REPORT ON BUDGET & OFF BUDGET OF REHABILITATION & RECONSTRUCTION PROJECTS IN NIAS ISLAND

N/A
N/A
Protected

Academic year: 2021

Membagikan "REPORT ON BUDGET & OFF BUDGET OF REHABILITATION & RECONSTRUCTION PROJECTS IN NIAS ISLAND"

Copied!
125
0
0

Teks penuh

(1)

REPORT ON BUDGET & OFF BUDGET

OF REHABILITATION & RECONSTRUCTION

PROJECTS IN NIAS ISLAND

As of December 01, 2006

Badan Rehabilitasi dan Rekonstruksi (BRR)

NAD-Nias Perwakilan Nias

Jl. Diponegoro No. 439 Desa Sifalaete Tab. Kec. Gunungsitoli Kab. Nias Sumatera Utara Fax/Telp. 0639-22174

Temporary Shelter Bawolato

ZTOF housing in Tetesua Sirombu

Jln Sirao Gunung Sitoli after the

construction

Idano Gawo Bridge construction

CWS housing in Fadoro Sirombu 2

public hydrant in zto housing in

tetesua sirombu

Perumahan Pengungsi Dahana

Acted housing in Muzoi

Lahewa 1

(2)

CONTENT

1.

On Budget Report

2.

Off Budget Summary

3.

Top 10 of NGO Commitment

4.

Top 10 of NGO Disbursed

5.

Progress Summary of NGO Projects

6.

List of Implementer Partner in Nias Island

7.

Off Budget Report ( Detail )

8.

Progress Report of NGO in Nias Island ( Detail)

(3)
(4)

( Rp)

%Terkontrak

% Realisasi

thdp Dipa

Thdp DIPA

Thdp

KONTRAK

1

2

3

4

5

6

7

8

9

I

Bidang Perencanaan dan Pemprograman

-

-

-

-

-

-II

Bidang Kelembagaan

42,278,030,000

33,836,688,600

9,032,995,278

26.70

21.37

39.33

1

462196

Peningkatan Sarana dan Prasarana Kantor Pemerintahan Nias

42,278,030,000

33,836,688,600

9,032,995,278

26.70

21.37

31.48

39.33

III

Bidang Perumahan,Infrastruktur & Tataguna Lahan

946,654,120,000

702,165,578,502

287,971,669,383

41.01

30.42

51.52

1

459033

Pembinaan Perencanaan Jalan Sumut

66,995,800,000

34,942,639,492

12,189,486,233

34.88

18.19

16.14

30.94

2

459064

Rehabilitasi dan Rekonstruksi Jalan Propinsi Sumut

109,490,160,000

105,300,705,720

52,566,610,309

49.92

48.01

53.00

55.11

Kontrak Multiyear

3

459192

Rehabilitasi dan Rekonstruksi Jalan Kabupaten Nias

24,855,000,000

23,991,110,627

12,281,774,127

51.19

49.41

79.33

82.19

4

459203

Rehabilitasi dan Rekonstruksi Jalan Kabupaten NiSel

24,410,900,000

19,240,851,639

7,119,030,937

37.00

29.16

39.32

49.88

5

462030

Pengembangan Perumahan dan Pemukiman Nias dan Nias Selatan

536,548,500,000

377,984,995,000

137,284,725,851

36.32

25.59

34.36

48.78

6

462052

Pengembangan Kinerja Pengelolaan Air Minum dan Air Limbah Nias

34,044,552,000

17,827,031,800

6,506,138,408

36.50

19.11

31.82

60.76

7

464175

Pengembangan Daerah Rawa dan Pengamanan Pantai Wilayah Nias

23,674,000,000

8,402,719,000

2,132,670,660

25.38

9.01

17.97

50.62

8

464162

Pengendalian Banjir dan Pengamanan Pantai Nias

35,831,700,000

32,514,487,446

20,634,696,621

63.46

57.59

57.66

63.54

9

464250

Irigasi Wilayah Nias

24,264,754,000

23,842,345,531

8,966,812,807

37.61

36.95

31.92

32.48

Kontrak Multiyear

10

464595

Peningkatan Kualitas Jasa Ketenaga Listrikan Nias

21,485,222,000

18,407,921,747

6,326,291,756

34.37

29.44

63.79

74.46

11

440759

Pemel.Rehab,Peningkatan Pembangunan SarPras Transportasi Nia

45,053,532,000

39,710,770,500

21,963,431,675

55.31

48.75

48.91

55.49

IV

Bidang Pemberdayaan Ekonomi dan Usaha

36,355,490,000

13,134,303,372

5,905,172,939

44.96

16.24

27.94

1

459435

Pemberdayaan Ekonomi dan Usaha Nias

36,355,490,000

13,134,303,372

5,905,172,939

44.96

16.24

10.09

27.94

V

Bidang Agama , Sosial dan Budaya

39,114,726,000

24,504,871,775

19,790,463,705

80.76

50.60

72.70

1

462262

Agama , Sosial dan Budaya Nias

39,114,726,000

24,504,871,775

19,790,463,705

80.76

50.60

45.55

72.70

VI

Bidang Pendidikan dan Kesehatan Nias

118,262,775,000

79,015,929,991

36,338,237,072

45.99

30.73

31.66

1

462247

Pendidikan dan Kesehatan Nias

85,710,330,000

59,076,867,472

29,340,404,213

49.66

34.23

23.44

34.01

2

462253

Pendidikan dan Kesehatan Nias Selatan

24,565,965,000

17,605,439,519

6,713,882,859

38.14

27.33

19.65

27.42

3

437880

Dinas Kesehatan Sumut - ETSP

7,986,480,000

2,333,623,000

283,950,000

12.17

3.56

1.28

4.37

Kontrak Multiyear

VII

Bidang Sekretariat,Perwakilan Nias,Keuangan,Komunikasi dan

Informasi

17,114,600,000

11,126,701,000

5,027,318,766

45.18

29.37

0.00

1

464878

Perwakilan Nias

17,114,600,000

11,126,701,000

5,027,318,766

45.18

29.37

29.37

-1,199,779,741,000

863,784,073,240

364,065,857,143

42.15%

30.34%

35.56%

48.81

A

SISA PAGU DIPA TERHADAP KONTRAK ( 3 - 4 )

335,995,667,760

28.00%

B

SISA NILAI KONTRAK TERHADAP REALISASI ( 4 - 5 )

499,718,216,097

57.85%

C

SISA PAGU DIPA TERHADAP REALISASI KEUANGAN ( 3 - 5 )

835,713,883,857

69.66%

D

Prosentase Nilai Kontrak Terhadap Nilai PAGU DIPA

72.00%

E

Prosentase Realisasi Keuangan Terhadap PAGU DIPA

30.34%

NO

SATKER

PAGU DIPA

NILAI KONTRAK

KET

T O T A L

REALISASI KEUANGAN

REKAPITULASI

LAPORAN STATUS AKHIR PELAKSANAAN KEGIATAN SATKER

ANGGARAN REHABILITASI DAN REKONSTRUKSI NAD-NIAS APBN-P 2006

Status Bulan : 1 Desember 2006

REALISASI FISIK (%)

(5)

Kurva - S BRR-Perwakilan Nias

RENCANA, REALISASI DAN FISIK

0.00

10.00

20.00

30.00

40.00

50.00

60.00

70.00

80.00

90.00

100.00

Bulan ( Mei - Desember )

Progres

Rencana

6.84697449 13.4736104 20.1002463 28.0555985 42.1234086 64.8214557 89.6626341

100

Realisasi

6.42

9.12

11.32

14.21

19.46

30.3443911

Fisik lapangan

6.42

9.27

13.45

20.34

36.90

48.81

1

2

3

4

5

6

7

8

64.82 %

(Minggu ke 4)

48.81%

30.34%

PAGU RP.

1.199.779.741.000,-OC-1_Des_1_06 PMCS Husmeizar

(6)

CHART ON BUDGET PER SECTOR

-100,000 200,000 300,000 400,000 500,000 600,000

SEKTOR

Pagu Dipa 42,278 66,996 109,490 24,855 24,411 536,549 34,045 23,674 35,832 24,265 21,485 45,054 36,355 39,115 85,710 24,566 7,986 17,115 N.Kontrak 33,837 34,943 105,301 23,991 19,241 377,985 17,827 8,403 32,514 23,842 18,408 39,711 13,134 24,505 59,077 17,605 2,334 11,127 Real.Keuangan 9,033 12,189 52,567 12,282 7,119 137,285 6,506 2,133 20,635 8,967 6,326 21,963 5,905 19,790 29,340 6,714 284 5,027 Peningkatan Sarana dan Prasarana pemerintahan Nias Pembinaan perencanaan Jalan Sumut Rehabilitasi dan Rekonstruksi Jalan Propinsi Sumut Rehabilitasi dan Rekonstruksi Jalan Kabupaten Nias Rehabilitasi dan Rekonstruksi Jalan Kabupaten Nias Pengembangan perumahan dan pemukiman Nias dan

Pengembangan sistem layanan air

minum dan air

Pengembangan daerah rawa dan pengamanan pantai

Pengendalian banjir dan pengamanan

pantai Nias

Irigasi wilayah Nias

Peningkatan kualitas ketenagalistrikan Nias Pemeliharaan,Rehab ,Peningk.pembangun an SarPras Trans Pemberdayaan ekonomi dan usaha

Nias

Agama, Sosial dan Budaya Nias Pendidikan dan Kesehatan Nias Pendidikan dan Kesehatan Nias Selatan Dinas Kesehatan

Sumut - ETSP Perwakilan Nias

6

10

(7)

Deputi Bidang : Perumahan, Infrastruktur dan Tata Guna Lahan Sub Bidang : Pembinaan Perencanaan Jalan Sumut

Satker : 459033 OC 1

Ka. Satker : Hotben Doloksaribu, ST STATUS : 22 NOPEMBER 2006

Fisik (Rp)

1 3 4 5 6 7 8 9 11 14 15 16 17

ADMINISTRASI UMUM 854,400,000 506,784,516

1 Administrasi Proyek 797,360,000 506,784,516 2 Pengadaan Alat Pengolahan Data 57,040,000

-Pengadaan Alat Berat / Alat Bantu 51,000,000,000 20,036,500,000 4,007,300,000 -

-1

Pengadaan Alat Berat K N Nias 1 Pkt 20,062,500,000 K 20,036,500,000 4,007,300,000 - -2 K N 1 Pkt 30,937,500,000 P - - -

-STUDY PERENCANAAN TEKNIS

10,904,798,000

10,782,235,392 5,830,946,567

1

K F Nias 1 Pkt 2,683,423,000 K 2,683,423,000 1,354,125,497 50.46 51.80 2

K F s dan Nias Sela 1 Pkt 2,326,940,000 K 2,326,940,000 662,404,460 28.47 51.62 3

K F s dan Nias Sela 1 Pkt 734,690,000 K 734,690,000 334,517,699 45.53 57.04 4 K F Nias Selatan 1 Pkt 1,274,295,000 K 1,274,295,000 590,519,363 46.34 65.19 5 K F Nias 1 Pkt 1,179,805,000 K 1,179,805,000 931,361,156 78.94 84.05 6 K F Nias Selatan 1 Pkt 1,089,110,000 K 1,089,110,000 863,962,000 79.33 82.88 K F Nias Selatan 1 Pkt 216,535,000 K 214,963,106 214,963,106 100.00 100.00 K F Nias 1 Pkt 175,000,000 K 98,120,000 98,120,000 100.00 100.00 K F Nias Selatan 1 Pkt 125,000,000 K 97,939,286 97,939,286 100.00 100.00 7 K F Nias 1 Pkt 1,100,000,000 K 1,082,950,000 683,034,000 63.07 80.00 4,236,602,000 4,123,904,100 1,844,455,150 1

K N s dan Nias Sela 1 Pkt 867,348,000 K 862,990,000 487,871,600 56.53 95.00 2

K N Nias 1 Pkt 870,848,000 K 868,490,000 173,698,000 20.00 98.00 3

K N s dan Nias Sela 1 Pkt 648,406,000 K 644,017,000 364,267,200 56.56 90.00 4

K N s dan Nias Sela 1 Pkt 950,000,000 K 948,502,500 189,700,500 20.00 80.00 5

K N Nias Pkt 50,000,000 K 49,996,100 49,996,100 100 100.00 6

K N Nias Selatan 1 Pkt 50,000,000 K 49,995,000 49,995,000 100 100.00 7

K N s dan Nias Sela 1 Pkt 50,000,000 K 49,912,500 49,912,500 100 100.00 8 K N Nias Selatan Pkt 50,000,000 K 49,973,000 49,973,000 100 100.00 9 K N Nias Selatan 1 Pkt 650,000,000 K 600,028,000 429,041,250 71.50 98.00 10 K N - - 50,000,000 P - - - -Total 66,995,800,000 34,942,639,492 12,189,486,233 34.88 30.94

Jumlah Paket Kontrak 19 10,904,798,000

Jumlah Paket Swakelola 0

-0 10,904,798,000 % R.FISIK THDP PAGU DIPA 16.14

19 4,236,602,000

Keterangan :

: K = Kontrak S = Swakelola : F = Fisik N = Non Fisik : K = Terkontrak (Paket Kontrak yang sudah diberikan SPMK) : L = Proses Lelang (Paket yang sedang dalam proses pelelangan : P = Persiapan (Paket yang belum melakukan pengumuman lelang)

PT. Equipindo Perkasa/SPK-14/BRR.459033/XI/06 '06 Nopember 2006 PT. Esconsoil Ensan SPK-03/BRR.459033/VI/06 07 Juni 2006 Lokasi Vol Realisasi Keuangan

PENGAWASAN TEKNIK JALAN DAN JEMBATAN

Paket - 06, Pengawasan Ruas Jalan Kabupaten Nias Selatan

-PT. Indah Karya (Persero) SPK-06/BRR.459033/VI/06 07 Juni 2006

Paket - 01, Pengawasan Teknik Jalan Lahewa - Afulu - Sirombu

-

PT. Herda Carter Indonesia SPK-01/BRR.459033/VI/06, 07 Juni 2006

Paket - 02, Pengawasan Teknik Jalan Miga - Sirombu; Miga - Lolowau

-PT. Diantama Rekanusa SPK-02/BRR.459033/VI/06 07 Juni 2006

Paket - 03, Pengawasan Teknik Jalan Gunungsitoli - Teluk Dlam

-PERENCANAAN TEKNIK JALAN DAN JEMBATAN Paket - 07, Perencanaan Teknik Jalan di Kepulauan Nias (Full

Design)Sepanjang 85.00 Km

PT. Andalas Graha Hutama SPK-08/BRR.459033/VI/06 23 Juni 2006

Paket - 10, Perencanaan Teknik Jembatan Kabupaten Nias PT. Tribina Matra Carya Cipta SPK-07/BRR.459033/VI/06 23 Juni 2006

Paket - 11, Perencanaan Jalan Simplfied Design Nias sepanjang 20.00 Km CV. Archiplan & ASS SPK-21.a/PER/P.11/BRR/IV/06 08 April 2006

(K/L/P)

Paket - 14, Perencanaan Teknik Jembatan - CV. Perca Bangun Persada SPK-24.a/PER./P.14/BRR/IV/06 12 April 2006

Paket - 12, Perencanaan Jalan Simplfied Design Nias Selatan sepanjang 20.00

Km

CV. Prima Rancang SPK-22.a/PER/P.12/BRR/IV/06 08 April 2006

Paket - 13, Perencanaan Teknik Jembatan - CV. Team Archieta SPK-23.a/PER/P.13/BRR/IV/06 12 April 2006

Jumlah Paket Fisik Jumlah Paket Non Fisik

(K/S) (F/N)

LAPORAN PELAKSANAAN KEGIATAN SATKER

ANGGARAN REHABILITASI DAN REKONSTRUKSI NAD - NIAS APBN 2006 (DANA HASIL MONATORIUM

No Satuan Pelaksana kegiatan / Bagian Pelaksana Kegiatan Sat Pagu K/L/P Nama Perusahaan/No/Tgl Kontrak Nilai Kontrak (RP)

Pengadaan Rangka Jembatan / Panel Bridge

Ket (%)

2 10

(%)

K/S F/N (Rp)

Paket - 04, Pengawasan Teknik Jembatan Propinsi

-PT. Eskapindo Matra C.E SPK-04/BRR.459033/VI/06 07 Juni 2006

Paket - 05, Pengawasan Ruas Jalan Kabupaten Nias - PT. Dacrea Mitrayasa SPK-05/BRR.459033/VI/06 07 Juni 2006

Lanjutan Paket Pengawasan 2005

Paket - 6a, Pengawasan Jalan Propinsi - PT. Herda Carter Indonesia KU.03.08/SKS/BRR-PPJSU-1/05 21 Desember 2005, Adendum I

Paket - 6b, Pengawasan Jalan Kabupaten Nias - PT. Dacrea Mitrayasa KU.03.08/SKS/BRR-PPJSU-1/05 21 Desember 2005,

Adendum I

Paket - 6c, Pengawasan Jalan Kabupaten Nias Selatan - PT. Arcende KU.03.08/SKS/BRR-PPJSU-1/05 21 Desember 2006,

Adendum I

Paket - 17, Perbantuan Pengawasan Perumahan Satker BRR - Pengembangan

Perumahan dan Permukiman Nias

PT. Pemetar Argeo Consultan SPK-12/BRR.459033/VI/06 28 Juni 2006

Paket - 08, Perencanaan Teknik Jalan Propinsi di kepulauan Nias (Full Design)

Sepanjang 85.00 Km

PT. Transima Citra Indo Consultan SPK-09/BRR.459033/VI/06 28 Juni 2006

Paket - 09, Perencanaan Teknik Jalan Kabupaten Full Design sepanjang 40.00

Km dan Simplfied Design 85.00 Km

PT. Erdrant Rizki Utama SPK-10/BRR.459033/VI/06 24 Juni 2006

Paket - 15, Rencana Tata Bangunan dan Lingkungan Kawasan Pusat Kota

Teluk Dalam Kabupaten Nias Selatan

PT. Wastu Widyawan SPK-11/BRR.459033/VI/06 28 Juni 2006

Paket - 16, Perencanaan Teknik Jembatan

-Kuasa Pengguna Anggaran Satker. BRR - Pembinaan Perencanaan Jalan Sumut

Hotben Doloksaribu, ST NIP : 110034467

(8)

Deputi Bidang : Bidang Kelembagaan

Sub Bidang : Peningkatan SarPras Pemerintah Nias

Status Bulan : 25 Nopember 2006 Ka SatKer : Hotben Doloksaribu, ST

NAMA PERUSAHAAN Fisik

NOMOR/TGL KONTRAK Keu Fisik Keuangan ( % ) ( % )

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

1 ADMINISTRASI UMUM 1,758,460,000 1,747,310,000 1,040,698,083

Administrasi Proyek 1,592,460,000 1,592,460,000 1,135,848,083 71 885,848,083 56 Pengadaan Alat Pengolahan Data K N 1 Paket 166,000,000 K

PT.Bangun Sukses Mandiri

023/BRR.462196/IV/2006

19/4/2006 154,850,000 154,850,000 100 154,850,000 100 100

2 PEMBANGUNAN GEDUNG 19,270,630,000 12,761,496,000 5,366,785,000

1 Pembangunan Gedung Kantor 5,311,400,000 4,983,924,000 2,649,274,000

- Pembangunan Gedung KODIM Nias K F G. Sitoli 1 Paket 2,595,400,000 K

PT.Jamal Putra SPP-15/PPK-AD/BRR-462196/VII/2006

4/7/2006 2,387,368,000 1,909,894,400 80 1,551,789,200 65 72 - Pembangunan /Renovasi Kantor KORAMIL K F G. Sitoli 1 Paket 1,491,300,000 K

PT.Bina Tama Sejahtera SPP-16/PPK-AD/BRR-62196/VII/2006

29/6/2006 1,371,856,000 1,371,856,000 100 1,097,484,800 80 100

-Pembayaran sisa Kontrak pengadilan negeri dan

pengadilan agama K F G. Sitoli 1,224,700,000 K 1,224,700,000 100 2 Pembangunan Rumah Negara 2,814,400,000 2,587,480,000 517,496,000

- Renovasi Rumah Dinas KODIM / KORAMIL K F G. Sitoli 1 Paket 2,814,400,000 K

PT.Kebun Buana Abadi SPP-17/PPK-AD/BRR-462196/VI/2006

30 Juni 2006 2,587,480,000 1,681,862,000 65 517,496,000 20 50 3 Pembangunan Gedung Khusus 4,000,000,000 3,670,000,000 1,284,500,000

- Pembangunan Gedung Khusus LP.Gn.Sitoli (bertahap) K F G. Sitoli 1 Paket 4,000,000,000 K

PT.Sige Sinar Gemilang SPP-O18/BRR-462196/VII/2006

07/7/2006 3,670,000,000 2,936,000,000 80 1,284,500,000 35 60 4 Pembangunan Sarana Prasarana Lingkungan Gedung 6,150,000,000 1,450,400,000 915,515,000

-Melengkapi Sarana untuk mengisi Infrastruktur

pemerintahan Wilayah terkena Bencana K N 1,500,000,000 P -

-Konsultan Perencanaan 4,650,000,000 1,450,400,000 915,515,000

- Perencanaan Rehabilitasi Stasiun RRI Gunungsitoli K N G. Sitoli 1 Paket 100,000,000 K

CV.Duta Mulia Persada 07/PPK-RRI/BRR 462196/IV/2006

4/3/2006 99,800,000 99,800,000 100 84,830,000 85 100

- Perencanaan Pembangunan Kantor di Kabupaten Nias K N G. Sitoli 1 Paket K

PT. Aryajasa Rekacipta 008/PPK-D-KP/BRR-462196/IV/2006

4/3/2006 416,000,000 416,000,000 100 208,000,000 50 100 - Perencanaan Pembangunan Kantor di Kabupaten Nias K N 1 Paket K

CV. SitimValley Engginering 10/PPK-D.KP/BRR-462196/IV/2006

03/4/206 50,700,000 50,700,000 100 43,095,000 85 100

-Perencanaan Pembangunan Gedung Kantor / Dinas

Baru Kabupaten Nias K N 1 Paket 1,000,000,000 P *)

-Perencanaan Pembangunan Gedung Kantor di

Kabupaten Nias Selatan K N 1 Paket 330,000,000 K

PT.Billy C onsultant

007/PPK-D-KP/BRR-462196/IV/2006 4/3/2006 300,000,000 300,000,000 100 150,000,000 50 100

-Perencanaan Pembangunan Gedung Kantor 26

Kecamatan di Kabupaten Nias (Pemekaran) K N 1 Paket 750,000,000 P *)

-Perencanaan Pembangunan Gedung Kantor / Dinas 14

Unit Kabupaten Nias Selatan K N 1 Paket 1,000,000,000 P *) SATKER : 462196

480,000,000

Format OC1

LAPORAN PELAKSANAAN KEGIATAN SATKER

ANGGARAN REHABILITASI DAN REKONSTRUKSI NAD-NIAS APBN 2006 (DANA HASIL MORATORIUM)

Ket. VOL

No PROYEK / BAGIAN PROYEK

KEGIATAN PAKET K/S F/N LOKASI Nilai Kontrak

Rencana (%) Realisasi Keuangan SAT Pagu DIPA K/L/P

(9)

NAMA PERUSAHAAN Fisik NOMOR/TGL KONTRAK Keu Fisik Keuangan ( % ) ( % )

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Ket. VOL

No PROYEK / BAGIAN PROYEK

KEGIATAN PAKET K/S F/N LOKASI Nilai Kontrak

Rencana (%) Realisasi Keuangan SAT Pagu DIPA K/L/P

-Perencanaan Pembangunan Gedung Kantor 10

Kecamatan di kabupaten Nias Selatan (Pemekaran) K N 1 Paket 400,000,000 P *)

-Perencanaan Pembangunan Gedung Kantor dan

Prasarana Gedung KPPN Gunungsitoli K N G. Sitoli 1 Paket 50,000,000 K

PT.Amethys Utama 006/PPK-D-KP/BRR-462196/IV/2006

4/3/2006 49,300,000 49,300,000 100 41,905,000 85 100

-Perencanaan Pembangunan Sarana dan Operasional

LAPAS di Kabupaten Nias dan P.Tello K N G. Sitoli 1 Paket 220,000,000 K

CV.Koridor Multi Gatra '06/PPK-LP/BRR-462196/IV/2006

4/3/2006 219,600,000 219,600,000 100 186,660,000 85 100

-Perencanaan Pembangunan Kantor dan Rumah Dinas

Kodim/Koramil Nias K N G. Sitoli 1 Paket 240,000,000 K

PT.Panca Rancang Pratama '06/PPK-AD/BRR-462196/IV/2006

4/3/2006 236,500,000 236,500,000 100 201,025,000 85 100 - Pengawasan Rehabilitasi Stasiun RRI Gunungsitoli K N 1 Paket 80,000,000 K

CV. Gamma '91

23/7/2006 78,500,000 23,550,000 30 75 5 Perencanaan Umum 994,830,000 69,692,000

-- Pengawasan Pembangunan Kantor di Kabupaten Nias K N 1 Paket 370,000,000 K

CV.Duta Mulia Persada

12/7/2006 34,692,000 10,407,600 30 100

-Pengawasan Pembangunan Kantor di Kabupaten Nias

Selatan K N 1 Paket 260,000,000 L

-Pengawasan Pembangunan Gedung Kantor dan

Prasarana KPPN Gunungsitoli K N 1 Paket 35,000,000 K

CV. Billindo Engginering Consultan

12/7/2006 35,000,000 10,500,000 30 100

-Pengawasan Pembangunan Sarana dan Operasi Lapas

Nias & Pulau Tello K N 1 Paket 180,000,000 L

-Pengawasan Pembangunan Gedung Kantor dan Rumah

Kodim / Koramil Nias K N 1 Paket 149,830,000 L

3 REHABILITASI BANGUNAN GEDUNG NEGARA 19,838,940,000 18,211,296,200 1,792,827,000

1 Pembangunan Gedung Kantor 880,320,000 869,880,000 478,434,000

-Rehabilitasi / Pembangunan Gedung KPPN

Gunungsitoli K F G. Sitoli 336 M2 880,320,000 K

UD.Karya Umbu SPP-080/PPK-KP/BRR-462196/VII/206

03 Juli 2006 869,880,000 695,904,000 80 478,434,000 55 57 2 Pembang.Prasarana & sarana lingkungan Gedung 206,500,000 201,960,000 127,578,000

-Rehabilitasi Kantor bagian samping dan belakang KPPN

Gunungsitoli K F G. Sitoli 182 M2 136,500,000 K

CV.Odowa SPP-081/PPK-KP/BRR-462196/VII/206

03 Juli 2006 133,980,000 133,980,000 100 107,184,000 80 100

- Rehabilitasi Kantor Bagian depan KPPN Gunungsitoli K F G. Sitoli 70 M2 70,000,000 K

CV.Taruna Permai Jaya SPP-79/PPK-KP/BRR-462196/VII/2006

03 Juli 2006 67,980,000 67,980,000 100 20,394,000 30 100 3 Pengadaan Perlengkapan Sarana Gedung 143,180,000 -

-- Komputer Untuk KPPN Gusit K N 48,000,000 P - Printer Untuk KPPN Gusit K N 32,000,000 P - AC SPLIT Untuk KPPN Gusit K N 63,180,000 P

4 Pengadaan Kendaraan Bermotor Roda-2 20,000,000 19,250,000 19,250,000

- Pengadaan kendaraan Roda-2 untuk KPPN G.Sitoli K N 1 Unit 20,000,000 K UD.Putra Exos 19,250,000 19,250,000 100 19,250,000 100 100 5 Rehabilitasi Bangunan Gedung Negara 18,588,940,000 17,120,206,200 1,167,565,000

- Rehabilitasi Stasiun RRI Gunungsitoli K F G. Sitoli 1 Unit 2,828,940,000 K

Fa.Puramot Jaya SPP-019/PPK-RRI/BRR-462196/VII/2006

07/7/2006 2,387,500,000 1,910,000,000 80 835,625,000 35 63 - Rehabilitasi / Pembangunan Kantor di Kabupaten Nias 9,120,000,000 9,066,204,000 331,940,000

- Pembangunan Kantor BPS Gunungsitoli K F G. Sitoli 1 Unit 570,000,000 K

CV.Deli Karya Indah SPP-093/PPK-KP/BRR-462196/VII/2006

07/7/2006 499,000,000 399,200,000 80 219,560,000 44 65 - Pembangunan Kantor Lurah Ilir Gununtsitoli K F G. Sitoli 1 Unit 430,000,000 K

CV.Trimatra Usaha Konstruksi SPP-094/PPK-KP/BRR-462196/VII/2006

07/7/2006 374,600,000 299,680,000 80 112,380,000 30 65

(10)

NAMA PERUSAHAAN Fisik NOMOR/TGL KONTRAK Keu Fisik Keuangan ( % ) ( % )

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Ket. VOL

No PROYEK / BAGIAN PROYEK

KEGIATAN PAKET K/S F/N LOKASI Nilai Kontrak

Rencana (%) Realisasi Keuangan SAT Pagu DIPA K/L/P

- Kantor DPRD Nias (bertahap) K F G. Sitoli 1 Unit 1,220,000,000 K PT. Devara Karya Mulia 1,388,000,000 SPP/SPMK Akhir Agustus

- Kantor Perwakilan BRR Nias (Lanjutan) K F G. Sitoli 1 Unit 1,200,000,000 K CV. Bernado 1,002,600,000 SPP/SPMK Akhir Agustus

- Kantor Camat Gunung Sitoli K F G. Sitoli 1 Unit 600,000,000 K CV. Gading Asia Mas 738,100,000 SPP/SPMK Akhir Agustus

- Kantor Camat Lahewa K F Lahewa 1 Unit 600,000,000 K CV. Welling 807,400,000 SPP/SPMK Akhir Agustus

- Rehabilitasi /Pembang.Kantor di Kabupaten Nisel 6,640,000,000 5,666,502,200

-- Pembang.Rung Kerja Bupati, Wakil & Sekda Nisel K F T. Dalam 1 Unit 1,600,000,000 K CV. Risma Karya 1,358,500,000 SPP/SPMK Akhir Agustus

- Pembangunan Kantor Dinas Parawisata Kab.Nisel K F T. Dalam 1 Unit 1,876,000,000 K CV. Torpana 1,714,000,000 di batalkan

- Pembangunan Pasar Teluk Dalam K F T. Dalam 1 Unit 1,586,000,000 K PT. Sinar Teknik Baru 1,341,265,200 SPP/SPMK Akhir Agustus

- Pembangunan Kantor Camat Kota Teluk Dalam K F T. Dalam 1 Unit 978,000,000 K CV. Mutiara Jaya 871,630,000 SPP/SPMK Akhir Agustus

- Pembang.Ktr Sektariat Bersama BRR Kab. Nisel K F T. Dalam 1 Unit 600,000,000 K CV. Indah Karya 381,107,000 SPP/SPMK Akhir Agustus

4 PEMBINAAN SARANA DAN PRASARANA 1,410,000,000 1,116,586,400 832,685,195

1 Pengadaan Perlengkapan Sarana Kantor 1,280,000,000 1,086,586,400 802,685,195

- Pembangunan Sarana Operasional LAPAS Gunungsitoli K F G. Sitoli 1 Pkt 630,000,000 K

CV.Perjuangan SPP-19/BRR-462196/VII/2006

5Juli 2006 553,915,000 553,915,000 100 443,132,000 80 98

-Pembangunan Tembok Pagar Keliling untuk Cabang

Rutan Pulau Tello K F P. Tello 1 Pkt 650,000,000 K

CV.Sahabat Baru

SPP-20/BRR-462196/VII/2006

5 Juli 2006 532,671,400 532,671,400 100 359,553,195 67.5 90 2 Pengadaan Meubeler

- Pengadaan Meubeler Cab.Rutan Pulau Tello K N 100,000,000 P 3 Pengadaan Kendaraan Bermotor Roda-2

-Pengadaan Kendaraan Operasional roda 2 untuk

LAPAS Gunungsitoli dan Pulau Tello K N 2 Unit 30,000,000 K

UD.Putra Exos S-47/BRR.462196/SPK/2006 22 Mei 2006 30,000,000 30,000,000 100 30,000,000 100 100 42,278,030,000 33,836,688,600 9,032,995,278 21.37 39.33 48 40,685,570,000 32,244,228,600 8,147,147,195 - 31.48 23 33,081,560,000 30,520,036,600 7,027,532,195 25 7,604,010,000 1,724,192,000 1,119,615,000 Keterangan : (K / S) : K = Kontrak, S = Swakelola (F / N) : F = Fisik, N = Non Fisik

(K / L / P ) : K = Terkontrak (Paket Pekerjaan Yang Sudah Diberikan SPK) (K / L / P) : L = Proses Lelang (Paket Yang Sudah Melakukan Pelelangan) (K / L / P) : P = Persiapan (Paket Yang Belum Melakukan Pengumuman Pelelangan

Kantor Pemerintahan Nias

Hotben Doloksaribu, ST Nip : 110043467

Jumlah Paket Swakelola

Jumlah Paket Fisik Jumlah Paket Non Fisik

Ka. Satker BRR - Pnk. Sapras

% Real.Fisik thdp PAGU TOTAL

(11)

Deputi Bidang : Bidang Perumahan,Insfrastruktur & Tataguna Lahan Sub Bidang : Rehabilitasi dan Rekonstruksi Jalan Propinsi Sumut

Status Bulan : 25 Nopember 2006 Ka SatKer : Ir.BuyungSitompul,MT

NAMA PERUSAHAAN Nilai Kontrak Fisik Nilai Fisik

NOMOR/TGL KONTRAK Addendum I Keu Fisik ( RP ) DIPA (%) Kontrak (%) ( % ) Thdp Kontrak (Rp) Rencana Sisa Anggaran

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

1 ADMINISTRASI UMUM 1,332,160,000 1,331,600,000 582,773,935 43.75 43.76 43.747 582,224,544 1,331,600,000 560,000 Administrasi Proyek 1,302,600,000 1,302,600,000 553,773,935 42.51 42.51 42.513 553,773,935 1,302,600,000 0 Pengadaan Alat Pengolahan Data 29,560,000 29,000,000 29,000,000 98.11 100.00 98.106 28,450,609 29,000,000 560,000 2 Peningkatan Jalan Arteri 88,250,000,000 309,998,166,440 87,170,006,720 44,837,756,513 50.81 51.44 52,272,229,173 87,170,006,720 1,079,993,280

1

Pembangunan Jalan

Gunungsitoli-Lolowau-Sirombu (Lanjutan) K F 1 Pkt 6,000,000,000 K PT. Cipayung SK-1690/BRR-459064/VIII/2006 04 Agustus 2006 5,704,689,000 5,704,689,000 3,999,534,961 66.66 70.11 84.000 4,791,938,760 5,704,689,000 295,311,000 Tahun Tunggal 2

Rehabilitasi Rekonstruksi Moi - Mandrehe-

Sirombu K F 1 Pkt 9,612,500,000 K

PT.AdiAnugrah Jaya Abadi SK-777/BRR-459064/V/2006

5 Mei 2006 24,264,218,000 9,612,500,000 7,426,791,844 77.26 30.61 23.984 5,819,530,045 9,612,500,000 0

Multi Year

3

Pembangunan Jalan Gunungsitoli - Lahewa -

Afulu (Lanjutan) K F 1 Pkt 3,250,000,000 K

PT. Gunung Mega Jaya SK-1691/BRR-459064/VIII/2006 04

Agustus 2006 3,149,106,000 3,149,106,000 1,222,478,014 37.61 38.82 71.000 2,235,865,260 3,149,106,000 100,894,000

Tahun Tunggal

4 Pembangunan Jalan Gunungsitoli - Binaka 1 Pkt 3,000,000,000 K

PT. Cipayung SK-1811/BRR-459064/VIII/2006 23

Agustus 2006 2,846,685,000 2,846,685,000 1,129,261,604 37.64 39.67 53.000 1,508,743,050 2,846,685,000 153,315,000

Tahun Tunggal

5 Pembangunan Jalan Miga - Moi 1 Pkt 8,000,000,000 K

PT. Hastatunggal Persadabhakti SK-1812/brr-459064/VIII/2006 23

Agustus 2006 7,589,709,000 7,589,709,000 1,517,941,800 18.97 20.00 24.090 1,828,360,898 7,589,709,000 410,291,000

Tahun Tunggal

6

Pembangunan Jalan Lahusa Teluk Dalam

-Lolowau ( -Lolowau - Teluk Dalam ) K F 1 Pkt 6,000,000,000 K

PT.Subur Sari Lasdrerich 122/ BRR-RRJ-SU / XII / 2005

12 Desember 2005 5,879,817,720 5,879,817,720 0 0.00 0.00 100.000 5,879,817,720 5,879,817,720 120,182,280

Tahun Tunggal

7

Rehab Rekons Jln

G.Sitoli-Tuhemberua-Lahewa K F 1 Pkt 19,000,000,000 K

PT.Duta Graha Indah SK-775/BRR-459064/V/2006

5 Mei 2006 31,044,960,000 19,000,000,000 11,067,497,167 58.25 35.65 44.000 13,659,782,400 19,000,000,000 0

Multi Year

8 Rehab Rekons Jln.Moi-Lolowau-Sirombu K F 1 Pkt 22,000,000,000 K

PT.Tulung Agung SK-776/BRR-459064/V/2006

5 Mei 2006 34,475,398,000 22,000,000,000 18,474,251,123 83.97 53.59 48.000 16,548,191,040 22,000,000,000 0

Multi Year

9

Rehab Rekons Lahusa - Teluk Dalam -

Lolowa'u K F 1 Pkt 2,100,000,000 K

PT.Tulung Agung SK-2543/BRR-459064/XI/2006 17

Nopember 2006 19,840,337,000 2,100,000,000 - 0.00 0.00 0.000 0 2,100,000,000 0

Multi Year

# Rehab Rekons Binaka - Lahusa K F 1 Pkt 1,530,000,000 K

PT.Tulung Agung SK-2540/BRR-459064/XI/2006 17

Nopember 2006 14,477,209,000 1,530,000,000 - 0.00 0.00 0.000 0 1,530,000,000 0

Multi Year

# Rehab Rekons Gunungsitoli - Binaka 1 K F 1 Pkt 1,657,500,000 K

PT. Duta Graha Indah SK-2538/BRR-459064/XI/2006 17

Nopember 2006 15,868,034,000 1,657,500,000 - 0.00 0.00 0.000 0 1,657,500,000 0

Multi Year

#

Rehab Rekons Tuhemberua (Sp. Lotu) -

Lahewa K F 1 Pkt 1,650,000,000 K

PT. Gorip Nanda Guna SK-2541/BRR-459064/XI/2006 17

Nopember 2006 15,741,141,000 1,650,000,000 - 0.00 0.00 0.000 0 1,650,000,000 0

Multi Year

# Rehab Rekons Miga - Moi 1 K F 1 Pkt 2,350,000,000 K

PT. Teras Bermutu SK-2539/BRR-459064/XI/2006 17

Nopember 2006 21,954,728,000 2,350,000,000 - 0.00 0.00 0.000 0 2,350,000,000 0

Multi Year

# Rehab Rekons Lahewa - Afulu K F 1 Pkt 2,100,000,000 K

PT. Triple's SK-2542-BRR-459064/XI/2006 17 Nopember 2006 19,992,128,000 2,100,000,000 - 0.00 0.00 0.000 0 2,100,000,000 0 Multi Year 3 Pembangunan Jembatan 19,908,000,000 18,130,699,000 18,130,699,000 7,146,079,861 5,753,966,706 11,274,146,500 8,633,853,500 1

Pembangunan Jembatan Siwalawa I ,

Siwalawa II da Lahusa K F 1 Pkt 10,500,000,000 K

PT.Adhi Karya SK-778/BRR-459064/V/2006

5 Mei 2006 9,505,536,000 9,505,536,000 2,483,104,813 23.65 26.12 14.000 1,330,775,040 5,323,100,160 5,176,899,840

Usulan Multi Year

2 Rehap / Rekon Jembatan Oyo K F 1 Pkt 8,608,000,000 K

PT.Adhi Karya SK-779/BRR-459064/V/2006

5 Mei 2006 7,865,049,000 7,865,049,000 4,510,952,248 52.40 57.35 54.000 4,247,126,460 5,190,932,340 3,417,067,660

Usulan Multi Year

3

Rehab Rekons Jembatan Lahusa Km.

78+000 K F 1 Pkt 800,000,000 K

CV. Dua Ribu SK-2083/BRR-459064/IX/2006 21

September 2006 760,114,000 760,114,000 152,022,800 19.00 20.00 23.163 176,065,206 760,114,000 39886000 Tahun Tunggal TOTAL 109,490,160,000 328,128,865,440 105,300,705,720 52,566,610,309 48 49.920473 55.1052 58,026,195,879 99,775,753,220.00 9,714,406,780

Jumlah Paket Kontrak 17 Jumlah Paket Swakelola 0

Jumlah Paket Fisik 17

Jumlah Paket Non Fisik 0 %REALISASI FISIK THDP DIPA 52.996722

Keterangan :

(K / S) : K = Kontrak, S = Swakelola (F / N) : F = Fisik, N = Non Fisik

(K / L / P ) : K = Terkontrak (Paket Pekerjaan Yang Sudah Diberikan SPK) (K / L / P) : L = Proses Lelang (Paket Yang Sudah Melakukan Pelelangan) (K / L / P) : P = Persiapan (Paket Yang Belum Melakukan Pengumuman Pelelangan

No PROYEK / BAGIAN PROYEK KEGIATAN PAKET K/S F/N LOKASI SAT Pagu DIPA Est. Penyerapan s/d 31 Desember 2006

LAPORAN PELAKSANAAN KEGIATAN SATKER

ANGGARAN REHABILITASI DAN REKONSTRUKSI NAD-NIAS APBN 2006 (DANA HASIL MORATORIUM)

Ket. K/L/P Nilai Kontrak Awal Rencana (%) Realisasi Keuangan

VOL

Format OC1 SATKER : 459064

(12)

Deputi Bidang : Bidang Infrastruktur, Lingkungan dan Pemeliharaan Sub Bidang : Rehabilitasi dan Rekonstruksi Jalan Kabupaten Nias

SATKER : 459192 Status Bulan : 25 November 2006

Ka SatKer : Mesachi Zebua, S.IP

NAMA PERUSAHAAN Fisik

NOMOR/TGL KONTRAK Keu Fisik ( RP ) % ( % )

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

1 ADMINISTRSI UMUM 835,400,000 834,140,000 443,599,500 53.18 Administrasi Proyek 795,340,000 795,340,000 404,799,500 50.90

Pengadaan Alat Pengolahan Data 40,060,000

CV. SAHABAT SPK.07/BRR.459192/VI/2006

08 Juni 2006 38,800,000 38,800,000 100.000 100.000 2 Pembangunan Jalan dan Jembatan Lokal (2005) 6,998,120,000 6,997,965,027 1,109,702,190 10.098 97.383

1 Pemeliharaan periodik jalan ruas Tetehösi - Bozihöna, Kecamatan Idanogawo, Rehabilitasi jalan dalam Kota Gidö, Rehabilitasi Jalan

ruas Sogae'adu - Sifaoro'asi Kecamatan Gidö (Lanjutan) K F

Kec. Idanögawo/

Gidö 1.00 Pkt 1,342,650,000 K

UD. Imbun 008/SPP/BRR/SATKER-N/I/2006

19 Januari 2006 1,342,623,707 100.000 - - 100.000 2 Rehabilitasi jalan ruas Hilindruria - Namöhalu Kecamatan Namöhalu,

Pemeliharaan Periodik Jalan Ruas Awa'ai - Bogali - Lotu Kecamatan Tuhemberua/ Lotu, Pemeliharaan jalan ruas Sawö - Botombawö

Kecamatan Tuhemberua (Lanjutan) K F

Kec. Namöhalu/

Tuhemberua/Lotu 1.00 Pkt 2,061,370,000 K

PT. Mitra Perdana 009/SPP/BRR/SATKER-N/I/2006

19 Januari 2006 2,061,363,553 100.000 520,909,895 25.270 100.000 3 Rehabilitasi jalan ruas Pasar Baru Lölömoyo dhi, dimulai dari

Bawadasi Kec. Sirombu, Rehabilitasi Peningkatan Jalan Ruas

Onolimbu - Lölöwa'u Kecamatan Sirombu (Lanjutan) K F Kec. Sirombu 1.00 Pkt 1,129,150,000 K

PT. Bintang Agung 010/SPP/BRR/SATKER-N/I/2006 19 Januari 2006 1,129,129,602 100.000 -Proses Pembayara n 83.780

Putus Kontrak Sesuai Surat Nomor: S.807/BRR.459192/IX/2006 Tanggal 11 September 2006 4 Pembangunan Jalan Ruas Lölöhia - Lasarafaga Kecamatan

Mandrehe (Lanjutan) K F Kec. Mandrehe 1.00 Pkt 416,350,000 K

CV. Sang saka 007/SPP/BRR/SATKER-N/XII/2006

23 Desember 2005 416,301,548 100.000 - - 100.000 5 Rehabilitasi Jalan Ruas Gunungsitoli - Faekhu Kecamatan

Gunungsitoli, Rehabilitasi Jalan Ruas Dahana - Tumöri Balöhili Kecamatan Gunungsitoli, Lanjutan Pembangunan Jalan Ruas

Hiliwöria - Onozikhö Kecamatan Gunungsitoli (Lanjutan) K F Kec. Gunungsitoli 1.00 Pkt 236,250,000 K

PT. Wincom Karya Utama 011/SPP/BRR/SATKER-N/I/2006 19 Januari 2006 236,250,000 100.000 -Proses Pembayara n 100.000

Putus Kontrak Sesuai Surat Nomor: S.727/BRR.459192/VIII/2006

Tanggal 24 Agustus 2006 6 Lanjutan Pembangunan Jalan Ruas Alo'oa menuju Simpang Lima

Kecamatan Hiliduho/Tuhemberua (Lanjutan) K F Kec. Hiliduho 1.00 Pkt 515,850,000 K

CV. Gading Asia Mas 006/SPP/BRR/SATKER-N/XII/2006

23 Desember 2005 515,805,191 100.000 - - 100.000 7

Rehabilitasi Berat Jalan Ruas Gunung Tua - Ononamölö Talafu dhi. Dimulai dari Ononamolo Talafu Kecamatan Persiapan Tugala Oyo, Pemeliharaan Periodik Jalan Ruas Larumae - Sinarikhi - Fadoro Lauru + 1 Jembatan Belly Bentang 30 m Kecamatan Hiliduho

(Lanjutan) K F

Kec. Alasa/

Hiliduho 1.00 Pkt 1,296,500,000 K

PT. Sagala & SON

012/SPP/BRR/SATKER-N/I/2006

19 Januari 2006 1,296,491,426 100.000 588,792,295 45.414 100.000 3 Pembangunan Jalan dan Jembatan Lokal (2006) 17,021,480,000 16,159,005,600 10,728,472,437 61.365 79.846

1 Peningkatan Jalan Dalam Kota Gunungsitoli K F Kec. Gunungsitoli 1.00 Pkt 5,789,600,000 K

PT. Cipayung SPP.02/BRR.459192/V/2006

31 Mei 2006 5,498,529,000 100.000 4,852,451,843 88.250 99.000 2 Peningkatan Jalan Ruas Hilina'a - Alasa Kecamatan

Gunungsitoli/Alasa K F Kec. Gunungsitoli 1.00 Pkt 3,834,880,000 K

PT. Cipayung SPP.03/BRR.459192/V/2006

31 Mei 2006 3,800,380,900 100.000 3,463,800,166 91.144 99.500 3 Pemeliharaan Jalan Ruas Botombawö - Lölöana'a Kecamatan

Hiliduho K F Kec. Hiliduho 1.00 Pkt 1,000,000,000 K

UD. Karya Umbu SPP.05/BRR.459192/V/2006

31 Mei 2006 968,774,300 100.000 674,373,477 69.611 72.905 4 Pemeliharaan Jalan Ruas Awa'ai - Bogali - Lotu Kecamatan

Tuhemberua/Lotu K F

Kec. Tuhemberua/

Lotu 1.00 Pkt 1,000,000,000 K

UD. Karya Umbu SPP.04/BRR.459192/V/2006

31 Mei 2006 929,016,400 100.000 824,966,563 88.800 100.000

5 Lanjutan Pembangunan Ruas DAO - AFIA Kecamatan Lahewa K F Kec. Lahewa 1.00 Pkt 1,000,000,000 K

CV. Tujuh Serangkai SPP.06/BRR.459192/V/2006

12 Juni 2006 994,965,000 100.000 912,880,388 91.750 100.000

6 Pembangunan Badan Jalan yang longsor ruas Lahewa - Afulu K F Kec. Lahewa 1.00 Pkt 3,000,000,000 K

PT. BUDI GRAHA SPP.07/BRR.459192/X/2006

18 Oktober 2006 2,702,340,000 100.000 - - 22.600 7 Lanjutan Rehabilitasi Jalan Ruas Dahana - Tumöri Balöhili +

Gunungsitoli - Faekhu + Hiliwöria - Onozikhö Kecamatan Gunungsitoli

(Ex Pemutusan Kontrak) K F Kec. Gunungsitoli 1.00 Pkt 1,397,000,000 K

PT. BUDI GRAHA SPP.08/BRR.459192/XI/2006 03 November 2006 1,265,000,000 100.000 - - 34.500 24,855,000,000 23,991,110,627 - 12,281,774,127 51.193 82.185 Paket Kontrak 14

Paket Swakelola 0 %R.FISIK THDP PAGU DIPA 79.328759

t Fisik 14

n Fisik 0

Gunungsitoli, 25 November 2006 Keterangan : An. KEPALA SATUAN KERJA SEMENTARA KEPALA SATUAN KERJA SEMENTARA

(K / S) : K = Kontrak, S = Swakelola BRR-REHABILITASI DAN REKONSTRUKSI BRR - REHABILITASI DAN REKONSTRUKSI JALAN KABUPATEN NIAS (F / N) : F = Fisik, N = Non Fisik JALAN KABUPATEN NIAS

(K / L / P ) : K = Terkontrak (Paket Pekerjaan Yang Sudah Diberikan SPK) Mewakili, MESACHI ZEBUA, S. IP (K / L / P) : L = Proses Lelang (Paket Yang Sudah Melakukan Pelelangan) Penata TK. I (K / L / P) : P = Persiapan (Paket Yang Belum Melakukan Pengumuman Pelelangan) NIP. 400029560

LAPORAN PELAKSANAAN KEGIATAN SATKER

ANGGARAN REHABILITASI DAN REKONSTRUKSI NAD-NIAS APBN 2006

Format OC1

Ket. K/S F/N LOKASI Pagu DIPA K/L/P

TOTAL

Nilai Kontrak

Rencana (%) Realisasi Keuangan VOL

No PROYEK / BAGIAN PROYEK

KEGIATAN PAKET SAT

*)

*)

*)

*)

(13)

Deputi Bidang : Bidang Perumahan,Insfrastruktur & Tataguna Lahan Sub Bidang : Rehabilitasi dan Rekonstruksi Jalan Kabupaten Nias Selatan

Status Bulan : 24 November 2006 Ka SatKer : Ir. Muh Insal U. Maha, MSc

NAMA PERUSAHAAN Fisik

NOMOR/TGL KONTRAK Keu Fisik ( RP ) % ( % )

1 2 3 4 5 6 7 8 10 11.00 12 13 14 15 16 17 18

1 ADMINISTRASI UMUM 916,900,000 916,900,000.00 476,803,410 Administrasi Proyek 876,840,000 876,840,000.00 437,103,410 49.85 Pengadaan Alat Pengolahan Data 40,060,000 40,060,000.00 39,700,000 99.10

2 Pembangunan Jalan dan Jembatan Lokal

1 SAFALAGO-SUSUA-AMOROSAPeningkatan Jalan Ruas Jalan GOMO- F Kec. Gomo 2000 M 1,447,000,000 CV. LEDY 1,302,000,000.00 145,000,000 0 0 260400000 20 14.00 Sedang dalam tahap pelaksanaan

2 Peningakatan Ruas Jalan

BAWODABARA-HILIFALAGO-SIWALAWA-HILINAWALO FAU K F Kec. Teluk Dalam 3500 M2 2,100,000,000

PT. SINAR BARU UNGGULAN K-74/BRR-459203/SPP/VI/2006 22

Juni 2006

1,890,000,000.00

210,000,000 36.86 40.089 378,000,000 20.00 33.83 Sedang dalam Test Case Show Cause Meeting Tingkat Deputi

3 Rehabilitasi dan Pelebaran dan Peningkatan

Jalan Ruas Jalan Teluk Dalam-Hilimondrege F Kec. Teluk Dalam 1200 M 1,000,000,000 CV. MITRA JAYA 900,000,000.00 100,000,000 0.00 0.00 34.14

Uang muka tidak bisa dicairkan karena belum ada persetujuan tahun jamak dari Deputi Keuangan dan Perencanaan BRR-NAD NIAS dan sedang diusulkan kembali 4

Rehabilitasi dan Pelebaran dan Peningkatan Jalan Ruas Jalan Simpang AUGE-BAWOLAHUSA-MAZINGO

F Kec. Teluk Dalam 2000 M 1,600,000,000 UD. MASA KARYA 1,465,000,000.00 135,000,000 0 0 0.00 0.00 15.03

Uang muka akan diproses minggu depan karena belum ada persetujuan tahun jamak dari deputi keuangan dan perencanaan NAD-NIAS tgl 13 nov'06

5 TelloRehabilitasi Berat dan Peleb Jalan Kelling Pulau F Kec. Pulau-Pulau Batu 3179 M 1,150,000,000 PT. WINDA PRATAMA KARYA 1,050,000,000.00 100,000,000 0 0 210000000.00 20.00 3.71 Sedang dalam tahap pelaksanaan

6 Peningkatan Jalan Ruas Eho - Tebolo K F Kec. Hibala 2100 M 1,858,740,000

CV. SAHABAT K-074/BRR.459203/SPP/VI/2006 22 Juni 2006 1,818,691,639.26 40,048,361 45.48 45.275 699643398.96 38.47 59.88

Sedang dalam Test Case Show Cause Meeting Tingkat Proyek

7 Peningkatan Jalan Ruas SOLEDUA - TOGIZITA - BAWOSALO'O - SEMBULU K F Lolowau/LolomatuaKec. M 2,300,000,000 CV.Ledy 2,300,000,000 Tender batal karena hanya ada satu penawaran 8 Rehab dan Peningk. Simp Jalan KM 19

Prov.Orahili -Bawonahono K F Kec. Teluk Dalam 3500 M 1,600,000,000

PT.Tisa Lestari

K-075/BRR.459203/SPP/VI/2006 1,460,000,000.00 140,000,000 38.64 47.028 530,949,440 36.37 47.50

Menunggu diterbitkan Addendum Pekerjaan Jembatan .Bobot jembatan 40% 9 Rehab dan Peningk. Simp Jalan KM 28

Prov.Orahili -Bawonahono Kec. Teluk Dalam 2,000,000,000

PT.Kasih Citra Timur

BELUM ADA KONTRAK 2,000,000,000 42.00BELUM ADA KONTRAK

10 Rehab dan Peningkatan ruas jln dari Hilizihono

-Bawomataluo - Siwalawa K F Kec. Teluk Dalam 2700 M 3,150,000,000

PT.Perkutut 602.2/048.1/SPP

INDUK/BRR-NISEL/II/2006 10 Februari 2006

3,150,000,000.00

- 73.27 100 1,358,053,200 43.11 66.59Progress sedang dihitung oleh Konsultan PT. Indah Karya dan Kontraktor

11 Rehabilitasi Berat Jalan Ruas Helezalulu -

Gomo K F Kec. Lahusa 7035 M 3,140,000,000

PT.JAYA MITRA KONSTRUKSI 602.2/048.2/SPP

INDUK/BRR-NISEL/II/2005 10 Februari 2006

3,140,000,000.00

- 85.05 100 1,992,518,400 63.46 81.31Progress sedang dihitung oleh Konsultan PT. Indah Karya dan Kontraktor

12 Rehabilitasi dan Peningkatan Ruas Jalan Sisaraholi Oyo - Lolomatua (Lanjutan) K F Kec. Lolomatua 3000 M 1,162,321,000

CV.Cahaya Baru 602.2/048.3/SPP

INDUK/BRR-NISEL/II/2006 10 Februari 2006

1,162,321,000.00

- 74.4 100 637,742,455 54.87 68.00Progress sedang dihitung oleh Konsultan PT. Indah Karya dan Kontraktor

13

Rehabilitasi dan Pelebaran d Ruas Jalan

Lagundri - Kompleks Sorake K F Kec. Teluk Dalam 1650 M 985,939,000

CV.Mentari Jasa Mulia 602.2/065/SPP INDUK/BRR-NISEL/II/2006 17 Februari 2006 985,939,000.00 100 100 574,920,633 58.31 100.00

Menunggu serah terima dari TIM PEMBERESAN ke Satker yang baru sampai dengan hari ini belum ada kejelasannya sehingga tidak dapat turun TIM PHO.

24,410,900,000

19,240,851,639.26 5,170,048,361 7,119,030,937 37.00 49.88 13

0

13 % Realisasi Fisik thdp DIPA 39.32

0

Keterangan : (K / L / P ) : K = Terkontrak (Paket Pekerjaan Yang Sudah Diberikan SPK) (K / S) : K = Kontrak, S = Swakelola (K / L / P) : L = Proses Lelang (Paket Yang Sudah Melakukan Pelelangan) (F / N) : F = Fisik, N = Non Fisik (K / L / P) : P = Persiapan (Paket Yang Belum Melakukan Pengumuman Pelelangan

Pagu DIPA LOKASI

PROYEK / BAGIAN PROYEK

KEGIATAN PAKET F/N SAT

SATKER : 459203 No

Jumlah Paket Fisik K/S

LAPORAN PELAKSANAAN KEGIATAN SATKER

ANGGARAN REHABILITASI DAN REKONSTRUKSI NAD-NIAS APBN 2006

Format OC1

Nilai Kontrak

Realisasi Keuangan

Ket.

VOL Nilai Kontrak (Awal ) Rencana (%)

TOTAL Jumlah Paket Kontrak Jumlah Paket Swakelola

Jumlah Paket Non Fisik

(14)

Deputi Bidang : Bidang Perumahan, Insfrastruktur & Tataguna Lahan

Sub Bidang : Pengembangan Perumahan dan Pemukiman Nias 15218405 15218405

Status Bulan : 11 - 18 Nopember 2006 Ka SatKer : Ir. Busmin Siagian

NAMA PERUSAHAAN Nilai Kontrak Fisik

NOMOR/TGL KONTRAK ADDENDUM I Keu Fisik ( RP ) % ( % )

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

1 ADMINISTRASI UMUM 3,995,700,000 3,589,200,000 1,502,306,511 - Administrasi Proyek 3,573,700,000 3,529,200,000 1,268,906,511

a. Honor Pegawai dan staf 635,700,000

b. Sewa Kendaraan 344,400,000

c. Sewa Rumah 135,000,000

d. Inventaris Kantor 70,000,000

e. Lelang Panitia 37,950,800

f. Langganan Listrik, Air dan Telepon 2,892,011

g. ATK Satker dan PPK 24,686,500

h. SPPD 18,277,200

- Pengadaan Alat dan Mesin 422,000,000 CV. ASEAN UTAMA 60,000,000 60,000,000 005/SPK/BRR-N/Perkim/III/2006 20 Maret 2006 CV. ASEAN UTAMA 50,000,000 009/SPK/BRR-N/Perkim/VI/2006 19 JUNI 2006 UD MOHAGA 74,600,000 007/SPK/BRR-N/Perkim/VI/2006 Juni 2006 UD. PASCALIS 48,800,000 010/SPK/BRR-N/Perkim/VII/2006 17 Juli 2006 UANG PERSEDIAAN 89,520,000

2 PENYUSUNAN PROGRAM DAN RENCAN KERJA /

TEKNIS / PROGRAM 6,659,000,000 3,995,690,000 1,155,917,900 Jasa Konsultan

- Konsultan Perencana Paket 1 Kab. Nias 1 659,000,000

PT. CAIL INDONESIA 269,957,000 269,957,000 100.00 46.T/KTR/BRR.N/PPP/2006

14 Maret 2006 - Konsultan Perencana Paket 2 Kab Nias Selatan 3 3,000,000,000

- Konsultan Pengawasan Kab. Nias dan Nias Selatan 1 1,000,000,000

PT. LYDUMA INTERMAS 748,550,000 1,076,900,000 224,565,000 30 233.5/KTR/BRR-PPPN/VI/2006

12 Juni 2006

PT. MISKAT ALAM KONSULTAN 685,465,000 205,639,500 30 233.4/KTR/BRR-PPPN/VI/2006

12 Juni 2006

CV. GRAHA PURNA KARYA CONSULTANT 746,075,000 223,822,500 30 233.3/KTR/BRR-PPPN/VI/2006

12 Juni 2006

PT. DWI BINA PRAKARSA 772,530,000 233.2/KTR/BRR-PPPN/VI/2006

SATKER : 462030

No PROYEK / BAGIAN PROYEK KEGIATAN PAKET Nilai Kontrak Awal Rencana (%) Realisasi Keuangan LAPORAN PELAKSANAAN KEGIATAN SATKER

ANGGARAN REHABILITASI DAN REKONSTRUKSI NAD-NIAS APBN 2006 (DANA HASIL MORATORIUM)

K/S F/N LOKASI VOL SAT Pagu DIPA K/L/P Ket./KONSULTAN SUPERVISI

Form

OC.1

Form

OC-1

Form

OC.1

Form

OC-1

Form

OC.1

Form

OC-1

Form

OC.1

Form

OC-1

Form

OC.1

Form

OC-1

Form

OC.1

Form

OC-1

Form

OC.1

Form

OC-1

Form

OC.1

Form

OC-1

Form

OC.1

Form

OC-1

(15)

NAMA PERUSAHAAN Nilai Kontrak Fisik NOMOR/TGL KONTRAK ADDENDUM I Keu Fisik ( RP ) % ( % )

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

No PROYEK / BAGIAN PROYEK KEGIATAN PAKET K/S F/N LOKASI VOL SAT Pagu DIPA K/L/P Nilai Kontrak Awal Rencana (%) Realisasi Keuangan Ket./KONSULTAN SUPERVISI

12 Juni 2006

PT. PUTERA DUA KONSULTAN 773,113,000 231,933,900 30 233.1/KTR/BRR-PPPN/VI/2006

12 Juni 2006

- Konsultan Pengawasan Kab. Nias dan Nias Selatan Tahap II 2 2,000,000,000

3 PENGADAAN TANAH 100000 10,000,000,000

4 PENANGANAN PASCA BENCANA ALAM & KERUSUHAN 515,893,800,000 370,400,105,000 134,626,501,440 36.35 SOSIAL

1. Belanja Barang Operasional Lainnya 2,443,300,000

Penserifikatan Tanah 1,559,500,000 - -- Pengukuran Bidang Tanah 5000 BID 600,000,000

- Pengumpulan Data Yuridis 5000 BID 550,000,000 - Sidang Panitia dan Penyiapan SK 5000 BID 67,500,000 - Pembukuan Hak 5000 BID 87,500,000 - Penerbitan Sertipikat 5000 BID 37,500,000 - Pengadaan Patok Batas (11000 bh) 1 LS 108,625,000 - Verifikasi data dan Pengumuman 5000 BID 17,500,000 - Kendali Mutu Pendaftaran tanah Sistematik 5000 BID 37,500,000 - Pengadaan Formulir / Blangko / Daftar Isian 1 PKT 5,000,000 - Penyiapan Alas hak termasuk materai 1 LS 25,000,000 - Pencetakan Peta Bidang Untuk Pengumuman 250 lbr 875,000 - Penjilidan Warkah,Buku Tanah dan SU 300 set 22,500,000

Pendukung Persertipikatan 883,800,000 - ATK/ Bahan Penunjang Komputer Tim 2 PKT 4,000,000 - Map, Box File @ odner 2 PKT 6,000,000 - 2 Perlengkapan Basecamp Tim Ajudikasi 2 PKT 68,600,000 - Perlengkapan Basecamp Tim Ajudikasi 1 PKT 31,600,000 - Langganan Air Minum (2 tim) 2 PKT 4,200,000 - Biaya Listrik / Operational Genset (2 tim) 10 BLN 15,000,000 - Biaya telepon / komunikasi Lainnya (2 tim) 12 BLN 24,000,000 - Pramuwisma (5 tim, 2 PIU repr, 1 PIU) 48 BLN 38,400,000 - Petugas Keamanan (5 tim, 2 PIU repr, 1 PIU x 6 bln) 48 BLN 43,200,000 - Petugas Pematokan (2 tim x 3 org x 6) 36 OB 28,800,000 - Petugas Kecamatan 20 OB 30,000,000 - 150 Pembuatan TDT orde 3 150 TTK 570,000,000 - Pembuatan Tugu Orde 4 100 TTK 20,000,000

2. Belanja Modal, Peralatan dan Mesin 1,290,000,000 Peralatan Pengukuran dan Pemetaan 1,220,000,000 Genset 70,000,000

3. Gedung dan Bangunan 500,000,000 - -- Renov Gedung Kantor Pertanahan Kab Nias 1 Pkt 500,000,000

4. Lembaga Sosial Lainnya 443,660,500,000 370,400,105,000 134,626,501,440 30.34 Pembangunan Rumah Baru Kabupaten Nias 5197 UNIT 259,850,000,000 242,752,900,000 66,211,413,335 Tahun Anggaran 2006 4903

(16)

NAMA PERUSAHAAN Nilai Kontrak Fisik NOMOR/TGL KONTRAK ADDENDUM I Keu Fisik ( RP ) % ( % )

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

No PROYEK / BAGIAN PROYEK KEGIATAN PAKET K/S F/N LOKASI VOL SAT Pagu DIPA K/L/P Nilai Kontrak Awal Rencana (%) Realisasi Keuangan Ket./KONSULTAN SUPERVISI

1 Olora G.Sitoli 28 Unit 1,400,000,000 K PT. Bangunan Indah Perumahan 1,254,400,000 100 100 0.0 11.71

26.T/KTR/BRR.N/PPP/2006

14 Maret 2006

2 Dahana G.Sitoli 109 Unit 5,450,000,000 K CV.Asean Utama 4,883,200,000 100 100 1,482,051,200 30.35 11.125 SUDAH DILAKSANAKAN

45.T/KTR/BRR.N/PPP/2006 SCM & ADA PERPANJANGAN

14 Maret 2006 WAKTU

3 Orahili Sirombu 8 Unit 400,000,000 K CV. Node 366,400,000 100 100 274,800,000 75.0 100

21.T/KTR/BRR.N/PPP/2006

14 Maret 2006

4 Lasara G.Sitoli 21 Unit 1,050,000,000 K CV. Ladarith 926,100,000 100 100 652,339,000 70.44 78.349

25.T/KTR/BRR.N/PPP/2006

14 Maret 2006

5 Kec.Ilir G.Sitoli 10 Unit 500,000,000 K CV.Benediksien 441,000,000 100 100 441,000,000 100.00 100 PT CAIL INDONESIA

35.T/KTR/BRR.N/PPP/2006

14 Maret 2006

6 Kec.Ilir G.Sitoli 11 Unit 550,000,000 K CV.Poppy 485,100,000 100 100 485,100,000 100.00 100 PT CAIL INDONESIA

04.T/KTR/BRR.N/PPP/2006

14 Maret 2006

7 Kec.Ilir G.Sitoli 10 Unit 500,000,000 K CV.Ceria 441,000,000 435,677,000 100 100 435,677,000 100.0 100 PT CAIL INDONESIA

37.T/KTR/BRR.N/PPP/2006

14 Maret 2006

8 Mudik G.Sitoli 6 Unit 300,000,000 K . 264,600,000 100 100 124,362,000 47.00 47 PT CAIL INDONESIA

33.T/KTR/BRR.N/PPP/2006

14 Maret 2006

9 Kec.Ilir G.Sitoli 17 Unit 850,000,000 K CV.Sahabat Sukses Mandiri 749,700,000 100 100 562,275,000 75.0 100 PT CAIL INDONESIA

03.T/KTR/BRR.N/PPP/2006

14 Maret 2006

10 Kec.Ilir G.Sitoli 20 Unit 1,000,000,000 K CV.Madala Agung Perkasa 882,000,000 878,117,000 100 100 878,117,000 100.0 100 PT CAIL INDONESIA

23.T/KTR/BRR.N/PPP/2006

14 Maret 2006

11 Kec.Ilir G.Sitoli 6 Unit 300,000,000 K CV.Marni 264,600,000 100 100 105,840,000 40.0 64 PT CAIL INDONESIA

28.T/KTR/BRR.N/PPP/2006

14 Maret 2006

12 Teehosi,Bozihona,Soewe,Sirete I.gawo/G 19 Unit 950,000,000 K CV.Tunas Muda 863,000,000 100 100 768,933,000 89.1 90.241 PT CAIL INDONESIA

30.T/KTR/BRR.N/PPP/2006

14 Maret 2006

13 Hiliwarokha(6),Hiliganaita(3)Sisarahili(1)Gazamanu(1) Bawolato 11 Unit 550,000,000 K CV.Anugrah Putra 500,500,000 100 100 500,500,000 100.00 100 PT CAIL INDONESIA

44.T/KTR/BRR.N/PPP/2006

14 Maret 2006

14 Dahana G.Sitoli 14 Unit 700,000,000 K UD.Sinar Kasih 627,200,000 100 100 313,600,000 50.0 55.1 PT CAIL INDONESIA

42.T/KTR/BRR.N/PPP/2006

14 Maret 2006

15 Hilina'a,Madolaoli G.Sitoli 5 Unit 250,000,000 K CV.Riwu 224,000,000 100 100 224,000,000 100.00 100 PT CAIL INDONESIA

39.T/KTR/BRR.N/PPP/2006

14 Maret 2006

16 Luana Laraga G.Sitoli 8 Unit 400,000,000 K CV.Memori 358,400,000 100 100 358,400,000 100.0 100 PT CAIL INDONESIA

18.T/KTR/BRR.N/PPP/2006

14 Maret 2006

17 Sifalaete Tab G.Sitoli 6 Unit 300,000,000 K CV.Saro Anugrah Mulia 264,600,000 100 100 79,380,000 30.00 100 PT CAIL INDONESIA

32.T/KTR/BRR.N/PPP/2006

14 Maret 2006

18 Bawodesolo Gido 5 Unit 250,000,000 K CV.Felix 226,000,000 100 100 226,000,000 100.0 100 PT CAIL INDONESIA

24.T/KTR/BRR.N/PPP/2006

14 Maret 2006

19 Mudik G.Sitoli 6 Unit 300,000,000 K CV.Purnama 264,600,000 100 100 264,600,000 100.00 100 PT CAIL INDONESIA

(17)

NAMA PERUSAHAAN Nilai Kontrak Fisik NOMOR/TGL KONTRAK ADDENDUM I Keu Fisik ( RP ) % ( % )

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

No PROYEK / BAGIAN PROYEK KEGIATAN PAKET K/S F/N LOKASI VOL SAT Pagu DIPA K/L/P Nilai Kontrak Awal Rencana (%) Realisasi Keuangan Ket./KONSULTAN SUPERVISI

14 Maret 2006

20 Hiliweto G.Sitoli 8 Unit 400,000,000 K CV.Sararali 361,600,000 100 100 361,600,000 100.0 100 PT CAIL INDONESIA

22.T/KTR/BRR.N/PPP/2006

14 Maret 2006

21 Luahafaraga G.Sitoli 10 Unit 500,000,000 K CV.Polaris Sakti Pratama 448,000,000 100 100 192,640,000 43.0 43.442 PT CAIL INDONESIA

36.T/KTR/BRR.N/PPP/2006

14 Maret 2006

22 Boya G.Sitoli 10 Unit 500,000,000 K CV.Amena 441,000,000 100 100 95 PT CAIL INDONESIA

40.T/KTR/BRR.N/PPP/2006

14 Maret 2006

23 Boya G.Sitoli 8 Unit 400,000,000 K UD. Mega Raya 357,000,000 100 100 357,000,000 100.00 100 PT CAIL INDONESIA

43.T/KTR/BRR.N/PPP/2006

14 Maret 2006

24 Tetehosi I.Gawo 6 Unit 300,000,000 K CV.Tiara Jaya Sakti 273,000,000 100 100 200,627,700 73.49 100 PT CAIL INDONESIA

29.T/KTR/BRR.N/PPP/2006

14 Maret 2006

25 Dahana G.Sitoli 8 Unit 400,000,000 K CV.Yasen 358,400,000 100 100 358,400,000 100.00 100 PT CAIL INDONESIA

05.T/KTR/BRR.N/PPP/2006

14 Maret 2006

26 Dahana G.Sitoli 4 Unit 200,000,000 K CV.Mutiara Jaya 179,200,000 100 100 179,200,000 100.0 100 PT CAIL INDONESIA

02.T/KTR/BRR.N/PPP/2006

14 Maret 2006

27 Dahana G.Sitoli 8 Unit 400,000,000 K CV.Taruna Permai Jaya 358,400,000 100 100 358,400,000 100.0 100 PT CAIL INDONESIA

19.T/KTR/BRR.N/PPP/2006

14 Maret 2006

28 Dahana G.Sitoli 9 Unit 450,000,000 K CV.Devianindo Binangun Persada 403,200,000 100 100 403,200,000 100.00 100 PT CAIL INDONESIA

41.T/KTR/BRR.N/PPP/2006

14 Maret 2006

29 Ilir G.Sitoli 22 Unit 1,100,000,000 K CV.Cipta Bangun Perkasa 970,200,000 100 100 921,690,000 95.00 100 PT CAIL INDONESIA

01.T/KTR/BRR.N/PPP/2006

14 Maret 2006

30 Iraono,Lasara Sowu,Tetehosi afia,Awa'ai G.Sitoli 10 Unit 500,000,000 K CV.Brilyan 447,000,000 100 100 447,000,000 100.00 100 PT CAIL INDONESIA

38.T/KTR/BRR.N/PPP/2006

14 Maret 2006

31 Lewuogura G.Sitoli 10 Unit 500,000,000 K CV.Lagundri Star 452,000,000 100 100 372,900,000 82.50 100 PT CAIL INDONESIA

07.T/KTR/BRR.N/PPP/2006

14 Maret 2006

32 Tumori Batohili G.Sitoli 10 Unit 500,000,000 K CV.Mulia Utama 448,000,000 100 100 448,000,000 100.0 100 PT CAIL INDONESIA

31.T/KTR/BRR.N/PPP/2006

14 Maret 2006

33 Mudik G.Sitoli 10 Unit 500,000,000 K CV.Berkat 441,000,000 100 100 441,000,000 100.0 100 PT CAIL INDONESIA

20.T/KTR/BRR.N/PPP/2006

14 Maret 2006

34 Sisarahili Sisambualahe G.Sitoli 5 Unit 250,000,000 K CV.Karya Bersama 220,500,000 100 100 220,500,000 100.0 100 PT CAIL INDONESIA

34.T/KTR/BRR.N/PPP/2006 14 Maret 2006 KUALIFIKASI BESAR DAN MENENGAH

-1 Saombo, Desa Iraonogeba, Moawo, Saewe, Fadoro Lasa K F Nias 225 Unit 11,250,000,000 K PT. TARA MULIA SETIA 10,800,000,000 95.15 5,819,731,200 53.89 57.647 PT. DWI BINA PRAKARSA Mudik, Sisarahili Gamo, Kelurahan Pasar, Kelurahan Ilir, Boyo - PRATAMA LUHUR (MC I, II, III) Juli, Agustus, September 06 Kecamatan Gunungsitoli Kabupaten Nias - 05/P2P/BRR/APBN/2006

21 Juni 2006

2 Sogae'du, Hilisebua, Lauri, Tumori Sebua, Orahili Tumori, K F Nias 300 Unit 15,000,000,000 K PT. ALPHA RHO DELTA 14,625,000,000 85.228 2,925,000,000 20.00 25.711 PT. DWI BINA PRAKARSA Lolowonu Nikaotano, Sihareo Siwahili, Hilina'a, Simandraolo, - 38/P2P/BRR/APBN/2006

Sisobahili, Sisobahili Tabaloho, Hili Baruzo, Tumori Balohili - 26 JUNI 2006 Sifalaete, Fodo, Sihareo II Tab, Fadoro Lasara, Ilir Kec. G. Sitoli