• Tidak ada hasil yang ditemukan

S TE 1204484 Bibliography

N/A
N/A
Protected

Academic year: 2017

Membagikan "S TE 1204484 Bibliography"

Copied!
3
0
0

Teks penuh

(1)

Ismi Dzakiyyah Azizah, 2016

Analisis Pengaruh Keberadaan Pltn Pada Keandalan Sistem Kelistrikan Jawa Barat Dengan Mempertimbangkan Loss Of Load Probability

Universitas Pendidikan Indonesia | repository.upi.edu | perpustakaan.upi.edu

DAFTAR PUSTAKA

Association, world nuclear. 2000. “Nuclear Power , Energy and the Environment.”

Atsawathawichok, Pramukpong, and Prasit Teekaput. 2 014. “Long Term Peak

Load Forecasting in Thailand Using Multiple Kernel Gaussian Process.” (1):

1–4.

Billinton, Roy, Life Fellow, and Jingdong Ge. 2004. “A Comparison of Four-State

Generating Unit Reliability Models for Peaking Units.” 19(2): 763–68.

Boroujeni, Hasan Fayazi;, Meysam; Eghtedari, and Mostafa; Elahe Behzadipour

Abdollahi. 2012. “Calculation of Generation System Reliability Index: Loss

of Load Probability.” 9(4): 4903–8.

Bunden, Richard L. 2005. Numerical Analysis Ninth Edition.

Cetinkaya, Nurettin. 2013. “Long-Term Electrical Load Forecasting Based on

Economic and Demographic Data for Turkey.” : 219–23.

Chutiprapat, Vivat, and Pornrapeepat Bhasaputra. 2012. “The Evaluation of

Economic and Social Effect from the Revised Nuclear Power Plant Planning

in Thailand.” : 2–5.

Deog Y, Oh. 1990. “Ins Trument Failure Detection and Estimation Methodology

for the Nuclear Power Plant.” 37(1): 21–31.

Du, Xinhui, Jingbo Bai, and Qing Fan. 2011. “Study of the Medium-Long Load

Forecasting Based on the Identical Dimension Addition Grey Model.” : 700–

703.

Ekstrom, Thomas E. 1995. “Guarantees of Gas Turbine.” 31(4).

Firmansyah, Rizki, Setya Budi, and Elok S Amitayani. 2015. “Peran PLTN Dalam

Meningkatkan Indeks Keandalan Loss Of Load Probability ( LOLP ) Sistem

(2)

Ismi Dzakiyyah Azizah, 2016

Analisis Pengaruh Keberadaan Pltn Pada Keandalan Sistem Kelistrikan Jawa Barat Dengan Mempertimbangkan Loss Of Load Probability

Universitas Pendidikan Indonesia | repository.upi.edu | perpustakaan.upi.edu

Gambirasio, Giorgio. 1976. “Computation of Loss-of-Load Probability.” (1): 54–

55.

Giraldo, Juan S et al. 2012. “Fundamentals of Nuclear Power.” (December).

Ichihara, Yoshiaki, and Senior Member. 2001. “A Perspective on Nuclear Power

Generation in the Future Electric Power Industry for Nonspecialists in the

Electric Power Related Industries.” 89(12): 1793–1807.

Jang, Hong-seok, Bok-ryul Kim, and Sang-keun Lee. 2011. “Including

Combined-Cycle Power Plants in Generation System Reliability Studies.”

(September).

Kumar, B Vinod et al. 2010. “Reliability Trending for Nuclear Power Plant.” :

391–94.

Kvam, Paul H. 1998. “A Parametric Mixture- Ommon-Cause Fai.” 47(1): 30–34.

Laouafi, Abderrezak, Mourad Mordjaoui, and Farida Laouafi. 2010. “An

Evaluation of Conventional and Computational Intelligence Methods for

Medium and Long-Term Load Forecasting in Algeria.”

Liu, Dichen, and Heng Luo. 2012. “Study on Nuclear Power Plant Dynamic Response Characteristics and Impact of Power Quality Problems.” (Ciced):

5–6.

Liu, Xu, and Syed Islam. 2006. “Wind Diesel Battery Hybrid Generation System

Reliability Analysis on Site and Size Factors.” (December): 19–21.

Marsudi, Djiteng. 2006. Operasi Sistem Tenaga Listrik. Yogyakarta: Graha Ilmu.

Min, Yao, Zhao Min, and Wang Dongyue. 2015. “Research on Mid-Long Term

Load Forecasting Based on Combination Forecasting Mode.” (5).

Oka, Ashok A. 2000. “Demand Not Supplied, Loss of Load Probability

Reliability Indices for Industrial Costumers.” : 602–7.

PT PLN Persero. 2015a. “35.000 MW Untuk Indonesia.”

PT PLN Persero. 2015b. “Rencana Usaha Penyediaan Tenaga Listrik.” : 1–515.

(3)

Ismi Dzakiyyah Azizah, 2016

Analisis Pengaruh Keberadaan Pltn Pada Keandalan Sistem Kelistrikan Jawa Barat Dengan Mempertimbangkan Loss Of Load Probability

Universitas Pendidikan Indonesia | repository.upi.edu | perpustakaan.upi.edu

2013. “Reliability Assessment of Bangladesh Power System Using Segmentation Method.”

Rem, N O T. 1975. “IEEE Guide for General Principles of Reliability Analysis of

Nuclear Power O.” 1975.

RISTEKDIKTI. 2015. “Kesiapan Pengembangan PLTN Di Indonesia.” : 1–22.

robert H.Miller, james H.Malinowski. 1993. Power Sistem Operation.

Sapkota, Deepak, Tri Ratna Bajracharya, and Mahesh Chandra Luintel. 2014.

“Reliability and Availability Evaluation of Sunkoshi Hydro Power Station.” :

197–202.

Shi, Qiuyun. 2012. “Study on the Faults of Nuclear Power Plant and Effects on

Transient Stability of Power System.” (Ciced): 5–6.

Spears, H T, Kenneth L Hicks, and Two-area Case. 1970. “Load for Three Areas.”

(4): 521–26.

Wang, L. 1977. “The Effects of Uncertainties in Forced Outage Rates and Load

Forcast on the Loss of Load Probability.” (6): 1920–27.

Weingarth, Lew. 2011. “Dynamic Positioning Power Plant System.”

Yu-fan, L I N. 2011. “Simple Analysis about the Environment Protection and

Design of Nuclear Power Plant.” : 233–35.

Zhang, Sheng et al. 2012. “Research on Reliability Data Collection and

Application Platform in Nuclear Power Plants.” : 1508–13.

Zhu, Jiping. 2013. “The Optimization Selection of Correlative Factors for Long

Referensi

Dokumen terkait

Hasil analisis regresi linier sederhana yang diperoleh antara kandungan logam berat Cu pada air laut dengan kandungan logam berat Cu pada sedimen dapat

Pernyataan diatas merupakan sesat pikir karena belum tentu bila seseorang tidak mengetahui sesuatu itu ada/ tidak bukan berarti sesuatu itu benar-benar tidak ada

Kewirausahaan adalah Kebuhhan akan prestasi, Keluarga dan Lingkungan, sedangkan yang tidak signifikan berpengaruh terhadap lntensi Kewirausahaan. adalah Usia, Gender

untuk negara yang sedang akan berkembang dalam aspek Pendidikan. mencapai 1,6% dan negara yang berkembang masuk berada pada level

HAM adalah hak-hak dasar yang melekat pada diri manusia,tanpa hak-hak itu manusia tidak dapat hidup layak sebagai manusia yang bersifat kodrati dan

279.000.000,- (Dua ratus tujuh puluh sembilan juta rupiah) Tahun Anggaran 2016, maka bersama ini kami Kelompok Kerja I Unit Layanan Pengadaan Barang / Jasa

Salah satu Produk De Nature adalah Ambejoss yang terbuat dari ekstrak daun ungu, mahkota dewa, kunyit putih Sedangkan Salep salwa dibuat dengan campuran propolis

500.000.000,- (Lima ratus juta rupiah) Tahun Anggaran 2016, maka bersama ini kami Kelompok Kerja I Unit Layanan Pengadaan Barang / Jasa Daerah Kabupaten