Signing Date Date :

Signature : Signature of the approved Signature :

Name : Name Name :

Title : Client Title :

Date : Signing Date Date :

Signature : Signature :

Name : Name :

Title : Title :

Date : Date :

Signature : Signature :

Name : Name :

Title : Title :

Date : Date :

Put here the project name Project Plan

(10)

2.4

Appendix B: Other Documents & Document

History

Related documentation:

· Proposal ver x.x

· Project Schedule ver x.x

· Project Assect Maintenance

· Stakeholder Involvement Sheet

· Risk & Issue List

· SRS ver x.x

· Any other supporting documents

[Note: Create hyperlynk for each related documentation]

Document History:

Version Date Change Reason Author

Referensi

Dokumen terkait

Keluhan dapat disertai sesak napas, nyeri dada atau pleuritic chest pain (bila disertai peradangan pleura), badan lemah, nafsu makan menurun, berat badan menurun,

Kebutuhan yang diperlukan oleh responden antara lain pelatihan-pelatihan yang menyangkut teknis pelaksanaan KBK mulai perencanaan pembelajaran, penyiapan bahan

Lomba Ketrampilan Siswa Tingkat Nasional sudah berjalan selama 25 tahun, kegiatan ini dimaksudkan untuk mengukur kompetensi siswa SMK dalam bidang keahlian menata display

Dalam industri ritel sebenarnya banyak terdapat faktor yang dapat mendukung dan mempengaruhi minat pembelian konsumen atau terdapat beberapa faktor yang dapat dijadikan

Awalnya, RUU tentang Pengendalian Dampak Produk Tembakau Terhadap Kesehatan diusulkan oleh 259 anggota DPR yang kemudian diendapkan oleh Baleg pada tahun 2011. Respon dari

Jual Vimax Di Tangerang 085325367609 PinBB : 2B3CFBF3 Agen Vimax Asli Di Tangerang Vimax adalah formula alami yang digunakan untuk meningkatkan ukurun alat vital Anda menjadi

MAJELIS PENDIDIKAN DASAR DAN MENENGAH ( DIKDASMEN ). PIMPINAN CABANG

Panitia Pengadaan Barang dan Jasa