• Tidak ada hasil yang ditemukan

KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL DIREKTORAT JENDERAL MINYAK DAN GAS BUMI

N/A
N/A
Protected

Academic year: 2021

Membagikan "KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL DIREKTORAT JENDERAL MINYAK DAN GAS BUMI"

Copied!
6
0
0

Teks penuh

(1)

KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL

DIREKTORAT JENDERAL MINYAK DAN GAS BUMI

KEMAMPUAN USAHA PENUNJANG MIGAS

PT. REKA PATRIA EKAGUNA

Kantor Pusat dan Workshop:

Alamat : Jalan Sultan Iskandar Muda, Kebayoran Lama Jakarta Selatan 12240

Telepon / Fax : (021) 29036500 / (021) 29036511 E-Mail : marketing@rpe-engineering.com Website : www.rpe-engineering.com

Penanggung Jawab : Ir. Arlan Septia Ananda Rasam (Direktur Utama) STATUS PERUSAHAAN: DALAM NEGERI

 Akta Pendirian Perusahaan No. 182 tanggal 18 Agustus 1990 oleh Notaris Yudo Paripurno, SH di Jakarta dan Akta perubahan terakhir No. 14 tanggal 21 April 2015 oleh Maria Gunarti, SH, M.Kn sebagai berikut :

- Organisasi Perusahaan : - Kepemilikan Saham :

o Komisaris Utama : Ir. Boyke Minarno o Indonesia : 100 % o Komisaris : Ir. Gammaria Gumayani Tusin

Ir. Iwan Gunawan

o Direktur Utama : Ir. Arlan Septia Ananda Rasam o Direktur : Ir. Budi Sarwono

Ir. Yuniana Idawati

Birman Prabowo

 Surat Ijin Usaha Perdagangan No. 01046-04/PB/P1/1.824.271 Tanggal 07 Pebruari 2014 oleh Pemprov DKI Jakarta

 Surat Ijin Usaha Konstruksi No. 1-002443-3171-4-01217 dan 1-002443-3171-4-01217 Tanggal 29 Juli 2015 oleh Pemprov DKI Jakarta

 Surat Keterangan Terdaftar (SKT) Migas No: 0148/SKT-01/DMT/2015 Tanggal 27 Mei 2015 oleh Direktorat Jenderal Migas

 Surat Keterangan Terdaftar (SKT) Migas No: 0149/SKT-01/DMT/2015 Tanggal 27 Mei 2015 oleh Direktorat Jenderal Migas

 Surat Kemampuan Usaha Penunjang Migas No. 2180/19.07/DMB/2016 Tanggal 19 Pebruari 2016 SISTEM MANAJEMEN :

 Sistem Manajemen Mutu : ISO 9001:2008 No. 01 100 99328 Tanggal 13 Pebruari 2015 oleh TUV Rheinland berlaku sampai dengan tanggal 12 Februari 2018

 Sistem Manajemen Lingkungan : ISO 14001:2004 No. 99328 Tanggal 3 Oktober 2013 oleh TUV Rheinland berlaku sampai dengan 02 Oktober 2016

 Sistem Manajemen Keselamatan Kerja : OHSAS 18001:2007 No. 01 113 99328 Tanggal 11 Maret 2014 oleh TUV Rheinland berlaku sampai tanggal 10 Maret 2017

KEMAMPUAN PRODUKSI JASA: JENIS

JASA BIDANG JASA KEMAMPUAN JASA

TENAGA KERJA

KUALIFIKASI WNIJUMLAHWNA

Konstruksi

Perencana Konstruksi :

Sipil/Perencanaan Rekayasa : - Jasa Desain Rekayasa untuk

Konstruksi Pondasi serta Struktur Bangunan, Jasa Desain Rekayasa Lainnya.

Mekanikal / Perencanaan Rekayasa :

- Jasa Desain Rekayasa untuk Pekerjaan Mekanikal, Jasa Desain Rekayasa untuk Proses Industrial dan Produksi, Jasa Desain Rekayasa Lainnya. Elektrikal/ Perencanaan Rekayasa :

- Jasa Desain Rekayasa untuk Pekerjaan Elektrikal dalam Bangunan, Jasa Desain Rekayasa Lainnya.

Tenaga Ahli :

- Ahli Manajemen Proyek-Madya - Ahli Teknik Bangunan

Gedung-Utama

- Ahli Teknik Bangunan Gedung-Madya

- Ahli Teknik Tenaga Listrik-Madya

- Ahli Teknik Mekanikal-Madya - Ahli K3L 2 1 3 1 2 1 10 - - - - - - -

PERINGKAT

KEBERPIHAKAN

(2)

JENIS JASA

BIDANG

JASA KEMAMPUAN JASA

TENAGA KERJA

KUALIFIKASI JUMLAH WNI WNA

Konstruksi Pengawas Konstruksi :

Layanan Jasa Manajemen Proyek / Konsultansi Lainnya : - Jasa Manajemen Proyek Terkait

Konstruksi Bangunan, Jasa Manajemen Proyek Terkait Pekerjaan Teknik Sipil Lainnya, Jasa Manajemen Proyek Terkait Konstruksi Pekerjaan Konstruksi Proses dan Fasilitas Produksi

Tenaga Terampil : - HSE Manager - Project Engineer - Structural Engineer - Lead Electrical Engineer - Piping Engineer - Lead Piping Engineer - Lead Process Engineer - Process Engineer

- Sr. Process Safety Engineer - Process Safety Engineer - Lead Instrument and Control

Engineer

- Instrument and Control Engineer - Instrument Drafter

- Electrical Drafter - Piping Drafter

- Sr. Civil / Structure Designer - Sr. Mechanical & Piping Designer

- Sr. Piping Designer 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 18 - - - - - - - - - - - - - - - - - - DAFTAR PERALATAN DAN PENGALAMAN TERLAMPIR

(3)

DAFTAR PERALATAN SOFTWARE PT. REKA PATRIA EKAGUNA

NO. NAMA SOFTWARE KEGUNAAN VERSI LISENSI TAHUN

Project Management, Planning & Schedule

1 PRIMAVERA Project Management, Planning & Schedule, Project Planner for scheduling and costing P6 2012 Computer Aided Design

2 Auto-CAD 2D Drawings 2014 2014

3

Plant Design Management System and includes; - Clash Manager - P&ID Manager

3D Design

- Add on software for PDMS to check & manage clashes - Add on software for PDMS to compare Smartplant P&ID

and 3D Model

2013 Interface Application to Engineering Software database

4 Aveva VNET or Intergraph Smart Plant Foundation

Plant Information solution, that brings together information from diverse applications & data sources (Primarily: PDMS, SPI & SI PID) and provides a unified digital profile of the physical plant. The solution feature includes capabilities to search tagged items, equipments, check data association characteristics, logical function & physical location.

NA

Process and Process Safety Design 5 HYSYS

Process Simulation (Steady State and Dynamic modules) along with Heat and Material Balance data extraction file

inclusive of extension to relevant software. 8.8 2016 6 PRO/II Alternative process simulation software for specific system NA

7 FLARESIM/Flare system Analyzer Flare Radiation and flare height calculation NA 8 FLARENET Flare Network Calculation (Back Pressure, Flare load, stream max velocity and etc Include Hysys

9 PHAST Gas Dispersion Analysis, Stack height Calculation, Ground Level Concentration Calculation, and etc. NA

10 Smart Plant PID P&ID Generation NA

11 HTRI or HTFS

Heat Exchanger Thermal / Mechanical Design, All of the software modules are provided with the license such as Shell & Tube, Plate Fin, Plat Frame, Air Cooler, Re-boiler, double pipe, fired heater, and etc, Other Heat Exchanger type design may use software approved by Company.

NA

12 PIPESIM Pipeline Steady State Hydraulic Design NA 13 Multiflash/ PVTSIM Hydrate Prediction and hydrate curve NA

14 OLGA Process Simulation NA Project Base

15 Pipenet Steady state fire water calculation NA Structural Engineering

16 STAAD Pro Structural analysis NA Project Base

Mechanical Engineering

17 PVELITE or equivalent Pressure Vessel & Heat Exchanger Design 2013 2014 18 ETANK 2000

Storage tank design or re-design, to verify or modify integrated function or existing storage tanks required in the project.

2013 2013 Piping Engineering

19 CAESAR II Piping Stress Analysis 2013 2014

Instrumentation 20 Instrucalc

Sizing software for checking control valves, PSV, flow elements etc. This is to ensure that Vendor submitted calculations are verified. SPI shall be used for checking Thermowell wake frequency calculations.

NA

21 SmartPlant Instrumentation (INtools)

Instrumentation Engineering database (Refer to SPI Implementation plan). Database manager and report generator for Instrument Index, I/O list, Datasheets, SRS etc.

NA

22 exSILentia SIL verification and calculation. NA

23 Reliability Analysis NA

Electrical

24 ETAP(min ver 7.5.1) Power System Studies 14.1 2015

25 Luxicon Lighting Calculation, including Scotopic feature to be included Free Commissioning Phase

(4)

DAFTAR PERALATAN PT. REKA PATRIA EKAGUNA

NO. NAMA ALAT MEREK/TIPE JUMLAH PEMBUATAN TAHUN KONDISI ALAT KEPEMILIKAN STATUS

1 Outside micrometer Mitutoyo 0”-1”, 0”-6”, 6”-12”, 12”-18” 4 - Baik Milik sendiri

DAFTAR PENGALAMAN

PT. REKA PATRIA EKAGUNA

NO. NAMA PROYEK/ SPESIFIKASI PEKERJAAN LOKASI PERIODE PEMBERI KERJA KOMITMEN TKDN

1

FEED STUDY FOR MDK DEVELOPMENT, Contract Reference No. 332003958 Perform Front End Engineering & Design services necessary for the preparation of EPCI bid documents for lump sum, turnkey, construction of facilities.

Develop detailed Project Execution Plan.

Refine the cost estimates developed

during the conceptual study. Feedback and inclusion of COMPANY input will be required throughout this process. Prior to finalization of estimate this shall be reviewed and approved by COMPANY.

Develop basic engineering designs for the

Offshore Platform, Topsides Processing Facilities and subsea pipeline sufficient to allow progression to detailed design. The minimum deliverable list for FEED design refers to the Section 4.

Develop a project schedule that reflects the project contracting strategy defined by the Project Management Team (PMT)

Identify long lead materials and equipment

and produce specifications and requisition packages for those items.

Prepare a proposed qualified vendor list with proven track record for long lead and critical items.

Prepare technical section for the ITB for the EPCI contract; this technical section is to be divided in major elements of work to be reviewed and approved by Company prior to issue.

JAKARTA Dec 2014 – April 2015

Husky-CNOOC

Madura Ltd. 100%

2

PMSS NDD PROJECT, BID NO. C1317586 The scope of work covers Construction Supervision Support Services, Engineering Services, Business Services/Project Controls services and various other professional and technical support services which may be required to oversee certain critical aspects of the work related to activities of North Duri Development Projects and others, as requested by Company.

DURI, PEKANBAR U Mar 2015 – Sept 2015 PT. CHEVRON PACIFIC INDONESIA 90,12% 3

DETAIL ENGINEERING DESIGN FOR PRE-TREATMENT SYSTEM (BALANCE OF PAQUES BLEED WATER SYSTEM) - Produce detail design datasheet, drawing

and MTO required for pre-treatment system with basic design from paques. - Perform required calculationto get the best

operational and reliability.

JAKARTA Aug 2014 – Dec 2014 PT. ADIPROTEK ENVIRODUNIA 100%

4

PROCUREMENT OF GAS PROCESSING FACILITY, CNG TRANSPORTATION AND DECOMPRESSING FACILITY TO SUPPLY GAS POWER PLANT IN LOMBOK - Produce overall design including

specification, datasheet, drawing and MTO required for detail design of CNG Plant Development.

- Perform calculation and simulation required to get the proper sizing and operation. - Conduct HAZOP/HAZID Meeting for the

JAKARTA 13 May 2014 – Ongoing PT. ETI for PT. PLN (Persero) 100%

(5)

NO. NAMA PROYEK/ SPESIFIKASI PEKERJAAN LOKASI PERIODE PEMBERI KERJA KOMITMEN TKDN facility.

- Prepare and submit all deliverables required for the construction CNG Plant Gressik and Lombok (not include the CNG Carrier).

5

PROJECT MANAGEMENT SUPPORT SERVICES CONTRACT – CONTRACT NO. C1040964

Provide project management support services to support works related to activities of North Duri Development area and covers construction supervision super services, engineering services, business services / project control services and various other professional and technical support servives which may be required to oversee certain critical aspects of the work related to activities of North Duri Development Projects and others

DURI, PEKANBAR U July 1st, 2013 – June 30th, 2016 PT. CHEVRON PACIFIC INDONESIA (PT.CPI) 90,29% 6

JASA KONSULTAN KAJIAN DESAIN DAN OPERASI ONSHORE RECEIVING FACILITY (ORF) SEBAGAI PERSIAPAN PENINGKATAN TEKANAN OPERASI Perform study to evaluate ability of existing Muara Karang Onshore Receiving Facilities (ORF) to handle increased gas pressure from Floating Storage and Regasification Unit (FSRU), and responsible in designing modification and/or additional facilities in ORF if required.

JAKARTA Jul 2014 – Nov 2014 PT. NUSANTARA REGAS 100%

7

PROFESSIONAL ENGINEERING SERVICES FOR EXISTING FACILITIES AND PIPELINES MODIFICATION, CONTRACT NO.: 332003205

Provide reimbursable engineering services to support offshore oil and gas production facilities modifications, gas compression, gas plant facilities and their tie-ins in the three business units of the COMPANY: North Business Unit (NBU), South Business Unit (SBU), Central Business Unit (CBU) and facilities of Gas Plant and Power Plant under Power Gas and Facilities (PGF) department.

JAKARTA Apr '12 – May ‘14 CNOOC SES Ltd. 100%

8

TECHNICAL SERVICES CONTRACT FOR TECHNICAL DOCUMENT CONTROL, CONTRACT NO. STC-0632

- To perform As-Built drawing verification to process drawings, structural drawings,, mechanical static drawings, and to COMPANY's critical drawing categories, that includes but not limited to One Line Diagram (OLD), Area Classification (ACL), Equipment Location Plan (EQL), Safety Analysis Function Evaluation Chart (SAFE), Piping & Instrument Diagram (PID), Process Flow Diagram (PFD), which consist of approximately 1500 drawings as a result of approved facility modification - To perform updating and redrawing on

approximately 1800 sheets of COMPANY engineering drawing that includes but not limited to process drawings, mechanical static drawings, electrical drawings, instrumentation drawings, and structural drawings. - To perform the development of

COMPANY's Guidelines and Operating & Maintenance Procedures upon required; and perform periodic revision to

JAKARTA Aug ’11 – Aug ‘14

PT PERTAMINA HULU ENERGI

ONWJ

(6)

NO. NAMA PROYEK/ SPESIFIKASI PEKERJAAN LOKASI PERIODE PEMBERI KERJA KOMITMEN TKDN approximately 1826 documents within the

scope of COMPANY that includes wells, subsea flow-lines, risers, structures, topsides, and the marine / terminal and offloading system

- To acquire International / Industrial Standards, Local Standards, and Local Regulation which required and requested by COMPANY.

- To perform document controlling activities both in projects and day-to-day operations as defined in Technical Document Control procedure.

9

Technical Services Contract for Tangguh Engineering Services, Contract No.: 4400000275

Provide the specific discipline specialist or perform engineering management, design, studies, drafting, reproduction, set-up and provide expertise of project management, engineering & cost estimation, assist project Installation & Construction including Commissioning, and unit start-up, integrity engineering & management and other related services to execute and support various modifications of company's existing gas related facilities at the Tangguh Offshore (Platform Topside Surface) and Onshore LNG Plant Facilities.

JAKARTA July 2013 Oct' 10 – BP Berau Ltd. 100%

10

PEMBUATAN FRONT END ENGINEERING DESIGN (FEED) FASILITAS PRODUKSI STASIUN PENGUMPUL BUNYU , NIBUNG FIELD BUNYU PT PERTAMINA EP REGION KTI, CONTRACT NO.: 3900184696

- To establish the selection of process equipment this shall be implemented to achieve product quality as per Pertamina EPs requirement of quality product. - To provide all data and information based

on the approved deliverables list which later on shall be the basis for EPC projects. - To estimate and optimize the reliable and

reasonable schedule for the execution of the EPC projects that shall cover all angles during project execution and sequences.

- To establish the capital investment that shall be based from MTO from all discipline engineering and project cost estimation derived from reliable sources compiled. - To provide a tender document that is

comprehensive for EPC contractor to understand the whole aspects of the project execution.

JAKARTA Sep '12 – Feb '13 PT Pertamina EP 100%

11

Front End Engineering Design for Surface Facilities of Bayan-A Field, Contract No. 011/MKI/CON/2010

Provide and Perform Engineering

Management, Design, Studies, Drafting and Cost Estimation and Other Related Service to Execute the Front End Engineering Design (FEED) for the new Surface Facilities at Bayan Field (Process Control System, Flaring System, Pipeline Distribution System, Electrical Power and Distribution, Compression System, Fire Water System, Instrument and Utility Air System, Water Dumping System)

JAKARTA Oct '10 – Jan '11

Manhattan Kalimantan Investment Pte.

Ltd.

Referensi

Dokumen terkait

Sertifikat Produk TKDN (%) Kapasitas (/Tahun) Oil Spill Control Equipment & Material OIL BOOM.. Oil Boom SL-10 Type Solid Floatation Boom

FC BLITZ CRANE REPAIR SUPPORT SERVICES East Kallimantan 2017 MITRABAHTERA SEGARA SEJATI - 4 DEMOBILIZATION FROM PLB AREA - SEMAYANG PORT (FOT) DEMOBILIZATION FROM PLB

KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL DIREKTORAT JENDERAL MINYAK DAN GAS BUMI KEMAMPUAN USAHA PENUNJANG

TENAGA KERJA KUALIFIKASI JUMLAH WNI WNA Non Konstruksi Survei Seismik (Sieismic Data Acquisition). - Survei Data Seismic 2D

KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL DIREKTORAT JENDERAL MINYAK DAN GAS BUMI KEMAMPUAN USAHA PENUNJANG

KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL DIREKTORAT JENDERAL MINYAK DAN GAS BUMI KEMAMPUAN USAHA PENUNJANG

Provision of Facility Maintenance and Repair Services for Bukit Tua and Kepodang Field Perawatan dan Pemeliharaan Fasilitas Produksi Ketapang 2015- 2019 PC Ketapang II

 Akte Pendirian Perusahaan No.9 tanggal 30 Juli 2004 oleh Notaris Rina Rustianing Warni, SH di Surabaya dan Akta Perubahan Terakhir No. Stadion