ABSTRAK

Lazuardi Gagah Mulyarko, 2014, Analisa Pengaruh Risiko Pada Kontrak Kerja Konstruksi Terhadap Biaya Pekerjaan (Studi Kasus : Proyek Pembangunan Jalan Tol Bogor Ring Road Seksi II A), Jurusan Teknik Sipil Fakultas Teknik Universitas Sebelas Maret Surakarta.

Dalam proyek konstruksi, risiko selalu ada dalam setiap proses pekerjaan proyek khususnya dalam kontrak kerja konstruksi. Hal ini disebabkan oleh ketidakpastian atau ketidakjelasan informasi yang terdapat dalam kontrak kerja konstruksi. Dan akan berpengaruh terhadap biaya pekerjaan konstruksi. Sehingga dilakukan penelitian mengenai pengaruh risiko pada kontrak kerja konstruksi terhadap biaya pekerjaan pada Proyek Pembangunan Jalan Tol Bogor Ring Road Seksi II A.

Metode penelitian yang digunakan adalah studi kasus. Rangkaian analisis dimulai dengan melakukan identifikasi variabel risiko melalui studi literatur. Kemudian dilakukan pengumpulan data dengan menggunakan metode survei dan wawancara terhadap responden yang terkait dengan proyek. Hasil identifikasi ini dianalisis

menggunakan metode Severity Index (SI) dan Matriks Probability and Impact.

Didapat hasil variabel risiko yang signifikan pada proyek. Dari hasil tersebut dilakukan analisis respon risiko oleh responden untuk penanganan risiko yang signifikan.

Berdasarkan hasil analisa diketahui bahwa variabel risiko yang signifikan terdapat dalam kode risiko A.3 (kontraktor mendapatkan informasi yang jelas mengenai kondisi lapangan pada saat kunjungan lapangan) dengan asumsi risiko yang mempengaruhi biaya pekerjaan sebesar 0,40 % dari nilai kontrak. Dan respon

yang dilakukan adalah secara avoid dan mitigate.

(2)

perpustakaan.uns.ac.id digilib.uns.ac.id

commit to user

vii

ABSTRACT

Lazuardi Gagah Mulyarko, 2014, Risk Analysis on Construction Contract Prefer to Construction Cost (Case Study: Bogor Ring Road Construction Project Section II A), Department of Civil Engineering, Faculty of Engineering, Sebelas Maret University, Surakarta.

In a construction project, The risk is probability happen in any project work process, especially on construction contract. These risks arise as a result of an event or activity that is not definite on construction contract. And will affect to construction cost. So we do research on the effect of risk on construction contract prefer to construction cost of Bogor Ring Road Construction Project Section II A.

The research method used is a case study method. The analysis starts from the identification of risk variables through the literature studies. Then collecting data using surveys methods and interviews with the respondents related to the project. The identification results were analyzed using Severity Index (SI) Method and Matrix probability and Impact. The result is a significant risk variables on the project. From these results, an analysis of risk response will performed to the respondent for the handling of significant risks.

From the result of the analysis known that have significant risk variable on code risk A.3 (Contractor obtain clear information about field conditions during field visits). Assuming the risks that affect the cost of the work was 0.40 % of the contract value. And the response is avoid and mitigate.

Referensi

Dokumen terkait

a). Pusat mengembangkan kemampuan dasar untuk setiap mata pelajaran, untuk setiap jenjang pendidikan. Propinsi bersama-sama dengan kabupaten/kota menyusun kisi-kisi dan

Ini berarti hasil belajar fisika siswa ranah kognitif dan ranah afektif selama proses pembelajaran yang diberikan dengan penerapan metode pembelajaran inkuiri

Penilaian autentik menitikberatkan pada tiga aspek penilaian yaitu afektif, kognitif, dan psikomotor. Sistem penilaian autentik yang terdapat dalam kurikulum 2013

Berdasarkan hasil tersebut dapat ditarik sebuah kesimpulan dari penelitian ini yaitu terdapat perbedaan hasil belajar ranah kognitif, afektif, dan psikomotor yang

1) Barang tahan lama adalah barang berwujud yang biasanya dikonsumsi dalam satu atau beberapa kegunaan, seperti bir dan sampo. Karena barang-barang ini sering dibeli, strategi

Secara umumnya perkara di atas menunjukkan bagaimana nas-nas berkenaan sunnah Allah sama ada di Makkah atau Madinah adalah turut sarat dengan pendekatan-pendekatan tarbiah

Hal ini disebabkan tanaman dapat tumbuh dengan baik apabila hara yang diperlukan dalam proses metabolisme tersedia dalam jumlah yang cukup dan diserap dengan

memiliki nilai investment opportunity set (IOS) yang tinggi dibandingkan dengan perusahaan lainnya yang artinya adalah apabila perusahaan memiliki nilai IOS yang tinggi