PA/KPA : K/L/D/I :

STKER : PDAM T irta Tandik Kabupaten Musi Banyuasin PPK : Azmi Julian, ST

T.A : 2012

PERKIRAAN MASA

No VOLUME PERKIRAAN SUMBER WAKTU MULAI PELAKSANAAN KETERANGAN

(Rp) DANA PELAKSANAAN (BULAN)

1 PENGADAAN BAHAN KIMIA UNTUK UNIT PENGOLAHAN PDAM KAB. MUBA

- PDAM SEKAYU, KAYUARA, LUMPATAN, MUARA TELADAN DAN BAILANGU PBJ 1 Paket Sekayu 400,000,000 APBD April 2012 April-Agustus 2012 - PDAM SUKARAMI, BABAT TOMAN, MANGUNJAYA, DAN ULAK PACEH JAYA PBJ 1 Paket Sekayu 400,000,000 APBD April 2012 April-Agustus 2012 - PDAM NGULAK, AIR BALUI, KEBAN I, PENGAGE DAN KEBAN II PBJ 1 Paket Sekayu 400,000,000 APBD April 2012 April-Agustus 2012 - PDAM TANAH ABANG, KELUANG, SUPAT, DAN SUNGAI LILIN PBJ 1 Paket Sekayu 400,000,000 APBD April 2012 April-Agustus 2012 - PDAM BAYUNG LENCIR, PENINGGALAN DAN LALAN PBJ 1 Paket Sekayu 400,000,000 APBD April 2012 April-Agustus 2012 - PDAM EPIL, LAIS, TELUK KIJING, PETALING DAN TANJUNG AGUNG BARAT PBJ 1 Paket Sekayu 400,000,000 APBD April 2012 April-Agustus 2012

- PDAM SUNGAI KERUH, JIRAK, DAN SINAR JAYA PBJ 1 Paket Sekayu 400,000,000 APBD April 2012 April-Agustus 2012

- PDAM PLAKAT TINGGI, AIR PUTIH ULU, SIALANG AGUNG, DAN BUKIT INDAH PBJ 1 Paket Sekayu 343,900,000 APBD April 2012 April-Agustus 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket 1,150,000 APBD April 2012 April-Agustus 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 300,000 APBD April 2012 April-Agustus 2012

- Belanja Pengandaan PBJ 1 Paket 375,000 APBD April 2012 April-Agustus 2012

1

PBJ 1 Paket Plakat Tinggi 3,298,985,000 APBD Mei 2012 April-Desember 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket 2,790,000 APBD April 2012 April-Desember 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 240,000 APBD April 2012 April-Desember 2012

- Belanja Pengandaan PBJ 1 Paket 375,000 APBD April 2012 April-Desember 2012

2

PBJ 1 Paket Plakat Tinggi 1,248,045,000 APBD Mei 2012 April-Desember 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket 2,280,000 APBD April 2012 April-Desember 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 180,000 APBD April 2012 April-Desember 2012

- Belanja Pengandaan PBJ 1 Paket 225,000 APBD April 2012 April-Desember 2012

3

PBJ 1 Paket Plakat Tinggi 1,601,045,000 APBD Mei 2012 April-Desember 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket 2,280,000 APBD April 2012 April-Desember 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 180,000 APBD April 2012 April-Desember 2012

- Belanja Pengandaan PBJ 1 Paket 225,000 APBD April 2012 April-Desember 2012

4

PBJ 1 Paket Sungai Lilin 5,715,290,000 APBD Mei 2012 April-Desember 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket 2,830,000 APBD April 2012 April-Desember 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 240,000 APBD April 2012 April-Desember 2012

- Belanja Pengandaan PBJ 1 Paket 300,000 APBD April 2012 April-Desember 2012

PENGUMUMAN

RENCANA UMUM PENGADAAN BARANG / JASA PEMERINTAH

NAMA PAKET PEKERJAAN

PEMBANGUNAN IPA KAPASITAS 5 L/DTK. BERIKUT JARINGAN PIPA DI DESA AIR PUTIH ILIR KEC. PLAKAT TINGGI

PEK. PEMASANGAN JARINGAN PIPA TRANSMISI DISTRIBUSI DI DESA CINTA KARYA KEC. PLAKAT TINGGI

PEK. PENAMBAHAN JARINGAN PIPA TRANSMISI DISTRIBUSI KE DESA TANJUNG KAPUTREN KEC. PLAKAT TINGGI

CARA PENGADAA

N

PEK. PENAMBAHAN IPA BARU KAPASITAS 30 L/DTK. BERIKUT JARINGAN PIPA TRANSMISI PADA PDAM CABANG SUNGAI LILIN

RENCANA PENGANGGARAN LOKASI

PEKERJAAN

(2)

PERKIRAAN MASA

No VOLUME PERKIRAAN SUMBER WAKTU MULAI PELAKSANAAN KETERANGAN

(Rp) DANA PELAKSANAAN (BULAN)

NAMA PAKET PEKERJAAN

CARA PENGADAA

N

RENCANA PENGANGGARAN LOKASI

PEKERJAAN

5

PBJ 1 Paket Sungai Lilin 2,951,335,000 APBD Mei 2012 April-Desember 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket 2,790,000 APBD April 2012 April-Desember 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 240,000 APBD April 2012 April-Desember 2012

- Belanja Pengandaan PBJ 1 Paket 375,000 APBD April 2012 April-Desember 2012

6

PBJ 1 Paket Babat Supat 5,889,404,000 APBD Mei 2012 April-Desember 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket 2,871,000 APBD April 2012 April-Desember 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 240,000 APBD April 2012 April-Desember 2012

- Belanja Pengandaan PBJ 1 Paket 300,000 APBD April 2012 April-Desember 2012

7

PBJ 1 Paket Bayung Lencir 4,241,015,000 APBD Mei 2012 April-Desember 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket 2,410,000 APBD April 2012 April-Desember 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 180,000 APBD April 2012 April-Desember 2012

- Belanja Pengandaan PBJ 1 Paket 225,000 APBD April 2012 April-Desember 2012

8

PBJ 1 Paket Bayung Lencir 4,091,015,000 APBD Mei 2012 April-Desember 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket 2,410,000 APBD April 2012 April-Desember 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 180,000 APBD April 2012 April-Desember 2012

- Belanja Pengandaan PBJ 1 Paket 225,000 APBD April 2012 April-Desember 2012

9

PBJ 1 Paket Keluang 7,797,290,000 APBD Mei 2012 April-Desember 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket 2,830,000 APBD April 2012 April-Desember 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 240,000 APBD April 2012 April-Desember 2012

- Belanja Pengandaan PBJ 1 Paket 300,000 APBD April 2012 April-Desember 2012

10

PBJ 1 Paket Keluang 1,313,045,000 APBD Mei 2012 April-Desember 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket 2,280,000 APBD April 2012 April-Desember 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 180,000 APBD April 2012 April-Desember 2012

- Belanja Pengandaan PBJ 1 Paket 225,000 APBD April 2012 April-Desember 2012

11

PBJ 1 Paket Keluang 1,531,045,000 APBD Mei 2012 April-Desember 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket 2,280,000 APBD April 2012 April-Desember 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 180,000 APBD April 2012 April-Desember 2012

- Belanja Pengandaan PBJ 1 Paket 225,000 APBD April 2012 April-Desember 2012

12

PBJ 1 Paket Batanghari Leko 3,635,985,000 APBD Mei 2012 April-Desember 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket 2,790,000 APBD April 2012 April-Desember 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 240,000 APBD April 2012 April-Desember 2012

- Belanja Pengandaan PBJ 1 Paket 375,000 APBD April 2012 April-Desember 2012

PEK. PEMBANGUNAN BOSTER PUMP STATION BERIKUT JARINGAN PIPA DI DESA SUKAMAJU DAN DESA LET ANG KECAMATAN BABAT SUPAT

PEK. PEMBANGUNAN BOSTER PUMP STATION BERIKUT JARINGAN PIPA DI DESA SUKAJAYA DAN WONOREJO KECAMATAN BAYUNG LENCIR

PEK. PEMBANGUNAN BOSTER PUMP STATION BERIKUT JARINGAN PIPA DI DESA SIMPANG BAYAT DAN LUBUK HARJO KEC. BAYUNG LENCIR

PEK. PEMBANGUNAN IPA KAPASITAS 40 L/DTK. BERIKUT JARINGAN PIPA TRANSMISI DISTRIBUSI DI DESA SRIDAMAI KE BOSTER PUMP KARYA MAJU KECAMATAN KELUANG

PEK. PEMASANGAN JARINGAN PIPA DISTRIBUSI DI DESA TEGAL MULYO KECAMATAN KELUANG

PEK. PEMBANGUNAN BOSTER PUMP STATION SUNGAI LILIN JAYA BERIKUT PEMASANGAN PIPA DI DESA MEKAR JADI DAN SUMBER REJEKI.

PEK. PEMASANGAN JARINGAN PIPA DISTRIBUSI DI DESA TENGGARO KECAMATAN KELUANG

PEK. PEMBANGUNAN IPA KAPASITAS 5 L/DTK. BERIKUT JARINGAN PIPA DI DESA SUNGAI NAPAL KECAMATAN BATANGHARI LEKO

(3)

PERKIRAAN MASA

No VOLUME PERKIRAAN SUMBER WAKTU MULAI PELAKSANAAN KETERANGAN

(Rp) DANA PELAKSANAAN (BULAN)

NAMA PAKET PEKERJAAN

CARA PENGADAA

N

RENCANA PENGANGGARAN LOKASI

PEKERJAAN

13

PBJ 1 Paket Sanga Desa 2,701,885,000 APBD Mei 2012 April-Desember 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket 2,790,000 APBD April 2012 April-Desember 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 240,000 APBD April 2012 April-Desember 2012

- Belanja Pengandaan PBJ 1 Paket 375,000 APBD April 2012 April-Desember 2012

14

PBJ 1 Paket Sanga Desa 1,363,045,000 APBD Mei 2012 April-Desember 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket 2,280,000 APBD April 2012 April-Desember 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 180,000 APBD April 2012 April-Desember 2012

- Belanja Pengandaan PBJ 1 Paket 225,000 APBD April 2012 April-Desember 2012

15 PEK. REHAB SIPAS DESA KRAMAT JAYA KECAMATAN SUNGAI KERUH PBJ 1 Paket Sungai Keruh 285,478,500 APBD April 2012 April-Desember 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket 1,004,000 APBD April 2012 April-Desember 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 180,000 APBD April 2012 April-Desember 2012

- Belanja Pengandaan PBJ 1 Paket 112,500 APBD April 2012 April-Desember 2012

16 PEK. REHAB SIPAS DESA JIRAK KECAMATAN SUNGAI KERUH PBJ 1 Paket Sungai Keruh 285,478,500 APBD April 2012 April-Desember 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket 1,004,000 APBD April 2012 April-Desember 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 180,000 APBD April 2012 April-Desember 2012

- Belanja Pengandaan PBJ 1 Paket 112,500 APBD April 2012 April-Desember 2012

17

PBJ 1 Paket Sekayu 5,486,195,000 APBD Mei 2012 April-Desember 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket 2,410,000 APBD April 2012 April-Desember 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 180,000 APBD April 2012 April-Desember 2012

- Belanja Pengandaan PBJ 1 Paket 225,000 APBD April 2012 April-Desember 2012

18 PENGADAAN PRINTER KHUSUS PENCETAK REKENING AIR PBJ 1 Paket Sekayu 173,012,000 APBD April 2012 April-Agustus 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket 538,000 APBD April 2012 April-Desember 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 90,000 APBD April 2012 April-Desember 2012

- Belanja Pengandaan PBJ 1 Paket 75,000 APBD April 2012 April-Desember 2012

19 PENGADAAN MATERIAL SAMBUNGAN PELANGGAN PBJ 1 Paket Sekayu 772,830,000 APBD April 2012 April-Agustus 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket 1,235,000 APBD April 2012 April-Desember 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 150,000 APBD April 2012 April-Desember 2012

- Belanja Pengandaan PBJ 1 Paket 150,000 APBD April 2012 April-Desember 2012

20 PENGADAAN 2 UNIT KENDARAAN MOBIL T ANGKI AIR PBJ 1 Paket Sekayu 700,115,000 APBD April 2012 April-Agustus 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket 1,235,000 APBD April 2012 April-Desember 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 180,000 APBD April 2012 April-Desember 2012

- Belanja Pengandaan PBJ 1 Paket 150,000 APBD April 2012 April-Desember 2012

21 PENGADAAN 1 UNIT KENDARAAN MOBIL OPERASIONAL PBJ 1 Paket Sekayu 213,372,000 APBD April 2012 April-Agustus 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket 1,083,000 APBD April 2012 April-Desember 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 120,000 APBD April 2012 April-Desember 2012

- Belanja Pengandaan PBJ 1 Paket 90,000 APBD April 2012 April-Desember 2012

PEK. PEMBANGUNAN IPA BARU KAPASITAS 50 L/DTK. UNTUK PENINGKATAN KAPASITAS PDAM PUSAT SEKAYU

PEK. PEMINDAHAN IPA PDAM LUMPATAN KE PDAM AIR BALUI KAPASITAS 5 LITER/DETIK BERIKUT BANGUNAN INTAKE, PEMBUATAN GROUND KAP. 50 M3 DAN MEKANIKAL ELEKT RIKAL KECAMATAN SANGA DESA

PEK. PEMBANGUNAN BOSTER PUMP STATION DESA KEMANG DAN PENAMBAHAN PIPA KE DESA TERUSAN KEC. SANGA DESA

(4)

PERKIRAAN MASA

No VOLUME PERKIRAAN SUMBER WAKTU MULAI PELAKSANAAN KETERANGAN

(Rp) DANA PELAKSANAAN (BULAN)

NAMA PAKET PEKERJAAN

CARA PENGADAA

N

RENCANA PENGANGGARAN LOKASI

PEKERJAAN

22 PENGADAAN KENDARAAN SEPEDA MOTOR OPERASIONAL PBJ 1 Paket Sekayu 213,372,000 APBD April 2012 April-Agustus 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket 1,083,000 APBD April 2012 April-Desember 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 120,000 APBD April 2012 April-Desember 2012

- Belanja Pengandaan PBJ 1 Paket 90,000 APBD April 2012 April-Desember 2012

23 PENGADAAN POMPA INTAKE AIR BAKU TYPE SUBMERSIBLE PBJ 1 Paket Sekayu 772,830,000 APBD April 2012 April-Agustus 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket 1,235,000 APBD April 2012 April-Desember 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 150,000 APBD April 2012 April-Desember 2012

- Belanja Pengandaan PBJ 1 Paket 150,000 APBD April 2012 April-Desember 2012

24 PENGADAAN POMPA DISTRIBUSI TYPE CENTRIFUGAL PBJ 1 Paket Sekayu 578,212,500 APBD April 2012 April-Agustus 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket 1,235,000 APBD April 2012 April-Desember 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 150,000 APBD April 2012 April-Desember 2012

- Belanja Pengandaan PBJ 1 Paket 112,500 APBD April 2012 April-Desember 2012

25 PEK. PEMBUATAN GUDANG PENYIMPANAN BAHAN MATERIAL PDAM KAYUARA PBJ 1 Paket Sekayu 238,372,000 APBD April 2012 April-Desember 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket 1,083,000 APBD April 2012 April-Desember 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 120,000 APBD April 2012 April-Desember 2012

- Belanja Pengandaan PBJ 1 Paket 90,000 APBD April 2012 April-Desember 2012

26 PEMASANGAN JARINGAN LISTRIK DAN TRAFO PLN UNTUK PDAM SINAR JAYA PBJ 1 Paket Sekayu 366,217,000 APBD April 2012 April-Desember 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket 538,000 APBD April 2012 April-Desember 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 90,000 APBD April 2012 April-Desember 2012

- Belanja Pengandaan PBJ 1 Paket 75,000 APBD April 2012 April-Desember 2012

27 PEMASANGAN JARINGAN LISTRIK DAN TRAFO PLN BOSTER KARYA MAJU PBJ 1 Paket Sekayu 412,638,500 APBD April 2012 April-Desember 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket 679,000 APBD April 2012 April-Desember 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 120,000 APBD April 2012 April-Desember 2012

- Belanja Pengandaan PBJ 1 Paket 112,500 APBD April 2012 April-Desember 2012

Sekayu, 26 Mart 2012 PDAM TIRTA RANDIK KAB. MUBA

DIREKTUR

FIRDAUS L. DINE, ST NIP. 19610520 199603 1 001

Referensi

Dokumen terkait

PEJABAT PENGADAAN BARANG/JASA BAGIAN PENGOLAHAN DATA ELEKTRONIK SEKRETARIAT DAERAH KABUPATEN

Penelitian yang berjudul PENGARUH DOSIS PUPUK HAYATI TERHADAP TINGKAT SERANGAN HAMA BOLENG UBI PADA TIGA VARIETAS KETELA RAMBAT ( Ipomoea batatas L) diharapkan

Memperhatikan ketentuan-ketentuan Peraturan Presiden Republik Indonesia Nomor 54 Tahun 2010 tentang Pengadaan Barang/Jasa Pemerintah sebagaimana diubah terakhir dengan

Multiple regression analysis was used to examine the magnitude of the influence of the independent variable that is independent Commissioners, audit committee,

These result show that 52,7% of variables cost of equity capital can be explained by the size of the public accounting firm, the industry specialization of auditors and audit

Namun, kandungan informasi tersebut tidak cukup besar untuk membentuk beda nilai yang signifikan antara sebelum dan setelah event , sehingga dapat disimpulkan

Dengan ini saya menyatakan bahwa skripsi dengan judul,PENGARUH VARIASI BERAT GLUKOSA PADA FILTRAT TOMAT (Solanum lycopersicum (L) Commune) dan LAMA FERMENTASI

URAIAN RENCANA HARI TANGGAL 1 Pemasukan Dokumen Penawaran Selasa 21 Nopember 2017 2 Pembukaan Dokumen Penawaran Rabu 22 Nopember 2017 3 Evaluasi Dokumen