• Tidak ada hasil yang ditemukan

IDX Investor Day Jakarta, 02 Mei 2012

N/A
N/A
Protected

Academic year: 2021

Membagikan "IDX Investor Day Jakarta, 02 Mei 2012"

Copied!
26
0
0

Teks penuh

(1)

IDX Investor Day 2012

Jakarta, 02 Mei 2012

(2)

DISCLAIMER

The views expressed here contain information derived from publicly available sources that have not been independently verified. No representation or warranty is made as to the accuracy, completeness or reliability of the

information. Any forward looking information in this presentation has been prepared on the basis of a number of assumptions which may prove to be incorrect. This presentation should not be relied upon as a recommendation or forecast by PT. Indo Tambangraya Megah Tbk. Nothing in this release should be construed as either an offer to buy or

(3)

1. Pendahuluan

2. Tinjauan Operasional

3. Tinjauan Pemasaran

4. Tinjauan Keuangan

(4)

1

(5)

Struktur dan Riwayat Perusahaan

ITMG

65.00%

Indominco Trubaindo Bharinto Jorong

PT Indominco Mandiri (CCOW Gen.I)

PT Trubaindo Coal Mining (CCOW Gen II)

PT Kitadin-Embalut (KP) PT Bharinto

Ekatama (CCOW Gen III)

PT Jorong Barutama Greston (CCOW Gen II)

50.00%

PT Indo Tambangraya Megah Tbk.

Banpu Minerals (Singapore) Pte Ltd 99.99% 99.99% 99.99% 99.99% 99.67% 174 Mt 695 Mt Resources Reserves 102 Mt 327 Mt Resources Reserves 13 Mt 150 Mt Resources Reserves 112 Mt 298 Mt Resources Reserves 6 Mt 144 Mt Resources Reserves Banpu Minerals Co.Ltd Reserves 417* Mt Resources 1,627* Mt BMS 99.99% BMC Banpu PCL Banpu Publik 35.00% Kitadin PT Kitadin-Td.Mayang (KP) 10 Mt 13 Mt Resources Reserves BCI 50.00% 100.00% Banpu Coal Investment Co.Ltd

Kalimantan Timur Kalimantan Timur Kalimantan Timur / Tengah Kalimantan Timur Kalimantan Selatan

INDONESIAN STOCK EXCHANGE

IPO 18thDec 2007

6,500-7,300 kcal/kg

(6)

Agenda

2

(7)

.

Indominco

Produksi batubara 2011: 14.8 juta ton. Target

produksi untuk 2012: 15.0 juta ton Pembangkit Listrik Berbahan bakar batubara Trubaindo Produksi batubara 2011: 7.1 juta ton. Target produksi untuk

2012: 7.1 juta ton

Jorong

Produksi batubara 2011: 1.4 juta ton. Target produksi untuk

2012: 1.0 juta ton

Bharinto

Target produksi untuk

2012: 0.7 juta ton Kitadin-Embalut

Produksi batubara 2011: 1.3 juta ton. Target produksi untuk 2012: 0.7 juta ton

Kitadin-Td.Mayang

Produksi batubara 2011: 0.4 juta ton dan target produksi untuk 2012: 2.7 juta ton. Saat ini juga bekerja

sebagai kontraktor tambang di area Indominco

Produksi 2011: 25 juta ton dan Target 2012: 27 juta ton

(8)

Indominco Mandiri

3.1 EAST BLOCK

Santan River Port stock

yard Bontang City Asphalt haul road 2.5Km 35Km Sea conveyor Mine stockyard Inland conveyor 4km 0 2 4 6 8 10km WEST BLOCK Operations Stockpile Ports Hauling Crusher ROM stockpile

SKEMA INDOMINCO-BONTANG

Post Panamax 95,000DWT

ANALISA PRODUKSI INDOMINCO

3.1 3.4 4.2 4.1 1Q 2Q 3Q 4Q 2011 2012 SR 13.5 11.8 12.0 12.1 Blok Barat 1.81.5 1.8 2.1 2.0 1Q 2Q 3Q 4Q Blok Timur 1.31.6 1.6 2.1 2.1 1Q 2Q 3Q 4Q SR 15.8 12.5 13.1 13.3 10.1 10.9 10.9 10.9 Volume

Produksi 2011: 14.8 juta ton dan Target 2012: 15.0 juta ton

Volume

MAJOR QUARTERLY UPDATES

z Produksi 2011 yang sesuai target disebabkan oleh kondisi cuaca dan curah hujan yang baik pada 2H11 dan adanya penambahan alat berat dari PAMA.

z Persiapan studi kelayakan untuk washing plant di Blok Timur masih berjalan.

z Penyelesaian tahap pre-studi kelayakan pada In-Pit Crushing Conveyer (IPCC) sistem.

z Studi untuk perluasan kapasitas pelabuhan batubara Bontang dan mine-stock yard yang dilakukan oleh konsultan dari luar

(9)

Trubaindo and Bharinto

Mahakam River Operation Stockpile Hauling Barge Port Crusher South Block 1 (Dayak Besar) North Block 40km Mine to port Kedangpahu River ROM stockpile Bunyut Port 0 5 10 15 20 25km Product coal conveyor, stacking, stockpile

SKEMA TRUBAINDO-BHARINTO

EAST KALIMANTAN Bharinto 60km south west of Trubaindo North Block South Block 2 (Biangan) PT. BHARINTO PT. TRUBAINDO

ANALISA PRODUKSI TRUBAINDO

1.5 1.6 1.7 1.8 2.1 1Q 2Q 3Q 4Q SR : 10.0 11.9 14.1 12.4

Produksi 2011: 7.1 juta ton dan Target 2012: 7.1 juta ton

2011 2012 Volume :

ANALISA PRODUKSI BHARINTO

1Q 2Q 3Q 4Q

Target 2012: 0.7 juta ton

Volume : 0.0 0.0 0.0 0.0 0.0

2011 2012

MAJOR QUARTERLY UPDATES

z Trubaindo:

ƒ Produksi 2011 sedikit dibawah target karena kapasitas coal stockyard Trubaindo yang sudah penuh sebagai dampak dari runtuhnya jembatan Kutai Kartanegara.

z Bharinto:

ƒ Aktifitas pre-stripping sudah dilakukan sejak Januari 2012. ƒ Fasilitas jalan untuk pengangkutan batubara diestimasikan

selesai pada 1Q12.

(10)

Kitadin Embalut and Td.Mayang

Balikpapan Mahakam

River

Samarinda to Muara Berau

Bontang city EMBALUT Embalut Port to Muara Jawa ROM stockpile Operations Stockpile Ports Hauling Crusher 0 2 4 6 8 10km 5km Mine to port TD. MAYANG EAST KALIMANTAN IMM EB

SKEMA KITADIN

IMM WB Bontang Port

ANALISA PRODUKSI EMBALUT

0.3 0.3 0.3 0.4

1Q 2Q 3Q 4Q

SR : 8.9 8.7 11.2 11.5

Produksi 2011 : 1.3 juta ton dan Target 2012: 0.7 juta ton

Volume :

ANALISA PRODUKSI TD. MAYANG

1Q 2Q 3Q 4Q

Volume :

0.0 0.0 0.0

0.2

Produksi 2011: 0.4 juta ton; Target 2012: 2.7 juta ton 2011 2012 2011 2012 0.4 0.5 15.1 SR :

MAJOR QUARTERLY UPDATES

z Kitadin Embalut:

ƒ Produksi 2011 lebih tinggi dari target dikarenakan oleh kinerja kontraktor yang cukup baik.

ƒ Penurunan target produksi batubara di tahun 2012 disebabkan oleh sulitnya kondisi lokasi tambang dan kompensasi lahan di area tambang Kitadin Embalut.

z Kitadin Tandung Mayang:

ƒ Memproduksi batubara pada area konsesinya sendiri sejak 3Q11 dan target produksi 2012 sebesar 2.7 juta ton.

(11)

Jorong

Coal terminal Jorong Pelaihari Pacific Ocean Haul road Operations Stockpile Hauling Barge Port 0 5 10 15 20 25km 20km

SKEMA JORONG

ANALISA PRODUKSI JORONG

0.3 0.2

1Q 2Q 3Q 4Q

SR :

Produksi 2011: 1.4 juta ton dan Target 2012: 1.0 juta ton

8.6 Volume : 0.4 8.6 0.4 8.6 2011 2012 0.3 8.6

MAJOR QUARTERLY UPDATES

ƒ Produksi 2011 sesuai dengan target dikarenakan oleh kinerja kontraktor yang cukup baik.

ƒ Mentargetkan produksi batubara sebesar kurang lebih 1.0 juta ton per tahun dikarenakan keterbatasan reserves

(12)

Agenda

3

(13)

Rata-rata harga jual batubara

30

50

70

90

110

130

150

170

190

J a n-07 Ma r-0 7 Ma y -0 7 Ju l-0 7 Se p -0 7 No v -0 7 J a n-08 Ma r-0 8 Ma y -0 8 Ju l-0 8 Se p -0 8 No v -0 8 J a n-09 Ma r-0 9 Ma y -0 9 Ju l-0 9 Se p -0 9 No v -0 9 J a n-10 Ma r-1 0 Ma y -1 0 Ju l-1 0 Se p -1 0 No v -1 0 J a n-11 Ma r-1 1 Ma y -1 1 Ju l-1 1 Se p -1 1 No v -1 1 J a n-12

USD / Ton

Triwulan Indeks NEX

NEX per 26 Apr 2012:

$101.90/ton

Triwulan harga jual rata-rata Indeks NEX bulanan

Rata-rata harga jual bulanan

Harga jual 4Q11: $103.1/t Harga jual FY11: $97.1/t

(14)

Indikasi penjualan batubara tahun 2012

Kontrak penjualan batubara dan harga

51%

31%

6%

13%

Status Kontrak

Status Harga

Kontrak Sudah ditetapkan

Mengacu indeks

TARGET PENJUALAN 2012: 27 juta ton

Belum dikontrak Harga belum

ditentukan Belum

terjual

87%

(15)

Penjualan batubara berdasarkan geografis 

JAPAN (16%)

INDIA (9%)

INDONESIA

(9%)

PHILIPPINES

(5%)

HONG KONG (4%)

TAIWAN (8%)

S.KOREA (5%)

THAILAND (7%)

2012

*Includes small, non-regular purchasers

Penjualan batubara

2011: 24.7 juta ton

OTHERS* (0%)

2012

CHINA (23%)

2012 2012 2012 2012 2012 2012 2012 4.1 4.2 4.5 4.1 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 2008 2009 2010 2011 2.4 0.6 1.8 1.4 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 2008 2009 2010 2011 2012 -0.9 1.2 0.9 0.20 0.40 0.60 0.80 1.00 1.20 1.40 2008 2009 2010 2011 1.6 3.1 5.1 5.8 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 2008 2009 2010 2011 1.4 1.4 1.8 1.8 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0 2008 2009 2010 2011 1.7 2.6 2.4 2.0 0.5 1.0 1.5 2.0 2.5 3.0 2008 2009 2010 2011 1.6 1.8 1.1 1.3 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0 2008 2009 2010 2011 1.4 1.3 0.5 2.1 0.5 1.0 1.5 2.0 2.5 2008 2009 2010 2011 2.1 2.0 1.5 1.7 0.5 1.0 1.5 2.0 2.5 2008 2009 2010 2011 0.1 0.2 0.2 0.1 0.1 0.2 0.2 0.3 2008 2009 2010 2011

MALAYSIA (5%)

2012 1.3 0.9 1.1 1.3 0.5 1.0 1.5 2.0 2.5 3.0 0.1 2.2 0.9 2.3 0.5 1.0 1.5 2.0 2.5 2008 2009 2010 2011

ITALY (7%)

(16)

Agenda

4

(17)

Penjualan Bersih

2007 2008 2009 2010 2011

2007 2008 2009 2010 2011

Satuan: Juta ton

VOLUME PENJUALAN

Satuan: USD/Ton

RATA-RATA HARGA JUAL BATUBARA

Satuan: Jutaan Dolar AS

PERTUMBUHAN PENJUALAN*

Indominco Trubaindo Jorong

Kitadin

* Tidak termasuk pendapatan dari pelabuhan

2007

2008

2009

2010

2011

18.1 17.7 +11% YoY 21.0 22.2 73.9 42.3 +30% YoY 71.5 74.9 2007 2008 2009 2010 2011 765 1,311 1,501 1,658 +45% YoY 24.7 97.1 2,397

(18)

Neraca Keuangan

Net Gearing (%)

Net D/E (times)

(30%) (0.34) (0.36) (34%) POSISI KEUANGAN

2007

2008

258 222 POSISI HUTANG

2007

2008

92 11 55

2009

429 (0.47) (44%)

2009

2011

612 0

2011

(0.57) (57%) 295

2010

0

2010

(0.41) (41%)

2007

2008

2009

2010

2011

(Satuan: Jutaan Dolar AS)

(19)

Kinerja Keuangan

2007 2008 2009 FY10 fy11

2007 2008 2009 FY10 FY11 2007 2008 2009 FY10 FY11

LABA BERSIH

LABA BERSIH

LABA USAHA**

LABA USAHA**

Satuan: Jutaan Dolar AS

163

56

235 7%

18%

Laba Usaha Margin Laba Usaha Laba Bersih Margin Laba Bersih

LABA KOTOR*

LABA KOTOR*

458

Laba Kotor Margin Laba Kotor

FY07 FY08 *) Termasuk royalti 27% 21% 29% FY09 563 492 33% 336 22% FY10 35% 38% 518 32% 416 388 25% 12% 204 FY11 206 892 37%

FY07 FY08 FY09 FY10 FY11

764 32%

FY07 FY08 FY09 FY10 FY11

546 23%

**) Laba usaha sebelum depresiasi dan amortisasi

(20)

Rencana Belanja Modal (Capex) 2012

Catatan: Jumlah pembelanjaan modal termasuk kantor pusat Jakarta

Indominco Trubaindo Bharinto Kitadin Jorong ITM Konsolidasi*

209

80

108

9

6

2

In-pit crushing conveyor (IPCC) Pengembangan pelabuhan Crushing plant & Washing plant

Infrastruktur Trubaindo Crushing plant

(21)

Pembayaran Dividen

* Pembayaran dividen pada tanggal 15 Mei 2012

2,506

1,168

795

706

295

678

407

1,286

344

1H08

3Q08

4Q08

1H09

2H09

1H10

2H10

1H11

2H11

Dividen payout (%)

Dividen per lembar saham (Rp)

60%

50%

67%

50%

88%

75%

75%

75%

90%

1H08

3Q08

4Q08

1H09

2H09

1H10

2H10

1H11

2H11

Rp 1,345 / share ( 60% payout ) Rp 1,964 / share ( 70% payout ) Rp 1,202/ share ( 75% payout ) Rp 3,674/ share ( 85% payout )

*

(22)
(23)

Agenda

(24)

Resources dan Reserves Batubara

(per 31 Des 2011)

Indominco

Kitadin-Td.Mayang

Jorong

Trubaindo

Blok barat

Blok Timur

242 28 453 151 14 144 6 327 102 298 112 12 RESOURCES RESERVES

Kitadin-Embalut

Total Reserves : 417 juta ton Total Resources : 1,627 juta ton

146

9

Bharinto

(25)

Peningkatan Reserves 2011

JORONG

INDOMINCO TRUBAINDO KITADIN EMB & TM BHARINTO

• Sistem In-Pit Crushing Conveying (IPCC) memungkinkan penambangan dapat dilakukan secara lebih ekonomis dan lebih dalam.

• Fasilitas IPCC akan membuat biaya pengupasan tanah lapisan atas (OB removal) lebih murah dan lebih cepat sehingga biaya OB removal per bcm lebih kompetitif. • Kegiatan eksplorasi telah meningkatkan reserves di Blok

Timur Indominco pada tahun 2011.

• Kegiatan penambahan reserves di Blok Timur Indominco akan tetap berlanjut dan akan berdasarkan atas kegiatan eksplorasi dan kajian pertambangan.

PENINGKATAN RESERVES : INDOMINCO BLOK TIMUR

• Kajian teknik (termasuk IPCC) dan pengeboran eksplorasi telah meningkatkan perkiraan reserves • Kegiatan penambahan reserves di Bharinto akan tetap

berlanjut dan akan berdasarkan atas kegiatan eksplorasi dan kajian pertambangan.

PENINGKATAN RESERVES : BHARINTO

(Satuan: Juta Ton)

2010 2011 PENJUALAN 25 -1 7 6 PENINGKATAN RESERVES 2010 2011 SALES -15 150 +39 174 2010 2011 -2 25 23 2010 2011 -7 109 102 2010 2011 45 +67 112

Total Reserves per 31 Desember 2011: 417 juta ton

PENINGKATAN RESERVES PENJUALAN

(26)

Peningkatan Reserves 2011: dengan metode IPCC

100 m 50 m PIT BENCHES BACKHOE EXCAVATOR TRUCK IN-PIT CRUSHER IN-PIT CONVEYORS SPREADER STOCK PILE 100 m 50 m

ILUSTRASI SISTEM IPCC

Sistem IPCC, metode penambangan yang mengandalkan listrik, cenderung membutuhkan belanja modal yang lebih tinggi, namun biaya yang

dikeluarkan akan lebih rendah apabila dibandingkan dengan menggunakan mesin excavator diesel dan pengangkutan dengan truk.

IPCC membutuhkan umur tambang yang lama (10 tahun+) dan volume batubara yang cukup banyak.

IPCC memungkinkan proses OB removal yang lebih ekonomis dan

penambangan batubara pada kedalaman 100 – 200m yang mana metode pengangkutan dengan menggunakan truk tidak dapat dilakukan.

SEMI-MOBILE CRUSHER

CONVEYOR

Gambar

ILUSTRASI SISTEM IPCC

Referensi

Dokumen terkait

Masalah yang dihadapi berkaitan dengan pengelolaan peralatan adalah peralatan yang ada saat ini dirasakan jumlahnya tidak cukup dan jenisnya tidak lengkap

Hasil pencapaian kemajuan program sampai saat ini adalah: (1) tercapainya transfer pengetahuan dan pemahaman teknis budidaya oleh mitra mengenai model dan konsep

Penelitian ini bertujuanV untuk mengetahui kee- fektifan Petugas Surveilans Kesehatan Demam Berdarah Dengue (GASURKES DBD) dalam menentukan Angka Bebas Jentik (ABJ) di Kota

Jalur (path) antara simpul i dan j adalah sebuah urutan simpul dan sisi yang dimulai dari simpul i dan berakhir di simpul j, dengan setiap sisi.. bersisian dengan

KABUPATEN / KOTA / Stock Akhir Januari Pebruari Maret April Mei Juni Juli Agustus Sept..

diagram (diagram sebab akibat), karena diagram ini diagram (diagram sebab akibat), karena diagram ini dapat dipergunakan untuk menjelaskan hubungan dapat dipergunakan untuk

Tantangan pembangunan yang dihadapi oleh Provinsi Aceh pada saat ini adalah: (1) meningkatkan pengeluaran pemerintah terhadap perkembangan sektor ekonomi, (2)

• Pemeriksaan slit lamp pada pasien yang kooperatif bisa menunjukkan kelainan yang berhubungan dengan seperti defek transiluminasi iris (red reflex gelap karena