• Tidak ada hasil yang ditemukan

EVALUASI KELAYAKAN INVESTASI ANGKUTAN BUS UMUM JURUSAN PURI ANJASMORO (PRPP) - UNDIP - KLIPANG KOTA SEMARANG - Diponegoro University | Institutional Repository (UNDIP-IR)

N/A
N/A
Protected

Academic year: 2017

Membagikan "EVALUASI KELAYAKAN INVESTASI ANGKUTAN BUS UMUM JURUSAN PURI ANJASMORO (PRPP) - UNDIP - KLIPANG KOTA SEMARANG - Diponegoro University | Institutional Repository (UNDIP-IR)"

Copied!
86
0
0

Teks penuh

(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13)
(14)
(15)
(16)
(17)
(18)
(19)
(20)
(21)
(22)
(23)
(24)
(25)
(26)
(27)
(28)
(29)
(30)
(31)
(32)
(33)
(34)
(35)
(36)
(37)
(38)
(39)
(40)
(41)
(42)
(43)
(44)
(45)
(46)
(47)
(48)
(49)
(50)
(51)
(52)
(53)
(54)
(55)
(56)
(57)
(58)
(59)
(60)
(61)
(62)
(63)
(64)
(65)
(66)
(67)
(68)
(69)
(70)
(71)
(72)
(73)
(74)
(75)
(76)
(77)
(78)
(79)
(80)
(81)
(82)
(83)
(84)
(85)
(86)

Referensi

Dokumen terkait

1. Bagian Hulu , yaitu dengan membangun dam pengendali banjir yang dapat memperlambat waktu tiba banjir dan menurunkan besarnya debit banjir,.. Bagian Hilir , yaitu dengan

Dari hasil pengolahan data dan analisis data, didapat debit banjir rencana dan.

I ntensitas curah hujan rata-rata digunakan sebagai parameter perhitungan debit banjir dengan. menggunakan cara Rasional atau

• Bekisting harus dapat dipakai dimanapun dibutuhkan atau bagian yang ditunjukkan oleh direksi untuk pembatasan dan pembentuk. beton agar letak dan elevasinya sesuai dengan

Pengendalian banjir diatas adalah bersifat teknis, kemudian yang tidak kalah. pentingnya adalah pengendalian banjir yang bersifat non teknis,

(Analyses of Public Transport Demand for Semarang - Sukorejo). Diajukan untuk memenuhi persyaratan

Pada Hari Libur……… 56 Gambar 4.13 Grafik Rata-rata Faktor Muat Statis Armada Bus Jurusan. Sukorejo-Semarang Pada

Mengetahui faktor beban (load factor), waktu antara(headway), waktu sirkulasi, waktu tunggu di terminal, kecepatan dan waktu henti sehingga dapat dijadikan tolak ukur