• Tidak ada hasil yang ditemukan

SUCCESS SemiAnnual Rpt July to Dec 2013 FINAL.508

N/A
N/A
Protected

Academic year: 2017

Membagikan "SUCCESS SemiAnnual Rpt July to Dec 2013 FINAL.508"

Copied!
46
0
0

Teks penuh

Loading

Gambar

Figure 1: Summary of the Global Partnership for Professionalizing Protected Area Management
Figure 2: This preliminary map displays the index values for nations worldwide.  Final maps will include highlights on small and island nations as well

Referensi

Dokumen terkait

Recently, a new version of the growth plan was written, “ Plan de Crecimiento para el Centro de Información Geográfica 2001-2002 ” stating the successes as well as shortfalls in

Panitia Pengadaan Barang dan Jasa dilingkungan Dinas Bina Marga Kabupaten Nagan Raya Sumber Dana APBK Tahun Anggaran 2011 mengundang Penyedia Barang, pekerjaan Kontruksi,

Unit Layanan Pengadaan (ULP)/Pejabat Pengadaan/Jasa Pemerintah Di-Lingkungan Dinas Pekerjaan Umum Kabupaten Barito Timur mengundang calon penyedia jasa berikut untuk

[r]

Pada hari ini Selasa tanggal Empat bulan Desember tahun Dua Ribu Dua Belas, yang bertandatangan di bawah ini kami Panitia Pengadaan Barang/Jasa (Pokja-ULP) Provinsi Jawa Barat,

Keterangan ini saya buat dengan sesungguhnya dan apabila keterangan ini ternyata tidak benar (palsu), saya bersedia dituntut dimuka pengadilan berdasarkan Undang-undang yang

Magang ini memang dimaksudkan untuk menambah wawasan tentang kegiatan pertanian di lapangan yang sesungguhnya, meningkatkan kualitas lulusan dalam hal pengalaman dan

Demikian kami sampaikan untuk menjadi maklum, atas perhatiannya kami ucapkan terima kasih. Tondano, 7 Agustus 2014 Pokja Pengadaan Konstruksi ULP Universitas Negeri Manado