• Tidak ada hasil yang ditemukan

Bab 4 Aplikasi pada Pemilik dan Kontraktor

N/A
N/A
Protected

Academic year: 2021

Membagikan "Bab 4 Aplikasi pada Pemilik dan Kontraktor"

Copied!
30
0
0

Teks penuh

(1)

Bab 4

Aplikasi

pada Pemilik dan Kontraktor

• Pengenalan Proyek

• Diagram Proses

• Perancangan Alat

• Keutuhan fungsi sistim,

• Keselamatan kerja dan lingkungan

• Lingkup Tambahan

(2)

FEASIBILITY STUDY FEED DETAIL DESIGN CONSTRUCTION OPERATION & MAINTENANCE

PEMILIK

PERANCANG

PEMBUAT BARANG

KONSTRUKTOR

TAHAPAN PEKERJAAN

PERAN

PENGGUNAAN STANDARD

INSPEKTOR

(3)

PROJECT POSITIONS & FUNCTIONS

• Project Manager

• Engineering/ Field Manager

• Project Engineer

• Lead Engineer

• Discipline/ Field Engineer

• Field Engineer

• Designer

• Design

• QA/QC

• Construction

• Inspection

• Start Up &

Commisioning

• Operation &

Maintanance

(4)

PROJECT ORGANIZATION CHART- OVERALL

CLIENT'S PROJECT MANAGER PROJECT MANAGER DEPUTY PROJECT MANAGER PROJECT SPONSOR/ DIRECTOR PROJECT CONTROL &

MONITORING QUALITY AND SAFETY

MANAGEMENT SYSTEM COMMITTEE

PROJECT ADMINISTRATOR

CONTRACT & SCOPE MANAGER

PROJECT MANAGEMENT OFFICE

PLANNING AND SCHEDULING MANAGER

SHE MANAGER COST ADMINISTRATOR

QA MANAGER

ENGINEERING MANAGER PROCUREMENT MANAGER FIELD MANAGER

CORPORATE MANAGEMENT CORPORATE MANAGEMENT

(5)

GENERAL METHODOLOGY FLOW CHART

Design Packages

Regulation, Code

& Standard Scope & COMPANY'srequirement Data

Discipline Kick Off Meeting

Objective & Criteria

Design Basis & Preliminary Design

Philosophy Specification

Design Philosophy

Design Activities (See Design Methodology Chart)

"Fit for Purpose" Design Check

(Operability, Constructability, Maintainability, Interdiscipline, etc)

Cost Estimation

Option Study

(6)

DESIGN METHODOLOGY FLOW CHART

DESIGN AND COORDINATION

DATA & INFORMATION - Design Basis

- Survey Data - Study Report - Inter-discipline Data & Requirement

MODELING & DESIGN

ANALYZE - Strength Capability - Constructability - Operability/Serviceability - Maintainability - Life Cycle Cost

INTER-DISCIPLINE/ INTEROFFICE CHECK COMPANY APPROVAL RE-DESIGN & RE-ANALYZE OUTPUT - Report - Drawing - Procedure - Boom

(7)

                   

Clarify to Experts all the associated project scope, schedule, and project goal. 8

 

 

   

Establish format to prepare Addendum on Company's supplied specification 7

 

 

   

Establish specification development priority for long lead equipment 6

 

 

   

stated in bid addendum, minutes etc.  

 

 

   

Guide Lead Engineer to incorporate any additional clarification or requirements 5

 

 

   

Reconfirm applicable Company's supplied specification c/w revision number 4

 

 

   

Establish Specification Interdiscipline Distribution Matrix 3

 

 

   

Establish clear assignment what discipline to prepare which specification 2

 

 

   

Construction Specification (Discipline) c          

Technical Specification (Discipline) b          

General Specification (Multi discipline) a          

Establish Specification Grouping 1         Engineering Manager 1 Distributed ** File in DC Completed Initial/Date Description No .

WORK INSTRUCTION FOR SPECIFICATION DEVELOPMENT ENG-04-03

(8)
(9)
(10)
(11)

LANGKAH PELAKSANAAN

Baca Lingkup Kerja pada Kontrak

Basic Philosophy dan Design criteria

Kenalilah PFD dan PID lingkup kerja

Kenali sifat materi yang diproses

Kumpulkan Design Specification, Common Practice Pemilik

Kumpulkan data lingkup kerja lainnya

Kumpulkan Standard & Code yang terkait

Baca Peraturan Lembaga Pemerintah yang berlaku

Perhatikan pola cuaca, gempa dan sifat alam lainnya yang terkait

Kenali peta dan tataletak peralatan dalam lokasi kerja

Kumpulkan Data Vendor, teknis, dokumen dan pengadaanya

Lakukan perancangan alat dan sistim beserta perhitungannya

Pemilihan jenis, kapasitas dan materialnya

Perhatikan keterkaitannya pada Disiplin lainnya

Kumpulkan Gambar Vendor dan Gambar instalasinya

Perhatikan penanganan material (beracun, pekat dlsb) dan keadaan tidak

normal pada saat instalasi maupun oprasi

Perhatikan faktor biaya, operability dan constructability dari rancangan

Siapkan bill of Material dan jalankan proses pembeliannya

(12)

DIAGRAM PROSES

• PROCESS FLOW DIAGRAM

• PROCESS & INSTRUMENTATION DIAGRAM

• Peralatan utama dan fungsinya dalam proses

• Pipa penghubung utama beserta komposisi aliran dan besaran fisisnya

• Tabel material balance

• Merupakan diagram yang disederhanakan (Tanpa Utility dan detail

Instrumentasi)

• Diagram peralatan lebih rinci, termasuk unit pelengkapnya

dengan penjelasan spesifikasinya

• Setiap peralatan lengkap dengan setiap pipa pemasok dan pipa

produknya, disertai nomor pipanya

• Dilengkapi dengan berbagai keterangan lainnya seperti tag

number, set point, pressure rating dlsb

• Loop utama kontrol proces lengkap dengan jenis instrumen

maupun aktuatornya

(13)

DIAGRAM PROSES

Scrubber

Pump 1

Separator

Pump 2

Heat Exchanger

Mixer

(14)

Kebutuhan Perancangan

• Bejana tempat terjadinya reaksi

• Pipa proces ataupun utilitasnya

• Pengaduk, motor beserta kontrolnya

• Indikator dan kontrol process

• Pompa dan Pertukaran Panas

• Struktur penyangga Peralatan

• Pengecatan

(15)

PARAMETER PERANCANGAN

• Design Philosophy

• Design Basis

• Design Criteria

• Regulations

• Codes

• Standard

• Recommended Practice

• Guidelines

• Company Specification

• Company Standard Practice

• Company Guide

• Project Specification

• Contractor Specification

(16)

Standard Alat

• Standard Instrumentasi Industri

• Standar Keamanan : Intrinsically

Safe, Explosion Proof

• Standard Kelistrikan : UL

• Standard Mekanikal/Piping

(17)

ROTATING AND RECIPROCATING MACHINERY

MECHANICAL EQUIPMENT AND PACKAGE SYSTEMS

VESSEL DESIGN

HEAT EXCHANGERS

MACHINE DESIGN

PIPING DESIGN/STRESS ANALYSIS

MECHANICAL ENGINEERING STUDIES

MATERIAL ENGINEERING

MECHANICAL SCOPE

(18)

Work scope:

1. Furnish complete design and drafting of code pressure vessels. API tanks, stacks, and like equipment.

2. Check vendor supplied drawings and calculations.

3. Maintain design trend and fabrication method awareness. 4. Recommend alternate constructions or design conditions. 5. Select or evaluate construction materials.

6. Erectability and fabricability studies / evaluations. 7. Analyses of vendor supplied extras.

Equipment Fields:

1. Pressure Vessel

2. Fractionation Columns, Absorbers, etc.

3. Storage Tanks - Atmospheric and Pressurized 4. Reactors

5. Steam Drums 6. Stacks

Usual Design Standards:

1. American Society of Mechanical Engineers (ASME) 2. American Petroleum Institute (API)

VESSEL DESIGN

(19)

Work Scope:

1. Provide planning, mechanical design, cost estimating, heat exchanger rating and checking as required for heat transfer equipment.

2. Determine materials, requirements, and fabrication methods for heat transfer equipment.

Type Equipment:

1. Shell and tube heat exchangers 2. Air - cooled heat exchangers 3. Double pipe heat exchangers

Usual Design Standards:

1. American Society of Mechanical Engineers (ASME) 2. Tubular Exchanger manufacturers Association (TEMA) 3. Heat Exchanger Institute (HEI)

4. American Petroleum Institute (API)

HEAT EXCHANGERS

(20)

HASIL PERANCANGAN

ALAT

• Line list dari pipa

• Equipment List

• Tagging

• Instrument Index

• Data Sheet

• Hook up Drawings

• Cause & Effect Diagram

• Control Diagram

• Annunciator

• Cable schedule

(21)
(22)

Keutuhan fungsi sistim

• Pemilihan alat

• Optimalisasi Proses : Monitoring,

Kontrol

• Keamanan Proses : Pressure Relief,

Shut Down

• Pengoprasian : Operatibility,

Maintainability

(23)

Cara yang Disarankan

(24)

Keselamatan Kerja dan Lingkungan

• Masa Konstruksi

• Masa Pemeliharaan

• Standard OHSA 18001, BS 8800

Bekerja di tempat tinggi

Bekerja dengan alat alat berat

Bekerja di Hazardous Area

Bekerja dengan zat berbahaya

Bekerja pada tempat yang tertutup

Plant shut down

Bekerja ditempat yang mudah terbakar//meledak

Melaksanakan Kalibrasi

(25)

PENGUNAAN STANDARD

• Membutuhkan banyak baca dan menggunakannya

untuk :

• Menentukan Standard yang dipakai sampai

nomornya, karena

• Satu barang dapat diikat oleh berbagai Standard

• Satu barang terangkai dengan alat lain yang bisa

menggunakan standard yang lain

• Dapat mengenal berbagai Badan Standard yang

diperlukan

• Dapat mengenal struktur Standard dari berbagai

Badan Standard

(26)

LINGKUP TAMBAHAN

• PUBLIC ADDRESS

• TELECOMMUNICATION

• SEA AND AIR BEACON

• FIRE WATER

• INSTRUMENT AIR

• HYDRAULIC POWER

• ELECTRICAL POWER

• CONTROL CENTER

• SAFETY DEVICES

(27)
(28)

Biaya konstruksi dan oprasi

• Rencana kerja : Urutan Kerja,

schedule kerja

• Perlengkapan Kerja untuk instalasi

dan pemeliharaan

(29)

KASUS 1

• API 550 : 1 Scfm requirement /

instrument

• Vendor Catalog requirements are :

Function of type and size

• Client Standard

(30)

Kasus 2

PERSYARATAN

CONTROL VALVE

• API 550 : One size down

• Vendor Calculation : 2 or 3

sizes down

• ( Vendor : Less

Conservative )

PERSYARATAN

LINE SIZE

• Velocity limit

• Pressure drop limit

• Noise limit

Gambar

DIAGRAM PROSES

Referensi

Dokumen terkait

Konsumen yang menggunakan jasa suster akan dicatat didalam sebuah kontrak kerja yang berisi data yang telah ditetapkan dan dinegosiasikan dengan LPK Cahaya Hati sebagai

Operasi ini digunakan untuk memasukkan data pembayaran yang didapat dari proses pembacaan tag ( tapping ) untuk diproses di dalam sistem, data yang dimasukkan berupa

melaksanakan tugas pokok tersebut Dinas Tenaga Kerja mempunyai fungsi yaitu :.. Perumusan kebijakan teknis lingkup pelatihan dan

dapatberupa benda, jasa dan informasi. 6) Bahan kerja, adalah masukan yang diproses menjadi hasil kerja. Bahan kerja dapat berupa bahan berwujud dan bahan tidak berwujud.

Sesuai dengan Pasal 59 ayat 1 Undang-Undang Nomor 13 Tahun 2003 Tentang Ketenagakerjaan menyebutkan bahwa perjanjian kerja untuk waktu tertentu (kontrak) hanya dapat

Karyawan kontrak adalah karyawan yang bekerja pasa suatu instansi dengan kerja waktu tertetnu yang didasari atas suatu perjanjian atau kontrak dapat juga disebut dengan

Konsumen yang menggunakan jasa suster akan dicatat didalam sebuah kontrak kerja yang berisi data yang telah ditetapkan dan dinegosiasikan dengan LPK Cahaya Hati sebagai

Menggunakan uji statistik t-test pada pengujian kelompok nilai pembelian historis (dengan harga spot) dan kelompok pembelian dengan simulasi hedging 2 kontrak