: Pengembangan Utilitas Kasiba
: 0
: Pembangunan Prasarana dan Sarana Air Minum Kasiba : KAB. BONE BOLANGO
: 2011
: 1,953,776,814.00 : 1,953,776,814.00
TOTAL HARGA PENAWARAN TERMASUK PPN 10%
(Rp)
KELENGKAPAN DOKUMEN PENAWARAN
EVALUASI
ADMINISTRASI EVALUASI TEKNIS EVALUASI HARGA
EVALUASI KUALIFIKASI
1 3 4 5 6 7 8 9
1 CV SINAR MULIA UTAMA Rp 1,691,392,000.00 MS MS MS TMS - GUGUR
2 CV MATARAM Rp 1,739,103,000.00 MS TMS - - - GUGUR
3 CV CAHAYA KARTINI Rp 1,767,995,700.00 MS MS MS - - GUGUR
4 CV UTAMA TEKNIK MANDIRI Rp 1,810,466,000.00 MS TMS - - - GUGUR
5 CV BUMI BERINGIN JAYA Rp 1,837,006,000.00 MS MS MS MS MS LULUS
Bone Bolango, 26 September 2012 DIBUAT OLEH,
POKJA 1 KONSTRUKSI
1IRWAN KURNIAWAN, ST KETUA ………..
2RAHMAN HASAN, ST SEKRETARIS ………..
3RAHMIATY PAKAJA, S.ST ANGGOTA ………..
PENAWARAN
[image:1.842.82.747.60.253.2]2
TABEL 8 REKAPITULASI HASIL EVALUASI ADMINISTRASI, TEKNIS, DAN HARGA
NO NAMA PERUSAHAAN KETERANGA