Status Bulan : 20 November 2006
LAPORAN STATUS PELAKSANAAN KEGIATAN SATKER
SATUAN KERJA : 094.06.462247) BRR - PENDIDIKAN DAN KESEHATAN NIAS
LOKASI : (07.11) KABUPATEN NIAS
PROGRAM : (01.90.0415) PROGRAM REHABILITASI DAN REKONSTRUKSI NAD DAN NIAS Status Bulan : 23 November 2006 Keu Fisik Rp. (%)
3 4 5 6 7 8 9 11 12 13 14 15 16 17
KESIAPSIAGAAN BENCANA 5,339,498,000
-0062 PAMERAN/VISUALISASI/PUBLIKASI DAN PROMOSI 650,000,000
-521119Belanja Barang Operasional Lainnya 425,000,000 -PERENCANAAN PROGRAM 25,000,000
- Perencanaan Program Promosi Kesehatan untuk
kesiap-siagaan bencana S N Kab. Nias 1.00 KEG 25,000,000 K No. M-199/BRR.462247/VII/2006 25000000 PELAKSANAAN PROMOSI KESEHATAN 375,000,000
- Pelatihan Gerak Cepat dalam Penanggulangan Bencana S N Kab. Nias 1.00 KEG 172,700,000 K No. M-199/BRR.462247/VII/2006 172700000 - Promosi kesiap-siagaan Bencana kepada Masyarakat S N Kab. Nias 1.00 KEG 202,300,000 K No. M-199/BRR.462247/VII/2006 202300000 EVALUASI PROMOSI KESEHATAN 25,000,000
- Pelaksanaan Evaluasi kesiap-siagaan Bencana S N Kab. Nias 1.00 KEG 25,000,000 K No. M-199/BRR.462247/VII/2006 25000000
521219Belanja Barang Non Operasional Lainnya 225,000,000
-PENGADAAN PERALATAN DAN OBAT 225,000,000
- Pengadaan peralatan dan obat penanggulangan bencana K F Dinas Kesehatan 1.00 KEG 150,000,000 K CV. RAJAWALI KARUNIA ABADI NO. M-717/BRR-462247/X/2006, Tgl 17-Okt-2006. 100,049,703 #REF!
- Biaya Distribusi dan Operasional Lapangan S N 1.00 KEG 75,000,000 P
0275 PENGADAAN ALAT KEDOKTERAN, KESEHATAN DAN KB 4,689,498,000
532111Belanja Modal Peralatan Dan Mesin 4,689,498,000 -- Peralatan Kamar Operasi K F RSU. Gunungsitoli 1.00 pt 4,000,000,000 K CV. MEFALTI KARUNIA ABADI NO. M-734/BRR-462247/X/2006, Tgl 27-Okt-2006. 3,507,796,501
-- Fasilitas Rawat jalan dan rawat Inap K F RSU. Gunungsitoli 1.00 pt 689,498,000 K CV. RAJAWALI KARUNIA ABADI NO. M-626/BRR-462247/X/2006, Tgl 11-Okt-2006. 618,008,827
-PEMELIHARAAN DAN PEMULIHAN KESEHATAN 971,753,000 149,178,270
0233 OPERASIONAL DAN PEMELIHARAAN RUMAH SAKIT 971,753,000 149,178,270
521119Belanja Barang Operasional Lainnya 698,387,000 149,178,270 - Perlengkapan / Peralatan Recam Medik K F RSU. Gunungsitoli 1.00 pt 338,709,000 K CV. CIPTA SENTOSA NO. M-627/BRR-462247/X/2006, Tgl 11-Okt-2006. 323,451,000 97,035,300
- Bahan dan Pemeriksaan Laboratorium K F RSU. Gunungsitoli 1.00 pt 100,000,000 K CV. MITRA MEDICA NO. M-569/BRR-462247/X/2006, Tgl 10-Okt-2006. 95,500,000
- Pengadaan pakaian kerja Kamar Operasi K F RSU. Gunungsitoli 1.00 pt 84,678,000 K CV. SOGUNANIA NO. M-566/BRR-462247/X/2006, Tgl 10-Okt-2006. 84,500,000
- Alat Rumah Tangga K F RSU. Gunungsitoli 1.00 pt 175,000,000 L CV. MOI MULIA PERKASA No. M-765a/BRR-462247/XI/2006, tgl 3 Nop. 2006 173,809,900 52,142,970
521211Belanja Bahan 84,657,000 -- Pangadaan ATK RSU Gunungsitoli K F RSU. Gunungsitoli 1.00 pt 84,657,000 K CV. LASER NO. M-565/BRR-462247/X/2006, Tgl 10-Okt-2006. 84,500,000
-523112Belanja Biaya Pemeliharaan Gedung dan Bangunan Lainnya 188,709,000 -- Pemeliharaan Gedung & Sarana Gedung Rumah Sakit S F RSU. Gunungsitoli 1.00 pt 188,709,000
PELAYANAN KEFARMASIAN DAN ALAT KESEHATAN 620,324,000
-0160 PENGADAAN OBAT-OBATAN/VAKSIN 620,324,000
-521211Belanja Bahan 580,324,000 -- Pengadaan obat-obatan K F Dinas Kesehatan 1.00 pkt 580,324,000 L PT. ABAD ARTA MEDICA NO. M-766a/BRR-462247/XI/2006, Tgl 3 Nop. 2006 575,131,100
522119Belanja Jasa Lainnya 40,000,000 -- Biaya Distribusi Obat S N 1.00 pt 40,000,000 P
PENINGKATAN KESEHATAN MASYARAKAT 12,159,192,000 9,118,785,000 2,804,646,200
0164 PEMBANGUNAN GEDUNG KESEHATAN 7,407,058,000 7,060,051,000 2,465,155,200
533111Belanja Modal Gedung dan Bangunan 7,407,058,000 7,060,051,000 2,465,155,200 BIAYA KONSTRUKSI PEMBANGUNAN BARU PENGGANTI 4,325,500,000
-- Puskesmas Rawat Inap Plus 1,203,500,000
-NAMA PAKET PEKERJAAN :
Puskesmas Rawat Inap Plus Lahewa K F Kec. Lahewa 1,203,500,000 K CV. ASEAN UTAMA NO. M-621/BRR-462247/X/2006, Tgl 11-Okt-2006. 1,184,240,000 236,848,000 20 5
- Puskesmas Rawat Jalan Type 135 M2 (2 Unit x 135 m2) 783,000,000
-NAMA PAKET PEKERJAAN : 783,000,000 765,600,000.00 422,480,000
Puskesmas Rawat Jalan Type 135 M2 Afulu K F Kec. Afulu 135 M2 391,500,000 L CV. SUKA KARYA NO. M-623/BRR-462247/X/2006, Tgl 11-Okt-2006. 380,000,000.00 114,000,000 30
Puskesmas Rawat Jalan Type 135 M2 Ulugawo K F Kec. Idanogawo 135 M2 391,500,000 K CV. ANUGRAH PUTRA M-289/BRR.462247/VIII/2006, Tgl. 4 Agustus 2006 385,600,000100.00 100.00 308,480,000 80.000 86.893
- Puskesmas Pembantu ( 6 Unit x 80 m2) 1,440,000,000
-NAMA PAKET PEKERJAAN : 1,440,000,000 1,423,583,200 427,074,960
Puskesmas Pembantu Lauru Fadoro (Pusk. Afulu) K F Kec. Afulu 80 M2 240,000,000 K CV. APRIL M-290/BRR.462247/VIII/2006, Tgl. 4 Agustus 2006 237,354,000 100.00 100.00 71,206,200 30.00 57.780
Puskesmas Pembantu Faekhu Na'a (Puks. Afulu) K F Kec. Afulu 80 M2 240,000,000 K CV. SETIAWAN M-291/BRR.462247/VIII/2006, Tgl. 4 Agustus 2006 238,798,000 100.00 100.00 71,639,400 30.00 37.840
Puskesmas Pembantu Idanondrawa Tefao (Puks. Lahewa) K F Kec. Lahewa 80 M2 240,000,000 K CV. SUDIRMAN M-292/BRR.462247/VIII/2006, Tgl. 4 Agustus 2006 238,083,000 100.00 100.00 71,424,900 30.00 100.000
Puskesmas Pembantu Hiligeo Afia (Pusk. Lotu) K F Kec. Lotu 80 M2 240,000,000 K CV. GADING ASIA MAS M-293/BRR.462247/VIII/2006, Tgl. 4 Agustus 2006 232,467,200 100.00 100.00 69,740,160 30.00 43.360
Puskesmas Pembantu Simpang Lima (Pusk. Awa'ai) K F Kec. Tuhemberua 80 M2 240,000,000 K CV. SOGUNANIA M-294/BRR.462247/VIII/2006, Tgl. 4 Agustus 2006 238,325,000 100.00 100.00 71,497,500 30.00 53.480
Puskesmas Pembantu Hiligawoni (Pusk. Alasa) K F kec. Alasa 80 M2 240,000,000 K CV. BETZY M-295/BRR.462247/VIII/2006, Tgl. 4 Agustus 2006 238,556,000 100.00 100.00 71,566,800 30.000 61.260
- Rumah Dokter (3 Unit x 70 m2) 609,000,000
-NAMA PAKET PEKERJAAN : 567,082,800 264,675,740
Rumah Dinas Dokter Bawolato K F Kec. Bawolato 70 M2 203,000,000 K CV. SENTRAL M-296/BRR.462247/VIII/2006, Tgl. 4 Agustus 2006 180,061,000 100.00 100.00 54,018,300 30.000 69.530
Rumah Dinas Dokter Mandrehe K F Kec. Mandrehe 70 M2 203,000,000 K CV. RELLINOSIA PANCA PUTRA M-297/BRR.462247/VIII/2006, Tgl. 4 Agustus 2006 189,101,800 100.00 100.00 151,281,440 80.000 86.227
Rumah Dinas Dokter Lahewa K F Kec. Lahewa 70 M2 203,000,000 K CV. FAISAL NO. M-622/BRR-462247/X/2006, Tgl 11-Okt-2006. 197,920,000 59,376,000 30.000 5
- Rumah Para Medis (2 Unit x 50 m2) 290,000,000
-NAMA PAKET PEKERJAAN :
Rumah Dinas Paramedis Tuhemberua K F Kec. Tuhemberua 50 M2 290,000,000 K CV. MILLENIUM M-298/BRR.462247/VIII/2006, Tgl. 4 Agustus 2006 288,750,000 100 100 86,625,000 30.000 100
BIAYA KONSULTAN 3,081,558,000 2,830,795,000 1,027,451,500
- Pengadaan Jasa Konsultan Perencanaan Bidang Kesehatan K F Nias 471,765,000 K CV. Biramos Konsultan M-031/BRR.462247/IV/2006, Tgl. 25 April 2006 697,000,000 100 100 557,600,000 80.000 80
- Pengadaan Jasa Konsultan Pengawasan Bidang Kesehatan K F Nias 697,641,000 K CV. Duta Mulia Persada M-286/BRR.462247/VIII/2006, Tgl. 3 Agustus 2006 430,925,000 100 100 129,277,500 30.000
- Biaya Pengelolaan/Administrasi Proyek Bidang Kesehatan S N Nias 126,717,000 P
-F/N LOKASI VOL SAT PAGU DIPA (Rp) K/L/P NOMOR/TGL.KONTRAK NILAI KONTRAK Realisasi Keuangan Fisik (%) ANGGARAN REHABILITASI DAN REKONTRUKSI NAD - NIAS APBN 2006
LAPORAN STATUS PELAKSANAAN KEGIATAN SATKER
Rencana (%)
Format : OC-1
KODE KEGIATAN / SUB KEGIATAN / JENIS BELANJA / RINCIAN BELANJA K/S NAMA PERUSAHAAN Ket
1 2 10
0415.4597
0415.4617
0415.4640
Keu Fisik Rp. (%)
3 4 5 6 7 8 9 11 12 13 14 15 16 17
F/N LOKASI VOL SAT PAGU DIPA (Rp) K/L/P NOMOR/TGL.KONTRAK NILAI KONTRAK Fisik (%)
KODE KEGIATAN / SUB KEGIATAN / JENIS BELANJA / RINCIAN BELANJA K/S NAMA PERUSAHAAN Ket
1 2 10
- Pengadaan Jasa Konsultan Perencanaan Paket Puskesmas Untuk Pembangunan Sarana Kesehatan Tahun 2007-2009 K F Nias 1,220,122,000 L PT. PEMETAR ARGEO CONSULT NO. M-708/BRR-462247/X/2006, Tgl 14-Okt-2006. 1,157,870,000 231,574,000 20
- Pengadaan Jasa Konsultan Perencanaan Kantor Dinkes, GFK
dan SPK/AKPER untuk Pembangunan Fisik Tahun 2007 K F Nias 565,313,000 L CV. TRICONE ENGINEERING NO. M-709/BRR-462247/X/2006, Tgl 14-Okt-2006. 545,000,000 109,000,000 20
0231 OPERASIONAL PUSKESMAS 2,006,399,000 512999000 157,500,000
512112Belanja Uang Honor Tidak Tetap 1,650,000,000 157,500,000 9.55
TUNJANGAN DAERAH TERPENCIL DAN TENAGA HARIAN LEPAS 1,650,000,000
-- Dokter/Dokter Gigi di Daerah Terpencil (2Org x 12 Bln) S N Puskesmas -- Tenaga Kesehatan di Daerah terpencil (10 Org x 12 Bln) S N Puskesmas -- Tenaga Harian Lepas / Paramedis Sukarela (100 Org x 12 Bln) S N Puskesmas 1,395,000,000 - Tenaga Harian Lepas Dinas Kesehatan (37 Org x 12 Bln) S N D.Kesehatan 45,000,000
HONORARIUM TIM TEKNIS 210,000,000 157,500,000 75.00
- Ketua Tim Teknis ( 2 Org x 9 Bln ) S N Satker Pend & Kes 67,500,000 52,500,000
- Anggota Tim Teknis ( 6 Org x 9 Bln ) S N Satker Pend & Kes 135,000,000 105,000,000
- Cadangan 7,500,000
521119Belanja Barang Operasional Lainnya 356,399,000 356399000
-DUKUNGAN OPERASIONAL PUSKESMAS 356,399,000 356399000
- Operasional Puskesmas (18 Pusk x 12 Bln) S N Puskesmas 156,600,000 M-199/BRR.462247/VII/2006, Tgl. 156600000 - Operasional Puskemas Keliling (12 Pusk x 12 Bln) S N Puskesmas 78,480,000 M-199/BRR.462247/VII/2006, Tgl. 78480000 - Operasional Puskesmas Pembantu (101 Pustu x 12 Bln) S N Puskesmas Pembantu 121,319,000 M-199/BRR.462247/VII/2006, Tgl. 121319000
0275 PENGADAAN ALAT KEDOKTERAN, KESEHATAN DAN KB 1,200,000,000 97,416,000
532111Belanja Modal Peralatan dan Mesin 1,200,000,000 97,416,000 PERALATAN KESEHATAN DASAR 1,200,000,000
- Peralatan Puskesmas Pembantu K F Puskesmas 12 set 600,000,000 K CV. MITRA MEDICA NO. M-625/BRR-462247/X/2006, Tgl 11-Okt-2006. 568,896,372
-- Emergency Kit K F Puskesmas 12 set 240,000,000 K PT. NIAGA MANDIRI LESTARI NO. M-718/BRR-462247/X/2006, Tgl 17-Okt-2006. 225,935,345
-- Sarana Non Medis (Meja, Kursi, Lemari, Tempat Tidur, dll) K F Puskesmas 12 set 360,000,000 K CV. CIPTA SENTOSA NO. M-719/BRR-462247/X/2006, Tgl 17-Okt-2006. 324,720,000 97,416,000 30
1035 DUKUNGAN PENYELENGGARAAN PELAYANAN KESEHATAN 1,545,735,000 1545735000 84,575,000
573119Belanja Lembaga Sosial Lainnya 1,545,735,000 1545735000 84,575,000
REVITALISASI POSYANDU 1,365,735,000 1365735000
- Sosialisasi dan Penyegaran Pengurus Posyandu TK Kabupaten S N Kab. Nias 84,575,000 M-236/BRR.462247/VII/2006, Tgl. 84575000 84,575,000
- Sosialisasi dan Penyegaran Pengurus Posyandu TK Kecamatan S N Kab. Nias 160,000,000 M-236/BRR.462247/VII/2006, Tgl. 160000000 - Pembentukan Lembaga Pembina Posyandu (LPP) TK Desa/Kel S N Kab. Nias 345,540,000 M-236/BRR.462247/VII/2006, Tgl. 345540000 - Pelatihan Kader Posyandu S N Kab. Nias 162,000,000 M-236/BRR.462247/VII/2006, Tgl. 162000000 - Insentif Kader Posyandu (7 org x 487xRp 15000 x 12 bln) S N Kab. Nias 613,620,000 M-236/BRR.462247/VII/2006, Tgl. 613620000 PEMBINAAN DAN TELAAH KEMANDIRIAN POSYANDU 180,000,000 180000000 - Kontak Kader (4 kw x 1 Kl) S N Kab. Nias 80,000,000 M-236/BRR.462247/VII/2006, Tgl. 80000000 - Lomba Posyandu S N Kab. Nias 100,000,000 M-236/BRR.462247/VII/2006, Tgl. 100000000
PERBAIKAN GIZI MASYARAKAT 976,600,000 21,000,000
-0232 PELAYANAN KESEHATAN/PERBAIKAN GIZI IBU/ANAK & KB 976,600,000 21,000,000
-521119Belanja Barang Operasional Lainnya 976,600,000 21,000,000 -PENGADAAN ANTROPOMETRI KIT D.Kesehatan 21,000,000 K CV. LASER NO. M-767a/BRR-462247/XI/2006, Tgl 3 Nop.2006 21,000,000
- Timbangan Berat Badan K F 12,000,000
- Alat Ukur Panjang Badan K F 4,500,000
- Alat Ukur Tinggi Badan K F 4,500,000
PELAKSANAAN 955,600,000
- Pelay. Tata Laksana Pasca Perawatan Kasus Gizi Buruk di Rum S N Puskesmas 710,600,000
- Sosialisasi Tata Laksana Pel. Anak Gizi Buruk di Tingkat Puskes S N Puskesmas 245,000,000 Dinas Kesehatan Kab.Nias M-119/BRR.462247/VII/2006, Tgl. 245000000
PENY. KEBIJAKAN DAN MANAJEMEN PEMBANGUNAN KESEHATAN 11,820,035,000 5,097,785,600
0012 PENDIDIKAN DAN PELATIHAN TEKNIS 10,518,785,000 5,000,000,000
521119Belanja Barang Operasional Lainnya 10,518,785,000 10236000000 5,000,000,000 PENDIDIKAN DAN PELATIHAN TENAGA KESEHATAN 10,518,785,000 10236000000
- Pelatihan Manajemen Puskemas S N D.Kesehatan 236,000,000 M-119/BRR.4622447/VII/2006, Tgl. 236000000 - Pelatihan dan Pendidikan Kesehatan S N D.Kesehatan 162,785,000
- Cadangan 120,000,000
- Program Beasiswa Dokter Umum, Dokter Spesialis dan Magiste S N UGM 10,000,000,000 S-402/BRR.4622447/VIII/2006, Tgl. 10,000,000,000 5,000,000,000
0277 PENGADAAN ALAT PENGOLAH DATA 1,301,250,000 97,785,600
532111Belanja Modal Peralatan dan Mesin 1,301,250,000 1,265,088,500 -- Pengadaan Perlengkapan Sistem Informasi Kesehatan Puskesm K F 339,600,000 K CV. BER£IN SIM@NDE NO. M-629/BRR-462247/X/2006, Tgl 11-Okt-2006. 325,952,000 97,785,600 30
- Pengadaan Perlengkapan Sistem Informasi Kesehatan Kantor
Dinas Kesehatan K F 195,400,000 K CV. OLORA INDAH NO. M-628/BRR-462247/X/2006, Tgl 11-Okt-2006. 180,549,000
-- Pengadaan Jaringan Sistem Informasi Managemen Rumah Sak K F 766,250,000 K CV. LASER NO. M-624/BRR-462247/X/2006, Tgl 11-Okt-2006. 758,587,500 227,576,250 30
PENGEMBANGAN PENDIDIKAN UNTUK SEMUA 53,822,928,000 49,937,082,472 21,288,794,143 39.55
0001 ADMINISTRASI UMUM 1,389,270,000 - 831,711,958 59.87
512112Belanja Uang Honor Tidak Tetap S N 748,000,000 551,000,000 73.66 521119Belanja Barang Operasional Lainnya S N 117,970,000 60,000,000 50.86 521211Belanja Bahan S N 45,000,000 27,920,500 62.05 522111Belanja Langganan Daya dan Jasa S N 43,980,000 6,142,181 13.97 522116Belanja Sewa S N 210,000,000 104,700,000 49.86 522119Belanja Jasa Lainnya S N 27,000,000 849,277 3.15 524119Belanja perjalanan lainnya S N 124,320,000 38,600,000 31.05 532111Belanja Modal Peralatan dan Mesin S N 73,000,000 42,500,000 58.22
0051 PENYUSUNAN PROGRAM DAN RENCANA KERJA/TEKNIS/PROGRAM 1,225,460,000 669,760,000 468,832,000
522115Belanja Jasa Konsultan 1,225,460,000 669,760,000 468832000 38.26 - Pengadaan Konsultan Perencana Program Pendidikan Nias S N 538,780,000 P
9305. 9305
0415.9307
Keu Fisik Rp. (%)
3 4 5 6 7 8 9 11 12 13 14 15 16 17
F/N LOKASI VOL SAT PAGU DIPA (Rp) K/L/P NOMOR/TGL.KONTRAK NILAI KONTRAK Fisik (%)
KODE KEGIATAN / SUB KEGIATAN / JENIS BELANJA / RINCIAN BELANJA K/S NAMA PERUSAHAAN Ket
1 2 10
- Pemetaan Kondisi Pendidikan Nias dan Nias Selatan S N 686,680,000 P PT. Wacana Tata Akademika M-036/BRR.462247/V/2006, 5 Mei 2006 669,760,000 468832000 70
0154 PENINGKATAN MUTU PENDIDIKAN 400,000,000 397,980,000 397,980,000
573119Belanja Lembaga Sosial Lainnya 400,000,000 397,980,000 397,980,000 99.50 - Diagnotis test pra UAN S N 100,000,000 K BT/BS BIMA 029.B/BRR-PKN/06/07/2006 100,000,000 100.00 100 100,000,000 100.00 100.00
- Remidial Teaching/Bimbingan Belajar Pra UAN S N 300,000,000 297,980,000 100.00 100 297,980,000 99.33 99.33
0165 PEMBANGUNAN GEDUNG PENDIDIKAN 37,832,578,000 36,568,312,500 37.368 13,664,848,700 37.37
522115Belanja Jasa Konsultan 2,945,738,000 2,837,303,600 1,551,121,120 54.67 PENGADAAN JASA KONSULTAN PERENCANA 1,213,945,000 1,213,945,000 971,156,000
- Gedung SD, SMP dan SMA K N 1,160,445,000 K PT. Jefrindo Consultan M-035/BRR.462247/IV/2006, Tgl. 25 April 2006 1,160,445,000 100 100 928,356,000 80.0 100
- Gedung Perguruan Tinggi K N 53,500,000 K CV. Duta Mulia Persada M-036/BRR.462247/IV/2006, Tgl. 25 April 2006 53,500,000 100 100 42,800,000 80.0 100
KONSULTAN PENGAWAS 1,731,793,000 1,623,358,600 579,965,120
- Gedung TK, SD, SMP dan SMA (Tahap I) K N 687,793,000 K PT. Billindo Engineering C. M- 285/BRR.462247/VIII/2006, Tgl. 3 Agustus 2006 649,396,000 100 100 467,565,120 72.0 60.000
- Gedung Perguruan tinggi K N 44,000,000 L PT. Ametys Utama M- /BRR.462247/VII/2006, Tgl. 28 Juli 2006 43,962,600 100 100
- Gedung SD, SMP dan SMA (Lanjutan) K N 100,000,000 K CV. Gamma ' 91 Consultant M-042/BRR.462247/V/2006, Tgl 05 Mei 2006 100,000,000 100 100 60,000,000 60.0 100.00
- Gedung TK, SD, SMP dan SMA (Tahap II) K N 900,000,000 P 830,000,000 NAMA PAKET PENGAWASAN TAHAP II : 896,000,000 830,000,000
Pengawasan Paket 1-15 Tahap II K N 284,600,000 CV. Sitim Valley Engineering 262,000,000 52400000
Pengawasan Paket 16-29 Tahap II K N 280,000,000 CV. Citra Pramatra 259,000,000 Pengawasan Paket 30-45 Tahap II K N 331,400,000 CV. Citra Pramatra 309,000,000
533111Belanja Modal Gedung dan Bangunan 34,886,840,000 33,731,008,900 12,113,727,580 PEMBANGUNAN UNIT GEDUNG BARU 16,016,960,000 15,409,932,100
- RKB Sekolah Dasar (95 kls x 56 m2) 14,257,600,000
NAMA PAKET PEKERJAAN : 14,407,680,000 13,946,307,100 6,315,837,940
## RKB SD No.070980 Mo'awo K F Kec. Gunungsitoli 168 m2 351,668,000 K CV. CATUR PUTRA AGUNG P. M-245/BRR.462247/VIII/2006, Tgl. 2 Agustus 2006 351,668,000 30 87.92 253,200,960 72.0 68.797
## RKB SD No.070994 Tabaloho Dahana K F Kec. Gunungsitoli 168 m2 352,362,000 K CV. ISTANA GROUP M-246/BRR.462247/VIII/2006, Tgl. 2 Agustus 2006 340,868,000 30 86.56 102,260,400 30.0 49.652
## RKB SD No .075019 Dahana Tabaloho K F Kec. Gunungsitoli 168 m2 351,116,000 K CV. BERKAT M-247/BRR.462247/VIII/2006, Tgl. 2 Agustus 2006 344,724,000 30 86.74 103,417,200 30.0 50.181
## RKB SD No.074046 Lolomoyo K F Kec. Gunungsitoli 168 m2 351,880,000 K CV. TARUNA PERMAI JAYA M-248/BRR.462247/VIII/2006, Tgl. 2 Agustus 2006 321,000,000 30 87.54 96,300,000 30.0 54.862
## RKB SD No. 071060 Lasara Idanoi K F Kec. Gido 224 m2 455,844,000 K CV. MURNI JAYA M-249/BRR.462247/VIII/2006, Tgl. 2 Agustus 2006 405,208,000 30 87.54 121,562,400 30.0 44.387
## RKB SD No. 076695 Saita Garamba K F Kec. Gido 168 m2 367,206,000 K CV. FAHMIN T.S M-250/BRR.462247/VIII/2006, Tgl. 2 Agustus 2006 363,897,000 30 85.32 109,169,100 30.0 64.152
## RKB SD No. 071019 Tuhemberua K F Kec. Tuhemberua 168 m2 361,172,000 K CV. IDA POLA M-251/BRR.462247/VIII/2006, Tgl. 2 Agustus 2006 357,607,000 30 87.59 107,282,100 30.0 52.659
## RKB SD No.075026 Alo'oa K F Kec. Tuhemberua 168 m2 375,034,000 K CV. KURNIA UTAMA M-252/BRR.462247/VIII/2006, Tgl. 2 Agustus 2006 370,317,000 30 87.35 188,861,670 51.0 54.154
## RKB SD No. 071041 Hunosihare'o K F Kec. Tuhemberua 168 m2 360,199,000 K CV. MEDIUM M-253/BRR.462247/VIII/2006, Tgl. 2 Agustus 2006 357,222,000 30 87.46 307,210,920 86.0 97.211
## RKB SD No. 071014 Dima K F Kec. Hiliduho 168 m2 358,638,000 K CV. PERJUANGAN M-254/BRR.462247/VIII/2006, Tgl. 2 Agustus 2006 356,017,000 30 86.53 181,568,670 51.0 50.166
## RKB SD No. 071001 Fadoro Tanose'o K F Kec. Hiliduho 168 m2 356,276,000 K CV. GAPURA M-255/BRR.462247/VIII/2006, Tgl. 2 Agustus 2006 350,165,000 30 87.78 252,118,800 72.0 72.485
## RKB SD No. 071013 Sisobahili I Tanose'o K F Kec. Hiliduho 168 m2 349,835,000 K CV. SOGUNANIA M-256/BRR.462247/VIII/2006, Tgl. 2 Agustus 2006 311,472,600 30 88.27 93,441,780 30.0 39.91
## RKB SD No. 070995 Hiligodu Tanose'o K F Kec. Hiliduho 168 m2 359,678,000 K CV. NISCAHYANTI M-257/BRR.462247/VIII/2006, Tgl. 2 Agustus 2006 359,194,000 30 86.91 215,516,400 60.0 78.11
## RKB SD No. 077289 Mida Lolomoyo K F Kec. Alasa 168 m2 364,693,000 K CV. YA'AHOWU M-258/BRR.462247/VIII/2006, Tgl. 2 Agustus 2006 349,333,000 30 86.98 104,799,900 30.0 48.88
## RKB SD No.076076 Banua Sibohou I K F Kec. Alasa 168 m2 366,654,000 K CV. LINDA PERMAI M-259/BRR.462247/VIII/2006, Tgl. 2 Agustus 2006 360,551,000 30 87.33 310,073,860 86.0 86.137
## RKB SD No. 077288 Hilisoromi K F Kec. Alasa 168 m2 369,753,000 K CV. MILENIUM CS. M-260/BRR.462247/VIII/2006, Tgl. 2 Agustus 2006 365,352,000 30 87.36 109,605,600 30.0 51.75
## RKB SD No. 071088 Mazingo K F Kec. Mandrehe 168 m2 457,456,000 K CV. SAHABAT SETIA M-261/BRR.462247/VIII/2006, Tgl. 2 Agustus 2006 454,161,500 30 89.90 136,248,450 30.0 44.274
## RKB SD No.078138 Hilimburune K F Kec. Mandrehe 168 m2 362,602,000 L CV. GOMBU M-685/BRR.462247/X/2006, Tgl. 12 Oktober 2006 358,554,000 107,566,200 15.57
## RKB SD No.071082 Lawelu K F Kec. Mandrehe 168 m2 368,082,000 K CV. SIAP SEDIA M-262/BRR.462247/VIII/2006, Tgl. 2 Agustus 2006 367,657,000 30 87.38 220,594,200 60.0 74.945
## RKB SD No. 071089 Sisarahili K F Kec. Mandrehe 168 m2 363,071,000 K CV. YOGA JAYA PERKASA M-263/BRR.462247/VIII/2006, Tgl. 2 Agustus 2006 362,199,000 30 87.25 184,721,490 51.0 50.176
## RKB SD No.071086 Iraonogambo K F Kec. Mandrehe 168 m2 378,174,000 K CV. CIPTA BANGUN PERKASA M-264/BRR.462247/VIII/2006, Tgl. 2 Agustus 2006 376,715,000 30 88.03 271,234,800 72.0 52.953
## RKB SD No. 076093 Hilisangawola K F Kec. Mandrehe 168 m2 542,700,000 K CV. TUNAS HARAPAN M-265/BRR.462247/VIII/2006, Tgl. 2 Agustus 2006 541,148,000 30 88.60 389,626,560 72.0 72.335
## RKB SD No. 071176 Sitolu Banua K F Kec. Sirombu 224 m2 368,326,000 K CV. BETZY M-266/BRR.462247/VIII/2006, Tgl. 2 Agustus 2006 368,276,000 30 86.50 110,482,800 30.0 50.011
## RKB SD No. 071179 Sisobandrao K F Kec. Sirombu 168 m2 366,297,000 K CV. TUNAS HARAPAN M-267/BRR.462247/VIII/2006, Tgl. 2 Agustus 2006 365,616,000 30 87.41 263,243,520 72.0 61.004
## RKB SD No. 075046 Lolofitu Moi K F Kec. Lolofitu Moi 168 m2 363,382,000 K CV. GADING ASIA MAS M-268/BRR.462247/VIII/2006, Tgl. 2 Agustus 2006 362,444,000 30 87.15 260,959,680 72.0 64.027
## RKB SD No.071139 Dima Muzoi K F Kec. Lahewa 168 m2 387254000 K CV. KURNIA UTAMA M-269/BRR.462247/VIII/2006, Tgl. 3 Agustus 2006 386,649,000 30 88.77 115,994,700 30.0 48.64
## RKB SD No. 075085 Iraonolase K F Kec. Lahewa 168 m2 378,087,000 K CV. CENTRAL M-270/BRR.462247/VIII/2006, Tgl. 3 Agustus 2006 361,623,000 30 87.14 108,486,900 30.0 51.518
## RKB SD No.075082 Marafala K F Kec. Lahewa 168 m2 365,599,000 K CV. BAHAGIA M-271/BRR.462247/VIII/2006, Tgl. 3 Agustus 2006 349,301,000 30 86.88 104,790,300 30.0 50.047
## RKB SD No. 077964 Fadoro Hilimbowo K F Kec. Lahewa 168 m2 449,866,000 K CV. ONODA M-272/BRR.462247/VIII/2006, Tgl. 3 Agustus 2006 448,308,000 30 90.35 228,637,080 51.0 41.138
## RKB SD No. 074067 Onozalukhu K F Kec. Lahewa 168 m2 376,706,000 K CV. GAPURA M-273/BRR.462247/VIII/2006, Tgl. 3 Agustus 2006 356,552,000 30 86.89 181,841,520 51.0 50.778
## RKB SD No. 075110 Lasara Berua K F Kec. Namohalu Esiwa 168 m2 367,227,000 K CV. ROTA M-274/BRR.462247/VIII/2006, Tgl. 3 Agustus 2006 305,399,000 30 86.74 219,887,280 72.0 80.056
## RKB SD No. 076678 Fadoro Fulolo K F Kec. Lotu 168 m2 360,383,000 K CV. TARUNA M-275/BRR.462247/VIII/2006, Tgl. 3 Agustus 2006 310,384,000 30 87.17 93,115,200 30.0 67.585
## RKB SD No. 075086 Lauru Afulu K F Kec. Afulu 168 m2 398,905,000 K CV. APRIL M-276/BRR.462247/VIII/2006, Tgl. 3 Agustus 2006 397,865,000 30 89.85 119,359,500 30.0 50.072
## RKB SD No. 071143 Afulu K F Kec. Afulu 168 m2 445,678,000 K CV. KARYA UMBU M-277/BRR.462247/VIII/2006, Tgl. 3 Agustus 2006 399,343,000 30 91.12 119,802,900 30.0 62.397
## RKB SD No.074060 Bozihona K F Kec. Idanogawo 168 m2 361,883,000 K CV. BAHAGIA M-278/BRR.462247/VIII/2006, Tgl. 3 Agustus 2006 361,041,000 30 86.63 108,312,300 30.0 48.627
## RKB SD No. 071054 Bio'uti K F Kec. Idanogawo 168 m2 358,408,000 K CV. MEMORI M-279/BRR.462247/VIII/2006, Tgl. 3 Agustus 2006 355,204,000 30 87.35 106,561,200 30.0 29.372
## RKB SD No. 076085 Sindrondro K F Kec. Bawolato 168 m2 366,159,000 K CV. SAMIGOR M-281/BRR.462247/VIII/2006, Tgl. 3 Agustus 2006 336,199,000 30 86.74 100,859,700 30.0 32.42
RKB SD No.075041 Dahana Kec. Bawolato 168 m2 369,427,000 UD. MAKMUR M-282/BRR.462247/VIII/2006, Tgl. 3 Agustus 2006 357,073,000 30 87.76 107,121,900 30.0 61.574
- RKB Sekolah Menengah Pertama (3 kls x 63 m2) 506,520,000 546,715,000
NAMA PAKET PEKERJAAN
## RKB SMPN 2 Afulu K F Kec. Afulu 189 m2 564,943,000 K CV. TARUNA PERMAI JAYA M-283/BRR.462247/VIII/2006, Tgl. 3 Agustus 2006 546,715,000 100 100 164,014,500 30.0 38.367
- RKB STT Sunderman (6 kls x 72 m2) 1,157,760,000 916,910,000
NAMA PAKET PEKERJAAN : (lebih Rp 58,423,000)
## RKB STT Sudermann K F Kec. Gunungsitoli 432 m2 1,099,337,000 K CV. BIDURI M-284/BRR.462247/VIII/2006, Tgl. 3 Agustus 2006 916,910,000 100 100 275,073,000 30.0 40.011
Cadangan 95,080,000
ABT 18,869,880,000 18,321,076,800.00
- RKB Sekolah Dasar (96 Lkl x 56 m2) 14,407,680,000
NAMA PAKET PEKERJAAN : 15,964,718,000 15,004,582,800.00 4501374840
1 RKB SDN 071016 Ononamolo II Lot K F Kec. Gunungsitoli 467,783,000.00 K CV. TIORIDA M-686/BRR.462247/X/2006, Tgl. 12 Oktober 2006 465,722,000.00 139716600 30.00 8.26
2 RKB SDN 074041 Lolomboli K F Kec. Gunungsitoli 465,156,000.00 K CV. DUA RIBU M-641/BRR.462247/X/2006, Tgl. 12 Oktober 2006 385,008,800.00 115502640 30.00 6.75
3 RKB MIS NU Gunungsitoli K F Kec. Gunungsitoli 372,965,000.00 K CV. FOVOLA INDAH PERMATA A M-642/BRR.462247/X/2006, Tgl. 12 Oktober 2006 371,763,000.00 111528900 30.00 14.22
Keu Fisik Rp. (%)
3 4 5 6 7 8 9 11 12 13 14 15 16 17
F/N LOKASI VOL SAT PAGU DIPA (Rp) K/L/P NOMOR/TGL.KONTRAK NILAI KONTRAK Fisik (%)
KODE KEGIATAN / SUB KEGIATAN / JENIS BELANJA / RINCIAN BELANJA K/S NAMA PERUSAHAAN Ket
1 2 10
5 RKB SDN 071068 Dekha Lahemo K F Kec. Gido 539,253,000.00 K CV. ANUGERAH SAKTI M-646/BRR.462247/X/2006, Tgl. 12 Oktober 2006 522,012,000.00 156603600 30.00 10.97
6 RKB MIS Muhammadiyah Foa K F Kec. Gido 263,271,000.00 K CV. POPPY M-647/BRR.462247/X/2006, Tgl. 12 Oktober 2006 254,187,000.00 76256100 30.00 20.57
7 RKB SDN 075044 Saewe K F Kec. Gido 365,158,000.00 K CV. FELIX M-648/BRR.462247/X/2006, Tgl. 12 Oktober 2006 302,118,000.00 90635400 30.00 20.83
8 RKB SDN 075034 Siofabanua K F Kec. Bawolato 372,030,000.00 K CV. SAHABAT BARU M-650/BRR.462247/X/2006, Tgl. 12 Oktober 2006 371,128,000.00 111338400 30.00 14.74
9 RKB SDN 077786 Tuhembaruzo K F Kec. Bawolato 430,810,000.00 K CV. FAMIN T.S M-651/BRR.462247/X/2006, Tgl. 12 Oktober 2006 408,224,000.00 122467200 30.00 12.67
10 RKB SDN 074058 Saiwahili K F Kec. Idanogawo 350,113,000.00 K CV. ANUGERAH PUTRA M-652/BRR.462247/X/2006, Tgl. 12 Oktober 2006 336,252,000.00 100875600 30.00 16.84
11 RKB SDN 075040 Awoni La'uso K F Kec. Idanogawo 371,602,000.00 K CV. JIMMY CLINTON M-653/BRR.462247/X/2006, Tgl. 12 Oktober 2006 362,085,000.00 108625500 30.00 25.48
12 RKB SDN 075043 Oladano K F Kec. Idanogawo 462,079,000.00 K CV. YA'AHOWO M-654/BRR.462247/X/2006, Tgl. 12 Oktober 2006 447,064,000.00 134119200 30.00 25.19
13 RKB SDN 076068 Botombawo K F Kec. Lotu 463,010,000.00 K CV. SETIAWAN M-655/BRR.462247/X/2006, Tgl. 12 Oktober 2006 443,048,000.00 132914400 30.00 17.80
14 RKB SDN 071022 Simpang Lima Las. K F Kec. Tuhemberua 468,061,000.00 K CV. TUJUH SERANGKAI M-657/BRR.462247/X/2006, Tgl. 12 Oktober 2006 416,450,000.00 124935000 30.00 14.93
15 RKB SDN 076682 Hilimbowo K F Kec. Tuhemberua 499,787,000.00 K CV. SUDIRMAN M-658/BRR.462247/X/2006, Tgl. 12 Oktober 2006 471,940,000.00 141582000 30.00 15.63
16 RKB SDN 071024 Tanayao K F Kec. Tuhemberua 496,784,000.00 K CV. KARYA BOGALI M-659/BRR.462247/X/2006, Tgl. 12 Oktober 2006 430,373,000.00 129111900 30.00 18.90
17 RKB SDN 076073 Ononazara K F Kec. Alasa 384,229,000.00 K CV. TELLY M-660/BRR.462247/X/2006, Tgl. 12 Oktober 2006 382,562,000.00 114768600 30.00 13.80
18 RKB SDN 076688 Hiligawoni K F Kec. Alasa 433,651,000.00 K CV. SAHABAT SUKSES MANDRI M-661/BRR.462247/X/2006, Tgl. 12 Oktober 2006 432,955,000.00 129886500 30.00 12.18
19 RKB SDN 071162 Esiwa K F Kec. Nahohalu Esiwa 373,116,000.00 K CV. AVORA M-662/BRR.462247/X/2006, Tgl. 12 Oktober 2006 315,113,000.00 94533900 30.00 15.49
20 RKB SDN 071163 Siwalubanua K F Kec. Nahohalu Esiwa 368,861,000.00 K CV. FALIERA M-663/BRR.462247/X/2006, Tgl. 12 Oktober 2006 338,898,000.00 101669400 30.00 15.22
21 RKB SDN 071144 Toiwo K F Kec. Lahewa 477,717,000.00 K CV. BINA HARAPAN M-664/BRR.462247/X/2006, Tgl. 12 Oktober 2006 444,406,000.00 133321800 30.00 13.94
22 RKB SDN 077284 Lafau Fadoro Zai K F Kec. Lahewa 386,453,000.00 K CV. TITIAN BARU M-665/BRR.462247/X/2006, Tgl. 12 Oktober 2006 385,615,000.00 115684500 30.00 15.27
23 RKB SDN 075089 Sisobahili K F Kec. Afulu 369,995,000.00 K CV. MEDIUM M-667/BRR.462247/X/2006, Tgl. 12 Oktober 2006 368,921,000.00 110676300 30.00 16.98
24 RKB SDN 071153 Sifaoro'asi K F Kec. Afulu 462,899,000.00 K CV. IDAPOLA M-668/BRR.462247/X/2006, Tgl. 12 Oktober 2006 461,949,000.00 138584700 30.00 13.79
25 RKB SDN 076058 Simpang Tiga Balohili K F Kec. Hiliduho 365,531,000.00 K CV. BUAKHE INDAH M-669/BRR.462247/X/2006, Tgl. 12 Oktober 2006 356,392,000.00 106917600 30.00 14.33
26 RKB SDN 071018 Sinarikhi K F Kec. Hiliduho 555,484,000.00 K CV. MEMORI M-670/BRR.462247/X/2006, Tgl. 12 Oktober 2006 490,279,000.00 147083700 30.00 11.67
27 RKB SDN 075024 Duria Balaki K F Kec. Hiliduho 465,304,000.00 K CV. TELLY M-671/BRR.462247/X/2006, Tgl. 12 Oktober 2006 400,877,000.00 120263100 30.00 13.05
28 RKB SDN 071085 Ambukha K F Kec. Lolofitu Moi 561,845,000.00 K CV. FAMIN T.S M-673/BRR.462247/X/2006, Tgl. 12 Oktober 2006 464,436,000.00 139330800 30.00 5.87
29 RKB SDN 071070 Onowaembo K F Kec. Lolofitu Moi 371,254,000.00 K CV. BUDI M-674/BRR.462247/X/2006, Tgl. 12 Oktober 2006 370,556,000.00 111166800 30.00 14.00
30 RKB SDN 071182 Ombolata K F Kec. Sirombu 380,527,000.00 K CV. MARCO M-676/BRR.462247/X/2006, Tgl. 12 Oktober 2006 379,529,000.00 113858700 30.00 18.17
31 RKB SDN 071177 Onolimbu K F Kec. Sirombu 470,094,000.00 K CV. CAHAYA SETIA M-677/BRR.462247/X/2006, Tgl. 12 Oktober 2006 466,934,000.00 140080200 30.00 14.02
32 RKB SDN 078434 Sisobaoho K F Kec. Sirombu 463,856,000.00 K CV. WELLING M-678/BRR.462247/X/2006, Tgl. 12 Oktober 2006 463,238,000.00 138971400 30.00 10.72
33 RKB SDN 076715 Siana'a K F Kec. Mandrehe 464,183,000.00 K CV. PRIBUMI ABDI M-680/BRR.462247/X/2006, Tgl. 12 Oktober 2006 454,257,000.00 136277100 30.00 34.27
34 RKB SDN 076713 Zuzundrao K F Kec. Mandrehe 482,339,000.00 K CV. YOGA JAYA PERKASA M-681/BRR.462247/X/2006, Tgl. 12 Oktober 2006 480,818,000.00 144245400 30.00 19.37
35 RKB SDN 071092 Hiliduho K F Kec. Mandrehe 485,349,000.00 K CV. PELITA NUSA M-682/BRR.462247/X/2006, Tgl. 12 Oktober 2006 380,514,000.00 114154200 30.00 16.48
36 RKB SDN 071095 Fukagambo K F Kec. Mandrehe 468,465,000.00 K CV. CIPSA M-683/BRR.462247/X/2006, Tgl. 12 Oktober 2006 467,517,000.00 140255100 30.00 14.15
37 RKB SDN 071091 Sisobambowo K F Kec. Mandrehe 325,150,000.00 K CV. PRIBUMI ABDI M-684/BRR.462247/X/2006, Tgl. 12 Oktober 2006 324,402,000.00 97320600 30.00 29.48
- RKB Sekolah Menengah Pertama (15 Lkl x 63 m2) 2,532,600,000
NAMA PAKET PEKERJAAN : 1,737,360,000 1,666,719,000.00 500015700
1 RKB SMPS BNKP Hilimajiaya K F Kec. Lotu 428,736,000 K CV. KARYA USADA M-656/BRR.462247/X/2006, Tgl. 12 Oktober 2006 392,194,000.00 117658200 15.57
2 RKB SMPN 2 Lahewa K F Kec. Lahewa 455,019,000 K CV. SUDIRMAN M-666/BRR.462247/X/2006, Tgl. 12 Oktober 2006 451,134,000.00 135340200 13.92
3 RKB SMPN 2 Lolofitu Moi K F Kec. Lolofitu Moi 421,745,000 K CV. LINDA PERMAI M-675/BRR.462247/X/2006, Tgl. 12 Oktober 2006 406,678,000.00 122003400 14.20
4 RKB SMPS Faomasi Lahomi K F Kec. Sirombu 431,860,000 K CV. CHAIRANI M-679/BRR.462247/X/2006, Tgl. 12 Oktober 2006 416,713,000.00 125013900 16.14
- RKB Sekolah Menengah Umum (10 Lkl x 72 m2) 1,929,600,000
NAMA PAKET PEKERJAAN : 1,715,306,000 1,649,775,000.00 357411600
1 RKB SMAN 1 Gunungsitoli K F Kec. Gunungsitoli 325,879,000 K CV. BERKAT SYUKUR M-643/BRR.462247/X/2006, Tgl. 12 Oktober 2006 325,182,000.00 97554600 22.49
2 RKB SMAN 3 Gunungsitoli K F Kec. Gunungsitoli 468,251,000 K CV. MESTIKA ABADI M-644/BRR.462247/X/2006, Tgl. 12 Oktober 2006 423,896,000.00 127168800 28.44
3 RKB SMAN 2 Gido K F Kec. Gido 459,260,000 K CV. EDGARD M-649/BRR.462247/X/2006, Tgl. 12 Oktober 2006 458,403,000.00 5.12
4 RKB SMAN 1 Hiliduho K F Kec. Hiliduho 461,916,000 K CV. SETIAWAN M-672/BRR.462247/X/2006, Tgl. 12 Oktober 2006 442,294,000.00 132688200 13.92
0273 PENGADAAN MEUBELAIR 6,780,620,000 6106875572
535111Belanja Modal Fisik Lainnya 6,780,620,000 PENGADAAN MEUBALAIR 4,081,700,000 - Meubelair RKB TK K F 65,200,000 K - Meubelair RKB SD/MI K F 2,385,000,000 K - Meubelair RKB SMP/MTs K F 1,000,200,000 K - Meubelair RKB SMU/MA K F 333,400,000 K - Meubelair RKB SMK K F 166,700,000 K - Meubelair RKB STT K F 65,600,000 K - Meubelair IKIP Gunung Sitoli K F 65,600,000 K
ABT 2,698,920,000 K
- Meubelair SD K F 2,098,800,000 K - Meubelair SMP K F 600,120,000 K
NAMA PAKET 6106875572
Pengadaan Meubelair TK Sekolah 4 Ruang K CV. KARYA BERSAMA M-757/BRR.462247/XI/2006, Tgl. 1 Nopember 2006 65000000
Pengadaan Meubelair SD/MI Sekolah 141 Ruang K PT. TRITANIA NUSANTARA M-736/BRR.462247/X/2006, Tgl. 28 Oktober 2006 4036474398
Pengadaan Meubelair SMP Sekolah 30 Ruang K PT. TRITANIA NUSANTARA M-737/BRR.462247/X/2006, Tgl. 28 Oktober 2006 892952940
Pengadaan Meubelair SMA/SMK 33 Ruang K PT. TRITANIA NUSANTARA M-738/BRR.462247/X/2006, Tgl. 28 Oktober 2006 982248234
Pengadaan Meubelair STT 5 Ruang K CV. SOGUNANIA M-758/BRR.462247/XI/2006, Tgl. 1 Nopember 2006 65200000
Pengadaan Meubelair IKIP Gunung Sitoli 5 Ruang K CV. SAHABAT SUKSES MANDIRI M-759/BRR.462247/XI/2006, Tgl. 1 Nopember 2006 65000000
1139 REHABILITASI GEDUNG 6,195,000,000 6,194,154,400 5,925,421,485
533111Belanja Modal Gedung dan Bangunan 6,195,000,000 6,194,154,400 5,925,421,485 95.65 - Rehab Sekolah Dasar (Lanjutan Thn. 2005) 3,750,000,000
NAMA PAKET PEKERJAAN : 2,679,682,110 3,828,117,300 3,559,384,385
## - Rehab. Total SD No. 077285 AFIA Lahewa K F Kec. Lahewa 4.00 ruang 138,368,160 K CV. WIDYA LESTARINDO 369/BRR-PPN/06/07/2006, 18 April 2006 197,668,800 100 100 187,785,360 100.00 100
Keu Fisik Rp. (%)
3 4 5 6 7 8 9 11 12 13 14 15 16 17
F/N LOKASI VOL SAT PAGU DIPA (Rp) K/L/P NOMOR/TGL.KONTRAK NILAI KONTRAK Fisik (%)
KODE KEGIATAN / SUB KEGIATAN / JENIS BELANJA / RINCIAN BELANJA K/S NAMA PERUSAHAAN Ket
1 2 10
## - Rehab Total SD No. 077782 Higawalo Lahewa K F Kec. Lahewa 4.00 ruang 138,506,340 K CV. AIDA CAHAYA LESTARI 383/BRR-PPN/06/07/2006, 18 April 2006 197,866,200 100 100 197,866,200 100.00 100
## - Rehab Total SD No. 075039 Hiliwarokha Bawolato K F Kec. Bawolato 4.00 ruang 139,454,000 K CV. SINAR HUMENE 384/BRR-PPN/06/07/2006, 18 April 2006 199,220,000 100 100 199,220,000 100.00 100
## - Rehab Total SD No. 071032 Lakha Tuhemberua K F Kec. Tuhemberua 3.00 ruang 102,753,000 K CV. ARGANA 385/BRR-PPN/06/07/2006, 18 April 2006 146,790,000 100 100 146,790,000 100.00 100
## - Rehab Total SD No. 075046 Lolofitumoi LolofituMoi K F Kec. Lolofitumoi 2.00 ruang 73,377,500 K UD. YOMAS SAKTIE 386/BRR-PPN/06/07/2006, 18 April 2006 104,825,000 100 100 104,825,000 100.00 100
## - Rehab Total SD No. 071150 Ombolata Alasa K F Kec. Alasa 2.00 ruang 73,402,000 K UD. DEDI KUIRNIA 387/BRR-PPN/06/07/2006, 18 April 2006 104,860,000 100 100 104,860,000 100.00 100
## - Rehab Total SD No. 076094 Onozalukhu Raya Mandrehe K F Kec. Mandrehe 4.00 ruang 139,503,000 K CV. ANUGERAH SEJAHTERA 388/BRR-PPN/06/07/2006, 18 April 2006 199,290,000 100 100 199,290,000 100.00 100
## - Rehab Total SD No. 071151 Onowaembo Sirombu K F Kec. Sirombu 6.00 ruang 213,027,500 K CV. RAZASA KARYA 389/BRR-PPN/06/07/2006, 18 April 2006 304,325,000 100 100 304,325,000 100.00 100
## - Rehab Total SD No. 071149 Lahewa Lahewa K F Kec. Lahewa 4.00 ruang 138,779,760 K CV. WAHANA GRAHA PERKASA391/BRR-PPN/06/07/2006, 18 April 2006 198,256,800 100 100 198,256,800 100.00 100
## - Rehab Total SD No. 078131 Niko'otano Dao Hiliduho K F Kec. Hiliduho 4.00 ruang 138,308,870 K CV. MILLENIUM 2001 392/BRR-PPN/06/07/2006, 18 April 2006 197,584,100 100 100 197,584,100 100.00 100
## - Rehab Total SD No.078013 Turenamohesa Afulu K F Kec. Afulu 5.00 ruang 175,313,670 K CV. SERENA 393/BRR-PPN/06/07/2006, 18 April 2006 250,448,100 100 100 - - 100
## - Rehab Total SD No.071091 Sisobambowo Mandrehe K F Kec. Mandrehe 4.00 ruang 139,527,500 K CV. RIGO UTAMA 395/BRR-PPN/06/07/2006, 18 April 2006 199,325,000 100 100 199,325,000 100.00 100
## - Rehab Berat/Total SD No. 071063 Soroma'asi lolofitu Moi K F Kec. Lolofitumoi 3.00 ruang 61,691,000 K CV. BAHAGIA 398/BRR-PPN/06/07/2006, 18 April 2006 88,130,000 100 100 88,130,000 100.00 100
## - Rehab Berat/Total SD No. 071154 Anaoma Alasa K F Kec. Alasa 6.00 ruang 115,003,000 K CV. DOLOK ZION KONSTRUKSI399/BRR-PPN/06/07/2006, 18 April 2006 164,290,000 100 100 164,290,000 100.00 100
## - Rehab Total SD No. 075021 Ombolata Salo'o Hiliduho K F Kec. Hiliduho 4.00 ruang 66,003,000 K CV. BAHAGIA 400/BRR-PPN/06/07/2006, 18 April 2006 94,290,000 100 100 94,290,000 100.00 100
## - Rehab Berat/Total SD No. 070988 Hilinakhe G. Sitoli K F Gunungsitoli 6.00 ruang 115,015,250 K CV. ANGGI PUTRA 401/BRR-PPN/06/07/2006, 18 April 2006 164,307,500 100 100 164,307,500 100.00 100
## - Rehab Berat/Total SD No. 071012 Hiligodu G. Sitoli K F Gunungsitoli 6.00 ruang 114,990,750 K CV. ABDISYAH PUTRA 402/BRR-PPN/06/07/2006, 18 April 2006 164,272,500 100 100 164,272,500 100.00 100
## - Rehab Berat SD No. 070981 Fodo G. Sitoli K F Gunungsitoli 3.00 ruang 51,327,500 K CV. MULTI KONSTRUKSI 403/BRR-PPN/06/07/2006, 18 April 2006 73,325,000 100 100 73,325,000 100.00 100
## - Rehab Berat SD No. 077285 Sisobahili Namohalu K F Kec. Namohalu 4.00 ruang 65,718,310 K CV. BUMBURAI INDAH 404/BRR-PPN/06/07/2006, 18 April 2006 93,883,300 100 100 93,883,300 100.00 100
## - Rehab Berat SD No. 071064 Helefanikha Gido K F Kec. Gido 3.00 ruang 51,364,250 K CV. IDA POLA 398/BRR-PPN/06/07/2006, 18 April 2006 73,377,500 100 100 73,370,000 100.00 100
## - Rehab Berat SD No. 076398 Lasara Tanose'o Hiliduho K F Kec. Hiliduho 3.00 ruang 51,327,500 K CV. AMPERA 399/BRR-PPN/06/07/2006, 18 April 2006 73,325,000 100 100 73,325,000 100.00 100
## - Rehab Berat SD No. 077272 Lolofaoso Tab G. Sitoli K F Gunungsitoli 5.00 ruang 83,177,500 K CV. BUDI 400/BRR-PPN/06/07/2006, 18 April 2006 118,825,000 100 100 118,825,000 100.00 100
## - Rehab Berat SD No. 071047 Bawolato bawolato K F Kec. Bawolato 7.00 ruang 117,514,250 K CV. IDA POLA 401/BRR-PPN/06/07/2006, 18 April 2006 167,877,500 100 100 159,483,625 95.00 100
- Rehab Sekolah Menengah Pertama (Lanjutan Thn. 2005) 1,875,000,000
NAMA PAKET PEKERJAAN : 1,286,541,060 1,837,915,800 1,837,915,800
## - Rehab Berat/Total SMP Neg 2 Sirombu K F Kec. Sirombu 4.00 ruang 117,453,000 K CV. AMPERA 402/BRR-PPN/06/07/2006, 18 April 2006 167,790,000 100 100 167,790,000 100.00 100
## - Rehab Total SMP Neg 1 Afulu K F Kec. Afulu 4.00 ruang 194,828,410 K UD. RUMONDANG 403/BRR-PPN/06/07/2006, 18 April 2006 278,326,300 100 100 278,326,300 100.00 100.00
## - Rehab Total SMP Neg 1 Lotu K F Kec. Lotu 3.00 ruang 117,457,900 K CV. HUTANAGODANG 404/BRR-PPN/06/07/2006, 18 April 2006 167,797,000 100 100 167,797,000 100.00 100
## - Rehab Berat/Total SMP Neg 2 Mandrehe K F Kec. Mandrehe 5.00 ruang 186,151,980 K CV. SINAR GOMO 405/BRR-PPN/06/07/2006, 18 April 2006 265,931,400 100 100 265,931,400 100.00 100
## - Rehab Ringan/Total SMP Neg 3 Hiliduho K F Kec. Hiliduho 7.00 ruang 125,493,900 K CV. BINTANG TIMUR BARU 406/BRR-PPN/06/07/2006, 18 April 2006 179,277,000 100 100 179,277,000 100.00 100
## - Rehab Berat/Total SMP Neg 2 Gido K F Kec. Mandrehe 4.00 ruang 90,608,840 K CV. SINAR GOMO 407/BRR-PPN/06/07/2006, 18 April 2006 129,441,200 100 100 129,441,200 100.00 100
## - Rehab Berat/Total SMP Neg 3 Mandrehe K F Kec. Gido 4.00 ruang 124,179,230 K CV. SRI DELI 408/BRR-PPN/06/07/2006, 18 April 2006 177,398,900 100 100 177,398,900 100.00 100
## - Rehab Berat/Total SMP Neg 1 Hiliduho K F Kec. Mandrehe 4.00 ruang 132,177,500 K CV. DOA IBU 409/BRR-PPN/06/07/2006, 18 April 2006 188,825,000 100 100 188,825,000 100.00 100
## - Rehab Berat/Total SMP Neg 1 Hiliduho K F Kec. Hiliduho 3.00 ruang 105,212,800 K CV. TATHA MANDIRI 410/BRR-PPN/06/07/2006, 18 April 2006 150,304,000 100 100 150,304,000 100.00 100
## - Rehab Berat SMP Neg 2 Hiliduho K F Kec. Hiliduho 4.00 ruang 92,977,500 K CV. BAHAGIA 415/BRR-PPN/06/07/2006, 18 April 2006 132,825,000 100 100 132,825,000 100.00 100
- Rehab Sekolah Menengah Umum (Lanjutan Thn. 2005) 570,000,000
NAMA PAKET PEKERJAAN 369,684,910 528,121,300 528,121,300
## - Rehab Total SMKS/STMK Gunungsitoli K F Gunungsitoli 2.00 ruang 114,001,440 K CV. SRI DELI 416/BRR-PPN/06/07/2006, 18 April 2006 162,859,200 100 100 162,859,200 100.00 100
## - Rehab Berat SMA Neg 1 Alasa K F Kec. Alasa 6.00 ruang 138,218,220 K CV. PRATAMA KARYA AGUNG 417/BRR-PPN/06/07/2006, 18 April 2006 197,454,600 100 100 197,454,600 100.00 100