PA/KPA :

K/L/D/I :

STKER : PDAM Tirta Tandik Kabupaten Musi Banyuasin PPK : Azmi Julian, ST

T.A : 2012

PERKIRAAN M ASA

No VOLUM E PERKIRAAN SUM BER W AKTU M ULAI PELAKSANAAN KETERANGAN

(Rp) DANA PELAKSANAAN (BULAN)

1

PBJ 1 Paket Babat Toman 818,955,000 APBD-P Dec-12 Desember 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket 2,280,000 APBD-P Nov-12 Nop-Des 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 180,000 APBD-P Nov-12 Nop-Des 2012

- Belanja Pengandaan PBJ 1 Paket 225,000 APBD-P Nov-12 Nop-Des 2012

2

PBJ 1 Paket Mangun Jaya Kec. 597,751,000 APBD-P Dec-12 Desember 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket Babat Toman 1,834,000 APBD-P Nov-12 Nop-Des 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 180,000 APBD-P Nov-12 Nop-Des 2012

- Belanja Pengandaan PBJ 1 Paket 150,000 APBD-P Nov-12 Nop-Des 2012

3

PBJ 1 Paket Air Putih Ulu Kec 504,651,000 APBD-P Dec-12 Desember 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket Plakat Tinggi 1,834,000 APBD-P Nov-12 Nop-Des 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 180,000 APBD-P Nov-12 Nop-Des 2012

- Belanja Pengandaan PBJ 1 Paket 150,000 APBD-P Nov-12 Nop-Des 2012

4

PBJ 1 Paket Bukit Indah Kec 524,651,000 APBD-P Dec-12 Desember 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket Plakat Tinggi 1,834,000 APBD-P Nov-12 Nop-Des 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 180,000 APBD-P Nov-12 Nop-Des 2012

- Belanja Pengandaan PBJ 1 Paket 150,000 APBD-P Nov-12 Nop-Des 2012

5

PBJ 1 Paket Supat Kec. Babat 1,688,845,000 APBD-P Dec-12 Desember 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket Supat 2,280,000 APBD-P Nov-12 Nop-Des 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 180,000 APBD-P Nov-12 Nop-Des 2012

- Belanja Pengandaan PBJ 1 Paket 225,000 APBD-P Nov-12 Nop-Des 2012

6

PBJ 1 Paket Kayuara, Lumpatan 474,651,000 APBD-P Dec-12 Desember 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket dan Muara Teladan 1,834,000 APBD-P Nov-12 Nop-Des 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 180,000 APBD-P Nov-12 Nop-Des 2012

- Belanja Pengandaan PBJ 1 Paket 150,000 APBD-P Nov-12 Nop-Des 2012

PENGUMUMAN

RENCANA UMUM PENGADAAN BARANG / JASA PEMERINTAH

CARA PENGADAAN

LOKASI PEKERJAAN

RENCANA PENGANGGARAN NAM A PAKET PEKERJAAN

PEK. PEMASANGAN JARINGAN PIPA DISTRIBUSI PDAM BABAT TOMAN KECAMATAN BABAT TOMAN

PEK. PEMASANGAN JARINGAN PIPA DISTRIBUSI PDAM MANGUNJAYA KECAMATAN BABAT TOMAN

PEK. PEMASANGAN JARINGAN PIPA DISTRIBUSI PDAM AIR PUTIH ULU KECAMATAN PLAKAT TINGGI

PEK. PEMASANGAN JARINGAN PIPA DISTRIBUSI PDAM BUKIT INDAH KECAMATAN PLAKAT TINGGI

PEK. PEMASANGAN JARINGAN PIPA TRANSMISI DAN DISTRIBUSI PDAM SUPAT KECAMATAN BABAT SUPAT.

(2)

PERKIRAAN M ASA

No VOLUM E PERKIRAAN SUM BER W AKTU M ULAI PELAKSANAAN KETERANGAN

(Rp) DANA PELAKSANAAN (BULAN)

CARA PENGADAAN

LOKASI PEKERJAAN

RENCANA PENGANGGARAN NAM A PAKET PEKERJAAN

7

PBJ 1 Paket Karya Maju dan 768,955,000 APBD-P Dec-12 Desember 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket Keluang 2,280,000 APBD-P Nov-12 Nop-Des 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 180,000 APBD-P Nov-12 Nop-Des 2012

- Belanja Pengandaan PBJ 1 Paket 225,000 APBD-P Nov-12 Nop-Des 2012

8

PBJ 1 Paket Desa Mulya Asih 1,663,845,000 APBD-P Dec-12 Desember 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket Kec. Keluang 2,280,000 APBD-P Nov-12 Nop-Des 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 180,000 APBD-P Nov-12 Nop-Des 2012

- Belanja Pengandaan PBJ 1 Paket 225,000 APBD-P Nov-12 Nop-Des 2012

9

PBJ 1 Paket Tebing Bulang 622,751,000 APBD-P Dec-12 Desember 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket Kec. Sungai Keruh 1,834,000 APBD-P Nov-12 Nop-Des 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 180,000 APBD-P Nov-12 Nop-Des 2012

- Belanja Pengandaan PBJ 1 Paket 150,000 APBD-P Nov-12 Nop-Des 2012

10

PBJ 1 Paket Desa Ulak Paceh 554,651,000 APBD-P Dec-12 Desember 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket 1,834,000 APBD-P Nov-12 Nop-Des 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 180,000 APBD-P Nov-12 Nop-Des 2012

- Belanja Pengandaan PBJ 1 Paket 150,000 APBD-P Nov-12 Nop-Des 2012

11

PBJ 1 Paket Sungai Lilin 763,343,900 APBD-P Dec-12 Desember 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket 2,280,000 APBD-P Nov-12 Nop-Des 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 180,000 APBD-P Nov-12 Nop-Des 2012

- Belanja Pengandaan PBJ 1 Paket 225,000 APBD-P Nov-12 Nop-Des 2012

12

PBJ 1 Paket Ds Talang Tinggi 2,009,405,000 APBD-P Dec-12 Desember 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket 2,280,000 APBD-P Nov-12 Nop-Des 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 180,000 APBD-P Nov-12 Nop-Des 2012

- Belanja Pengandaan PBJ 1 Paket 225,000 APBD-P Nov-12 Nop-Des 2012

13 PBJ 1 Paket Ds. Air Putuh Ulu 436,856,000 APBD-P Dec-12 Desember 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket 711,500 APBD-P Nov-12 Nop-Des 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 120,000 APBD-P Nov-12 Nop-Des 2012

- Belanja Pengandaan PBJ 1 Paket 112,500 APBD-P Nov-12 Nop-Des 2012

14 PBJ 1 Paket Ds. Bukit Indah 436,856,000 APBD-P Dec-12 Desember 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket 711,500 APBD-P Nov-12 Nop-Des 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 120,000 APBD-P Nov-12 Nop-Des 2012

- Belanja Pengandaan PBJ 1 Paket 112,500 APBD-P Nov-12 Nop-Des 2012

PEK. PENAMBAHAN JARINGAN PIPA DISTRIBUSI PDAM SUNGAI LILIN KECAMATAN SUNGAI LILIN

PEK. PEMASANGAN JARINGAN LISTRIK KABEL TANAM BERIKUT TRAFO DAN KAPASITOR BANK PADA INSTALASI PDAM TALANG TINGGI

PEK. PENAMBAHAN JARINGAN PIPA DISTRIBUSI PELAYANAN PDAM KELUANG DAN BOSTER KARYA MAJU KECAMATAN KELUANG

PEK. PEMASANGAN JARINGAN PIPA TRANSMISI DAN DISTRIBUSI DESA MULYA ASIH KECAMATAN KELUANG

PEK. PEMASANGAN PIPA TRANSMISI PDAM TEBING BULANG KECAMATAN SUNGAI KERUH

PEK. PEMASANGAN KABEL INTAKE SERTA PEMASANGAN PIPA PDAM ULAK PACEH JAYA

PEK. PEMASANGAN JARINGAN LISTRIK DAN TRAFO PLN PDAM AIR PUTIH ULU

(3)

PERKIRAAN M ASA

No VOLUM E PERKIRAAN SUM BER W AKTU M ULAI PELAKSANAAN KETERANGAN

(Rp) DANA PELAKSANAAN (BULAN)

CARA PENGADAAN

LOKASI PEKERJAAN

RENCANA PENGANGGARAN NAM A PAKET PEKERJAAN

15 PEK. PEMASANGAN JARINGAN LISTRIK DAN TRAFO PLN PDAM WARGA MULYA PBJ 1 Paket Ds. Warga Mulya 396,856,000 APBD-P Dec-12 Desember 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket 711,500 APBD-P Nov-12 Nop-Des 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 120,000 APBD-P Nov-12 Nop-Des 2012

- Belanja Pengandaan PBJ 1 Paket 112,500 APBD-P Nov-12 Nop-Des 2012

16 PEK. PEMASANGAN JARINGAN LISTRIK DAN TRAFO PLN BOSTER KARANGWARU PBJ 1 Paket Ds. Karang Waru 397,356,000 APBD-P Dec-12 Desember 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket 711,500 APBD-P Nov-12 Nop-Des 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 120,000 APBD-P Nov-12 Nop-Des 2012

- Belanja Pengandaan PBJ 1 Paket 112,500 APBD-P Nov-12 Nop-Des 2012

17

PBJ 1 Paket Sekayu, Lumpatan, 648,556,000 APBD-P Dec-12 Desember 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket Bayung Lencir, 711,500 APBD-P Nov-12 Nop-Des 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket S.Lilin & B.Toman 120,000 APBD-P Nov-12 Nop-Des 2012

- Belanja Pengandaan PBJ 1 Paket 112,500 APBD-P Nov-12 Nop-Des 2012

18

PBJ 1 Paket Ds. Kemang 386,856,000 APBD-P Dec-12 Desember 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket 711,500 APBD-P Nov-12 Nop-Des 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 120,000 APBD-P Nov-12 Nop-Des 2012

- Belanja Pengandaan PBJ 1 Paket 112,500 APBD-P Nov-12 Nop-Des 2012

19 PEK. PENGADAAN MATERIAL SAMBUNGAN PELANGGAN PBJ 1 Paket Sekayu 776,205,000 APBD-P Dec-12 Desember 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket 1,235,000 APBD-P Nov-12 Nop-Des 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 150,000 APBD-P Nov-12 Nop-Des 2012

- Belanja Pengandaan PBJ 1 Paket 150,000 APBD-P Nov-12 Nop-Des 2012

20 PEK. PENGADAAN 2 UNIT KENDARAAN MOBIL OPERASIONAL PBJ 1 Paket Sekayu 429,487,000 APBD-P Dec-12 Desember 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket 1,083,000 APBD-P Nov-12 Nop-Des 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 120,000 APBD-P Nov-12 Nop-Des 2012

- Belanja Pengandaan PBJ 1 Paket 90,000 APBD-P Nov-12 Nop-Des 2012

21 PEK. PENGADAAN POMPA INTAKE AIR BAKU TYPE SUBMERSIBLE PBJ 1 Paket Sekayu 774,420,000 APBD-P Dec-12 Desember 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket 2,280,000 APBD-P Nov-12 Nop-Des 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 180,000 APBD-P Nov-12 Nop-Des 2012

- Belanja Pengandaan PBJ 1 Paket 225,000 APBD-P Nov-12 Nop-Des 2012

22 PEK. PENGADAAN POMPA DISTRIBUSI TYPE CENTRIFUGAL PBJ 1 Paket Sekayu 774,420,000 APBD-P Dec-12 Desember 2012

- Belanja Alat Tulis Kantor PBJ 1 Paket 2,280,000 APBD-P Nov-12 Nop-Des 2012

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 180,000 APBD-P Nov-12 Nop-Des 2012

- Belanja Pengandaan PBJ 1 Paket 225,000 APBD-P Nov-12 Nop-Des 2012

Sekayu, 6 Nopember 2012 PDAM TIRTA RANDIK KAB. MUBA

DIREKTUR

FIRDAUS L. DINE, ST NIP. 19610520 199603 1 001 PEK. PEMASANGAN KAPASITOR BANK PDAM SEKAYU, LUMPATAN, BAYUNG LENCIR,

SUNGAI LILIN DAN BABATTOMAN

Referensi

Dokumen terkait

Pada tahap ketiga, praktik penerapan joyful learning based social constructivism pedagogy ini dilakukan di MTS NU 14 Al MA’arif Kaligading dilakukan oleh guru

[r]

Kegiatan yang dilakukan adalah mengidentifikasi layanan-layanan pada website pemerintah dengan cara studi pustaka/dokumentasi dan observasi website pemerintah Kabupaten

Memperhatikan ketentuan-ketentuan Peraturan Presiden Republik Indonesia Nomor 54 Tahun 2010 tentang Pengadaan Barang/Jasa Pemerintah sebagaimana diubah terakhir dengan

Jadi nanoteknologi tidak hanya sebatas bagaimana cara menghasilkan material ataupun partikel yang berukuran nanometer, melainkan memiliki pengertian yang lebih luas termasuk

[r]

Dalam proses berjalannya system penerimaan mahasiswa baru, tentu akan membutuhkan sebuah system yang baik untuk menyelesaikan permasalahn yang ada pada system penerimaan mahasiswa

Biaya penentuan pembelian dan pengiriman barang dalam persoalan transportasi dengan fuzzy cost dapat lebih optimal dengan menggunakan pendekatan basis tree. Meskipun