www.cikarangdryport.com
www.cikarangdryport.com
Cikarang Dry Port - Indonesia
Why Indonesia Needs Dry Port? (1)
22.9% 21.3%
Gross Regional Domestic Product Composition
Demography Composition (Total Indonesia 237 Million)
59.0% Economic Growth : 6.10%
Inflation : 6.96%
< 1 Million Ton/Year 1-20 Million Ton/Year
20-50 Million Ton/Year
50-100 Million Ton/Year
> 100 Million Ton/Year
< 0.1 Million Ton/Year 0.1-1.0 Million Ton/Year
1-10 Million Ton/Year
10-50 Million Ton/Year
> 50 Million Ton/Year
Sources : MOT, Land Transport Dept
Goods Population O-D Flow of Goods
• High density population in Java Island (57.5% equivalent with 136.2 Million)
Why Indonesia Needs Dry Port? (2)
Sea Port Limited Capacity and Dwelling Time
Inadequate infrastructure (i.e. Access Road, Railway)
Uncertainty on lead time and cost
Current Logistics Condition
Rank Country Score
1 Germany 4.12 2 Netherlands 4.05 3 Belgium 4.04 5 Singapore 4.00 25 Malaysia 3.59 35 Thailand 3.43 48 Vietnam 3.15 53 Indonesia 3.08
About Cikarang Dry Port
•
Owned and operated by
PT. Cikarang Inland Port
, a subsidiary
company of PT. Jababeka, Tbk on infrastructure business portfolio.
•
The First Inland Port
in Indonesia with International Port Code and
appointed by Government as
Integrated Customs Services Zone
(KPPT
–
Kawasan Pelayanan Pabean Terpadu)
o
Integrated Port and Logistics Facilities as One-Stop-Services
o
Bringing Port, Customs, and Quarantine Services to Industrial Estate
and Industrial Zone
o
Security and Safety comply to International Standard
Bringing Port Closer to Industries
62%
International Port Code:
IDJBK
Bird Eye View
Port (70 Ha):
•Customs
•Quarantine
•Physical Check
•Container Yard
•Reefer Plugs
•CFS
Logistics Park
•Warehouses
•TPP
Railway:
•Domestic
•International
200 Ha of fully integrated facilities
Terminal Operation 24/7 Container Freight Station: Consolidation (upcoming)
Facilities & Services
Online Tracking & INSW Connected Bonded Trucking
Shipping Line Representative Office
Facilities & Services
Special Containers Handling
Facilities & Services
General Warehouse
Integrated Customs & Quarantine
•
Joint Physical Inspection Inside Terminal
•
24/7 Customs and Terminal Operation
Direct Shipment
Direct export import through Cikarang Dry Port are served by:
Multimodal Transport Bill of Lading
Through Cikarang Dry Port
Stakeholders and Customers
Terminal
Operator
(4)
Land
Transporter
(3)
PT Mustika Alam Lestari
GAP Logistics
Logistics
Service
Provider
(30+)
Stakeholders and Customers
PT PETA SEJATI NIRMALA
Shipper
Consignee
Business Process
CY-Tanjung Priok (IDJKT)
CY- CDP
(IDJBK)
Import Process
By Consignee / Forwarder
Flow Chart
Shipper / Consignee
Multimodal B/L
B/L @ CDP
“Place of Delivery” CIF/CNF @IDJBK By Carrier
Export Process
Multimodal B/L
BL @ CDP
“Place of Receipt”
On Truck/Train On Board @IDJBK
Import
Multimodal B/L
•
Make Order to Shipping Line using
code IDJBK
•
Monitor shipment arrival via CDP
Website
•
Customs declaration & clearance
•
Quarantine declaration & clearance
•
Prepare delivery documents
•
Physical Inspection (on request)
•
Port Clearance (SP2 Document)
•
Pick Up / Delivery containers
•
Returning back empty containers
to Depot
•
Contact Shipping Line
•
Contact Logistics Provider
•
Register EDI Number & Updating
Permit
Export
Multimodal B/L
•
Make Order to Shipping Line using
code IDJBK
•
Pick Up Empty Containers from
Depot
•
Customs declaration
•
Request Port Entering Card via email
•
Movement laden containers to CDP
Terminal
•
Customs Clearance
•
Monitor shipments via CDP Website
•
Movement laden containers (CDP to
Tg Priok Port) under Shipping line B/L
•
Contact Shipping Line
•
Contact Logistics Provider
•
Register EDI Number & Updating
Permit
How to Start
Preparation
Tracking
Import
Export
Value Proposition
•
Predicted Lead time
and Cost using
Multimodal B/L
•
Import : Avoid
Overbrengen and
Penalty
•
Export : Closing Time at
CDP and allowed early
stack
•
Managed bonded
transportation with
Electronic Seal for
better security &
monitoring
•
Reduced risk by
transfer responsibility
at CDP
•
Better planning,
inventory reduction
and increasing
productivity
•
Storage start counting
at CDP (Multimodal
B/L)
•
Free time storage:
import 5 days ATA CDP,
export 7 days ETD
vessel
Terminal Tariff Comparison
(*) Storage cost is 62% lower than Tanjung Priok Sea Port
(**) Port charges are settled in Cikarang Dry Port instead of Tanjung Priok Sea Port
Tanjung Priok Sea Port
20 ft 40ft
Handling
- Lift On / Lift Off 187,500 281,300
Storage
- Basic Tariff 27,200 54,400
- Day 1 - 3 Free Free
- Day 4 - 10 136,000 272,000 - Day 11 and forth 204,000 408,000
Free Time Storage Import 3 days from ATA Priok Free Time Storage Export 5 days counted 1 –basic
tariff
Penalty
- After SPPB (Customs) 200% -After SP2 (Port) 300%
Physical Check (Behandle) 1,015,000 1,390,000
Cikarang Dry Port
20 ft 40ft Handling
- Lift On / Lift Off 187,500 281,300
Storage
- Basic Tariff 25,840 51,680
- Day 1 - 5 Free Free
- Day 6 - 10 51,680 103,360 - Day 11 and forth 77,520 155,040
Free Time Storage Import 5 days ATA CDP Free Time Storage Export 7 days ETD Vessel
Penalty
- After SPPB (customs) Free - After SP2 (Port) Free
Cost & Time Benefits
(3
rdParty Study)
World Bank Study 2011
Existing Tg Priok Scheme
Simulation Using CDP
Avg Lead Time = 16 days
Avg Lead Time = 8 days
(saving time 50%)
Avg Cost = IDR 8.6 Mill
Avg Cost = IDR 5,6 Mill
(saving cost 41%)
0 1,000,000 6,000,000 11,000,000 16,000,000
(4,000,000) 1,000,000 6,000,000 11,000,000 16,000,000
Program : Dry Port to Dry Port
Benefits
•Expand and Explore the market
Connecting strategic industrial zones and getting closer to the markets
•One Stop Service Solution
Port, Customs, and Quarantine are located and integrated in the same area
•Better Visibility and Certainty
Predicted lead time and cost using Multimodal Transport Bill of Lading
•Faster Transit Time
6 days total lead time Lat Krabang–Cikarang including 3 days sailing time
In Cooperation With
•Service First
•Customer’s Satisfaction is Our Priority
Infrastructure Development
CDP
RailwayLegend :
New Toll Exit Km 29
New Exit Km 29 to Cikarang Dry Port
From Jakarta
To New Toll Exit Km 34
Domestic Rail Freight Service
PT. Cikarang Inland Port
@CikarangDryPort
marketing@cikarangdryport.com
+6221 2908 2908