xv
DAFTAR PUSTAKA
Jr. Patton DJoseph. 1996.Preventive Maintenance. Instrument of America,
Prentice-Hall, Inc. Englewood Cliffs, N.J 07632.
SUHARTO. IR, Sistem Perawatan Terpadu, jakarta : RINEKA CIPTA
Bastanta, Joel. 2016.PENERAPAN TOTAL PRODUCTIVE MAINTENANCE
UNTUK PENINGKATAN EFISIENSI PRODUKSI DENGAN
MENGGUNAKAN METODE OVERALL EQUIPMENT
EFFECTIVENESS PADA TURBIN UAP TYPE C5 DS II – GVS
DI PT. PP LONDON SUMATERA INDONESIA Tbk BEGERPANG
POM (Skripsi Sarjana). Medan : Fakultas Teknik Sumatera Utara.
Keith, R. M. 1957.Maintenance Engineering Handbook-Seventh Edition. United
State of Amerika : The McGraw-Hill Companies, Inc.
Ljungberg, O. 1998.Measurement of overall equipment effectiveness as a basis for
TPM activities. International Journal of Operations & Production
Management.
Nakajima, S. 1988.Introduction to Total Productive Maintenance. Cambridge:
MA,Productive Press, Inc.
Springer. 2003.Handbook of reliability engineering. New Jersey USA : Sunrise
Setting Ltd, Torquay, Devon, UK
S.,Nehete, E., Narhede, and K., Mahajan.Total Productive Maintenance: A Critical
Review.
http://www.plant-maintenance.com/articles/RCMvTPM.shtml
www.oee.com/world-class-oee.html, diakses pada 09 Mei 2016.
http://www.leanproduction.com/tpm.html, diakses pada 01 Juli 2016, 05.23 WIB
http://www.oee.com/oee-six-big-losses.html, diakses pada 01 Juli 2016, 05.28 WIB
Pabrik Peleburan Aluminium, diakses dari http://www.inalum.co.id/article/pabrik-peleburan-aluminium.html, pada tanggal 3 Juni 2016 pukul 21.20 WIB