NO
JUDUL MAKALAH
TAHUN
1 MANAJEMEN PENGENDALIAN BIAYA TAK LANGSUNG 2003
2 METODE BEKISTING DAN PERANCAH MASJID AL-FALAH NABIRE STUDI PENENTUAN JUMLAH
OPTIMAL TENAGA PROYEK 2003
3 KEUANGAN DAN AKUNTANSI DENGAN MENGGUNAKAN ANALISIS BEBAN KERJA (WORKLOAD
ANALYSIS) 2003
4 SISTEM INFORMASI MANAJEMEN TAGIHAN SEBAGAI ALTERNATIF ALAT KENDALI PENGELOLAAN
PIUTANG 2003
5 CADANGAN BIAYA RM KONSEP DAN INOVASI 2003
6 TINJAUAN HUKUM JAMINAN STUDI KASUS PT ASURNASI KARYAMAS 2003 7 ANALISA DAN PERANCANGAN DASHBOARD SISTEM MANAJEMEN JARINGAN TERHADAP DOWN
TIME PELAYANAN IT WIKA 2003
8 PROGRAM PERHITUNGAN KEBUTUHAN BESI BETON DENGAN MENGGUNAKAN MS-EXCEL 2003 9 METODE PENYUSUNAN LAPORAN PROYEK SELESAI (PROYEK PALEMBANG 150 GFCC) 2003 10 MODIFIKASI PROSEDUR PENGUJIAN PLATE BERING PADA PEKERJAAN TIMBUNAN 2003 11 PENGGUNAAN DATA PEMAKAIAN SUMBER DAYA DAN OUTPUT SIMPAK PRODUKSI SEBAGAI
DASAR PENGENDALIAN DAN PENILAIAN KEWAJARAN BIAYA PROYEK 2003 12 ANALISA POLA MANAJEMEN PADA PEKERJAAN RIGID PAVEMENT 2003 13
PENGGUNAAN SUPPORTING BAJA UNTUK LAUNCHING BRIDGE SEBAGAIALTERNATIF LAIN DLM PELAKSANAAN ERECTION GIRDER (STUDI KASUS (PROYEK PEMBANGUNAN JEMBATAN OGAN TANJUNG RAJA PALEMBANG)
2003
14
PENGGUNAAN BOOM SYSTEM PADA MATERIAL HANDLING STRUKTUR PENGECORAN DLM RANGKA PENINGKATAN PRODUKTIVITAS KERJA DITINJAU TERHADAP ASPEK WAKTU, BIAYA DAN MUTU PADA PELAKSANAAN PROYEK BANGUNAN GEDUNG
2003 15 ALTERNATIF DESAIN TEMPORARY STEEL SHEET PILE PADA INTAKE CANAL AREA 2003 16 PEMILIHAN DAN METODE KERJA STRUKTUR PENAHAN TANAH DI PROYEK GEDUNG MENARA NUSA
LANJUTAN 2003
17 PILE EXTENSION DENGAN BETON BERTULANG 2003
18 TINJAUAN PENGGUNAAN STEEL FRAME UNTUK KONSTRUKSI STEAM TURBIN TOP DECK PROYEK
CCPP CILEGON 2003
19 PENERAPAN STYROFOAM INSULATOR SEBAGAI TEMPERATUR KONTROL SISTEM PADA MASS
CONCRETE DI PROYEK PLTU CILACAP 2003
20 PENGGUNAAN ADITIF SBG AKSELELATOR PADA PEKERJAAN STRUKTUR BETON BANGUNAN
BERTINGKAT TERHADAP ASPEK WAKTU, MUTU DAN BUDAYA 2003 21 PROBLEMATIKA PEKERJAAN TOILET PADA APARTEMEN DAN TOILET PRECAST SBG DIMENSI BARU
METODE PELAKSANAAN PEKERJAAN TOILET 2003
22 KAJIAN ULANG PENGGUNAAN DINDING PATON PADA BANGUNAN TYPICAL STUDI KASUS PROYEK
MEDITERANIA GMR 2003
23 OPTIMALISASI DATA PENGUKURAN DLM MENDUKUNG PROSES REKAYASA TEKNIK (APLIKASI
SOFTWARE LAND DEVELOPMENT DESKTOP) 2003
24 APLICATION OF MASS PILING 2003
25 OPTIMALISASI SCREEN AMP UNTUK MENGURANGI LOOSE MATERIAL PROYEK WILAYAH KALSEL
DSU III 2003
26 JADWAL RENCANA KERJA PROGRAM PELATIHAN KERJA RESUME KEGIATAN STAFF TRAINEE
EVALUASI PROGRAM MAGANG 2003
27 ESTIMASI BIAYA LANGSUNG PER JOINT PIPA ERW Q20 APISL-X52 TEBAL 9,5 MM PROYEK
PENGGANTIAN PIPA 20 LAWE-LAWE PENAJAM
NO
JUDUL MAKALAH
TAHUN
KUMPULAN JUDUL MAKALAH CAPEG
28 ANALISA PERBANDINGAN METODE KONVENSIONAL DAN METODE PRECAST PROYEK PERKUATAN
TEBING SUNGAI MARTAPURA KALSEL 2003
29 PERENCANAAN EFESIENSI TIANG PANCANG GROUP, PROYEK JALAN TOL LINGKAR LUAR
JAKARTA (JOOR) RUAS KE-3 (CAKUNG-CILINCING) 2003
30 STUDI PENENTUAN JUMLAH OPTIMAL TENAGA PROYEK BIDANG KEUANGAN DAN AKUNTANSI
DNG MENGGUNAKAN ANALISIS BEBAN KERJA (WORKLOAD ANALYSIS) 2003 31 DESAIN SISTEM PEMIPAAN DIAREA TANKI DAN POMPA PADA PROYEK TPPI TUBAN 2004 32 ANALISIS PROSEDUR PENGAKUAN PENJUALAN JASA ENGINEERING SBG SALAH SATU SUMBER
PENDAPATAN (STUDI KASUS TPPI TUBAN) 2004
33 TINJAUAN PENGELOLAAN BUKTI KAS DAN BUKTI MEMORIAL PADA PROYEK-PROYEK DSU I 2004 34 ADMINISTRASI PENGELOLAAN BESI BETON DILOKASI FABRIKASI DENGAN MENGGUNAKAN
MICROSOFT ACCESS 2004
35 PENYEMPURNAAN DALAM PENGINPUTAN NOTA-NOTA BTL PADA BUKTI KAS / BANK SECARA
KOMPUTERISASI 2004
36 BENCH MARKING ; SATU LANGKAH MENUJU PEMBENTUKAN ORGANISASI PEMBELAJARAN 2004 37 STRATEGI KOMUNIKASI DALAM MENINGKATKAN BRAND IMAGE PERUSAHAAN 2004 38 ANALISA MIGRASI SERVER KEUANGAN DARI SISTEM OPRASI NOVELL MENJADI SISTEM OPRASI
LINUXREDHAT PT WIKA 2004
39 ANALISA DAN PERANCANGAN SISTEM JARINGAN NIRKABEL (WIRELESS LOCAL AREA NETWORK
DI WIKA) 2004
40 TAHAPAN PEMBUATAN REQUISITION DATASHEET & TECHNICAL BIDANG ANALYSIS (TBA) DNG
STUDI KASUS FLOW ELEMENT (ORIFILE) 2004
41 PIPE STRESS & FLEXIBILITY ANALYSIS TERHADAP SISTEM PEMIPAAN DIDAERAH POMPA PADA
TUBAN AROMATIC PROJECT DENGAN MENGGUNAKAN SOFTWARE AUTOPIPE VER.5.0. 2004 42 PENGAKUAN DESAIN SBG PENJUALAN PD BISNIS JASA ENGINEERING 2004 43 PROGRAM DESAIN RETAINING WALL DENGAN MENGGUNAKAN MS-EXCEL 2004 44 PENGGUNAAN PROGRAM PROTECTION SYSTEM UNTUK GALIAN STRUKTUR 2004 45 SISTEM MANAJEMEN DAMPAK LINGKUNGAN (ENVIRONMENTAL IMPACT MANAGEMENT SYSTEM)
PD PROYEK JALUR GANDA KROYA-YOGYA THP. I 2004
46 PERBANDINGAN SISTEM PERI SATECO DAN KONVENSIONAL SEBAGAI FROMWORK ELEMENT
VERTIKAL PADA KONSTRUKSI GEDUNG BERTINGKAT 2004
47 PERBANDINGAN METODE CLIMBING FROM DAN SLIPFROM "ALTERNATIF PEMILIHAN BEKISTING
DLM PEKERJAAN PENGECORAN PLER" 2004
48 LAUNCHER GANTRY CRANE 100 TON ;43 METER "APLIKASI DAN INOVASI PELAKSANAAN PADA
PROYEK JEMBATAN CIKUBANG" 2004
49 METODE REACTION PILE DENGAN EXTRA PILE SEBAGAI SOLUSI TEPAT UNTUK PERMASALAHAN
LOADING TEST BH 1966 2004
50 EVALUASI SISTEM MANAJEMEN K3 PADA PROYEK PALEMBANG 150 MW GFCC PC DAN
PENERAPAN PELATIHAN DENGAN METODE VISUAL 2004
51 PANDUAN PRAKTIS MENENTUKAN METODE GALIAN TANAH DAN SISTEM KONSTRUKSI PENAHAN
TANAH BASEMENT DNG APLIKASI PROGRAM MICROSOFT VISUAL BASIC 6.0. 2004 52 PERHITUNGAN VOLUME PEKERJAAN STRUKTUR BANGUNAN GEDUNG MENGGUNAKAN PROGRAM
DELPHI V.6.0. 2004
53 ANALISA OVERALL EQUIPMENT EFECTIVENESS (DEE) ALAT PAVERS COMACO (STUSI KASUS
NO
JUDUL MAKALAH
TAHUN
KUMPULAN JUDUL MAKALAH CAPEG
54
DESAIN JEMBATAN UNTUK PIPA DAN PONDASI TANGKI 50 KL CIMALAYA XBLOC AS AN
ALTERNATIVE OF BREAKWATER ARMOUR TYPE THE CASE STUDY OF CILACAP 2 X 300 MW CFSPP BREAKWATER & UNLOADING JETTY
2004 55 PROPOSAL SISTEM DAN PROSEDUR FOTO DOKUMENTASI PROYEK (STUDI KASUS PROYEK
PEMBANGUNAN JEMBATAN S. KARAJAE CS) 2004
56 KAJIAN PEMILIHAN MOBILE CRANE UNTUK ERECTION STEEL STRUCTURE PROYEK CCPP
CILEGON 2005
57 CLEAN COAL TECHNOLOGIES KAJIAN ELEKTROSTATISTIC PRECIPITATOR (DESAIN REVIEW) 2005 58 ANALISA KEKUATAN DESAIN SUPPORT SADDLE HORIZONTAL VESSEL DNG STIFFENER RING
METODE ZICK'S ANALYSIS 2005
59 PEMAKAIAN PIPA DUCTILE IRON UNTUK LINE FIRE WATER (KASUS PADA TUBAN AROMATIC
PROJECT) 2005
60 KAJIAN INSTRUMENTASI PADA COMBUSTION TURBINE GENERATOR 2005 61 INTEGRASI SUPPLY CHAIN MANAGEMENT DAN PROGRAM KMK DALAM PROSES PENGADAAN PT
WIKA 2005
62 OPTIMALISASI SKEDUL PEKERJAAN (INTEGRASI MS-OFFICE UNTUK PENGENDALIAN PROYEK) 2005 63 APLIKASI SISTEM BALOK PRECAST PADA PROYEK KONSTRUKSI BANGUNAN GEDUNG 2005 64 PERBANDINGAN WINSURFER DAN AUTOCAD LAND DEVELOPMENT UNTUK MEMANTAU PRODUKSI
HARIAN TAMBANG 2005
65 PENENTUAN SKUEN TAMBANG PROYEK TAMBANG BATUBARA ANTANG GUNUNG MERATUS
KABUPATEN TAPIAN KALSEL 2005
66 DESAIN SEBAGAI PENDUKUNG PEMASARAN DAN PENYEIMBANG PRODUKSI DESAIN JEMBATAN
BAJA 2005
67 WASTEWATER TREATMENT PLANT (CRITICAL STUDY OF PARALLEL PLATE INTERCEPTOR) 2005 68 DASAR PEMILIHAN TURBIN AIR (STUDI KASUS PLTM LOBONG-MONGANGO MERASAP DAN PLTA
POIGAR 2005
69 PERHITUNGAN ARUS HUBUNG SINGKAT DENGAN SOFTWARE ETAP POWERSTATION 4.0. 2005
70 KEUNGGULAN GAS INSULATED SWITCHGEAR 2005
71 PIPING STRESS ANALYSISI 2005
72 ECONOMICAL CONSIDERATION IN DISTRIBUTION TRANSFORMER TYPE SELECTION 2005 73 DASAR PEMILIHAN TURBIN GAS PENGGUNAAN MATERIAL BEKISTING LOADING RAMP PROYEK
PKS PT PSA KEBUN TAMBUSAI RIAU 2005
74 POLA PENEMPATAN / PENUGASAN BERBASIS KOMPETENSI 2005 75 SOLUSI UNTUK MEMPERBAIKI KINERJA SISTEM E-PROCUREMENT WIKA 2005 76 VIBRATION ON CENTRIFUGAL PUMP DURING CONSTRUCTION PHASE 2005 77 ANALISIS STRESS DAN DESAI PADA PIPA HEADER SEA WATER IN TAKE 2005 78 MODIFIKASI SISTEM KENDALI DALAM UNIT TANKI DAN POMPA UNTUK MENINGKATKAN KE
HANDALAN SISTEM 2005
79 APLIKASI STUDI KEHANDALAN DALAM DESAIN SISTEM TENAGA LISTRIK (KASUS PADA TUBAN
AROMATIC PROJECT) 2005
80 SISTEM MONITORING PROGRESS PEKERJAAN STRUKTUR DENGAN 2005 81 MENGGUNAKAN PROGRAM MICROSOFT ACCESS DAN MICROSOFT EXEL BERBASIS DATABASE 2005 82 ANALISA PERENCANAAN EFESIENSI MODEL SAMBUNGAN GIRDER PROYEK JALAN TOL
NO
JUDUL MAKALAH
TAHUN
KUMPULAN JUDUL MAKALAH CAPEG
83 EFESIENSI PENGGUNAAN TIANG MIRING PADA STRUKTUR DERMAGA 2005 84 KEGIATAN ELEKTRIKAL PRE-COMMISSIONING DAN STUDI PERHITUNGAN BEBAN ELEKTRIK 400V 2005 85 PENGENDALIAN PEMBAYARAN OPNAME UNTUK PEKERJAAN REPAIR FINISHING PROYEK GAJAH
MADA RESIDANCE JAKARTA
-86 APLIKASI STABILITAS LERENG DAN PENCEGAHAN TERHADAP UNDERSEEPAGE PADA BANGUNAN
PELIMPAH STUDI KASUS PROYEK REHABILITASI DAN IRIGASI BENDUNGAN LODAN 2006
87 ELECTRONIC BOOK AND STANDARD FORM FOR ROAD MATERIAL TEST 2006 88 KAJIAN KERJASAMA OPERASI MELALUI PENDEKATAN MANAJEMEN RESIKO 2006 89 PROSES HOT TAPPING PROYEK PEMASANGAN PIPA PCC INDOTAISEI - CURUG PT PGN (PERSERO)
TBK PAKET 14 2006
90 MONITORING FORM PEKERJAAN VARIATION 2006
91 SISTEM PENGELOLAAN PERALATAN EKSTRA KOMPTABEL DENGAN MENGGUNAKAN PROGRAM
MS. ACCESS DI PROYEK ACEH ROAD AND BRIDGE RECONSTRUCTION AND REHABILITANION 2006 92 SISTEM INFORMASI MONITORING BUKTI TRANSAKSI SEBAGAI SARANA KEMUDAHAN MONITOR
DAN PENCATATAN BUKTI TRANSAKSI 2006
93 STRATEGI HUMAS MENINGKATKAN CORPORATE IMAGE 2007
94 LAUNCHING CANTILEVER METHOD FOR STEEL TRUSS ERECTION 2007 95 MENUJU KESUKSESAN DENGAN PERSONAL BALANCED SCORECARD 2007
96 STUDI AWAL PROSES PEMBUATAN BIODIESEL 2007
97 PROJECT TIME MANAGEMENT TEMPLATE UNTUK PROYEK BANGUNAN GEDUNG PT WIJAYA KARYA 2007 98 PENGKAJIAN KLAIM VARIATIONS MELALUI PENDEKATAN MANAJEMEN RESIKO STUDI KASUS
PROYEK BENDUNGAN LODAN 2007
99 SCORING QPASS STRUKTUR BAJA DAN ANALISA PENYIMPANGANNYA 2007 100 UPAYA EFISIENSI MELALUI REDESAIN SISTEM PENGANGKURAN DAN DIMENSI BALOK BETON
PRAKTEKAN PADA PROYEK 2007
103 PENERAPAN STRATEGI SAMUDERA BIRU DI PROYEK ALJAZAIR 2007 104 APLIKASI PROGRAM SIMULASI HYSYS DI DEPARTEMEN EPC PT WIJAYA KARYA 2007 105 PENGGUNAAN DINDING PENAHAN TANAH MODIFIKASI SEBAGAI PERKUATAN LERENG SUNGAI
MARTAPURA 2007
106 MINIMALISASI CACAT PADA PEKERJAAN PENGELASAN PIPA GAS DENGAN PROSES SHIELDED
METAL ARC WELDING (SMAW) 2007
107 DIRECT REWARDING PROGRAMME SEBAGAI SALAH SATU BENTUK PENGHARGAAN DAN UPAYA
MENINGKATKAN KINERJA FUNGSI PEMASARAN PT WIJAYA KARYA 2007
108 EVALUASI PENGAPLIKASIAN SIMPAK 2007
109 MEMINIMALISASI CACAT PADA PEKERJAAN PENJELASAN PIPA DENGAN PROSES SWAN
110 METODE TAPERED SLIPFORN 2008
111 METODE PENGECORAN BENDUNG BAWAH TANAH 2008
112 METODE KERJA DAN ANALISIS TEKNIK PERCEPATAN SIKLUS BERKESTING KAYU PADA BALOK
PLOT DAN KOLOM 2008
NO
JUDUL MAKALAH
TAHUN
KUMPULAN JUDUL MAKALAH CAPEG
114 BEKISTING SEMI SISTEM DENGANBESI HOLLOW 2008
115 OPTIMALISASI KAPASITAS TIANG PANCANG DENGAN PENURUNAN NILAI FINAL SET 2008 116 SISTEM APLIKASI DATABASE DAN PERFORMANCE APPRAISAL TENAGA KONTRAK PROYEK 2008
117 APLIKASI CRM - CSI DALAM SIMPA 2008
118 DASAR PEMILIHAN MEDIA ATOMISASI PADA GUN-TYPEOIL BURNER UNTUK PROSES START-UP
CFB BOILER 2008
119 PERKUATAN LAUNCHING GANTRY DENGAN EKSTERNAL STRESSING 2008 120 ANALISA PENGGUNAAN PRE-BORING PASA PEKERJAAN PEMANCANGAN DI PROYEK PLTU
INDRAMAYU 2008
121 USULAN EFISIENSI STRAND PADA SISTEM PRATEGANG EKSTERNAL (STUDI KASUS :
PEMBANGUNAN DAN PENINGKATAN SIMPANG TAK SEBIDANG FLYOVER ROXY) 2007 122 PEMBUATAN LAPORAN ARUS KAS DENGAN BANTUAN APLIKASI QUERY JURNAL (INTEGRASI
LAPORAN ARUS KAS & SIMPRO DENGAN MS AXCEL) 2008
123 TRUST RECEIPT SEBAHAGAI ALTERNATIF PEMBIAYAAN L/C (STUDI KASUS PROYEK PIPANISASI
BALONGAN) 2008
124
SISTEM MONITORING PROGRES PEKERJAAN DENGAN MENGOPTIMALKAN APLIKASI MICROSOFT EXCEL DAN VISUAL BASIC FOR APLICATION UNTUK PENGENDALIAN SKEDUL PEKERJAAN KULIT LUAR
2007
125 EOT PROTOCOL 2008
126 DASAR-DASAR PERANCANGAN CHIMNEY 2008
127 APLIKASI PENGINPUTAN SIMHU OFF LINE SEBAGAI SOLUSI PENGINPUTAN SIMHU SECARA UP
LOAD DI WEB SIMHU 2007
128 SUPERHEATHER PENINGKAT LABA PERUSAHAAN 2008
129 TERMINAL AUTOMATION SYSTEM Pada Proposal Pembangunan Terminal Transit Bau Bau 2008 130 PENGENDALIAN PARTIKEL PADAT GAS BUANG HASIL PEMBAKARAN BATUBARA PADA
PEMBANGKIT LISTRIK TENAGA UAP 2007
131 ANALISA SISTEM DRAINASE TOL SUMO SEKSI IA 2008
132 OPTIMALISASI PENGGUNAAN PVD (Prefabricated Vertical Drain) PADA PROYEK PEMBANGUNAN
JALAN TOL SAURABAYA - MOJOKERTO 2008
133 KORELASI ANTARA SIFAT - SIFAT TANAH DAN DAYA DUKUNG LATERAL 2008
134 STUDI REKAYASA DESAIN PLANTER BOX DROP OFF 2008
135 OPTIMALISASI PORTAL HOIST UNTUK ERECTION [CU GIRDER PROYEK PEMBANGUNAN FLY OVER
AMPLAS MEDAN 2008
136 OPTIMASI BIAYA PEKERJAAN GROUND ANCHOR BERDASARKAN HASIL PROVING TEST PROYEK
PARAGON CITY SEMARANG 2008
137 PENGARUH PENERAPAN PRINSIP 80/20 PARETO TERHADAP PERFORMA PROYEK SEMI DESIGN &
BUILD (REHABILITASI PASAR IMOGIRI BANTUL) 2008
138 PROGRAM PENGENDALIAN BESI BERBASIS DELPHI DAN MYSQL 2008 139 ANALISA PERBANDINGAN PROFIL BAJA PADA BALOK & PENGGUNAAN SPANDECK PADA PELAT
BETON DENGAN BETON KONVENSIONAL 2008
140 APLIKASI PENGGUNAAN PRECAST HALF SLAB PRE STRESS (PROYEK PARAGON CITY SEMARANG) 2008 141 ERECTION STEEL FLUE LINER; STUDI KASUS STRUKTUR STEEL FLUE LINER (H=150M; D=2.4M)
PROYEK PLTU LABUHAN ANGIN SIBOLGA, TAPANULI TENGAH SUMATRA UTARA 2008 142 TURBINE INSTALLATION : METHOD, PROBLEMS, AND SOLUTION 2008
NO
JUDUL MAKALAH
TAHUN
KUMPULAN JUDUL MAKALAH CAPEG
143 EFISIENSI PEKERJAAN COFFERDAM MENGGUNAKAN GABION 2008 144 METODE PELAKSANAAN PADA PEKERJAAN PELEDAKAN BATUAN "ROCK BLASTING" 2008 145 KAJIAN ANALISA PERHITUNGAN DAN MANAJEMEN RESIKO PADA PEKERJAAN ROCK BLASTING 2008 146 ALTERNATIF DESAIN DERMAGA DENGAN STRUKTUR DECK ON PILE PADA PROYEK
PEMBANGUNAN PELABUHAN CALANG, NAD 2008
147 ANALYSIS PERBANDINGAN METODE MICROTUNNELING (MTBM) DENGAN HORISONTAL AUGER
BORING UNTUK PEMASANGAN PIPA DIA 1200 mm DAN 2000mm (PADA PROYEK RIYADH PIPELINE) 2008 148 PENINGKATAN EFISIENSI SISTEM DAYA LISTRIK MENGGUNAKAN TABEL COS PHI DAN SIMULASI
ETAP 4.00 2008
149 OPTIMALISASI DESAIN SISTEM PROTEKSI KATODIK PADA PROYEK PIPANISASI BALONGAN -
JAKARTA II 2008
150 OPTIMALISASI DENGAN SISTEM METERING TERMINAL TRANSIT UTAMA BALONGAN PADA PROYEK
PIPANISASI BALONGAN - JAKARTA II 2008
151 ANALISA EKONOMIS GARDU INDUK 2008
152 KOMPARASI PRODUKTIVITAS TENAGA KERJA ALJAZAIR DENGAN TENAGA KERJA INDONESIA
(STUDI KASUS PADA EAST-WEST MOTORWAY ALGIERS) 2008
153 GAS INSULATED SWITCHGER (GIS) 2008
154 DESAIN FIRE PROTECTION SYSTEM PADA MCC ROOM DI PROYEK OVERLAND COVEYOR ADARO 2008 155 ANALISA RESIKO MANAJEMEN PERALATAN KONSTRUKSI BERDASARKAN CONTRACT LEND 2008 156 ALTERNATIF DESAIN DERMAGA PENAHAN TANAH PROYEK JALAN RESIDENCY BRUNEI 2008 157 PEMILIHAN APLIKASI DISTRIBUSI PEMBEBANAN GROUP PILE DIBANDINGKAN SINGEL PILE PADA
PONDASI AREA TRESLE BRIDGE 2008
158 EFISIENSI PRODUKSI ASPAL HOTMIX (PROYEK REHABILITASI DAN REKONSTRUKSI JALAN
NASIONAL - NAD) 2008
159 DESAIN TIANG PANCANG KOMPETITIF (STUDI KASUS JETTY DERMAGA BATUBARA GRESIK) 2008
160 HANDLING PROLONGATION CLAIM 2008
161
OPTIMALISASIPEMILIHAN MATERIAL CASING UNTUK PERLINTASAN JALAN RAYA DAN JALAN KERETA API MENGGUNAKAN STANDARD API RP 1102 PADA PROYEK PIPANISASI BALONGAN - JAKARTA II
2008
162 MODEL STRATEGI PENAWARAN BERDASARKAN EXPECTED PROFIT MAXIMUM UNTUK PROYEK
KONSTRUKSI 2008
163 ANALISIS PERBANDINGAN AJACK CILACAP DENGAN AJACK LABUAN 2008 164 ANALISA JATUH TEGANGAN TERHADAP PENGURANGAN TRANSFORMATOR PADA SETIAP
GENERATOR 2008
165 ANALISA VALUE ENGINEERING PROYEK PENYELESAIAN TERMINAL UTARA BANDARA ADI
SOEMARMO SURAKARTA MELALUI PROSES DESIGN - BUILD 2008 166 PEMILIHAN SISTEM PROTEKSI KATODIK PADA SISTEM PERPIPAAN DARAT (UNDERGROUND
PIPELINE) 2008
167 OPTIMALISASI DESIGN GROUNDING GRID SUBSTATION PADA PLTU 2 SULAWESI UTARA DENGAN
METODE PROGRAMMING GUI MATLAB 2008
168 PENGGUNAAN PC PRESLAB PADA PROYEK BSD ENTERTAINMENT CENTER 2008 169 OPTIMASI PEKERJAAN GROUND ANCHOR PADA PROYEK PARAGON CITY SEMARANG 2008 170 LAPORAN SUMBER DAN PENGGUNAAN KAS SEBAGAI ALAT UNTUK MENGANALISIS KEBUTUHAN
NO
JUDUL MAKALAH
TAHUN
KUMPULAN JUDUL MAKALAH CAPEG
171 PEMBUATAN BALANCED SCORECARD PABRIK FABRIKASI BAJA 2008 172 PERANCANGAN DESIN TATA LETAK STASIUN KERJA PABRIK DENGAN METODE KESEIMBANGAN
LINI UNTUK PRODUKSI TABUNG GAS DI PABRIK PABRIKASI BAJA WIKA DME 2008 173 PENGENDALIAN BIAYA TIDAK LANGSUNG PADA PROYEK CAUSEWAY SURAMADU 2008 174 PENERAPAN EARLY WARNING SYSTEM DENGAN VISUALISASI 3 DIMENSI MENGGUNAKAN
APLIKASI VICO SOFTWARE 2008
175 UPAYA PENGENDALIAN BESI BETON UNTUK MENEKAN WASTE MENCAPAI 1 % DI PROYEK PLTU
PALABUHAN RATU 2008
176 METODE KERJA PENGGALIAN CYCLE WATER PIT DAN TURBIN GENERATOR FOUNDATION 2008 177 PENGGUNAAN MECHANICAL JOINT PADA PROYEK PLTU PALABUHAN RATU 2008 178 METODE PELAKSANAAN PEKERJAAN BORE PILE DENGAN KAJIAN PRODUKTIVITAS MESIN BOR
(Studi pada Proyek Suramadu Approach Bridge) 2008
179 EFISIENSI PEMAKAIAN ANGKUR HIDUP - MATI PADA GIRDER BENTANG 30.8 METER (Proyek
Pembangunan JKT Outter Ring Road (JORR) Seksi W1 Ruas Kebon Jeruk-Penjaringan) 2008 180 METODE BEKISTING KANTILERVER (SISTEM GANTUNG) [Fly Over Amplas - Medan] 2008 181 CRITICAL POINT INTERNAL CONTROL DALAM TRANSAKSI UNTUK PROCUREMENT DI LEBIH DARI
DUA PIHAK (DUA NEGARA) 2008
182 PELUANG KLAIM PENYESUAIAN HARGA (ESKALASI)DALAM PROYEK PLTU SULUT DARI SUDUT
REGULASI DAN KONTRAK 2008
183 PRINSIP KETERBUKAAN INFORMASI PADA BADAN USAHA MILIK NEGARA YANG BERSTATUS
PERUSAHAAN PERSEROAN TERBUKA 2008
184 PERUBAHAN PUTARAN KERJA FAN UNTUK MENDAPATKAN PENGHEMATAN BIAYA PADA PROYEK
RFO PF-II PT PETROKIMIA GRESIK 2008
185 DESAIN KETEBALAN INSULASI SHELL TANGKI PENYIMPANAN AMONIAK 2008
186 DESAIN APRON FEEDER PADA CLAY CRUSHER 2008
187 OPTIMALISASI DESIGN GAS OIL STORAGE TANK PT SHELL INDONESIA KAPASITAS 17864 m³ 2008 188 KEUNGGULAN SISTEM VERTIKAL STERILIZER PADA PABRIK KELAPA SAWIT 2008 189 PENGARUH PERBAIKAN TANAH DENGAN METODE CEMENTED SOIL TERHADAP DAYA DUKUNG
LATERAL 2008
190
ANALISIS PENGARUH PERUBAHAN CARA PEMBAYARAN TAGIHAN WIKA TERKAIT MATERIAL IMPOR DAN IMPLEMENTASI KEBIJAKAN KREDIT MODAL KERJA (KMK) TERKAIT PEMBAYARAN TAGIHAN VENDOR - SUBKONTRAKTOR TERHADAP LABA PADA PROYEK PLTU 2 SULUT 2X25 MW
2008
191 PEMILIHAN SISTIM STRUKTUR TAHAN GEMPA PADA BANGUNAN CRUSHER HOUSE PROYEK PLTU
2 SULUT 2X25 MW 2008
192 STUDI PERBANDINGAN STRUKTUR DRY COAL SHED PLTU 2 SULAWESI UTARA 2X25 MW 2008 193 PERBANDINGAN PEREKRUTAN TENAGA PROYEK ANTARA TENAGA PROYEK LOKAL DAN NON
LOKAL UNTUK MENGETAHUI EFISIENSI BIAYA TAK LANGSUNG PROYEK 2008 194 STABLE CATENARY CHAIN BUCKET SHIP-UNLOADER PADA PLTU LABUHAN ANGIN 2X115 MW 2008
195 OPTIMALISASI KONTRAKTOR KEET PROYEK 2008
196 PROGRAM DANA TABUNGAN KOMPENSASI BAGI TENAGA KERJA OUTSOURCING 2008 197 KAJIAN DAN KEMAJUAN PROYEK BERDASARKAN PENDEKATAN EARNED VALUE TERHADAP
PENJADWALAN ANGGARAN MELALUI MODEL SIMULASI MONTE CARLO 2008 198 ALTERNATIF KOLOM PRAKTIS MODIFIKASI PADA PROYEK APARTEMEN SERPONG TOWN SQUARE 2008
NO
JUDUL MAKALAH
TAHUN
KUMPULAN JUDUL MAKALAH CAPEG
199
ALTERNATIF SOLUSI PENYUSUNAN LAPORAN KEUANGAN ATAS PERBEDAAN PRINSIP AKUNTANSI AL JAZAIR DAN AKUNTANSI INDONESIA (PSAK 2004) UNTUK MENYUSUN LAPORAN KEUANGAN DI DUA NEGARA SERTA PERBANDINGANNYA DENGAN INTERNATIONAL FINANCIAL REPORTING STANDARDS
2008
200 ANALISIS KORELASI STOCK MATERIAL DENGAN KEMAJUAN PROGRESS PEKERJAAN DALAM CASH
FLOW MELALUI PENDEKATAN MRP & JIT 2008
201 PEMANFAATAN ENERGI MATAHARI UNTUK EFISIENSI ENERGI PADA GEDUNG ASURANSI ASTRA 2008
202 GREEN ROOFING APARTEMENT CERVINO VILLAGE 2008
203 EFISIENSI GROUP PILE DENGAN PERUBAHAN KONFIGURASI TIPE PILE PADA PROYEK JORR W1
RUAS KEBON JERUK - PENJARINGAN 2008
204 POLA PENGENDALIAN BBM KENDARAAN PADA PROYEK JEMBATAN LINTAS BARAT SULAWESI
SELATAN 2008
205 OPTIMALISASI KONTROL MOV DENGAN SISTEM SERIAL BUS CONTROL RS 485 PADA PROYEK
PIPANISASI BALONGAN - JAKARTA II 2008
206 EVALUASI HARGA POKOK PRODUKSI PROSES COATING 3LPE PADA PROYEK PIPANISASI
BALONGAN - JAKARTA II 2008
207 OPTIMALISASI WAKTU PRODUKSI COATING 3 LAYER PE DI PT. KHI PIPE INDUSTRIES (KRAKATAU
STEEL GROUP) 2008
208 OPTIMALISASI CATU DAYA 1000 KVA DENGAN PEMILIHAN METODE STARTING MOTOR SUCTION
PUMP 2008
209 SENSOR TEMPERATURE, TEKANAN DAN LEVEL (SISTEM INSTRUMENTASI) PADA STEAM DRUM
BOILER PLTU 2X115 MW LABUHAN ANGIN, SUMATERA UTARA 2008 210 DISTRIBUTED CONTROL SYSTEM DI PLTU LABUHAN ANGIN 2X115 MW 2008 211 WASTE BETON PADA A-JACK, PENYEBAB DAN ALTERNATIVE PENANGANANNYA 2008 212 TINJAUAN TEKNIS DAN PERENCANAAN FLYIN FORMWORK DENGAN MEMANFAATKAN STRUKTUR
KONSOL PENDEK UNTUK PENGECORAN TOP SLAB RAW WATER TANK 2008 213 STUDI PERBANDINGAN SISTEM STRUKTUR DAN BIAYA MAIN BUILDING POWER PLANT PLTU 2 X 25
MW SULAWESI UTARA ANTARA STRUKTUR BAJA DAN STRUKTUR BETON 2008 214 PRODUKSI DAN TRANSPORT MATERIAL ADDITIVE PADA PCC GRINDING 2008 215 PEMILIHAN SISTEM BEKISTING PONDASI GAS TURBIN DITINJAU 2008 216 PENGGUNAAN CAISSON SEBAGAI FORMWORK PEKERJAAN PILE CAP (PROYEK APPROACH
BRIDGE SURAMADU) SURABAYA 2008
217 OPTIMALISASI DESAIN TEMPORARY JETTY PLTU 2 KAPASITAS 2 X 25 MW SULAWESI UTARA 2008
218 METODE PEMANCANGAN DIAREA SWITCHYARD 2008
219 METODE PENGECORAN PADA STRUKTUR GAS TURBINE MAT FOUNDATION 2008 220 TEST & COMISSIONING SISTEM KELISTRIKAN COAL HANDLING DI PLTU LABUHAN ANGIN 2 X 115
MW SIBOLGA SUMATERA UTARA 2008
221 SINKRONISASI GENERATOR PADA PLTU LABUHAN ANGIN 2 X 115 MW 2008 222 PERANCANGAN SISTEM PENGECATAN UNTUK PRODUKSI TABUNG LPG 3 Kg KAPASITAS 5000
Pcs/Hari DI PABRIK PABRIKASI BAJA WIKA DME 2008
223 PEMILIHAN DAN INSTALASI FLOW SENSOR DAN TRANSMITTER PADA INLET DEAERATOR PROYEK
PLTU 2 X 115 MW LABUHAN ANGIN SIBOLGA 2008
224 MANAJEMEN RISIKO SEBAGAI ALAT PENGENDALI DI PT WIJAYA KARYA DAN WELCOMRISK
SEBAGAI ALAT BANTU PROSES MANAJEMEN RISIKO 2008
NO
JUDUL MAKALAH
TAHUN
KUMPULAN JUDUL MAKALAH CAPEG
226 ANALISA PERHITUNGAN BUNGA KMK UNTUK KONDISI PROYEK SURPLUS JETTY & MARINE WORK
PLTU 2 LABUAN - BANTEN (2 X 300 MW) 2008
227
ANALISA PERBANDINGAN PENGGUNAAN SAMBUNGAN PIPA BESI SISTEM COUPLING DENGAN SISTEM KOMBINASI LAS DAN FLANGES PADA PROYEK PEMBANGUNAN GEDUNG PERKANTORAN ASTRA
2008 228 APLIKASI INPUT KEBUTUHAN MANPOWER SEBAGAI RESOURCES PADA PRIMAVERA PROJECT
MANAGEMENT (VERSION 6.0) 2008
229 ANALISA EFISIENSI PADA POLA PEMBELANJAAN MANDOR, MANDOR PLUS, DAN SUBKONTRAKTOR
UNTUK PEKERJAAN BEKISTING DI PROYEK GEDUNG ASTRA 2008 230 STANDARISASI LAPORAN KEUANGAN TAMBAHAN UNTUK MEMPEROLEH LAPORAN KEUANGAN
YANG RELEVAN DAN RELIABEL 2008
231 OPTIMASI BORED PILE DENGAN TEST VIBRATING WIRE STRAIN GAUGES (VWSGs) 2008 232 PERENCANAAN DESAIN COFFERDAM SEBAGAI PENDUKUNG KONSTRUKSI OUTFALL PADA
PROYEK PLTU 2 LABUAN 2008
233 SISTEM SUPPORT KANTILEVER KAYU PADA PEKERJAAN FINISHING DINDING LUAR BANGUNAN -
PLTU 2 LABUAN BANTEN 2008
234 ANALISA DESIGN SHADING "PROYEK LEARNING CENTER WIKA" DENGAN APLIKASI ECOTECT 2008 235 PENGGANTIAN KAYU DENGAN PIPA UNTUK SUPPORT DIAGONAL FORMWORK PADA PROYEK PLTU
PALABUHAN RATU 2008
236 ANALISA PERBANDINGAN PENGGUNAAN BEKISTING KONVENSIONAL DENGAN SISTEM MESA
PADA PROYEK APARTEMEN PULOMAS CITY PARK 2008
237 PEMANFAATAN SISA POTONGAN BESI SIKU DALAM PEMBUATAN RACKING ANCHOR BOLT 2008 238 ANALISA PUSHOVER BERDASARKAN SRPMK DAN SRPMM PADA BANGUNAN CRUSHER HOUSE
PROYEK PLTU 2 SULUT 2 X 25 MW 2008
239 MANAJEMEN DAN PERHITUNGAN PRODUKTIVITAS AKIBAT DOWN TIME KAPAL KERUK PADA
PEKERJAAN PENGERUKAN 2008
240 ANALISA PERHITUNGAN KAPASITAS KAPASITOR PADA AREA MALL (ZONE B) 2008 241 PENERAPAN PENJADWALAN JUST INTIME PADA PEKERJAAN STRUKTUR BAJA DI PROYEK DC-2
JABABEKA 2008
242 PROSEDUR PELAKSANAAN PERPAJAKAN SEBAGAI ELEMEN DARI PENGENDALIAN INTERNAL 2008 243 ANALISIS DAN STRATEGI PEMASARAN JASA KONSTRUKSI BANGUNAN SIPIL PEMBANGKIT TENAGA
LISTRIK DI INDONESIA 2008
244 EVALUASI PENGGUNAAN BALOK U-SHELL PROYEK PARAGON CITY SEMARANG 2008 245 PENGGUNAAN RODA PADA BEKISTING KOLOM SEBAGAI PENGGANTI TOWER CRANE 2008 246 OPTIMASI BIAYA KONSTRUKSI PADA PROYEK BSD ENTERTAINMENT CENTER DENGAN
MENGGUNAKAN CONSTRAINT SIMULASI MONTE CARLO 2008
247 OPTIMALISASI MIX DESIGN BETON PADA PROYEK PLTU SULUT 2X25 MW 2008
248 OPTIMASI LAY OUT DERMAGA PLTU SULUT 2X25 MW 2008
249
OPTIMASI TEST VIBRATING WIRE STRAIN GAUGE (VWSG) PADA BORED PILE DENGAN PENGGUNAAN TELL-TALE DAN SONIC LOGGING - STUDI KASUS PROYEK APARTEMEN CERVINO VILLAGE
2008 250
ANALISA PERBANDINGAN TALENT IDEAL DENGAN TALENT AKTUAL MANAJER PROYEK BERDASARKAN TIPOLOGI TALENT GALLUP, BESERTA USULAN PENGEMBANGAN TALENT-NYA
2008
251 PSYCHOLOGICAL OWNERSHIP KARYAWAN WIKA 2008
252 ALTERNATIF PEKERJAAN SCREEDING KERAMIK MENGGUNAKAN METODE SISTEM SILO
DRY MORTAR PADA PROYEK CERVINO VILLAGE APARTEMEN JAKARTA 2008
NO
JUDUL MAKALAH
TAHUN
KUMPULAN JUDUL MAKALAH CAPEG
254 ANALISA METODE EVA & MVA TERHADAP KINERJA PT. WIKA 2008 255 OPTIMASI DESAIN ATAP KANOPI PADA PROYEK GEDUNG PERKANTORAN ASTRA 2008 256 ANALISA PERBANDINGAN SLUMP UNTUK PEKERJAAN MASS CONCRETE STRUKTUR
BANGUNAN PELIMPAH PROYEK BENDUNGAN JATIGEDE 2008
257 METODE KONSTRUKSI TRESTEL PERMANEN JETTY PADA PROYEK PLTU 2 SULUT 2008 258 ALTERNATIF DESAIN RECLAIM FEEDER CONVEYOR UNTUK EFISIENSI BIAYA PADA COAL
HANDLING PLTU 2 SULUT 2X25 MW 2008
259 ALTERNATIF METODE BUNGA DAN PEMBAYARAN PADA S2P MENGGUNAKAN ANALISIS
PRESENT VALUE OF MONEY 2008
260 PERSEPSI PEGAWAI WIKA TERHADAP PROGRAM PENGEMBANGAN 2008
261 PENGGUNAAN GEOMEMBRAN PADA BREAKWATER 2008
262 DAMPAK PP NO.51 TH.2008 TENTANG TARIF JASA KONSTRUKSI FINAL 3% DAN TARIF
TUNGGAL PPH BADAN 28% TERHADAP PROYEK PLTU 2 SULUT 2X25 MW 2008 263 ANALISA PROSES MONITORING ESKALASI PROYEK-PROYEK DI WIKA 2008 264 TRANSFORMASI KONSEP DESAIN KE DALAM PROSES KONSTRUKSI PROYEK L.J.
MERITUS SURABAYA 2008
265 ALTERNATIF EFISIENSI DESIGN SECANT PILE PADA PROYEK APARTEMEN CERVINO
VILLAGE 2008
266
EVALUASI SISTEM DAN PROSEDUR PENGADAAN MATERIAL BESI ANTARA PUSAT (DEPARTEMEN) DENGAN PROYEK - SUATU KAJIAN DAN STUDI KASUS PENGGELAPAN MATERIAL BESI DI PROYEK FLY OVER AMPLAS, MEDAN
2008
267 CALCULUX VS PERHITUNGAN MANUAL - KOMPARASI PENGHITUNGAN TINGKAT
ILUMINASI PADA DESAIN SISTEM PENCAHAYAAN 2008
268 ERECTION BALL MILL PADA CEMENT MILL 2008
269 OPTIMASI PEKERJAAN SHEET PILE TEMPORARY SUPPORT DENGAN METODE RAKER
SYSTEM DITINJAU DARI SEGI BIAYA DAN MUTU 2008
270 HIDRAULIC CALCULATION DAN WATER HAMMER ANALYSIS PADA PROYEK AVIASI DEPO
PENGISIAN PESAWAT UDARA KUALANAMU 2008
271 EXTENSI JARAK CONCRETE ANCHORAGE UNTUK KELANCARAN PRODUKSI BATUBARA 2008 272 VALUE ENGINEERING ANALISA JEMBATAN SEBAGAI ALTERNATIF PENGAMBILAN
KEPUTUSAN PADA PROYEK PERTAMINA FIELD LIRIK 2009
273 OPTIMALISASI DESAIN SISTEM PENAHAN ASAM PADA PROYEK RFO II PLANT GRESIK 2009 274 OPTIMALISASI METODE PELAKSANAAN PENINGGIAN EVALASI LANTAI GROUND FLOOR
GEDUNG PROSES UNIT 300 RFO PF 2 PLANT PT. PETROKIMIA GRESIK 2009 275 REDESAIN FASADE KACA AREA LOBI PADA PROYEK GEDUNG PERKANTORAN ASTRA 2009 276 PERCEPATAN PENGAJUAN MOCK UP DENGAN MENGGUNAKAN VISUALISASI 3D UNTUK
MENGURANGI RESIKO PEKERJAAN BERULANG 2009
277 VALUE ENGINEERING PADA MODIFIKASI CONVEYOR 2009
278 PENGGUNAAN GROUND VIBRATION MONITORING UNTUK MENENTUKAN TIPE PONDASI
TIANG 2009
279 SUBSTITUSI BORED PILE DENGAN DRIVING PILE PADA PROYEK PLTU KALIMANTAN
SELATAN 2 X 65 MW 2009
280 TINJAUAN ASPEK DISAIN ARSITEKTUR PADA PROYEK "DESIGN & BUILD" BANDAR UDARA
ADISOEMARMO SURAKARTA 2009
281 TINJAUAN ANALISA MATERIAL DINDING GRC (GLASFIBRE REINFORCED CEMENT) DAN
NO
JUDUL MAKALAH
TAHUN
KUMPULAN JUDUL MAKALAH CAPEG
282 PEMILIHAN TIPE PONDASI DENGAN METODE KERJA YANG EFISIEN PADA METODE TOP
DOWN PROYEK TRILLIUM OFFICE & RESIDENCE SURABAYA 2009 283 PERBANDINGAN BIAYA, MUTU, WAKTU BALOK KONVENSIONAL DENGAN PRESTRESS 2009 284 REDESAIN SISTEM ELEKTRIKAL MOTOR MIXER PADA PROYEK PENAMBAHAN CRUDE
TANK KAPASITAS 3 X @ 400 mb DI KILANG UP-VI BALONGAN 2009 285 SIRTU + AGITATOR > SPLIT + PASIR + MOLLEN = OK
SOLUSI PERCEPATAN PEKERJAAN BETON CYCLOPE K-125 PROYEK EMBUNG MURU 2009 286 MAKALAH "EKUALISASI PAJAK ATAS PEREDARAN USAHA" 2009 287 METODE PRECAST BEAM BANGUNAN NEW RELAY HOUSE PADA SWITCHYARD AREA 2009 288 "RAISED UP" LANTAI CIRCULATING WATER PUMP HOUSE 2009 289 EVALUASI PENGGUNAAN BEKISTING PERMANEN PELAT LANTAI 2009 290 METODE KERJA LIFTING STRUKTURE PEKERJAAN MODIFIKASI CIRCULATING WATER
PUMP HOUSE PADA PROYEK PEMBANGKIT LISTRI TENAGA GAS UAP MUARA KARANG 2009 291 OPTIMALISASI DESAIN GROUND ANCHOR JS. KALI BONE PADA PROYEK PEMBANGUNAN
JEMBATAN LINTAS BARAT PROVINSI SULAWESI SELATAN 2009
292 ALTERNATIF DESAIN STRUKTUR TRESTLE BRIDGE YANG PALING OPTIMUM 2009 293
VALUE ENGINEERING ANALISA PONDASI TANGKI SEBAGAI ALTERNATIF PENGAMBILAN KEPUTUSAN PADA PROYEK PENAMBAHAN TIGA UNIT TANGKI CRUDE KAPASITAS 3 X @400MB DI KILANG UP VI - PERTAMINA BALONGAN
2009
294 KAPASITAS DAYA DUKUNG TIANG PANCANG TUNGGAL BERDASARKAN STATIC LOAD
TEST DENGAN DYNAMIC LOAD TEST SERTA KELAYAKANNYA PADA KONDISI SAAT INI 2009 295 KONSTRUKSI TIMBUNAN JALAN DI ATAS TANAH LUNAK DENGAN PERKUATAN GALAR
KAYU (PROYEK PLTU 1 KALIMANTAN TENGAH 2X60MW) 2009
296 DESAIN FONDASI TIANG DENGAN PC PILE DAN TIANG BOR PADA TANAH LUNAK (STUDI
KASUS PROYEK MJIS KALIMANTAN SELATAN) 2009
297 CURTAIN WALL & FAKTOR DASAR PERANCANGAN (DESIGN) DAN PELAKSANAAN PADA
HIGH RISE BUILDING 2009
298 KISS (KOORDINASI, INTEGRASI, SINKRONISASI DAN SIMPLIKASI) DALAM PROSES
ENGINEERING MEMBUAT GAMBAR KERJA 2009
299 EFISIENSI ANTARA GYPSUM DAN ACIAN UNTUK PEKERJAAN EXPOE BALOK (STUDY
PROYEK APARTEMEN SOLO PARAGON) 2009
300 METODE PELAKSANAAN JEMBATAN VOIDED SLAB (BKT - 117) 2009 301 ANALISA STRESSING GIRDER DENGAN MENGGUNAKAN SISTEM BERTAHAP PADA
PROYEK JORR SEKSI W1 2009
302
PERBANDINGAN PELAKSANAAN PEKERJAAN BOX GIRDER DENGAN TRAVELER FORMWORK DESAIN CIC DAN CCC PADA PROYEK APROACH BRIDGE JEMBATAN SURAMADU
2009
303 ANALISA PENILAIAN PERUSAHAAN ATAS RENCANA PENYERTAAN PT WIJAYA KARYA
PADA PT MARGA NUJYA SUMO AGUNG 2009
NO
JUDUL MAKALAH
TAHUN
KUMPULAN JUDUL MAKALAH CAPEG
305 OPTIMASI STRUKTUR ATAS DENGAN TES SPECTRAL ANALYSIS OF SURFACE WAVES
(SASW) 2009
306
PEMANFAATAN H-BEAM (EX-SHORING PROTECTION) SEBAGAI FORMWORK SUPPORT STRUKTUR ATAP EMERGENCY D/G BUILDING (MUARA KARANG GAS POWER PLANT PROJECT)
2009
307 TINDAKAN KOREKSI UNTUK MENGENDALIKAN PEMAKAIAN MATERIAL BESI BETON
(PROYEK PLTGU MUARA KARANG) 2009
308 PENENTUAN FINAL SET FONDASI TIANG PANCANG 2009
309 BUKU MANUAL PEMASANGAN WIKA PANEL 2009
310 VALUE ENGINEERING : ANALISA DESAIN CONVEYOR PADA PROYEK P9/P10 ADDITIVE
PREPARATION & DOZING STATION PT. INDOCEMENT TUNGGAL PRAKASA, Tbk 2009 311 METODE KERJA PELAKSANAAN PEKERJAAN CATWALK SEBAGAI SOLUSI UNTUK
PERCEPATAN WAKTU PELAKSANAAN 2009
312
AGITASI SEBAGAI FAKTOR YANG PERLU DIPERTIMBANGKAN DALAM PERENCANAAN HARGA SATUAN DAN NEGOSIASI PEKERJAAN DREDGING, UNTUK MENGHADAPI TENDER - TENDER FIGHT
2009
313 EFISIENSI PEMAKAIAN SHORING PADA PEKERJAAN FINISHING DINDING LUAR
BANGUNAN (PROYEK PLTU 1 JAWA BARAT, INDRAMAYU POWER PLANT 3X330 MW) 2009 314 ANALISIS BEBAN KERJA (DILAKUKAN PADA TIM PEKERJA PROYEK PEMBANGUNAN RSIA
YPK MANDIRI PT WIJAYA KARYA) 2010
315 ALTERNATIF PEMAKAIAN BEKISTING TANGGA PADA KONDISI BANGUNAN YANG MEMILIKI TANGGA
TYPIKAL/SERAGAM 2010
316 OPTIMALISASI TIANG PANCANG MENGGUNAKAN VIBRATING WIRE STRAIN GAUGE (VWSG) TEST 2010
317 METODE PEMASANGAN BONNA PIPE 2010
318 MANAJEMEN RISIKO SEBAGAI PELUANG PENAMBAH MARGIN PADA PROYEK PENGGANTIAN
FASILITAS DPPU SOEKARNO HATTA 2010
319 ALTERNATIF METODE ERECTION JEMBATAN PELENGKUNG BAJA PADA PROYEK JEMBATAN LAU
LUHUNG 2010
320 OPTIMASI DESAIN STRUKTUR JEMBATAN PELENGKUNG 2010
321 PERENCANA STANDAR MODUL RUANG INSTALASI RAWAT INAP 2010 322 PEMANFAATAN SCORECARD SECARA OPTIMAL DENGAN MENERAPKAN METODE DMAIC 2010 323 DESIGN REVIEW DISPOSAL SYSTEM PADA PROYEK PEMBANGUNAN TERMINAL LPG
PRESSURIZED TANJUNG SEKONG-BANTEN 2010
324 DED KEBUTUHAN AIR PENDINGIN TANGKI LPG SPHERICAL PROYEK TERMINAL LPG TANJUNG
SEKONG 2010
325 ANALISIS TRANSIENT PADA PROYEK PENGGANTIAN FASILITAS DPPU SOEKARNO-HATTA 2010 326 GLOBAL POSITIONING SYSTEM SEBAGAI ALAT PANDU PADA MOTOR GRADER DALAM PEKERJAAN
SPREADING BASE COARSE 2010
327 DESIGN KABEL POWER PADA PROYEK PENGGANTIAN FASILITAS DPPU SOEKARNO-HATTA 2010 328 ANALISA PERUBAHAN WELDED JOINT MENJADI GROOVED COUPLING JOINT PADA FIRE WATER
NO
JUDUL MAKALAH
TAHUN
KUMPULAN JUDUL MAKALAH CAPEG
329 ANALISIS PRODUKTIVITAS DAN PROFITABILITAS PEGAWAI 2010 330 PENGARUH KETERLAMBATAN DOKUMEN LETTER OF CREDIT TERHADAP JADWAL KEDATANGAN
DAN BIAYA MATERIAL PADA PROYEK PEMBANGUNAN DPPU KUALANAMU MEDAN 2010 331 TINJAUAN TEKNIS EKONOMIS PENGGUNAAN HE TIPE PLATE UNTUK MENGGANTIKAN HE TIPE
SHELL & TUBE PADA PROYEK ALUMINA PLANT TAYAN 2010 332 ANALISA PENENTUAN KAPASITAS POMPA BASE OIL YANG OPTIMAL, STUDY KASUS : PROYEK
LOBP UPP JAKARTA PT PERTAMINA (PERSERO) 2010
333 TRIPPER CAR DESIGN 2010
334 USULAN KONTRAK PENGADAAN BARANG/EQUIPMENT UNTUK PROYEK MEKANIKAL ELEKTRIKAL 2010 335 CONSTRUCTION CLAIMS STRATEGY : A CASE STUDY IN PROJECT JN 46 2010 336 PERENCANAAN PENYANGGA TEROWONGAN DENGAN METODE EMPIRIS RMR, Q DAN GSI 2010 337 PERENCANAAN STRUKTUR JETTY PADA TENDER JETTY HOLCIM 2010 338 OPTIMALISASI KONFIGURASI SISTEM KONTROL PADA TENDER PLTU 1 KALIMANTAN TENGAH 2 X
60 MW 2010
339 OPTIMASI PENGGUNAAN WELLHEAD CONTROL PANEL UNTUK BEBERAPA WELLHEAD PADA
PROYEK PEMBANGUNAN CENTRAL PROCESSING PLANT (CPP) AREA GUNDIH 2010 340 OPTIMASI JARINGAN SISTEM KONTROL MOV PADA TENDER DEPOT LPG TANJUNG PRIOK 2010 341 PENGGUNAAN METODE CROSS-MATCHING ANTARA ACCRUAL BASIS DENGAN CASH BASIS
SEBAGAI ALAT MONITOR LABA PROYEK 2010
342
MIGRASI PENCATATAN MANUAL KE SISTEM KOMPUTERISASI DALAM PROSES KONSOLIDASI LAPORAN KEUANGAN DARI DUA MATA UANG BERBEDA PADA PROYEK EAST-WEST MOTORWAY ALGERIA
2010 343 KOMPARASI ANTARA PENGGUNAAN METODE PRECAST DENGAN METODE KONVENSIONAL PADA
BANGKU TRIBUN STADION DI PROYEK SPORT CENTER KUANTAN SINGINGI RIAU 2010 344 ANALISA NILAI CADANGAN RESIKO YANG BERHUBUNGAN DENGAN BIAYA PADA PROYEK -
PROYEK GEDUNG DENGAN SIMULASI MONTE CARLO 2010
345 EFISIENSI ANGGARAN BIAYA PADA PEMBUATAN LISTPLANK DENGAN SISTEM PRECAST PADA
PROYEK BANDAR UDARA MEDAN BARU PAKET 7A 2010
346 PROGRAM MANAJEMEN PERSEDIAAN GUDANG SEBAGAI ALAT BANTU ADMINISTRATIF DAN
KONTROL MATERIAL 2010
347 KODEFIKASI WARNA DALAM PENGENDALIAN PDP SEBAGAI SISTEM PENDETEKSI DINI UNTUK
MANAJEMEN 2010
348 STRATEGI PENGENDALIAN MUTU TERHADAP EFISIENSI BIAYA CLOSING 2010 349 MODIFIKASI TEMPORARY BRIDGE UNTUK PEMBANGUNAN STRUKTUR UNDERPASS DI STASIUN
CIREBON 2010
350 ANALISIS TAHAPAN PELAKSANAAN PEKERJAAN PADA PROYEK STASIUN CIREBON DENGAN
METODE SIMULASI 2010
351 PROGRAM PENGOLAHAN MANAJEMEN PRODUKSI, TEKNIK & PENGADAAN PADA PROYEK
EIGHTRIUM 2010
352 STUDI KOMPARATIF BROJONG BIASA DAN BROJONG BER-EKOR SEBAGAI PERKUATAN TIMBUNAN 2011 353 STRATEGI KLAIM CONTRACTOR ALL RISK (CAR), STUDI KASUS : PROYEK RSIA YPK MANDIRI 2011 354 PERANCANGAN SISTEM INFORMASI MANAJEMEN APLIKASI KREDIT (SIMAK) DALAM RANGKA 2011 355
EARLY WARNING SYSTEM BIAYA MATERIAL AKIBAT POLA BELANJA SWAKELOLA UNTUK
MENINGKATKAN KINERJA HASIL USAHA PADA PROYEK RUSUNAMI PUNCAK PERMAI APARTEMEN SURABAYA
2011 356 ANALISIS IMPLEMENTASI ACCPAC MENGGUNAKAN METODE PILOT PROJECT 2011
NO
JUDUL MAKALAH
TAHUN
KUMPULAN JUDUL MAKALAH CAPEG
357 KOMPARASI PENGGUNAAN KONDUKTOR TEMBAGA DAN ALUMINIUM UNTUK SISTEM PENTANAHAN 2011 358 OPTIMASI DESAIN FILTER HARMONIK PADA PROYEK CHEMICAL GRADE ALUMINA TAYAN,
KALIMANTAN BARAT 2011
359 PERENCANAANPERHITUNGAN SERTA RANCANG BANGUN SISTEM PENGKONDISIAN UDARA PADA
COLD STORAGE DI PT SYGENTA PASURUAN JATIM 2011
360 PENGGUNAAN METODE HOT TAPPING PAAD PROYEK REOKASI DEPOT LPG TANJUNG PRIOK 2011 361 SUBMARINE PIPELINE DESIGN - RANCANGAN JARINGAN PIPA DI DASAR LAUT 2011 362 TINJAUAN TEKNIS EKONOMIS PENGGUNAAN FLUIDIZED BED DRYER (FBD) PADA PEMBANGKIT
LISTRIK TENAGA UAP (STUDI KASUS PROYEK IPP PLTU MULUT TAMBANG 2 X 300 MW) 2011 363 INTEGRASI SISTEM KONTROL FIRE AND GAS PADA PROYEK TERMINAL LPG TANJUNG SEKONG 2011 364
PERBANDINGAN PEMAKAIAN STERILIZER TIPE VERTIKAL DAN HORIZONTAL PADA PABRIK KELAPA SAWIT DAN ANALISA PENGARUH TEKANAN DAN WAKTU PEREBUSAN TERHADAP KADAR AIR DAN KADAR MINYAK DI STASIUN PEREBUSAN
2011
365 METODE PENGGANTIAN DBB VALVE 20" DAN MANUAL VALVE 20" PADA LINE EXISTING DI
CHAMBER AREA BANDARA SOEKARNO - HATTA 2011
366 MENJADIKAN COMPANY PROFILE SEBAGAI SENJATA STRATEGI PERUSAHAAN 2011 367 APLIKASI DEORADAR DLAM REVIEW DESAIN BORED PILE 2011 368 REVIEW DESIGN PROYEK PERBAIKAN JALANN R.E. MARTADINATA 2011 369 ALTERNATIF DESAIN POMPA LPG FILLING "PROYEK RELOKASI DEPOT LPG TANJUNG PRIOK
BESERTA SARFAS PENUNJANGNYA" 2011
370 ANALISA DESAIN DAN BIAYA KONSTRUKSI SCREW COMPRESSOR PADA PROYEK TAYAN 2011 371 DESAIN VERTICAL LIFT FIXED WHEEL GATE UNTUK "PERUSAHAAN 1 & 2 HYDROELECTRIC POWER
PLANT CONSTRUCTION PROJECT" 2011
372 PROSEDUR PERPINDAHAN SISTEM KONTROL SERTA INTERKONEKSI DENGAN INSTRUMENT
EKSISTING "PROYEK PENGGANTIAN FASILITAS DPPU SOEKARNO-HATTA" 2011 373 KAJIAN OPTIMASI PENGENDALIAN SUHU DAN SETTING-TIME BETON, SERTA PERCEPATAN
PEKERJAAN PONDASI RAFT DENGAN STUDI KASUS PROYEK KEMANG VILLAGE MALL 2011 374 LAYERING PLACEMENT SEBAGAI ALTERNATIF METODE PENGECORAN MASS CONCRETE
STRUKTUR SPILLWAY PROYEK BENDUNGAN JATIGEDE 2011
375 PENGGANTIAN PIPA PSL 2 DENGAN PIPA PSL 1 2011
376 EKUALISASI PAJAK ATAS BIAYA SUBKONTRAKTOR DALAM UPAYA MEMINIMALISIR KERUGIAN
PERPAJAKAN PT WIKA GEDUNG 2011
377 REVIEW DESIGN PIER FLY OVER DI ATAS UNDERPASS CASABLANCA 2011 378 METODE PERHITUNGAN DAN PEMILIHAN FAN (STUDY KASUS INDUCED DRAFT FAN PLTU
KALIMANTAN SELATAN 2 X 65 MW 2011
379 PENGGUNAAN TEKNOLOGI WIRELESS PADA FIELD INSTRUMENT 2011 380 STRATEGI TENDER DALAM MENGHADAPI KOMPETISI BISNIS EPC BERDASARKAN ANALISA
MENANG KALAH DI DEPARTEMEN ENERGI 2011
381 ANALISA PERBANDINGAN PENGGUNAAN PABX, HYBRID IP PBX, DAN IP PBX MURNI PADA SISTEM
TELEPON 2011
382 ANALISA TEKNIK DAN EKONOMI PENGGUNAAN BUSDUCT ALUMUNIUM DIBANDINGKAN DENGAN
BUSDUCT TEMBAGA PADA PEMBANGUNAN GEDUNG TTC TELKOMSEL SURABAYA 2011 383 OTOMASI BISNIS FLOW DPPU SOEKARNO - HATTA DENGAN TERMINAL AUTOMATION SYSTEM
(TAS) 2011
384 OPTIMALISASI JARINGAN SISTEM AUTOMATIC TANK GAUGING (ATG) PADA PALM OIL REFINERY
COMPLEX PROJECT UNTUK PT GOLDEN OPE NUSANTARA 2011
385 ANALISIS TAX REVIEW DALAM RANGKA MEMINIMALISASI BEBAN PAJAK PENGHASILAN PASAL 21
NO
JUDUL MAKALAH
TAHUN
KUMPULAN JUDUL MAKALAH CAPEG
386 IMPLEMENTASI TEKNOLOGI CLOUD STORAGE DI PT WIJAYA KARYA (PERSERO) Tbk. 2011 387 PROSEDUR PELAKSANAAN KEGIATAN KOMISIONING PROYEK EPC 2011 388
ANALISA HARGA SATUAN BARU PEKERJAAN URUGAN DAN PEMADATAN TANAH DALAM UPAYA KLAIM AKIBAT CHANGE ORDER PENINGGIAN ELEVASI PROYEK RELOKASI DEPOT LPG TANJUNG PRIOK BERIKUT SARFAS PENUNJANGNYA
2011 389 APLIKASI DATABASE SEBAGAI ALAT BANTU MONITORING PENGADAAN MATERIAL 2011 390 DESAIN TIANG PANCANG PADA TANK FARM DAN METODE SEQUENCE DI PROYEK PALM OIL
REFINERY COMPLEX KOTABARU KALIMANTAN SELATAN 2011
391 METODE UNLOADING APRON FEEDER CONVEYOR DARI LANDING CRAFT TANK PADA PROYEK PT
ADARO INDONESIA 2011
392 OPTIMALISASI PEMILIHAN AIR DRYER PADA OIL FREE COMPRESSOR SYSTEM DI PROYEK
ALUMINA TAYAN 2011
393 ANALISIS RISIKO PROSES IMPOR MATERIAL UTAMA (BOILER, TURBINE, GENERATOR) PROYEK
PLTU 2 SULAWESI UTARA 2 X 25 MW 2011
394 OPTIMASI DESAIN PONDASI "LIGHT WEIGHT BUILDING" PADA TANAH LUNAK STUDI KASUS
PROYEK PALM REFINARY, PULAU LAUT 2011
395 PERBANDINGAN DUA ALTERNATIF METODE KERJA PROTEKSI SEMENTARA PEKERJAAN
BREASTING DOLPHIN BARU PADA PROYEK LATI UPGRADE IV PT BERAU COAL 2011 396 REVIEW METODE PELAKSANAAN KONSTRUKSI JEMBATAN PROYEK JEMBATAN SEI TAYAN,
KALIMANTAN BARAT 2011
397 VISUALISASI INSTRUKTUR KERJA (IK) MASTER 2011
398 PENGAWASAN PENGAJUAN DAN PELAKSANAAN PROYEK INVESTASI 2011 399 PENERAPAN PSAK TERKINI PADA PENYAJIAN LAPORAN KEUANGAN PROYEK NORMALISASI
KALIGARANG 2011
400 SMART GOAL SEBAGAI SALAH SATU KONSEP MENEROBOS PASAR LUAR NEGERI 2011 401 METODE EVALUASI KUAT TEKAN BETON MENGGUNAKAN APLIKASI PROGRAM VISUAL BASIC 6 2011 402 REVIEW DESIGN STRUKTUR MAIN ROAD PENAMBAHAN LAJUR (PELEBARAN KELUAR) RUAS
TMII-CIBUBUR (KM 03+800 - KM 13+800) JALUR B PADA JALAN TOL JAGORAWI 2011 403 PERBAIKAN TANAH SEBAGAI VALUE ENGINEERING TERHADAP PONDASI OCS 2011 404 DAMPAK KONVERGENSI IFRS TERHADAP LAPORAN POSISI KEUANGAN (NERACA) DAN RASIO
KEUANGAN DEPARTEMEN BANGUNAN GEDUNG DESEMBER 2010 2011 405 PERANCANGAN SISTEM INFORMASI UTANG DI DEPARTEMEN BANGUNAN GEDUNG 2011 406 METODE CURING MASS CONCRETE DENGAN MENGGUNAKAN STYROFOAM 2011 407 KAJIAN PENGGUNAAN DOUBLE WALL STEEL SHEET PILE SEBAGAI COFFERDAM PADA
KONSTRUKSI OUTFALL TANJUNG PRIOK GFPPE PROJECT 2011
408 MENGUBAH RISIKO MENJADI PELUANG (REVIEW DESIGN STRUKTUR PIER JEMBATAN SEIGUGUS
TANJUNG PINANG) 2011
409 ANALISIS PENGGUNAAN DEAD ANCHOR DI JETTY PULAU LAUT 2011 410 PROPOSAL STANDARISASI KEET PROYEK YANG MODULAR DENGAN SISTEM KNOCKDOWN 2011 411 PENERAPAN SISTEM RATING UNTUK SERTIFIKASI GREEN BUILDING COUNCIL INDONESIA (GBCI)
PADA PROYEK INTEGRATED FACULTY CLUB UNIVERSITAS INDONESIA 2011 412 OPTIMALISASI SISTEM PERPIPAAN FUEL OIL SYSTEM PADA PLTU KETAPANG 2X10 MW 2011 413 ANALISA PEMILIHAN MATERIAL SUBSTITUSI UNTUK SPG-E-G Mn (Carbon Steel) PADA SISTEM
PERPIPAAN DI PROYEK ALUMINA TAYAN 2011
414
LEMBAR REKAPITULASI SURAT JALAN (DOCKET) MATERIAL BETONUNTUK MENGEFEKTIFKAN PEKERJAAN KEUANGAN & AKUNTANSI DALAM MEMBUKUKAN TRANSAKSI UTANG PADA STUDI KASUS PROYEK KEMANG VILLAGE MALL
Tim Program Megister
1 ANALISA SISTEM DRAINASE TOL SUMO SEKSI IA ANDRIANTO WIDHI NUGROHO, ST
2
OPTIMALISASI PENGGUNAAN PVD (Prefabricated Vertical Drain) PADA PROYEK PEMBANGUNAN JALAN
TOL SAURABAYA - MOJOKERTO
HENKY ADI BERLIANO, ST
3
KORELASI ANTARA SIFAT - SIFAT TANAH DAN DAYA
DUKUNG LATERAL MUHAMAD ZAENURI, ST
4
STUDI REKAYASA DESAIN PLANTER BOX DROP
OFF ANDI PRASETYO, ST
5
OPTIMALISASI PORTAL HOIST UNTUK ERECTION [CU GIRDER PROYEK PEMBANGUNAN FLY OVER
AMPLAS MEDAN
BAYU BUDI PRASETYO
6
OPTIMASI BIAYA PEKERJAAN GROUND ANCHOR BERDASARKAN HASIL PROVING TEST PROYEK
PARAGON CITY SEMARANG
ARDI NOVIANTO
7
PENGARUH PENERAPAN PRINSIP 80/20 PARETO TERHADAP PERFORMA PROYEK SEMI DESIGN & BUILD (REHABILITASI PASAR IMOGIRI BANTUL)
RUDY HARIANTO
8
PROGRAM PENGENDALIAN BESI BERBASIS DELPHI
DAN MYSQL BUHARIANTO
9
ANALISA PERBANDINGAN PROFIL BAJA PADA BALOK & PENGGUNAAN SPANDECK PADA PELAT
BETON DENGAN BETON KONVENSIONAL
OKE NOVIANTO
10
APLIKASI PENGGUNAAN PRECAST HALF SLAB PRE
STRESS (PROYEK PARAGON CITY SEMARANG) AHMAD NURJAMAN
11
ERECTION STEEL FLUE LINER; STUDI KASUS STRUKTUR STEEL FLUE LINER (H=150M; D=2.4M)
PROYEK PLTU LABUHAN ANGIN SIBOLGA, TAPANULI TENGAH SUMATRA UTARA
RETHON MULIANA CANOPY, ST.
12
TURBINE INSTALLATION : METHOD, PROBLEMS,
AND SOLUTION BAGUS SETYO WICAKSONO
13
EFISIENSI PEKERJAAN COFFERDAM
MENGGUNAKAN GABION ISMANUEL LELOMALI
14
METODE PELAKSANAAN PADA PEKERJAAN
PELEDAKAN BATUAN "ROCK BLASTING" YOHAN ROY GRATIA
15
KAJIAN ANALISA PERHITUNGAN DAN MANAJEMEN
RESIKO PADA PEKERJAAN ROCK BLASTING PANJI DWIJAYAGUNA
JUDUL MAKALAH CAPEG ANGKT' 17
16
ALTERNATIF DESAIN DERMAGA DENGAN STRUKTUR DECK ON PILE PADA PROYEK PEMBANGUNAN PELABUHAN CALANG, NAD
M. AQROBIN
17
ANALYSIS PERBANDINGAN METODE MICROTUNNELING (MTBM) DENGAN HORISONTAL
AUGER BORING UNTUK PEMASANGAN PIPA DIA 1200 mm DAN 2000mm (PADA PROYEK RIYADH
PIPELINE)
DENNY EKA BUDHIARTO
18
PENINGKATAN EFISIENSI SISTEM DAYA LISTRIK MENGGUNAKAN TABEL COS PHI DAN SIMULASI
ETAP 4.00
BUDI DANIANTO
19
OPTIMALISASI DESAIN SISTEM PROTEKSI KATODIK
PADA PROYEK PIPANISASI BALONGAN - JAKARTA II BUDHI SATRIYA
20
OPTIMALISASI DENGAN SISTEM METERING TERMINAL TRANSIT UTAMA BALONGAN PADA
PROYEK PIPANISASI BALONGAN - JAKARTA II
DOMINICUS ADHITYA CHANDRA WILAGA
21 ANALISA EKONOMIS GARDU INDUK FERDI FIRDAUSY
22
KOMPARASI PRODUKTIVITAS TENAGA KERJA ALJAZAIR DENGAN TENAGA KERJA INDONESIA
(STUDI KASUS PADA EAST-WEST MOTORWAY ALGIERS)
THONY ARISANO
23 GAS INSULATED SWITCHGER (GIS) SUYATMOKO
24
DESAIN FIRE PROTECTION SYSTEM PADA MCC
ROOM DI PROYEK OVERLAND COVEYOR ADARO DHONNY ARIYANTO SIGIT
25
ANALISA RESIKO MANAJEMEN PERALATAN
KONSTRUKSI BERDASARKAN CONTRACT LEND DEDENG JEFRI ARTHUR
26
ALTERNATIF DESAIN DERMAGA PENAHAN TANAH
PROYEK JALAN RESIDENCY BRUNEI HENDRY FERMADI
27
PEMILIHAN APLIKASI DISTRIBUSI PEMBEBANAN GROUP PILE DIBANDINGKAN SINGEL PILE PADA
PONDASI AREA TRESLE BRIDGE
M. DEDEN MULIARSYAH
28
EFISIENSI PRODUKSI ASPAL HOTMIX (PROYEK REHABILITASI DAN REKONSTRUKSI JALAN
NASIONAL - NAD)
RIDWAN SYARIFUDDIN ZUHRI
29
DESAIN TIANG PANCANG KOMPETITIF (STUDI
KASUS JETTY DERMAGA BATUBARA GRESIK) YANUAR BUDIMAN
30 HANDLING PROLONGATION CLAIM CRISHTANTO NUGROHO
31
OPTIMALISASIPEMILIHAN MATERIAL CASING UNTUK PERLINTASAN JALAN RAYA DAN JALAN KERETA API MENGGUNAKAN STANDARD API RP
1102 PADA PROYEK PIPANISASI BALONGAN - JAKARTA II
FITRIANA AGUNG NUGROHO
32
MODEL STRATEGI PENAWARAN BERDASARKAN EXPECTED PROFIT MAXIMUM UNTUK PROYEK
KONSTRUKSI
DANY PUTU WIRAWAN
33
ANALISIS PERBANDINGAN AJACK CILACAP
√ √ √ √ √ √ √ √ √ √ √ √ √ SOFT COPY
√
√
√
√
di pinjem pak djoko
√ √ √ √ √ √ √ √ √ √ √
1
ANALISA JATUH TEGANGAN TERHADAP PENGURANGAN TRANSFORMATOR PADA SETIAP
GENERATOR
RADITA HARIO UTOMO
2
ANALISA VALUE ENGINEERING PROYEK PENYELESAIAN TERMINAL UTARA BANDARA ADI SOEMARMO SURAKARTA MELALUI PROSES DESIGN
- BUILD
BOGI DWI CAHYANTO
3
PEMILIHAN SISTEM PROTEKSI KATODIK PADA SISTEM PERPIPAAN DARAT (UNDERGROUND
PIPELINE)
AMIN BUDI SANTOSO
4
OPTIMALISASI DESIGN GROUNDING GRID SUBSTATION PADA PLTU 2 SULAWESI UTARA DENGAN METODE PROGRAMMING GUI MATLAB
RAHAYU DWI CAHYO
5 PENGGUNAAN PC PRESLAB PADA PROYEK BSD
ENTERTAINMENT CENTER YAYAN NURDIANSYAH
6 OPTIMASI PEKERJAAN GROUND ANCHOR PADA
PROYEK PARAGON CITY SEMARANG ALI ABRAR SITEPU
7
LAPORAN SUMBER DAN PENGGUNAAN KAS SEBAGAI ALAT UNTUK MENGANALISIS KEBUTUHAN
KAS BERDASARKAN TINGKAT PRODUKSI
ADJI ADITYA REZA P.
8 PEMBUATAN BALANCED SCORECARD PABRIK
FABRIKASI BAJA SRI HARTATY
9
PERANCANGAN DESIN TATA LETAK STASIUN KERJA PABRIK DENGAN METODE KESEIMBANGAN LINI
UNTUK PRODUKSI TABUNG GAS DI PABRIK PABRIKASI BAJA WIKA DME
DONNY R.
10 PENGENDALIAN BIAYA TIDAK LANGSUNG PADA
PROYEK CAUSEWAY SURAMADU BELA PRAKOSA
11
PENERAPAN EARLY WARNING SYSTEM DENGAN VISUALISASI 3 DIMENSI MENGGUNAKAN APLIKASI
VICO SOFTWARE
RIAN CHOIRUL ANNAM
12
UPAYA PENGENDALIAN BESI BETON UNTUK MENEKAN WASTE MENCAPAI 1 % DI PROYEK PLTU
PALABUHAN RATU
DANANG HERADI PERDANA
13 METODE KERJA PENGGALIAN CYCLE WATER PIT
DAN TURBIN GENERATOR FOUNDATION ARIEF THIRTANA
JUDUL MAKALAH CAPEG ANGKT' 18
14 PENGGUNAAN MECHANICAL JOINT PADA PROYEK
PLTU PALABUHAN RATU ARDIAN PRIYANDANA
15
METODE PELAKSANAAN PEKERJAAN BORE PILE DENGAN KAJIAN PRODUKTIVITAS MESIN BOR (Studi
pada Proyek Suramadu Approach Bridge)
FAJAR ARIYANTO
16
EFISIENSI PEMAKAIAN ANGKUR HIDUP - MATI PADA GIRDER BENTANG 30.8 METER (Proyek Pembangunan
JKT Outter Ring Road (JORR) Seksi W1 Ruas Kebon Jeruk-Penjaringan)
AFIF ADHIYAN
17 METODE BEKISTING KANTILERVER (SISTEM
GANTUNG) [Fly Over Amplas - Medan] PUNTO BANGUN WICAKSONO
18
CRITICAL POINT INTERNAL CONTROL DALAM TRANSAKSI UNTUK PROCUREMENT DI LEBIH DARI
DUA PIHAK (DUA NEGARA)
PRIYO JATMIKO S.
19
PELUANG KLAIM PENYESUAIAN HARGA (ESKALASI)DALAM PROYEK PLTU SULUT DARI
SUDUT REGULASI DAN KONTRAK
WIDI SEDIANTO
20
PRINSIP KETERBUKAAN INFORMASI PADA BADAN USAHA MILIK NEGARA YANG BERSTATUS
PERUSAHAAN PERSEROAN TERBUKA
WISMA UBAYAJI
21
PERUBAHAN PUTARAN KERJA FAN UNTUK MENDAPATKAN PENGHEMATAN BIAYA PADA
PROYEK RFO PF-II PT PETROKIMIA GRESIK
ERY MARTDE ELSANICO
22 DESAIN KETEBALAN INSULASI SHELL TANGKI
PENYIMPANAN AMONIAK FEDRIANTO
23 DESAIN APRON FEEDER PADA CLAY CRUSHER PRADITYATAMA 24 OPTIMALISASI DESIGN GAS OIL STORAGE TANK PT
SHELL INDONESIA KAPASITAS 17864 m³ M.SAZALI NUR ROKHMAN 25 KEUNGGULAN SISTEM VERTIKAL STERILIZER PADA
PABRIK KELAPA SAWIT MUSTOPO
26
PENGARUH PERBAIKAN TANAH DENGAN METODE CEMENTED SOIL TERHADAP DAYA DUKUNG
LATERAL
R. ABI LANABORA
27
ANALISIS PENGARUH PERUBAHAN CARA PEMBAYARAN TAGIHAN WIKA TERKAIT MATERIAL
IMPOR DAN IMPLEMENTASI KEBIJAKAN KREDIT MODAL KERJA (KMK) TERKAIT PEMBAYARAN TAGIHAN VENDOR - SUBKONTRAKTOR TERHADAP
LABA PADA PROYEK PLTU 2 SULUT 2 X 25 MW
DANANG MUKTI ALI
28
PEMILIHAN SISTIM STRUKTUR TAHAN GEMPA PADA BANGUNAN CRUSHER HOUSE PROYEK PLTU 2
SULUT 2X25 MW
29 STUDI PERBANDINGAN STRUKTUR DRY COAL SHED
PLTU 2 SULAWESI UTARA 2X25 MW YONAS BIMA ERTANTO
30
PERBANDINGAN PEREKRUTAN TENAGA PROYEK ANTARA TENAGA PROYEK LOKAL DAN NON LOKAL
UNTUK MENGETAHUI EFISIENSI BIAYA TAK LANGSUNG PROYEK
HASBI DZIKRAT
31 STABLE CATENARY CHAIN BUCKET
√ √ √ √ √ √ √ √ √ √ √ √ SOFT COPY
√ √ √ √ √ √ √ √ √
√
√
1 OPTIMALISASI KONTRAKTOR KEET PROYEK WIDYONO ADHI PERMADI
2 PROGRAM DANA TABUNGAN KOMPENSASI BAGI
TENAGA KERJA OUTSOURCING BUDHI PRASETYO
3
KAJIAN DAN KEMAJUAN PROYEK BERDASARKAN PENDEKATAN EARNED VALUE TERHADAP PENJADWALAN ANGGARAN MELALUI MODEL
SIMULASI MONTE CARLO
RENALDI
4 ALTERNATIF KOLOM PRAKTIS MODIFIKASI PADA
PROYEK APARTEMEN SERPONG TOWN SQUARE SYAMSUL BACHRI YANUAR
5
ALTERNATIF SOLUSI PENYUSUNAN LAPORAN KEUANGAN ATAS PERBEDAAN PRINSIP AKUNTANSI AL JAZAIR DAN AKUNTANSI INDONESIA (PSAK 2004) UNTUK MENYUSUN LAPORAN KEUANGAN DI DUA
NEGARA SERTA PERBANDINGANNYA DENGAN INTERNATIONAL FINANCIAL REPORTING
STANDARDS
FARIDA ERNAWATI DIAH
6
ANALISIS KORELASI STOCK MATERIAL DENGAN KEMAJUAN PROGRESS PEKERJAAN DALAM CASH
FLOW MELALUI PENDEKATAN MRP & JIT
BRAHMA SATRYA
7 PEMANFAATAN ENERGI MATAHARI UNTUK
EFISIENSI ENERGI PADA GEDUNG ASURANSI ASTRA HAEKAL SALEH BATATY
8 GREEN ROOFING APARTEMENT CERVINO VILLAGE ARIF AJI MUKTI
9
EFISIENSI GROUP PILE DENGAN PERUBAHAN KONFIGURASI TIPE PILE PADA PROYEK JORR W1
RUAS KEBON JERUK - PENJARINGAN
I GUSTI AGUNG USADHANA
10
POLA PENGENDALIAN BBM KENDARAAN PADA PROYEK JEMBATAN LINTAS BARAT SULAWESI
SELATAN
AKBAR DWI NUGRAHA
11
OPTIMALISASI KONTROL MOV DENGAN SISTEM SERIAL BUS CONTROL RS 485 PADA PROYEK
PIPANISASI BALONGAN - JAKARTA II
ARIP ROCHMANTO
JUDUL MAKALAH CAPEG ANGKT' 19
12
EVALUASI HARGA POKOK PRODUKSI PROSES COATING 3LPE PADA PROYEK PIPANISASI
BALONGAN - JAKARTA II
BUDI NUR A.
13
OPTIMALISASI WAKTU PRODUKSI COATING 3 LAYER PE DI PT. KHI PIPE INDUSTRIES (KRAKATAU STEEL
GROUP)
M. KHOLDUN
14
OPTIMALISASI CATU DAYA 1000 KVA DENGAN PEMILIHAN METODE STARTING MOTOR SUCTION
PUMP
INDRA SETIYAWAN
15
SENSOR TEMPERATURE, TEKANAN DAN LEVEL (SISTEM INSTRUMENTASI) PADA STEAM DRUM
BOILER PLTU 2X115 MW LABUHAN ANGIN, SUMATERA UTARA
I PUTU ANTON WIJAYA
16 DISTRIBUTED CONTROL SYSTEM DI PLTU LABUHAN
ANGIN 2X115 MW EKO PRASETYO
17 WASTE BETON PADA A-JACK, PENYEBAB DAN
ALTERNATIVE PENANGANANNYA EKO WIDODO
18
TINJAUAN TEKNIS DAN PERENCANAAN FLYIN FORMWORK DENGAN MEMANFAATKAN STRUKTUR KONSOL PENDEK UNTUK PENGECORAN TOP SLAB
RAW WATER TANK
ANDRY PUTRA STYAWAN
19
STUDI PERBANDINGAN SISTEM STRUKTUR DAN BIAYA MAIN BUILDING POWER PLANT PLTU 2 X 25
MW SULAWESI UTARA ANTARA STRUKTUR BAJA DAN STRUKTUR BETON
ADI IRMAWANTO
20 PRODUKSI DAN TRANSPORT MATERIAL ADDITIVE
PADA PCC GRINDING ANDRIANTO NUGROHO
21 PEMILIHAN SISTEM BEKISTING PONDASI GAS
TURBIN DITINJAU ARIES KURNIAWAN
22
PENGGUNAAN CAISSON SEBAGAI FORMWORK PEKERJAAN PILE CAP (PROYEK APPROACH BRIDGE
SURAMADU) SURABAYA
DEDDI FRANGKY SINAGA
23 OPTIMALISASI DESAIN TEMPORARY JETTY PLTU 2
KAPASITAS 2 X 25 MW SULAWESI UTARA BAKA KUSUMA DIKOMARA
25 METODE PENGECORAN PADA STRUKTUR GAS
TURBINE MAT FOUNDATION RINGGO RADETYO
26
TEST & COMISSIONING SISTEM KELISTRIKAN COAL HANDLING DI PLTU LABUHAN ANGIN 2 X 115 MW
SIBOLGA SUMATERA UTARA
IVAN CHANAVI
27 SINKRONISASI GENERATOR PADA PLTU LABUHAN
ANGIN 2 X 115 MW DWIKO RIYONO
28 SALMAN BERBUDI
29
PERANCANGAN SISTEM PENGECATAN UNTUK PRODUKSI TABUNG LPG 3 Kg KAPASITAS 5000 Pcs/Hari DI PABRIK PABRIKASI BAJA WIKA DME
JOKO TRISNANTO
30
PEMILIHAN DAN INSTALASI FLOW SENSOR DAN TRANSMITTER PADA INLET DEAERATOR PROYEK
PLTU 2 X 115 MW LABUHAN ANGIN SIBOLGA
DEDDY ANWAR
31
MANAJEMEN RISIKO SEBAGAI ALAT PENGENDALI DI PT WIJAYA KARYA DAN WELCOMRISK SEBAGAI
ALAT BANTU PROSES MANAJEMEN RISIKO
√ √ √ √ √ √ √ √ √ SOFT COPY
√ √ √ √ √ √ √ √ √
√
√
√
1 EVALUASI KINERJA ALAT BERAT PADA PEKERJAAN
TIMBUNAN BIASA AGUS SULISTYA
2
ANALISA PERHITUNGAN BUNGA KMK UNTUK KONDISI PROYEK SURPLUS JETTY & MARINE WORK PLTU 2 LABUAN -
BANTEN (2 X 300 MW)
ANDHY PRASETYA
3
ANALISA PERBANDINGAN PENGGUNAAN SAMBUNGAN PIPA BESI SISTEM COUPLING DENGAN SISTEM KOMBINASI LAS
DAN FLANGES PADA PROYEK PEMBANGUNAN GEDUNG PERKANTORAN ASTRA
ARIF WAHYUDIN, ST.
4
APLIKASI INPUT KEBUTUHAN MANPOWER SEBAGAI RESOURCES PADA PRIMAVERA PROJECT MANAGEMENT
(VERSION 6.0)
AWNOR ROFIK
5
ANALISA EFISIENSI PADA POLA PEMBELANJAAN MANDOR, MANDOR PLUS, DAN SUBKONTRAKTOR UNTUK PEKERJAAN
BEKISTING DI PROYEK GEDUNG ASTRA
BEPRI BNUGROHO
6
STANDARISASI LAPORAN KEUANGAN TAMBAHAN UNTUK MEMPEROLEH LAPORAN KEUANGAN YANG RELEVAN DAN
RELIABEL
BOPRIARI KUSUMAWIJAYA
7 OPTIMASI BORED PILE DENGAN TEST VIBRATING WIRE
STRAIN GAUGES (VWSGs) DAMAR EKO ARIWIBOWO
8
PERENCANAAN DESAIN COFFERDAM SEBAGAI PENDUKUNG KONSTRUKSI OUTFALL PADA PROYEK PLTU 2
LABUAN
DODY PUTRANTO, S.T.
9
SISTEM SUPPORT KANTILEVER KAYU PADA PEKERJAAN FINISHING DINDING LUAR BANGUNAN - PLTU 2 LABUAN
BANTEN
DWI MULYONO
10 ANALISA DESIGN SHADING "PROYEK LEARNING CENTER
WIKA" DENGAN APLIKASI ECOTECT EKO NURACHMAT WIBOWO
11
PENGGANTIAN KAYU DENGAN PIPA UNTUK SUPPORT DIAGONAL FORMWORK PADA PROYEK PLTU PALABUHAN
RATU
FAISHAL AMIR
12
ANALISA PERBANDINGAN PENGGUNAAN BEKISTING KONVENSIONAL DENGAN SISTEM MESA PADA PROYEK
APARTEMEN PULOMAS CITY PARK
FAJAR IKA A.
JUDUL MAKALAH CAPEG ANGKT' 20
13 PEMANFAATAN SISA POTONGAN BESI SIKU DALAM
PEMBUATAN RACKING ANCHOR BOLT FEBI ANDYASTANTO, S.T.
14
ANALISA PUSHOVER BERDASARKAN SRPMK DAN SRPMM PADA BANGUNAN CRUSHER HOUSE PROYEK PLTU 2 SULUT
2 X 25 MW
HENDRI SETIAWAN
15
MANAJEMEN DAN PERHITUNGAN PRODUKTIVITAS AKIBAT DOWN TIME KAPAL KERUK PADA PEKERJAAN
PENGERUKAN
HERU DESKRISYE
16 ANALISA PERHITUNGAN KAPASITAS KAPASITOR PADA
AREA MALL (ZONE B) JUNI PURWO WIDADI, ST.
17 PENERAPAN PENJADWALAN JUST INTIME PADA
PEKERJAAN STRUKTUR BAJA DI PROYEK DC-2 JABABEKA MADE DIMAS AGUNG P.
18 PROSEDUR PELAKSANAAN PERPAJAKAN SEBAGAI ELEMEN
DARI PENGENDALIAN INTERNAL MIRNA HAPSARI
19
ANALISIS DAN STRATEGI PEMASARAN JASA KONSTRUKSI BANGUNAN SIPIL PEMBANGKIT TENAGA LISTRIK DI
INDONESIA
RIDWAN MARTAKUSUMAH
20 EVALUASI PENGGUNAAN BALOK U-SHELL PROYEK
PARAGON CITY SEMARANG RIEZA ARDI WIRAWAN, S.T.
21 PENGGUNAAN RODA PADA BEKISTING KOLOM SEBAGAI
PENGGANTI TOWER CRANE SHALAHUDDIN SULTHANY
22
OPTIMASI BIAYA KONSTRUKSI PADA PROYEK BSD ENTERTAINMENT CENTER DENGAN MENGGUNAKAN
CONSTRAINT SIMULASI MONTE CARLO
ADITYA DANANG WAHYUDI
23 OPTIMALISASI MIX DESIGN BETON PADA PROYEK PLTU
SULUT 2X25 MW SARIPUDIN
24 OPTIMASI LAY OUT DERMAGA PLTU SULUT 2X25 MW WAHYONO
√ √ √ √ √ √ √ √ √ √ √ SOFT COPY
√ √ √ √ √ √ √ √
No. Nama Pendidikan
1 Adam Perdana SIPIL
2 Agus Widayat PSIKOLOGI
3 Ahmad Amiriansjah Pabittei PSIKOLOGI
4 Amri Al Ghazali ARSITEKTUR
5 Andhyka Pratama SIPIL
6 Arif Wicaksono KEUANGAN
7 Asnul Rizal ARSITEKTUR
8 Awalia Rahmawati SIPIL
9 Berto Wijaya SIPIL
10 Deddy Panjaitan SIPIL
11 Erlangga Danu Ariyanto AKUNTANSI
12 Faridzki Pratama PSIKOLOGI
13 Heri Kasyanto SIPIL
14 Heri Wiyanto AKUNTANSI
15 Indah Lestari Banuwati AKUNTANSI
16 Iwan Setiawan ARSITEKTUR
17 Lutfi Burhani SIPIL
18 Riliyan Marsyah SIPIL
19 Ronni Wanapresta AKUNTANSI
20 Rosmar Hanipramulia ELEKTRO
21 Subhan Arie MESIN
22 Tengku Temmy Rifindo AKUNTANSI
23 Yunan Haribowo SIPIL
24 Yupie Deswar SIPIL
25 Zepri Rustadi MESIN
Heru Andraiko
Judul Makalah
Optimasi Test Vibrating Wire Strain Gauge (VWSG) pada Bored Pile dengan Penggunaan Tell-Tale dan Sonic Logging - Studi Kasus Proyek Apartemen Cervino Village
Analisa Perbandingan Talent Ideal dengan Talent Aktual Manajer Proyek Berdasarkan Tipologi Talent Gallup, Beserta Usulan Pengembangan Talent-nya Psychological Ownership Karyawan Wika
Alternatif Pekerjaan Screeding Lantai Menggunakan Metode Sistem Silo Dispenser Dry Mortar pada Proyek Cervino Village Apartemen Jakarta
Optimasi Desain Administration Building Pada Proyek PLTU 2 Sulawesi Utara 2 x 25 MW
Analisa Metode Economic Value Added Pada PT. Wijaya Karya (PERSERO) Tbk. Optimasi Desain Atap Canopi pada Proyek Gedung Perkantoran Astra
Analisa Perbandingan Slump untuk Pekerjaan Mass Concrete Struktur Bangunan Pelimpah Proyek Bendungan Jatigede
Metode Konstruksi Pemancangan Trestle Pada Permanen Jetty Proyek PLTU 2x25 MW Sulut
Alternatif Desain Reclaim Feeder Conveyor untuk Efisiensi Biaya pada Coal Handling PLTU 2 Sulut 2x25 MW
Alternatif Metode Bunga dan Pembayaran pada S2P Menggunakan Analisis Present Value of Money
Persepsi Pegawai Wika terhadap Program Pengembangan
Penggunaan Geomembran pada Pekerjaan Pemecah Gelombang (Breakwater) Dampak PP No.51 Th.2008 tentang Tarif Jasa Konstruksi Final 3% dan Tarif Tunggal PPH Badan 28% terhadap Proyek PLTU 2 Sulut 2x25 MW
Analisa Proses Monitoring Eskalasi Proyek-Proyek di Wika
Analisa Perbandingan Acian Konvensional Dengan Skimkot Putih Pada Proyek L.J. Meritus Hotel Surabaya
Analisa Komparasi Metode Anchor Pile Dan Metode Kentledge Pada Pekerjaan Pile Load Test
Alternatif Efisiensi Design Secant Pile pada Proyek Apartemen Cervino Village Evaluasi Sistem dan Prosedur Pengadaan Material Besi antara Pusat (Departemen) dengan Proyek - Suatu Kajian dan Studi Kasus Penggelapan Material Besi di Proyek Fly Over Amplas, Medan
Calculux Vs Perhitungan Manual - Komparasi Penghitungan Tingkat Iluminasi pada Desain Sistem Pencahayaan
Erection Ball Mill dengan Turn Table
Evaluasi Efektifitas program Buy Back Oleh BUMN Pada Kondisi Pasar Berpotensi Krisis
Optimasi Pekerjaan Sheet Pile Temporary Support dengan Metode Raker System Ditinjau dari Segi Biaya dan Waktu
Extensi Jarak Concrete Anchorage Untuk Kelancaran Produksi Batubara Hidraulic Calculation dan Water Hammer Analysis pada Proyek Aviasi Depo Pengisian Pesawat Udara Kualanamu
ALTERNATIF STANDARISASI PEMBUATAN CONTRACTOR KEET PADA PROYEK BANGUNAN GEDUNG (Proyek MT Haryono Square)
No. Nama Pendidikan 1 Didik Wardoyo Teknik Sipil
2 Haries Yolanda Teknik Sipil
3 Moch. Fathir Ma'ruf Teknik Sipil
4 Teddy Eka Putra Teknik Arsitektur
5 Nety Ermayanti Teknik Arsitektur
6 Firman Aziz Teknik Sipil
7 Doni Pratama Biantoro Teknik Sipil / Geoteknik
8 Gumalawirmon Teknik Sipil
9 Andhika Adi Pradana Teknik Arsitektur
10 Raden Fikey Marga Suryono Teknik Arsitektur
11 Heidi Duma Teknik Sipil
12 Madona Eko Prihantoro Teknik Sipil
13 Thomas Antonius P. Teknik Elektro
14 Satria Agus Nugroho Teknik Sipil / Geoteknik
15 Nur Wahyu Wulandari Teknik Sipil / Geoteknik
16 Fitria Mahanani Administrasi Pajak
17 Edi Yuniarto Teknik Sipil
18 Iman Sukarno Teknik Sipil 19 Agus Budi Riyanto Teknik Sipil
20 Yudhistira Bayu Setia Aji Teknik Sipil
Judul Makalah
VALUE ENGINEERING ANALISA JEMBATAN SEBAGAI ALTERNATIF PENGAMBILAN KEPUTUSAN PADA PROYEK PERTAMINA FIELD LIRIK
OPTIMALISASI DESAIN SISTEM PENAHAN ASAM PADA PROYEK RFO II PLANT GRESIK
OPTIMALISASI METODE PELAKSANAAN PENINGGIAN EVALASI LANTAI GROUND FLOOR GEDUNG PROSES UNIT 300 RFO PF 2 PLANT PT. PETROKIMIA GRESIK
REDESAIN FASADE KACA AREA LOBI PADA PROYEK GEDUNG PERKANTORAN ASTRA
PERCEPATAN PENGAJUAN MOCK UP DENGAN MENGGUNAKAN VISUALISASI 3D UNTUK MENGURANGI RESIKO PEKERJAAN BERULANG
VALUE ENGINEERING PADA MODIFIKASI CONVEYOR
PENGGUNAAN GROUND VIBRATION MONITORING UNTUK MENENTUKAN TIPE PONDASI TIANG
SUBSTITUSI BORED PILE DENGAN DRIVING PILE PADA PROYEK PLTU KALIMANTAN SELATAN 2 X 65 MW
TINJAUAN ASPEK DISAIN ARSITEKTUR PADA PROYEK "DESIGN & BUILD" BANDAR UDARA ADISOEMARMO SURAKARTA
TINJAUAN ANALISA MATERIAL DINDING GRC (GLASFIBRE REINFORCED CEMENT) DAN DINDING PRECAST BETON PADA FASADE LUAR PROYEK ADHIWANGSA
PEMILIHAN TIPE PONDASI DENGAN METODE KERJA YANG EFISIEN PADA METODE TOP DOWN PROYEK TRILLIUM OFFICE & RESIDENCE SURABAYA PERBANDINGAN BIAYA, MUTU, WAKTU BALOK KONVENSIONAL DENGAN PRESTRESS
REDESAIN SISTEM ELEKTRIKAL MOTOR MIXER PADA PROYEK PENAMBAHAN CRUDE TANK KAPASITAS 3 X @ 400 mb DI KILANG UP-VI BALONGAN
SIRTU + AGITATOR > SPLIT + PASIR + MOLLEN = OK
SOLUSI PERCEPATAN PEKERJAAN BETON CYCLOPE K-125 PROYEK EMBUNG MURU
MAKALAH "EKUALISASI PAJAK ATAS PEREDARAN USAHA"
METODE PRECAST BEAM BANGUNAN NEW RELAY HOUSE PADA SWITCHYARD AREA
"RAISED UP" LANTAI CIRCULATING WATER PUMP HOUSE EVALUASI PENGGUNAAN BEKISTING PERMANEN PELAT LANTAI
METODE KERJA LIFTING STRUKTURE PEKERJAAN MODIFIKASI CIRCULATING WATER PUMP HOUSE PADA PROYEK PEMBANGKIT LISTRI TENAGA GAS UAP MUARA KARANG
No. Nama Pendidikan 1 NUR WAHYU WULANDARI, S.T. Teknik Sipil /
Geoteknik
2 GATOT BANGUN SUGIARTO, S.T. Teknik Sipil
3 RADEN RYAN HERYANDANI, S.T. Teknik Sipil
4 MUNAWIR, S.T. Teknik Sipil
5 HARI PURNAMA, S.T. Teknik Sipil
6 PURWO MAHARDI, S.T. Teknik Sipil
7 DHANI RAGIL ARFIANTO, S.T. Teknik Arsitektur
8 OINIKE SITUMORANG, S.T. Teknik Arsitektur
9 YUDHI PRAMANA SURYA, S.T. Teknik Arsitektur
10 RP. PURNOMO ADI PRIYANTO, S.T. Teknik Sipil
11 QOMARUL ARIFIN, S.T. Teknik Sipil
12 HUSNI MUNAWAR, S.T. Teknik Sipil
13 ARI RAHMAT, S.E. Manajemen
14 FACHRUL RAZI, S.T. Teknik Sipil
15 IGN. WIKA KOMALASARI, S.T. Teknik Sipil
16 RONI FEBRIANTO, S.T. Teknik Sipil
17 ISMU ADI NOORSEHA, S.T. Teknik Sipil 18 NUR AMIN, S.T. Teknik Sipil
19 NANANG BAYU BUZAT W., S.T. Teknik Sipil
20 ARIEF WAHYU HIDAYAT, S.T. Teknik Sipil
21 MOCHAMMAD IMRON, S.T. Teknik Sipil
22 BUDI HANDONO, S.T. Teknik Sipil
23 HARI YUDIANTO, S.T. Teknik Sipil
Judul Makalah
OPTIMALISASI DESAIN GROUND ANCHOR JS. KALI BONE PADA PROYEK PEMBANGUNAN JEMBATAN LINTAS BARAT PROVINSI SULAWESI SELATAN
ALTERNATIF DESAIN STRUKTUR TRESTLE BRIDGE YANG PALING OPTIMUM
VALUE ENGINEERING ANALISA PONDASI TANGKI SEBAGAI ALTERNATIF PENGAMBILAN KEPUTUSAN PADA PROYEK PENAMBAHAN TIGA UNIT TANGKI CRUDE KAPASITAS 3 X @400MB DI KILANG UP VI - PERTAMINA BALONGAN
KAPASITAS DAYA DUKUNG TIANG PANCANG TUNGGAL BERDASARKAN STATIC LOAD TEST DENGAN DYNAMIC LOAD TEST SERTA
KELAYAKANNYA PADA KONDISI SAAT INI
KONSTRUKSI TIMBUNAN JALAN DI ATAS TANAH LUNAK DENGAN PERKUATAN GALAR KAYU (PROYEK PLTU 1 KALIMANTAN TENGAH 2X60MW)
DESAIN FONDASI TIANG DENGAN PC PILE DAN TIANG BOR PADA TANAH LUNAK (STUDI KASUS PROYEK MJIS KALIMANTAN SELATAN)
CURTAIN WALL & FAKTOR DASAR PERANCANGAN (DESIGN) DAN PELAKSANAAN PADA HIGH RISE BUILDING
KISS (KOORDINASI, INTEGRASI, SINKRONISASI DAN SIMPLIKASI) DALAM PROSES ENGINEERING MEMBUAT GAMBAR KERJA
EFISIENSI ANTARA GYPSUM DAN ACIAN UNTUK PEKERJAAN EXPOE BALOK (STUDY PROYEK APARTEMEN SOLO PARAGON)
METODE PELAKSANAAN JEMBATAN VOIDED SLAB (BKT - 117)
ANALISA STRESSING GIRDER DENGAN MENGGUNAKAN SISTEM BERTAHAP PADA PROYEK JORR SEKSI W1
PERBANDINGAN PELAKSANAAN PEKERJAAN BOX GIRDER DENGAN TRAVELER FORMWORK DESAIN CIC DAN CCC PADA PROYEK APROACH BRIDGE JEMBATAN SURAMADU
ANALISA PENILAIAN PERUSAHAAN ATAS RENCANA PENYERTAAN PT WIJAYA KARYA PADA PT MARGA NUJYA SUMO AGUNG
OPTIMALISASI PEKERJAAN BEKISTING PADA BANGUNAN " MIXED USED"
OPTIMASI STRUKTUR ATAS DENGAN TES SPECTRAL ANALYSIS OF SURFACE WAVES (SASW)
PEMANFAATAN H-BEAM (EX-SHORING PROTECTION) SEBAGAI FORMWORK SUPPORT STRUKTUR ATAP EMERGENCY D/G BUILDING (MUARA KARANG GAS POWER PLANT PROJECT)
TINDAKAN KOREKSI UNTUK MENGENDALIKAN PEMAKAIAN MATERIAL BESI BETON (PROYEK PLTGU MUARA KARANG)
PENENTUAN FINAL SET FONDASI TIANG PANCANG
BUKU MANUAL PEMASANGAN WIKA PANEL
VALUE ENGINEERING : ANALISA DESAIN CONVEYOR PADA PROYEK P9/P10 ADDITIVE PREPARATION & DOZING STATION PT. INDOCEMENT TUNGGAL PRAKASA, Tbk
METODE KERJA PELAKSANAAN PEKERJAAN CATWALK SEBAGAI SOLUSI UNTUK PERCEPATAN WAKTU PELAKSANAAN
AGITASI SEBAGAI FAKTOR YANG PERLU DIPERTIMBANGKAN DALAM PERENCANAAN HARGA SATUAN DAN NEGOSIASI PEKERJAAN DREDGING, UNTUK MENGHADAPI TENDER - TENDER FIGHT
EFISIENSI PEMAKAIAN SHORING PADA PEKERJAAN FINISHING DINDING LUAR BANGUNAN (PROYEK PLTU 1 JAWA BARAT, INDRAMAYU POWER PLANT 3X330 MW)
No.
Nama
Pendidikan
1 IRFAN APRIYANTO ST SIPIL
2 MUAMMAR CHUMAIDI ST SIPIL 3 FERRY SETIAWAN BANGUN ST SIPIL 4 ZICO BAYU SETIYADI ST SIPIL
5 MUHAMMAD KHADAFI ST SIPIL
6 TEZAR KHALIFA ST SIPIL
7 ANASTASYA YOLANDA ST ARSITEKTUR
8 ALISA ARYANA PRATIWI ST INDUSTRI
9 EDI YAHYA SAPUTRA NASUTION ST KIMIA
10 KARTIKA AULIA ST KIMIA
11 SRIYONO ST KIMIA
12 M. ADIB AMRILLAH ST ELEKTRO
13 BINTANG TODDY M. PANGARIBUAN ST ELEKTRO
14 ANANG WIRDIANTO ST MESIN
15 JOHN HERSA SE AKUNTANSI