• Tidak ada hasil yang ditemukan

carbasm.doc 61KB Jun 05 2011 09:30:50 PM

N/A
N/A
Protected

Academic year: 2017

Membagikan "carbasm.doc 61KB Jun 05 2011 09:30:50 PM"

Copied!
3
0
0

Teks penuh

(1)

SUPPLEMENTARY MATERIAL

Selected HF/6-31G** geometrical parameters (bond lenghts in Angstroms and bond angles in degrees) for the stable conformers of the compounds of Scheme 1.

1 1TT 1TG 1TG´ 1GT 1GG 1GG´ 1G´T 1G´G 1G´G´

C-O 1.4072 1.3951 1.4030 1.3893

N-C 1.4236 1.4334 1.4314 1.4412

N-C-O 110.95 107.09 115.62 110.17

R4-C-O 110.24 111.25 105.36 105.49

R4-C-N 108.58 108.05 108.70 114.26

R5-C-O 110.25 109.36 110.50 111.45

R5-C-N 108.57 113.56 108.19 107.65

R1-O-C-N 179.89 170.36 69.70 48.34

R2-N-C-O 59.26 -64.95 66.89 -166.75

R3-N-C-O -59.35 173.82 -54.34 71.39

2 2TT 2TG 2TG´ 2GT 2GG 2GG´ 2G´T 2G´G 2G´G´

C-O 1.4019 1.3892 1.4008 1.3856

N-C 1.4228 1.4336 1.4306 1.4425

N-C-O 111.52 107.58 116.19 111.46

R1-O-C 114.18 114.12 115.73 115.22

R4-C-O 109.62 110.71 105.16 105.08

R4-C-N 109.01 108.46 108.64 113.66

R5-C-O 109.62 108.84 109.78 110.75

R5-C-N 109.01 113.85 108.27 107.73

R1-O-C-N 179.99 178.40 72.47 66.78

R2-N-C-O 59.51 -65.46 54.21 -166.57

R3-N-C-O -59.52 173.7 -68.36 71.99

3 3TT 3TG 3TG´ 3GT 3GG 3GG´ 3G´T 3G´G 3G´G´

C-O 1.4127 1.3993 1.4002 1.4082 1.3950 1.4090 1.3944 N-C 1.4285 1.4390 1.4393 1.4361 1.4459 1.4370 1.4460 N-C-O 109.50 105.54 105.39 114.06 108.47 114.04 108.80 R1-O-C 110.20 109.83 109.57 109.82 107.77 109.95 107.83 R4-C-O 109.01 110.21 108.47 104.12 104.52 109.31 110.29 R4-C-N 107.42 107.10 112.37 107.46 112.98 106.97 106.48 R5-C-O 110.87 110.38 111.62 111.12 111.77 106.44 106.80 R5-C-N 110.49 114.61 110.09 110.21 109.97 110.47 115.32 R1-O-C-N -176.35 178.99 -171.28 69.53 48.89 -64.86 -45.70 R2-N-C-O 57.70 -60.80 175.31 51.94 -173.93 65.53 -71.48 R3-N-C-O -60.18 178.78 55.11 -68.48 65.16 -55.04 167.52

4 4TT 4TG 4TG´ 4GT 4GG 4GG´ 4G´T 4G´G 4G´G´

C-O 1.4188 1.4059 1.4150 1.4012

N-C 1.4349 1.4462 1.4426 1.4523

N-C-O 108.15 104.12 112.70 107.32

R1-O-C 110.27 109.70 109.82 107.80

R4-C-O 109.52 110.34 105.07 105.54

R4-C-N 109.00 108.63 108.95 113.74

R5-C-O 109.51 109.13 109.74 110.34

R5-C-N 109.00 113.08 108.75 108.46

R1-O-C-N -179.98 177.91 65.89 46.99

R2-N-C-O 58.68 -54.10 66.68 -173.16

(2)

5 5TT 5TG 5TG´ 5GT 5GG 5GG´ 5G´T 5G´G 5G´G´ C-O 1.4085 1.3940 1.3970 1.4042 1.3890 1.3914 1.4047 1.3884 1.3920 N-C 1.4207 1.4313 1.4285 1.4297 1.4417 1.4372 1.4281 1.4393 1.4387 N-C-O 111.30 107.19 108.22 115.64 111.95 110.93 115.83 110.23 112.57 R1-O-C 110.12 109.75 109.71 110.37 110.27 107.85 109.93 107.96 110.31 R3-N-C 115.14 113.89 114.93 115.66 113.34 114.74 115.47 114.39 115.13 R4-C-O 109.99 111.42 109.22 105.62 106.79 105.37 110.33 111.64 109.36 R4-C-N 108.46 108.38 112.59 108.44 108.10 113.41 108.12 107.84 112.02 R5-C-O 110.11 109.87 110.88 110.27 110.04 111.21 105.19 105.90 106.54 R5-C-N 108.56 112.66 108.08 108.28 112.23 107.80 108.76 113.61 108.03 R1-O-C-N 175.33 170.92 -161.87 76.47 75.95 50.46 -69.09 -51.90 -78.87 R2-N-C-O 62.89 -53.26 -161.39 61.34 -60.27 -159.88 70.67 -60.53 -159.84 R3-N-C-O -62.42 -178.19 71.61 -64.54 175.96 73.50 -57.17 174.94 74.19

6 6TT 6TG 6TG´ 6GT 6GG 6GG´ 6G´T 6G´G 6G´G´

C-O 1.4030 1.3912 1.3877 1.4023 1.3846 1.3881 1.3874

N-C 1.4199 1.4284 1.4319 1.4275 1.4404 1.4375 1.4414

N-C-O 111.76 108.54 107.67 116.29 111.32 112.01 113.25

R1-O-C 114.19 114.12 114.24 115.57 115.21 115.12 115.62

R2-N-C 115.17 114.83 113.72 115.56 113.91 114.58 113.89

R4-C-O 109.52 110.43 109.37 104.99 105.66 110.58 109.13

R4-C-N 108.97 108.55 112.93 108.73 113.01 107.94 112.11

R5-C-O 109.44 108.73 110.92 109.65 111.03 104.96 105.97

R5-C-N 108.94 112.85 108.77 108.21 107.95 112.88 108.16

R1-O-C-N -178.31 175.58 -178.95 71.45 69.03 -67.17 -66.58

R2-N-C-O 62.56 -71.98 177.49 56.56 -176.47 -72.91 -157.73

R3-N-C-O -62.95 161.40 52.90 -72.44 59.43 160.41 78.25

7 7TT 7TG 7TG´ 7GT 7GG 7GG´ 7G´T 7G´G 7G´G´

C-O 1.4032 1.3891 1.3858

N-C 1.4206 1.4323 1.4415

N-C-O 111.83 109.07 112.30

R1-O-C 114.18 114.09 115.07

R2-N-C 113.86 112.78 112.36

R3-N-C 113.86 111.93 112.36

R4-C-O 109.40 110.28 105.56

R4-C-N 108.98 108.58 112.21

R5-C-O 109.40 109.27 110.48

R5-C-N 108.98 112.07 108.01

R1-O-C-N 179.99 176.26 68.26

R2-N-C-O 65.45 -64.14 -166.70

R3-N-C-O -65.46 168.01 65.50

8 8TT 8TG 8TG´ 8GT 8GG 8GG´ 8G´T 8G´G 8G´G´

C-O 1.4089 1.3951 1.4046 1.3900 1.3896

N-C 1.4214 1.4325 1.4309 1.4422 1.4408

N-C-O 111.39 108.78 115.67 112.63 111.34

R1-O-C 110.09 109.71 110.27 110.46 108.00 R2-N-C 113.81 112.89 113.67 113.05 112.66 R3-N-C 113.82 112.11 114.20 111.34 112.54 R4-C-O 109.95 110.65 105.43 107.02 105.80 R4-C-N 108.53 108.15 108.61 107.95 112.76 R5-C-O 109.98 109.78 110.21 109.88 111.05 R5-C-N 108.55 111.78 108.25 111.32 107.91

R1-O-C-N 179.21 160.19 74.27 88.84 53.2

R2-N-C-O 65.37 -64.51 62.24 -62.14 -165.25 R3-N-C-O -65.39 167.26 -68.66 170.43 66.75

(3)

C-O 1.4139 1.4007 1.4009 1.4098 1.3969 1.3963 1.4098 1.3954 1.3958 N-C 1.4259 1.4413 1.4378 1.4354 1.4517 1.4462 1.4333 1.4474 1.4485 N-C-O 109.82 105.02 106.57 114.16 109.40 109.43 114.34 107.79 110.79 R1-O-C 110.23 109.79 109.85 110.34 110.18 107.81 109.78 108.05 110.34 R3-N-C 115.22 115.32 117.52 115.85 115.29 117.29 115.52 116.23 117.72 R4-C-O 110.57 111.10 110.34 106.51 107.23 106.63 110.87 111.22 110.40 R4-C-N 110.48 111.64 115.75 110.38 111.29 116.70 110.20 111.91 115.38 R5-C-O 108.98 108.97 109.80 109.14 109.20 110.01 104.02 104.85 105.41 R5-C-N 107.38 111.11 105.95 106.99 110.54 105.55 107.48 111.95 105.84 R1-O-C-N 172.44 176.83 -172.68 71.78 79.96 47.54 -69.23 -55.53 -82.89 R2-N-C-O 62.69 -36.43 -164.52 61.95 -33.24 -160.42 71.39 -49.97 -166.35 R3-N-C-O -62.05 -160.27 66.26 -63.68 -158.21 70.70 -55.90 -172.98 65.30

10 10TT 10TG 10TG´ 10GT 10GG 10GG´ 10G´T 10G´G 10G´G´

Referensi

Dokumen terkait

Hal ini menyebabkan timbulnya beberapa permasalahan dalam pengolahan data , sebagai contohnya sering terjadi kekeliruan dalam hal pemasukan data material proyek, lambatnya

Sehubungan dengan Pengumuman Lelang Pekerjaan Verifikasi Ekspor Produk Industri Kehutanan Tahun Anggaran 2014 yang diumumkan pada tanggal 29 November 2013 yaitu :. Terjadi

Melakukan penelitian/evalusasi secara saksama terhadap surat penawaran yang memenuhi persyaratan administrasi dan persyaratan teknik sebanyak 3 (tiga) calon penyedia yang diterima

Menindak lanjuti hasil evaluasi yang dilakukan oleh Kelompok Kerja Pengadaan Barang/Jasa Politenik Kesehatan Maluku Tahun Anggaran 2016, dan berdasarkan Berita Acara

[r]

In chapter 4, I presented a second study performed with the aim to examine the interplay between the role of motor perspective (agent) and action organization

[r]

Pada hari ini SENIN tanggal DUA PULUH DUA Bulan AGUSTUS tahun DUA RIBU ENAM BELAS kami Unit Layanan Pengadaan Barang/Jasa BBPK Ciloto telah mengadakan evaluasi