44 Lampiran 1
Contoh Jurnal – jurnal yang terkait dengan Pengakuan Pendapatan MEMORIAL VOUCHER
PT. RANTE MUTIARA INSANI NO. VOUCHER M-ABC0001
MEMORIAL VOUCHER DATE 01.02.12
001/INV/RMI-ABC/I/2012 Periode : January-12
11.000.000
11.000.000
PROPOSED BY CHECKED BY INPUT BY
PT. RANTE MUTIARA INSANI NO. VOUCHER M-ABC0002
MEMORIAL VOUCHER DATE 01.02.12
1 AR. PT ABC 15.750.000
AR. PT ABC / PPh 23 750.000
Rental Unit Komatsu D85 15.000.000
PPN Out 1.500.000
002/INV/RMI-ABC/I/2012 Periode : January-12
16.500.000
16.500.000
PROPOSED BY CHECKED BY INPUT BY
PT. RANTE MUTIARA INSANI NO. VOUCHER M-ABC0003
MEMORIAL VOUCHER DATE 01.02.12
1 AR. PT ABC 21.000.000
AR. PT ABC / PPh 23 1.000.000
Pembuatan Bundwall, Parking Bay 20.000.000
PPN Out 2.000.000
003/INV/RMI-ABC/I/2012 Periode : January-12
22.000.000
22.000.000
PROPOSED BY CHECKED BY APPROVED BY INPUT BY
APPROVED BY
APPROVED BY
NO. DESCRIPTION ACCOUNT DEBET KREDIT
TOTAL
NO. DESCRIPTION ACCOUNT DEBET KREDIT
TOTAL
NO. DESCRIPTION ACCOUNT DEBET KREDIT
45
PT. RANTE MUTIARA INSANI NO. VOUCHER : B01-0001 BANK VOUCHER DATE : 15.03.12
1 Bank Sendiri Tanjung 49.500.000
AR. PT ABC
001/INV/RMI-ABC/I/2012 11.000.000
002/INV/RMI-ABC/I/2012 16.500.000
003/INV/RMI-ABC/I/2012 22.000.000
49.500.000
49.500.000
NO. DESCRIPTION ACCOUNT DEBET KREDIT
46 Lampiran 2
Format Laporan Laba Rugi PT. RMI
PT. RANTE MUTIARA INSANI LABA RUGI
Periode 31 Desember 20X1
Nilai
(Bulan Berjalan)
% Nilai (Kumulatif)
%
Pendapatan
Jasa Pertambangan xxxx xxxx
Biaya Operasional Proyek
Beban Operasional Langsung xxxx xxxx
Total Biaya Operasional Proyek xxxx xxxx
Laba / Rugi Operasional xxxx xxxx
Biaya Operasional Umum
Beban Usaha
Biaya Operasional Umum xxxx xxxx
Total Biaya Operasional Umum xxxx xxxx
Laba / Rugi Operasional xxxx xxxx
Pendapatan dan Beban Lain – lain
Pendapatan dan Beban Lain - lain
Pendapatan Bunga xxxx xxxx
Pendapatan Lain – lain xxxx xxxx
Laba Selisih Kurs xxxx xxxx
Rugi Selisih Kurs (xxxx) (xxxx)
Beban Bunga (xxxx) (xxxx)
Biaya Lain – lain (xxxx) (xxxx)
Total Pendapatan dan Beban Lain - lain xxxx xxxx
Laba Rugi Sebelum Pajak xxxx xxxx
Biaya Pajak Biaya Pajak
Biaya Pajak (PPH 29) xxxx xxxx
Total Biaya Pajak xxxx xxxx
47 Contoh Matrik Harga Produksi
TABEL 1 : OB RATES FOR MONTHLY PRODUCTION (US $)
HORIZONTAL DISTANCE (M)
500 1.000 1.500 2.000 2.500 3.000 3.500
PT RANTE MUTIARA INSANI General Contractor & Supplier
Jl. Belimbing D III/13 Komperta Murung Pudak Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
48 Lampiran 4
Paringin, 9 Februari 2012
Nomor : 001/INV/RMI-ABC/II/12 Lampirann : 1. Invoice
2. Kwitansi 3. Faktur Pajak
Perihal : Permintaan Pembayaran
Overburden, Coal Mining dan Coal Hauling to Kelanis
Kepada Yth, PT. ABC Indonesia
Jalan Patimura, Blok 5, Kav 1-2 Salatiga, Indonesia.
Dengan hormat,
Bersama dengan ini kami sampaikan bahwa pekerjaan untuk bulan Januari 2012
telah selesai kami kerjakan.
Maka dengan ini kami mengajukan permintaan pembayaran sebesar :
Terbilang : Dua puluh dua milyar sembilan ratus lima puluh lima juta dua ratus delapan puluh empat ribu dua ratus tujuh puluh lima rupiah
Mohon supaya ditransfer ke rekening kami A/C No. 031.009.653.0038 pada Bank
Sendiri Cabang Tanjung A/N PT. Rante Mutiara Insani.
Demikian dari kami, atas perhatian dan persetujuan dari Bapak kami ucapkan
terima kasih.
Hormat kami,
PT. Rante Mutiara Insani
Guno Gumilang
Operation Manager
rmi
PT RANTE MUTIARA INSANI General Contractor & Supplier
Jl. Belimbing D III/13 Komperta Murung Pudak Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526
49 Invoice : 001/INV/RMI-ABC/II/12
PRODUCTION PAYMENT SUMMARY
Period : Januari 2012
No Description Amount IDR
A PARINGIN PIT
Coal Mining
1000 TON x $ 1,25 x Rp. 9.500
Coal Hauling
((1000 TON x $0 ,50 ) + ( $ 0,40 x 1000 TON x 5.000 KM)) x
Rp. 9.500
2.850.300.000
11.875.000
19.000.000.500
SUBTOTAL 21.862.175.500
PPN 5% 1.093.108.775
TOTAL 22.955.284.275
Tanjung, 9 Februari 2012
PT. ABC INDONESIA PT. ABC INDONESIA PT. RANTE MUTIARA INSANI
Approved By, Approved By, Approved By,
SURYONO MUSLIH GUNO GUMILANG
General Operation Manager Deputy GM. Strategic Planing Operation Manager
rmi
PT RANTE MUTIARA INSANI General Contractor & Supplier
Jl. Belimbing D III/13 Komperta Murung Pudak Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526
50 Lampiran 6
KWITANSI
Sudah terima dari : PT. ABC INDONESIA
Banyaknya uang : Dua puluh dua milyar sembilan ratus lima puluh lima juta dua ratus delapan puluh empat ribu dua ratus tujuh puluh lima rupiah
Untuk pembayaran : Pekerjaan Overburden, Coal Mining, dan Coal Hauling bulan Februari 2012.
Rp.
rmi
PT RANTE MUTIARA INSANI General Contractor & Supplier
Jl. Belimbing D III/13 Komperta Murung Pudak Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526
CONTOH
Tanjung, 9 Februari 2012 PT. Rante Mutiara Insani
51 Invoice : 001/INV/RMI-ABC/II/12
MINING SUMMARY SHEET
Period : Januari 2012
No Description Quantity
This Month Year to Date A. PARINGIN PIT
1 Overburden Removal (BCM)
Paringin Mine
Transport Distance (m)
Vertical Distance (m)
30,000
Transport Distance (m)
Vertical Distance (m)
1,000
3,000
55,00
45,000
3 Coal Hauling(Ton)
Paringin Mine
Transport Distance (km)
1,000
1,000
5,000
3,000
PT. ABC INDONESIA PT. RANTE MUTIARA INSANI
Checked By, Checked By,
MUSLIH GUNO GUMILANG
Deputy GM. Strategic Planing Operation Manager
Date : Date :
rmi
PT RANTE MUTIARA INSANI General Contractor & Supplier
Jl. Belimbing D III/13 Komperta Murung Pudak Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526 2023747
52
Lampiran 8
REKAPITULASI BIAYA PEKERJAAN
MINE INFRASTRUCTURE DEPARTMENT
Uraian Pekerjaan : Capex Cost Code : 178.20.15
Periode : 26 Januari s/d 25 Februari 2012 Nama Kontraktor : PT. Rante Mutiara Insani
No. Uraian Pekerjaan Volume Satuan Harga Satuan (Rp)
Jumlah Biaya
(Rp) Keterangan 1 Haul Road Wara to North Tutupan
Supplied by, Approved by, PT. Rante Mutiara Insani PT. ABC Indonesia
Guno Gumilang Hendra
Operation Manager Mine Civilwork Superintendent
53
Monthly Equipment Time Sheet Periode : 01 – 31 Januari 2012 PT. Rante Mutiara Insani
Job Site : PT. ABC Indonesia Equipment No : XE 100 S Unit Produksi : Kobelco SK 330 Serial No : -
Contract No : 001/ABC/K/MAT/I/2012
Salatiga, 1 Februari 2012
Dibuat Oleh, Disetujui Oleh, Disetujui Oleh,
PT. Rante Mutiara Insani PT. ABC Indonesia PT. ABC Indonesia
Guno Gumilang Putra Atma
54 Lampiran 10
BERITA ACARA PRODUKSI No: 001/BAP/RMI-ABC/I/12
Period : Januari 2012
Contact No : 001/ABC/K/MAT/I/2012
No Description
Total
Salatiga, 1 Februari 2012
PT. ABC INDONESIA PT. RANTE MUTIARA INSANI
Approved By, Prepared By,
SAPTO GUNO GUMILANG
Production Manager Operation Manager
rmi
PT RANTE MUTIARA INSANI General Contractor & Supplier
Jl. Belimbing D III/13 Komperta Murung Pudak Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526 2023747
55
56
Lampiran 12
BERITA ACARA JOINT SURVEY PT. ABC INDONESIA
DENGAN
PT. RANTE MUTIARA INSANI PROGRESS : JANUARI 2012
Pada hari ini, Senin tanggal 1 bulan Februari tahun 2012. Telah dilaksanakan penandatanganan berita acara joint survey over burden removal dengan penjelasan sebagai berikut :
- Berdasarkan : Perjanjian jasa penambangan batubara tanggal 1 januari 2008 antara PT. ABC Indonesia dengan PT. Rante Mutiara Insani
- Progress pekerjaan : Januari 2012 - Pelaksanaan joint survey : 31 Januari 2012 - Volume OB removal : 100,000.00 bcm
- Jarak angkut OB : 1000 m
- Volume coal getting : 10,000 ton - Jarak angkut batubara : 8.000 km
Terlampir peta progress dan data pendukung lainnya.
Demikian berita acara ini dibuat dengan sesungguhnya untuk dapat dipergunakan sebagaimana perlunya.
PT. Rante Mutiara Insani PT. ABC Indonesia
Muchlis Abduloh Susilo Husodo
Deputy Operation Manager Prod. Eng. Section Head
Mengetahui,
Sandoro Adi Prakoso Operation Manager
57
Invoice : 001/INV/RMI/ABC/MINING/I/2012
PRODUCTION PAYMENT SUMMARY
Period : Januari 2012
Tanjung, 9 Februari 2012
PT. ABC INDONESIA PT. ABC INDONESIA PT. RANTE MUTIARA INSANI
Approved By, Approved By, Approved By,
SURYONO MUSLIH GUNO GUMILANG
General Operation Manager Deputy GM. Strategic Planing Operation Manager
rmi
PT RANTE MUTIARA INSANI General Contractor & Supplier
Jl. Belimbing D III/13 Komperta Murung Pudak Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526
58 Lampiran 14
Invoice : 001/INV/RMI/ABC/CONST/I/2012
Working Summary Sheet
Period : Januari 2012
No Job Description Volume Unit Rate Total
Sudirman PIT (Rp) (Rp)
1 Perbaikan jalan
menuju lokasi tambang Sudirman PIT
20 Km 100.000 2.000.000
2 Pembuatan Kolam
Penampungan air
5000 M3 50.000 250.000.000
SUBTOTAL 252.000.000
PPN 5% 12.600.000
GRAND TOTAL 264.600.000
Tanjung, 9 Februari 2012
PT. ABC INDONESIA PT. RANTE MUTIARA INSANI
Supplied By, Approved By,
SURYONO GUNO GUMILANG
Mine Civilwork Superintenden Operation Manager
rmi
PT RANTE MUTIARA INSANI General Contractor & Supplier
Jl. Belimbing D III/13 Komperta Murung Pudak Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526
59
PRODUCTION SUMMARY No: 001/BAP/RMI/ABC/RENT/I/2012
Working Period : Januari 2012
Contract Number : -
Invoice Number : 001/INV/RMI/ABC/RENT/I/2012
No Unit Used
Sub Total 5.000.000 PPN 10% 500.000 Grand Total 5.500.000
Salatiga, 1 Februari 2012
PT. ABC INDONESIA PT. RANTE MUTIARA INSANI
Approved By, Prepared By,
SAPTO GUNO GUMILANG
Production Manager Operation Manager
rmi
PT RANTE MUTIARA INSANI General Contractor & Supplier
Jl. Belimbing D III/13 Komperta Murung Pudak Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526 2023747
61
DAFTAR RIWAYAT HIDUP
Nama Lengkap : Mahatma Hendranata Saputra
Jenis Kelamin : Laki-laki
Tempat/Tanggal Lahir : Boyolali, 19 Januari 1990
Agama : Kristen
Alamat Domisili : Jalan Perintis Kemerdekaan, Bangunharjo,
RT 07 RW II, Bangunharjo, Pulisen,
Boyolali
Status : Belum Kawin
Telp. : 085643747539
Email : mahatma_hs@yahoo.com
Nama Orang Tua
Nama Ayah : Hendratmoko
Nama Ibu : Sri Rahayuningsih
INFORMASI PENDIDIKAN
Pendidikan Nama Institusi Kota Tahun Lulus Jurusan
SD SD Pulisen Boyolali 2002
SMP SMP Negeri 1 Boyolali 2005
SMA SMA Negeri 1 Boyolali 2008 IPS
S1 Universitas Kristen Satya Wacana
Salatiga 2012 Akuntansi
PENGALAMAN PRIBADI
Pengalaman Keterangan Tahun
Sertifikasi 1. Brevet Pajak A & B Fakultas
Ekonomika dan Bisnis UKSW.
62
Pengalaman Organisasi 1. Divisi Eksternal Himpunan
Mahasiswa Program Studi Kelompok
Studi Akuntansi – Senat Mahasiswa
Fakultas Ekonomika dan Bisnis
2. Divisi Internal Himpunan Mahasiswa
Program Studi Kelompok Studi
Akuntansi – Senat Mahasiswa
Fakultas Ekonomika dan Bisnis.
2009
2010
Pengalaman Kerja 1. Asisten Dosen Aplikasi Spreadsheet
Fakultas Ekonomika dan Bisnis
UKSW
2. Asisten Dosen Aplikasi Spreadsheet
dan Pengantar Akuntansi Fakultas
Ekonomika dan Bisnis UKSW
2011
2012
Kepanitiaan 1. Panitia Accounting Fair “Globalisasi
Akuntansi dan Penguatan Usaha Kecil Menengah di Indonesia”
2. Panitia Seminar Nasional “Kode Etik Profesi Akuntan Publik”
3. Sekretaris National Seminar on
Accounting“Peran Akuntansi Dalam Pemberantasan Korupsi”
4. Ketua National Seminar on
Accounting“ Penyusunan Laporan Keuangan Berbasis SAK 2010” 5. Ketua National Seminar on
Accounting“ Penyusunan Laporan Keuangan Berbasis SAK ETAP” 6. Panitia Makrab Ekonomi, “Economic
63
Seminar dan Pelatihan 1. Golden 2008 ( Program Pengenalan
Fakultas )
2. Talk Show Fakultas Ekonomika dan
Bisnis
3. Latihan Kepemimpinan Pra Dasar
Mahasiswa
4. Seminar Kerohanian “Keluargaku, Penting nggak sih?”
5. Accounting Weekend Fellowship
2008 ( Pengenalan Program Studi dan
Keakraban Mahasiswa Program
Studi)
6. Kegiatan Pelestarian Budaya Melalui “NOANCEP”
7. Kuliah Umum “Asuransi Sebagai Pilihan Investasi”
8. Kegiatan Basic Leadership Training “Prepare Future Leaders In Creative and Innovative”
9. Seminar Nasional Kewirausahaan “Great Man Have a Great Mind” 10.Sosialisasi Undang – Undang No. 21
Tahun 2011 Tentang Otoritas Jasa
Keuangan
Pertunjukan UKSW
2. Konser Kursus Fakultas Seni
Pertunjukan UKSW “Brighten Your Day With Music”
2010