::PEMBANGUNAN TAMBATAN PERAHU
PEMBANGUNAN TAMBATAN PERAHU
LOKASI
LOKASI
::DESA TONGGO -
DESA TONGGO - KECAMATAN NANGARORO - KABUPATEN NAGEKEO
KECAMATAN NANGARORO - KABUPATEN NAGEKEO
TAHUN ANGGARAN
TAHUN ANGGARAN
::2018
2018
NO.
NO.
BIAYA
BIAYA
(Rp.)
(Rp.)
AA.. PPEEKKEERRJJAAAAN N PPEERRSSIIAAPPAANN 8800..004477..115599,,5588 B B.. PPEEKKEERRJJAAAAN N TTRREESSTTLLE E ((665 5 x x 22..5500) ) MM22 494933..332233..007766,,9933 C C.. PPEEKKEERRJJAAAAN N DDEERRMMAAGGA A ((224 4 x x 33) ) MM22 227799..998822..332277,,8888 S SUUB B TTOOTTAAL L 11 858533..335522..556644,,3399 P PPPNN 1100%% 8855..333355..225566,,4444 S SUUB B TTOOTTAAL L 22 939388..668877..882200,,8833 P PEERREENNCCAANNAAAAN N 44% % DDAAN N SSUUPPEERRVVIISSI I 22,,55%% 5566..332211..226699,,2255 A
ADDMMIINNIISSTTRRAASSII 55..000000..000000,,0000 G GRRAANND D TTOOTTAALL 11..000000..000099..009900,,0088 G GRRAANND D TTOOTTAAL L DDIIBBUULLAATTKKAANN 11..000000..000000..000000,,0000 Terbilang Terbilang :: Mbay,
Mbay, 3 3 Juli Juli 20172017 Kepala Dinas Perhubungan Kepala Dinas Perhubungan
ALEX JATA, SH ALEX JATA, SH NIP. 19650722 199403 1 004 NIP. 19650722 199403 1 004
URAIAN PEKERJAAN
URAIAN PEKERJAAN
Satu milyard rupiah Satu milyard rupiah
Kabupaten Nagekeo Kabupaten Nagekeo
REKAPITULASI
REKAPITULASI
RENCANA
SATUAN KERJA : DINAS PERHUBUNGAN KABUPATEN NAGEKEO PEKERJAAN : PEMBANGUNAN TAMBATAN PERAHU
LOKASI : DESA TONGGO - KECAMATAN NANGARORO - KABUPATEN NAGEKEO TAHUN ANGGARAN : 2018
NO. URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN
(Rp)
JUMLAH HARGA (Rp) A. PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilsasi ls 1,00 6.900.000,00 6.900.000,00 2 Pengukuran dan positioning ls 1,00 1.148.037,58 1.148.037,58 3 Pembuatan gudang semen dan alat-alat m2 12,00 1.683.202,50 20.198.430,00 4 Pelaporan dan Dokumentasi ls 1,00 6.400.000,00 6.400.000,00 5 Penerangan, Keamanan dan Keselamatan Kerja hari 120,00 378.339,10 45.400.692,00 JUMLAH 80.047.159,58 B. PEKERJAAN TRESTLE (65 x 2.50) M2
1 Pekerjaan pemancangan m 132,00 808.000,00 106.656.000,00
2 Tiang pancang 20/20 cm beton K250 m3 15,84 11.996.544,61 190.025.266,66 3 Balok melintang dan memanjang uk. 8/12 cm kayu kelas I m3 2,67 19.683.750,00 52.550.888,40 4 Balok Skur uk. 5/10 cm kayu kelas I m3 3,15 19.683.750,00 62.053.021,88 5 Lantai papan 4/20 cm kayu kelas I m2 163,00 503.300,00 82.037.900,00 JUMLAH 493.323.076,93 C. PEKERJAAN DERMAGA (24 x 3) M2
1 Pekerjaan pemancangan m 68,00 808.000,00 54.944.000,00
2 Tiang pancang 20/20 cm beton K250 m3 10,88 11.996.544,61 130.522.405,38 3 Balok melintang dan memanjang uk. 8/12 cm kayu kelas I m3 1,73 19.683.750,00 34.013.520,00 4 Balok Skur uk. 5/10 cm kayu kelas I m3 1,11 19.683.750,00 21.848.962,50 5 Lantai papan 3/20 cm kayu kelas I m2 76,80 503.300,00 38.653.440,00 JUMLAH 279.982.327,88
RENCANA ANGGARAN BIAYA RAB)
DAFTAR UPAH, ALAT DAN MATERIAL PEKERJAAN : PEMBANGUNAN TAMBATAN PERAHU
LOKASI : DESA TONGGO - KECAMATAN NANGARORO - KABUPATEN NAGEKEO TAHUN ANGGARAN : 2018
NO. URAIAN SATUAN HARGA
(Rp.) A UPAH
PEKERJA
1 KepalaTukangBatu oh 150.000,00
2 KepalaTukangBesi oh 150.000,00
3 KepalaTukangKayu oh 150.000,00
4 Mandor oh 175.000,00
5 Pekerja oh 75.000,00
6 Pembantusurveyor oh 100.000,00
7 Pembantu Operator / Pembantu Sopir oh 75.000,00
8 Satpam oh 75.000,00 9 Sekretaris ob 100.000,00 10 Sopir/Operator ob 100.000,00 11 Surveyor oh 150.000,00 12 TukangBatu oh 100.000,00 13 TukangBesi oh 100.000,00 14 TukangKayu oh 100.000,00
NO. URAIAN SATUAN HARGA (Rp.)
B BAHAN
1 Agregat pecahan mesin 20-30 mm m3 500.000,00
2 Air m3 15.000,00
3 Alat tulis kantor bulan 500.000,00
4 Alat pancang hari 5.000.000,00
5 Albumfoto bh 150.000,00
6 As buit drawing eksemplar 1.000.000,00
7 Atap seng gelombang lbr 73.980,00
8 Bahan timbunan pilihan m3 150.727,50
9 Balok kayu kelas I ulin m3 15.000.000,00
10 Batubelah15/20 m3 250.000,00
11 Batu uk. 40 - 60 kg/bh m3 175.000,00
12 Baut 5/8" panjang 30 cm bh 20.000,00
13 Bensin ltr 10.500,00
14 Besibetonpolos kg 20.000,00
15 Biaya komunikasi atau dokumentasi bulan 1.500.000,00
16 Kawat beton/Bendrat RRT kg 27.750,00
17 Kayudolken m3 2.500.000,00
18 Kayu kaso kelas II m3 4.450.000,00
19 Kayu kelas III m3 3.500.000,00
20 Laporan bulanan eksemplar 150.000,00
21 Laporan harian eksemplar 70.000,00
22 Laporan Mingguan eksemplar 100.000,00
23 Multiplek9mm lbr 157.500,00
24 Oli ltr 30.000,00
25 Paku kg 27.400,00
26 Papan kayu kelas I ulin m3 15.000.000,00
27 PasirBeton(PB) m3 300.000,00 28 PasirPasang(PP) m3 250.000,00 29 Perlengkapan keamanan ls 3.000.000,00 30 Perlengkapan PPPK/Keselamatan ls 3.000.000,00 31 PortlandCement(PC) kg 2.025,00 32 Solar ltr 9.500,00 33 Usukmeranti m3 4.000.000,00
NO. URAIAN SATUAN HARGA (Rp.) C. ALAT
1 Alat bantu pancang hari 10.000.000,00
2 Dumptruck3,5ton jam 250.000,00
3 Genset1.5Kva unit 3.500.000,00
4 Excavator jam 145.492,72
5 TandemRoller jam 241.142,19
6 Theodolit jam 80.320,00
7 Waterpass jam 17.700,00
8 Watertanker jam 211.416,88
DAFTAR ANALISA HARGA SATUAN
PEKERJAAN : PEMBANGUNAN TAMBATAN PERAHU
LOKASI : DESA TONGGO - KECAMATAN NANGARORO - KABUPATEN NAGEKEO TAHUN ANGGARAN : 2018
No. Uraian Satuan Koefisien Harga (Rp.)
Jumlah Harga (Rp.)
1 Mobilisasi Demobilisasi
Alat pacang modifikasi komplit Ls 1,0000 4.900.000,00 4.900.000,00 Excavator Ls 1,0000 400.000,00 400.000,00 Dump truck 3,5 ton Ls 3,0000 400.000,00 1.200.000,00 Watertanker Ls 1,0000 400.000,00 400.000,00
Harga Satuan Pekerjaan 6.900.000,00 2 Pengukuran dan Positioning (ls/hari)
Pekerja oh 0,1667 75.000,00 12.502,50 Kepala Tukang Batu oh 0,1000 150.000,00 15.000,00 Mandor oh 0,1667 175.000,00 29.172,50 Pembantu surveyor oh 1,0000 100.000,00 100.000,00 Surveyor oh 1,0000 150.000,00 150.000,00 TukangKayu oh 0,1667 100.000,00 16.670,00 Theodolit jam 5,0000 80.320,00 401.600,00 Waterpass jam 5,0000 17.700,00 88.500,00 Paku kg 0,0417 27.400,00 1.142,58 Kayu kaso kelas II m3 0,0500 4.450.000,00 222.500,00 KayukelasIII m3 0,0317 3.500.000,00 110.950,00
Harga Satuan Pekerjaan 1.148.037,58 3 Pembuatan gudang semen dan alat-alat (m2) (SNI 03-2835-02)
Pekerja oh 1,0000 75.000,00 75.000,00 Mandor oh 0,0500 175.000,00 8.750,00 Kepala Tukang Kayu oh 0,3000 150.000,00 45.000,00 TukangKayu oh 2,0000 100.000,00 200.000,00 Portland Cement (PC) kg 10,5000 2.025,00 21.262,50 Agregat pecahan mesin 20-30 mm m3 0,0500 500.000,00 25.000,00 Pasir Beton (PB) m3 0,0300 300.000,00 9.000,00 Paku kg 0,3000 27.400,00 8.220,00 Kayu kaso kelas II m3 0,1000 4.450.000,00 445.000,00 KayukelasIII m3 0,2100 3.500.000,00 735.000,00 Atap seng gelombang lbr 1,5000 73.980,00 110.970,00
No. Uraian Satuan Koefisien Harga (Rp.)
Jumlah Harga (Rp.)
4 Pelaporan dan Dokumentasi (ls/bulan) (PM 75 TAHUN 2013 KEMENHUB)
Sekretaris ob 1,0000 100.000,00 100.000,00 Album foto eksemplar 3,0000 150.000,00 450.000,00 As buit drawing eksemplar 1,0000 1.000.000,00 1.000.000,00 Laporan bulanan eksemplar 3,0000 150.000,00 450.000,00 Laporan harian eksemplar 30,0000 70.000,00 2.100.000,00 Laporan Mingguan eksemplar 3,0000 100.000,00 300.000,00 Alat tulis kantor bln 1,0000 500.000,00 500.000,00 Biaya komunikasi atau dokumentasi bln 1,0000 1.500.000,00 1.500.000,00
Harga Satuan Pekerjaan 6.400.000,00 5 Penerangan, Keamanan dan Keselamatan Kerja (ls/hari) (PM 75 TAHUN 2013 KEMENHUB)
Satpam oh 2,4000 75.000,00 180.000,00
Solar ltr 15,2778 9.500,00 145.139,10
Genset1.5Kva unit 0,0056 3.500.000,00 19.600,00 Perlengkapan keamanan ls 0,0056 3.000.000,00 16.800,00 Perlengkapan PPPK/Keselamatan ls 0,0056 3.000.000,00 16.800,00
Harga Satuan Pekerjaan 378.339,10 6 Menggali 1 m³ tanah biasa sedalam 1 meter (SNI 2008)
Pekerja oh 0,7500 75.000,00 56.250,00
Mandor oh 0,0250 175.000,00 4.375,00
Harga Satuan Pekerjaan 60.625,00 7 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 3 PP (SNI 2008)
Bahan Batu Belah 15/20 m³ 1,2000 250.000,00 300.000,00 Portland Cement (PC) kg 202,0000 2.025,00 409.050,00 Pasir Pasang (PP) m³ 0,4850 250.000,00 121.250,00 0,00 Tenaga Pekerja oh 1,5000 75.000,00 112.500,00 Tukang Batu oh 0,6000 100.000,00 60.000,00 Kepala Tukang Batu oh 0,0600 150.000,00 9.000,00
Mandor oh 0,0750 175.000,00 13.125,00
No. Uraian Satuan Koefisien Harga (Rp.)
Jumlah Harga (Rp.)
8 Timbunan Pilihan (PM 75 TAHUN 2013 KEMENHUB) Tenaga
Pekerja oh 0,4092 75.000,00 30.687,00 Mandor oh 0,1023 175.000,00 17.900,75
Alat
MotorGreder jam 0,0040 #N/A #N/A
WheelLoader jam 0,0085 403.217,97 3.427,35 Dump truck 3,5 ton jam 0,5115 250.000,00 127.863,25 TandemRoller jam 0,0161 241.142,19 3.883,59 Watertanker jam 0,0070 211.416,88 1.486,26
Bahan
Bahan timbunan pilihan m3 1,2000 150.727,50 180.873,00
Harga Satuan Pekerjaan #N/A 7 Membuat 1 m³ beton mutu f'c = 21.7 MPa (K 250), slump (12 ± 2) cm, w/c = 0.56 (SNI 7394:2008)
Bahan
Portland Cement (PC) kg 384,0000 2.025,00 777.600,00 Pasir Beton (PB) kg 0,4325 300.000,00 129.750,00 Agregat pecahan mesin 20-30 mm m³ 0,7166 500.000,00 358.275,86 Air m³ 0,2150 15.000,00 3.225,00
Tenaga
Pekerja oh 1,6500 75.000,00 123.750,00 Tukang Batu oh 0,2750 100.000,00 27.500,00 Kepala Tukang Batu oh 0,0280 150.000,00 4.200,00 Mandor oh 0,0830 175.000,00 14.525,00
Harga Satuan Pekerjaan 1.438.825,86 Pembesian dengan besi polos (kg) (SNI 2008)
Pekerja oh 0,0070 75.000,00 525,00 Mandor oh 0,0003 175.000,00 52,50 TukangBatu oh 0,0070 100.000,00 700,00 Kepala Tukang Batu oh 0,0007 150.000,00 105,00 Besi beton polos kg 1,0500 20.000,00 21.000,00 Kawat beton/Bendrat RRT kg 0,0150 27.750,00 416,25
No. Uraian Satuan Koefisien Harga (Rp.)
Jumlah Harga (Rp.) 7 Membuat 1 m2 Cetakan beton / begisting memakai multiplek (SNI 2008)
Bahan Usuk meranti m³ 0,0170 4.000.000,00 68.000,00 Multiplek 9 mm lbr 0,3470 157.500,00 54.652,50 Paku kg 0,4000 27.400,00 10.960,00 Tenaga Pekerja oh 0,2000 75.000,00 15.000,00 Tukang Kayu oh 0,5000 100.000,00 50.000,00
Kepala Tukang Kayu oh 0,0500 150.000,00 7.500,00
Mandor oh 0,0100 175.000,00 1.750,00
Harga Satuan Pekerjaan 207.862,50
7 Stutwerk untuk 1 m3 beton, tinggi 3 - 4 m ( memakai dolken ) (SNI 2008) Bahan
Kayu dolken m³ 0,7000 2.500.000,00 1.750.000,00
Tenaga
Pekerja oh 3,5000 75.000,00 262.500,00
Tukang Kayu oh 10,5000 100.000,00 1.050.000,00
Kepala Tukang Kayu oh 1,0500 150.000,00 157.500,00
Mandor oh 0,1750 175.000,00 30.625,00
Harga Satuan Pekerjaan 3.250.625,00
7 1 m3 Membongkar Cetakan (SNI 2008) Tenaga
Pekerja oh 4,0000 75.000,00 300.000,00
No. Uraian Satuan Koefisien Harga (Rp.)
Jumlah Harga (Rp.) 7 1 m3Beton K250 untuk foot plat (SNI 2008)
Beton K 250 m³ 1,0000 1.438.825,86 1.438.825,86
Tulangan kg 125,0000 22.798,75 2.849.843,75
Cetakan beton/bekisting m2 20,0000 207.862,50 4.157.250,00
Membongkar cetakan m3 1,0000 300.000,00 300.000,00
Harga Satuan Pekerjaan 8.745.919,61
7 1 m3Beton K250 untuk kolom (SNI 2008)
Beton K 250 m³ 1,0000 1.438.825,86 1.438.825,86
Tulangan kg 125,0000 22.798,75 2.849.843,75
Cetakan beton/bekisting m2 20,0000 207.862,50 4.157.250,00
Stut werk / perancah m3 1,0000 3.250.625,00 3.250.625,00
Membongkar cetakan m3 1,0000 300.000,00 300.000,00
Harga Satuan Pekerjaan 11.996.544,61
7 Memasang 1 m3 gelagar kayu kelas I (BOW)
Bahan
Balok kayu kelas I ulin m³ 1,1000 15.000.000,00 16.500.000,00
Baut 5/8" panjang 30 cm bh 52,0000 20.000,00 1.040.000,00
Tenaga
Pekerja oh 5,0000 75.000,00 375.000,00
Tukang Kayu oh 15,0000 100.000,00 1.500.000,00
Kepala Tukang Kayu oh 1,5000 150.000,00 225.000,00
Mandor oh 0,2500 175.000,00 43.750,00
Harga Satuan Pekerjaan 19.683.750,00
7 Memasang 1 m2 lantai papan kayu kelas I diketam (BOW) Bahan
Papan kayu kelas I ulin m³ 0,0254 15.000.000,00 381.000,00
Paku kg 0,2500 27.400,00 6.850,00
Tenaga
Pekerja oh 0,2800 75.000,00 21.000,00
Tukang Kayu oh 0,8000 100.000,00 80.000,00
Kepala Tukang Kayu oh 0,0800 150.000,00 12.000,00
Mandor oh 0,0140 175.000,00 2.450,00