REKAPITULASI DAFTAR KUANTITAS DAN HARGA
Unit Kerja
: Dinas Kimpraswil Kota Banjarbaru
Kegiatan
: Pembangunan Gedung/ Kantor Kota Banjarbaru
Pekerjaan
: Pembangunan Gedung DPRD Kota Banjarbaru
No. Paket
: 01 (satu)
Lokasi
: Banjarbaru
NO.
URAIAN PEKERJAAN
JUMLAH HARGA
1
2
3
A.
BANGUNAN UTAMA
I PEKERJAAN PERSIAPAN
Rp.
84,060,000.00
II PEKERJAAN TANAH, PASIR, GALAM
Rp.
168,158,176.68
III PEK. PAS.BATU, BATA
Rp.
924,740,730.68
IV PEK. BETON BERTULANG
Rp.
3,665,724,777.50
V PEKERJAAN KAP/ATAP, PLAFOND
Rp.
241,343,743.71
VI PEK. KUSEN, PINTU, JENDELA/VENTILASI DAN PERLENGKAPAN PINTU
Rp.
66,589,800.00
VII PEK. INSTALASI AIR / SANITAIR
Rp.
-
VIII PEK. CAT-CATAN, LAIN-LAIN
Rp.
6,334,101,544.11
TOTAL A Rp.
11,484,718,772.68
B.
FASILITAS PENUNJANG
I PEK. INSTALASI LISTRIK
Rp.
-
II PEK. INSTALASI PENANGKAL PETIR
Rp.
-
TOTAL B Rp.
-
C.
TOTAL HARGA (A+B)
Rp.
11,484,718,772.68
D.
DIBULATKAN
Rp.
11,484,718,773.00
Err:511
Banjarmasin, 05 Juni 2006
PT. Adiquatro Elektrikindo Perkasa
Djunaidi Limbong
DAFTAR KUANTITAS DAN HARGA Unit Kerja : Dinas Kimpraswil Kota Banjarbaru
Kegiatan : Pembangunan Gedung/ Kantor Kota Banjarbaru Pekerjaan : Pembangunan Gedung DPRD Kota Banjarbaru No. Paket : 01 (satu)
Lokasi : Banjarbaru
No. Uraian Pekerjaan Analisa Volume
1 2 3 4 5 6 7
A BANGUNAN UTAMA I PEKERJAAN PERSIAPAN
1 Direksi Keet - 64.00 100,000.00 6,400,000.00
2 Izin Mendirikan Bangunan (IMB) - ls 1.00 50,000,000.00 50,000,000.00
3 Pembersihan lahan / lokasi bangunan - 2,304.00 6,510.42 15,000,000.00
4 Pengukuran / pasang bouwplank - m' 172.00 14,534.88 2,500,000.00
5 Pembuatan pagar pengaman proyek + papan nama proyek - ls 1.00 5,160,000.00 5,160,000.00
6 Mobilisasi dan Demobilisasi - ls 1.00 5,000,000.00 5,000,000.00
Jumlah 84,060,000.00 II PEKERJAAN TANAH, PASIR, GALAM
1 Galian tanah pondasi batu kali & poer A.1 976.72 28,985.00 28,310,229.20
2 Urugan tanah kembali 1/3.A.1 245.27 9,661.67 2,369,716.98
3 Pasir urug bawah pondasi, lantai, rabat A.18 458.04 50,700.00 23,222,628.00
4 Tanah urug bawah lantai A.16 728.70 38,575.00 28,109,602.50
5 Tongkat kayu galam diameter 8-10 pj 5 m - bj 11,558.00 5,000.00 57,790,000.00
6 Galam perancah pj 2 m - bj 18,904.00 1,500.00 28,356,000.00
Jumlah 168,158,176.68 III PEK. PAS.BATU, BATA
1 Pasangan batu kosong - 84.37 135,000.00 11,389,950.00
2 Pasangan batu kali camp. 1:4 G.32h+G.26 205.28 403,909.20 82,914,480.58
3 Lantai kerja camp. 1:3:5 (dibawah poer) G.43.a 6.51 486,610.00 3,167,831.10 4 Lantai / raam kend.beton tumbuk tebal 7 cm camp. 1:3:6 G.67 1,139.75 249,000.00 283,797,750.00 Rabat beton cor tebal 5 cm camp. 1:3:6 G.67 269.20 348,600.00 93,843,120.00 5 Rollag/Trasraam/Pasangan dinding batu bata 1:2 G.33m+G.27 63.86 636,838.00 40,668,474.68
6 Plesteran Camp. 1:2 tebal 15 mm - 502.53 20,000.00 10,050,600.00
7 Pasangan dinding batu bata camp. 1:4 G.33+G.27/m3 426.79 571,157.00 243,764,096.03 8 Plesteran dinding bata tebal 15 mm camp. 1:4 G.50q+G.48/m2 6,952.13 22,316.10 155,144,428.29
Jumlah 924,740,730.68 IV PEK. BETON BERTULANG
1 G.sup.i 60.75 3,517,700.00 213,700,275.00 2 G.sup.i 30.00 4,642,700.00 139,281,000.00 3 G.sup.i 62.30 3,180,200.00 198,126,460.00 4 G.sup.i 146.35 3,742,700.00 547,744,145.00 G.sup.i 126.24 3,292,700.00 415,670,448.00 G.sup.i 86.10 3,798,950.00 327,089,595.00 5 G.sup.i 99.58 3,517,700.00 350,292,566.00 6 G.sup.i 212.11 3,461,450.00 734,208,159.50 7 G.sup.i 162.26 2,505,200.00 406,493,752.00 8 Tangga beton : G.sup.i 39.48 3,461,450.00 136,658,046.00 G.sup.i 25.19 2,505,200.00 63,105,988.00 9 G.sup.i 34.09 3,292,700.00 112,248,143.00 10 G.sup.i 6.00 3,517,700.00 21,106,200.00 Jumlah 3,665,724,777.50 V PEKERJAAN KAP/ATAP, PLAFOND
1 - Kap baja L 70.70.7, L 60.60.6 (kap gording) 3/4.(I.1) kg 2,152.82 16,118.75 34,700,767.38 - Plat landas & perletakan t.10 mm, plat buhul 8 mm 3/4.(I.3) kg 920.85 16,118.75 14,842,950.94
- Bout angker dia.3/4" - 40 cm - buah 40.00 10,000.00 400,000.00
- Bout angker dia.1/2" - 30 cm - buah 750.00 8,500.00 6,375,000.00
Las-lasan - ls 1.00 - -
2 Penutup atap polycarbonat - 115.00 - -
3 Bubungan /pemuung setara atap - m' 35.00 - -
4 Listplank kap baja - m' 40.00 - -
5 Kuda-kuda / rangka atap baja ringan - 1,153.00 15,000.00 17,295,000.00
Satuan Harga Satuan (Rp.) Jumlah (Rp.) m2 m2 m3 m3 m3 m3 m3 m3 m3 m2 m2 m3 m2 m3 m2 Plat poer (190 kg/ m3) m3 Sloof 25/30 (290 kg/ m3) m3 Sloof 40/50 (160 kg/ m3) m3
Kolom 50x50, 40x40, dia.40, dia.30 (210 kg/ m3) m3
Balok lantai 1 & 2 40x60 (170 kg/ m3) m3
Balok lantai 1 & 2 25x40 (215 kg/ m3) m3
Ring balok 30x40, 20x30, balok givel 30x40, balok tangga 25x40 (190 kg/ m3)
m3 Plat lantai 1 & 2 tanpa balok (185 kg/ m3) m3 Plat daag, listplank daag, plat sunshiding jendela (100 kg/ m3) m3
- plat tangga + bordes t.15 cm (185 kg/ m3) m3
- anak tangga & bordes (100 kg/ m3) m3
Kolom 15/15, balok pengunci kusen aluminium 10/30 (170 kg/ m3) m3
Pondasi Lift (190 kg/ m3) m3
m2
No. Uraian Pekerjaan Analisa Volume 1 2 3 4 5 6 7 Satuan Harga Satuan (Rp.) Jumlah (Rp.) 6 H.9 1,153.00 12,420.00 14,320,260.00
7 Talang jurai baja ringan papan reuter 2/25 + papan tampuk 2x2/15 - m' 319.00 - -
8 Listplank papan ulin 2x2/20 + lanan 5/7 pengencang - 75.20 - -
9 Plafond transparan (fiber) + rangka stainless - 64.00 - -
10 Plafond gipsum 9 mm + rangka F.37 2,828.08 52,880.00 149,548,870.40
11 List gipsum lebar 25 cm - m' 2,615.97 - -
12 Plafond kisi-kisi lanan + rangka + list (samping givel) F.37.a 46.50 83,030.00 3,860,895.00
13 - buah 3,899.00 - -
Jumlah 241,343,743.71 VI
1 Kusen kayu ulin 6/14 F.26 13.56 3,867,500.00 52,443,300.00
Kusen aluminium warna + karet (terpasang) - m' 1,424.30 - -
2 Pintu panil ulin berukir ganda terpasang - pasang 3.00 - -
Pintu lipat/folding gate (ruang saji) - 25.00 - -
3 Pintu kaca 5 mm - 16.00 - -
4 Pintu panil lanan (pabrikasi) - 49.08 - -
5 Pintu panil ulin (pabrikasi) - 50.47 - -
6 Dinding partisi double kalsiboard t.6 mm rangka kayu 5/10 - 239.20 - -
7 Daun jendela kaca rayband 5 mm - 75.49 - -
8 Kaca mati rayband 5 mm - 187.17 50,000.00 9,358,500.00
9 Kaca stopsol (termasuk jendela) warna biru - 403.06 - -
10 Kunci tanam 2 slaag setara seis - buah 72.00 - -
11 Kunci Alpha KM/WC - buah 18.00 - -
12 Espagnolete tanam - pasang 15.00 - -
13 Engsel pintu kuningan 4" - buah 396.00 8,000.00 3,168,000.00
14 Grendel pintu toilet - buah 17.00 - -
15 Engsel pintu kuningan 3" - buah 216.00 7,500.00 1,620,000.00
16 Grendel jendela - buah 216.00 - -
17 Kait angin jendela kuningan - buah 216.00 - -
18 Pegangan jendela - buah 108.00 - -
19 Casment jendela kaca stopsol - buah 16.00 - -
Jumlah 66,589,800.00 VII PEK. INSTALASI AIR / SANITAIR
1 Kloset duduk - buah 18.00 - -
2 Urinoir - buah 12.00 - -
3 Bak air lapis keramik - buah 16.00 - -
4 Kran air sun ei - buah 16.00 - -
5 FD - buah 30.00 - -
6 Wastafel + kran + cermin & meja wastafel - unit 15.00 - -
7 Septic tank + bak peresapan - unit 5.00 - -
8 Instalasi air bersih dari menara - ls 1.00 - -
9 Instalasi air kotor/bekas - ls 1.00 - -
10 Bak air (fiber kap. 2 m3) - unit 2.00 - -
11 Pompa listrik + instalasi air dan penyambungan ke PDAM - unit 1.00 - - 12 Sal. Keliling pas bata diplester + gorong-gorong 1/2 dia. - m' 139.00 - -
13 Bak kontrol 40 x 40 cm - buah 12.00 - -
14 Grille penutup saluran teras - m' 55.50 - -
15 Ground Reservoir 2x5x2 m - buah 1.00 - -
16 Tempat wudhu lapis keramik + kran - buah 2.00 - -
Jumlah - VIII PEK. CAT-CATAN, LAIN-LAIN
1 Cat tembok (plafond, dinding) setara Danacryl G.53.a 11,665.38 516,500.00 6,025,168,770.00
2 Cat kilap/ kayu setara Dulux (2K6+K.23) 499.30 74,175.00 37,035,577.50
3 Cat menie/ ter-teran - ls 1.00 - -
4 Reilling tangga steinlis/ void - 20.00 - -
Reilling tangga steinlis - m' 94.00 - -
Ukiran reilling tangga ulin - buah 12.00 - -
Plint karet injakan tangga - m' 133.20 - -
5 Pas. ubin keramik 40 x 40 (type rocktile) G.72 2,744.62 68,546.00 188,132,722.52 Pas. ubin keramik (lantai/ dinding toilet) G.72.c 494.60 63,546.00 31,429,851.60
Pas. Dinding granit (luar depan, samping kanan kiri) - 197.50 - -
Logo dan tulisan DPRD kuningan/ stenlis - unit 1.00 - -
Dinding granit tempat logo - 9.00 - -
Ubin keramik 40 x 40 anti slip pada ram dan carport G.72/m2 82.50 73,546.00 6,067,545.00 Atap setara atap metal multi colour 0,4 mm type prisma (metal +
zincalume coated) m2 m2 m2 m2 m2 Beugel + besi strip + mur-bout + angker tanam (perlengkapan
kuda-kuda)
PEK. KUSEN, PINTU, JENDELA/VENTILASI DAN PERLENGKAPAN PINTU m3 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
No. Uraian Pekerjaan Analisa Volume 1 2 3 4 5 6 7 Satuan Harga Satuan (Rp.) Jumlah (Rp.)
Pasangan batu alam kel. Bangunan dan bawah tangga - 67.82 - -
Plint keramik 10 x 40 - m' 1,271.65 - -
6 Ukiran ulin pada dinding luar depan dan dahi lawang terpasang - ls 1.00 - -
7 Expose kolom diameter 40 keliling bangunan - buah 33.00 - -
Expose kolom diameter 50 depan bangunan - buah 10.00 - -
Expose kolom 50 x 50 pada aula - buah 6.00 - -
- buah 2.00 - -
Expose kolom 40 x 40 pada ruang rapat/ sidang - buah 10.00 - -
Expose kolom diameter 40 pada void - buah 2.00 - -
Plesteran kolom - ls 1.00 - -
8 Bak bunga - buah 10.00 - -
9 Pentas lantai dasar dan lantai dua - unit 2.00 - -
10 Expose plesteran atap daag, listplank beton, geuvel G.50q+G.48 2,073.26 22,316.10 46,267,077.49
11 List plesteran dinding luar - m' 303.00 - -
12 Lapisan waterprofing (talang daag) - 350.00 - -
13 - unit 1.00 - -
14 Sunshiding beton variasi dg kayu dan cat - m' 94.00 - -
15 Ukiran dan panil ulin untuk background panggung lantai dasar - unit 1.00 - - 16
Ukiran dan panil ulin untuk background panggung lantai ruang sidang
- unit 1.00 - -
17 Tangga darurat besi - unit 1.00 - -
Jumlah 6,334,101,544.11 B FASILITAS PENUNJANG
I PEK. INSTALASI LISTRIK
1 Penyambungan daya PLN - paket 1.00 - -
2 Ohm saklar/ time swit (terpasang) - unit 1.00 - -
3 Panel utama - unit 1.00 - -
4 Panel pembagi (PHB I, PHB II, PHB III) - unit 3.00 - -
5 Panel AC - unit 3.00 - -
6 Panel sound system - unit 3.00 - -
7 Panel telepon - unit 3.00 - -
8 - m' 128.00 - - 9 - m' 20.00 - - 10 - m' 19.00 - - 11 - m' 24.00 - - 12 - m' 12.00 - - 13 - m' 114.00 - -
14 Lampu TL 3 x 18 w + Rmo - buah 18.00 - -
15 Lampu TL 2 x 18 w + Rmo - buah 61.00 - -
16 Lampu baret SL 40 w - buah 14.00 - -
17 Lampu pijar 40 w - buah 41.00 - -
18 Lampu tanam (DL) SL 75 w - buah 174.00 - -
19 Lampu tanam (DL) Hollogen 50 w - buah 28.00 - -
20 Lampu dinding/ spotlight 25 w - buah 2.00 - -
21 Saklar tunggal - buah 40.00 - -
22 Lampu hias 300 w - buah 1.00 - -
23 Lampu hias 200 w - buah 2.00 - -
24 Stop kontak 200 w setara bravo warna - buah 66.00 - -
25 Instalasi (titik lampu + stop kontak) - titik 409.00 - -
26 Saklar ganda - buah 65.00 - -
27 Instalasi AC ceiling - unit 44.00 - -
Jumlah - II PEK. INSTALASI PENANGKAL PETIR
1 - buah 6.00 - -
2 Support gip. Med class dia. 1" tinggi 50 cm - buah 6.00 - -
3 - m 200.00 - -
4 Pentanahan lengkap dengan bak kontrol - titik 2.00 - -
5 Material bantu (klem, fisher, sekrup, dll) - ls 1.00 - -
Jumlah -
m2
Expose kolom diameter 50 pada bordes lantai I dan dicat dengan airbrush
m2 m2 Plang nama gedung pada halaman kantor 5 x 2 m lapis keramik,
tulisan dan logo stenlis + pot bunga
Kabel NYFGBY 4 x 120 mm2 Kabel NYY 4 x 50 mm2 Kabel NYY 4 x 35 mm2 Kabel NYY 4 x 25 mm2 Kabel NYY 4 x 16 mm2 Kabel NYM 3 x 4 mm2
Air terminal (rod type), tembaga murni, tinggi 30 cm, dia. 3/4" ujung runcing
DAFTAR ANALISA HARGA SATUAN Unit Kerja : Dinas Kimpraswil Kota Banjarbaru
Kegiatan : Pembangunan Gedung/ Kantor Kota Banjarbaru
Pekerjaan : Pembangunan Gedung DPRD Kota Banjarbaru
No. Paket : 01 (satu)
Lokasi : Banjarbaru
No. Uraian Pekerjaan Analisa/ Satuan
1 Galian Tanah Keras
1.0000 hari Pekerja 27,500.00 27,500.00 27,500.00
0.0330 hari Mandor 45,000.00 1,485.00 1,485.00
28,985.00 - 28,985.00
2 Urugan Pasir di Bawah Lantai
1.2000 m3 Pasir urug 35,000.00 42,000.00 42,000.00
0.3000 hari Pekerja 27,500.00 8,250.00 8,250.00
0.0100 hari Mandor 45,000.00 450.00 450.00
8,700.00 42,000.00 50,700.00 3 Urugan Tanah di Bawah Lantai
1.2500 m3 Tanah urug 25,000.00 31,250.00 31,250.00 0.2500 hari Pekerja 27,500.00 6,875.00 6,875.00 0.0100 hari Mandor 45,000.00 450.00 450.00 7,325.00 31,250.00 38,575.00 4 700.0000 bh Batu bata 350.00 245,000.00 245,000.00 2.5330 zak Semen (50 kg) 44,000.00 111,452.00 111,452.00 0.4060 m3 Pasir pasang 55,000.00 22,330.00 22,330.00
0.1500 hari Kepala tukang 40,000.00 6,000.00 6,000.00
1.5000 hari Tukang batu 35,000.00 52,500.00 52,500.00
4.5000 hari Pekerja 27,500.00 123,750.00 123,750.00 0.2250 hari Mandor 45,000.00 10,125.00 10,125.00 192,375.00 378,782.00 571,157.00 5 700.0000 bh Batu bata 350.00 245,000.00 245,000.00 4.1170 zak Semen (50 kg) 44,000.00 181,148.00 181,148.00 0.3330 m3 Pasir pasang 55,000.00 18,315.00 18,315.00
0.1500 hari Kepala tukang 40,000.00 6,000.00 6,000.00
1.5000 hari Tukang batu 35,000.00 52,500.00 52,500.00
4.5000 hari Pekerja 27,500.00 123,750.00 123,750.00 0.2250 hari Mandor 45,000.00 10,125.00 10,125.00 192,375.00 444,463.00 636,838.00 6 0.0864 zak Semen (50 kg) 44,000.00 3,801.60 3,801.60 0.0139 m3 Pasir pasang 55,000.00 764.50 764.50
0.0150 hari Kepala tukang 40,000.00 600.00 600.00
0.1500 hari Tukang batu 35,000.00 5,250.00 5,250.00
0.4000 hari Pekerja 27,500.00 11,000.00 11,000.00 0.0200 hari Mandor 45,000.00 900.00 900.00 17,750.00 4,566.10 22,316.10 7 1.2000 m3 Batu kali 65,000.00 78,000.00 78,000.00 3.2568 zak Semen (50 kg) 44,000.00 143,299.20 143,299.20 0.5220 m3 Pasir pasang 55,000.00 28,710.00 28,710.00
0.1200 hari Kepala tukang 40,000.00 4,800.00 4,800.00
1.2000 hari Tukang batu 35,000.00 42,000.00 42,000.00
3.6000 hari Pekerja 27,500.00 99,000.00 99,000.00 0.1800 hari Mandor 45,000.00 8,100.00 8,100.00 153,900.00 250,009.20 403,909.20 8 0.0700 m3 Kerikil 65,000.00 4,550.00 4,550.00 Upah Rp. Bahan Rp. Jumlah Rp. A.2/ m3 A.18/ m3 A.16/ m3
Pasangan Batu Bata campuran 1 : 4
G.33h+G.27/ m3
Pasangan Batu Bata campuran 1 : 2
G.33m+G.27/ m3
Plesteran Batu Bata campuran 1 : 4
G.50q+G.48/ m2
Pasangan Batu Gunung/Kali Campuran 1 : 4
G.32h+G.26/ m3
Pekerjaan Beton Campuran 1 : 3 : 6
No. Uraian Pekerjaan Analisa/ Satuan Upah Rp. Bahan Rp. Jumlah Rp. 0.0450 m3 Pasir pasang 55,000.00 2,475.00 2,475.00 0.0350 zak Semen (50 kg) 44,000.00 1,540.00 1,540.00
0.0135 hari Kepala tukang 40,000.00 540.00 540.00
0.1350 hari Tukang batu 35,000.00 4,725.00 4,725.00
0.0720 hari Pekerja 27,500.00 1,980.00 1,980.00 0.0360 hari Mandor 45,000.00 1,620.00 1,620.00 8,865.00 8,565.00 17,430.00 Tebal 7 cm = 126,642.86 122,357.14 249,000.00 Tebal 5 cm = 177,300.00 171,300.00 348,600.00 9 0.8200 m3 Kerikil 65,000.00 53,300.00 53,300.00 0.5400 m3 Pasir pasang 55,000.00 29,700.00 29,700.00 6.8000 zak Semen (50 kg) 44,000.00 299,200.00 299,200.00
0.1000 hari Kepala tukang 40,000.00 4,000.00 4,000.00
1.0000 hari Tukang batu 35,000.00 35,000.00 35,000.00
6.0000 hari Pekerja 27,500.00 165,000.00 165,000.00 0.3000 hari Mandor 45,000.00 13,500.00 13,500.00 217,500.00 382,200.00 599,700.00 10 0.9100 m3 Kerikil 65,000.00 59,150.00 59,150.00 0.5400 m3 Pasir pasang 55,000.00 29,700.00 29,700.00 4.5400 zak Semen (50 kg) 44,000.00 199,760.00 199,760.00
0.0500 hari Kepala tukang 40,000.00 2,000.00 2,000.00
0.5000 hari Tukang batu 35,000.00 17,500.00 17,500.00
6.0000 hari Pekerja 27,500.00 165,000.00 165,000.00
0.3000 hari Mandor 45,000.00 13,500.00 13,500.00
198,000.00 288,610.00 486,610.00 11 Pekerjaan Tulangan Besi G.3/4-12/ 100 kg
3.0000 hari Kepala tukang 40,000.00 120,000.00 120,000.00
9.0000 hari Tukang besi 35,000.00 315,000.00 315,000.00
6.0000 hari Pekerja 27,500.00 165,000.00 165,000.00 110.0000 kg Besi beton 6,000.00 660,000.00 660,000.00 2.0000 kg Kawat beton 7,500.00 15,000.00 15,000.00 600,000.00 675,000.00 1,275,000.00 3/4 x Upah 450,000.00 675,000.00 1,125,000.00 untuk Tulangan 1 kg 4,500.00 6,750.00 11,250.00 12 Pekerjaan Cetakan
0.5000 hari Kepala tukang 40,000.00 20,000.00 20,000.00
5.0000 hari Tukang kayu 35,000.00 175,000.00 175,000.00
6.0000 hari Pekerja 27,500.00 165,000.00 165,000.00
0.1000 hari Mandor 45,000.00 4,500.00 4,500.00
4.0000 kg Paku 9,000.00 36,000.00 36,000.00
0.4000 m3 Kayu bekisting (kelas 3) 950,000.00 380,000.00 380,000.00 364,500.00 416,000.00 780,500.00 13
3.0000 hari Kepala tukang 40,000.00 120,000.00 120,000.00
30.0000 hari Tukang kayu 35,000.00 1,050,000.00 1,050,000.00
10.0000 hari Pekerja 27,500.00 275,000.00 275,000.00
0.5000 hari Mandor 45,000.00 22,500.00 22,500.00
1.2000 m3 Kayu ulin 2,000,000.00 2,400,000.00 2,400,000.00
1,467,500.00 2,400,000.00 3,867,500.00 14
3.6000 hari Kepala tukang 40,000.00 144,000.00 144,000.00
36.0000 hari Tukang kayu 35,000.00 1,260,000.00 1,260,000.00
12.0000 hari Pekerja 27,500.00 330,000.00 330,000.00
0.6000 hari Mandor 45,000.00 27,000.00 27,000.00
1.2000 m3 Kayu lanan 1,200,000.00 1,440,000.00 1,440,000.00
8.0000 kg Paku/ beugel/ angker 9,000.00 72,000.00 72,000.00
1,761,000.00 1,512,000.00 3,273,000.00 15
0.0800 hari Kepala tukang 40,000.00 3,200.00 3,200.00
0.8000 hari Tukang kayu 35,000.00 28,000.00 28,000.00
0.2800 hari Pekerja 27,500.00 7,700.00 7,700.00
Pekerjaan Beton Campuran 1 : 2 : 3
G.41/ m3
Pekerjaan Beton Campuran 1 : 3 : 5
G.43.a/ m3
F.8/ 10 m2
Pekerjaan Kusen Pintu/ Jendela dari Ulin
F.26/ m3
Rangka Kap Kuda-kuda Bentang > 7 m
3/4 F.23/ m3
Pekerjaan Plafond Gifsum 9 mm + Rangka
No. Uraian Pekerjaan Analisa/ Satuan Upah Rp. Bahan Rp. Jumlah Rp. 0.0140 hari Mandor 45,000.00 630.00 630.00 0.0100 m3 Kayu lanan 1,200,000.00 12,000.00 12,000.00 0.3360 lbr Gifsum - - - 0.1500 kg Paku 9,000.00 1,350.00 1,350.00 39,530.00 13,350.00 52,880.00 16
Upah sama dengan F.37 39,530.00 39,530.00
0.0240 m3 Papan lanan 1,200,000.00 28,800.00 28,800.00
0.0100 m3 Kayu lanan 1,200,000.00 12,000.00 12,000.00
0.3000 kg Paku 9,000.00 2,700.00 2,700.00
39,530.00 43,500.00 83,030.00 17
0.0800 hari Kepala tukang 40,000.00 3,200.00 3,200.00
0.8000 hari Tukang kayu 35,000.00 28,000.00 28,000.00
0.2800 hari Pekerja 27,500.00 7,700.00 7,700.00
0.0140 hari Mandor 45,000.00 630.00 630.00
0.0240 m3 Papan ulin 2,000,000.00 48,000.00 48,000.00
0.2500 kg Paku 9,000.00 2,250.00 2,250.00
39,530.00 50,250.00 89,780.00 18 Pekerjaan Kasau/ Reng
0.0100 hari Kepala tukang 40,000.00 400.00 400.00
0.1000 hari Tukang kayu 35,000.00 3,500.00 3,500.00
0.1000 hari Pekerja 27,500.00 2,750.00 2,750.00 0.0025 hari Mandor 45,000.00 112.50 112.50 0.0160 m3 Kayu lanan 1,200,000.00 19,200.00 19,200.00 0.2500 kg Paku 9,000.00 2,250.00 2,250.00 6,762.50 21,450.00 28,212.50 19 3/4 (I.1)/ 100 kg
9.0000 hari Tukang besi 35,000.00 315,000.00 315,000.00
3.0000 hari Kepala tukang 40,000.00 120,000.00 120,000.00
9.0000 hari Pekerja 27,500.00 247,500.00 247,500.00 110.0000 kg Besi siku 10,000.00 1,100,000.00 1,100,000.00 682,500.00 1,100,000.00 1,782,500.00 Upah 3/4 511,875.00 1,100,000.00 1,611,875.00 per kg 5,118.75 11,000.00 16,118.75 20 3/4 (I.3)/ 100 kg
9.0000 hari Tukang besi 35,000.00 315,000.00 315,000.00
3.0000 hari Kepala tukang 40,000.00 120,000.00 120,000.00
9.0000 hari Pekerja 27,500.00 247,500.00 247,500.00 110.0000 kg Besi plat 9,000.00 990,000.00 990,000.00 682,500.00 990,000.00 1,672,500.00 Upah 3/4 511,875.00 990,000.00 1,501,875.00 per kg 5,118.75 9,900.00 15,018.75 21
0.0200 hari Kepala tukang 40,000.00 800.00 800.00
0.2000 hari Tukang kayu 35,000.00 7,000.00 7,000.00
0.1500 hari Pekerja 27,500.00 4,125.00 4,125.00
0.0050 hari Mandor 45,000.00 225.00 225.00
1.0000 m2 Genteng metal - - -
0.0300 kg Paku genteng metal 9,000.00 270.00 270.00
12,150.00 270.00 12,420.00
22 G.53.a
1.0000 hari Tukang cat 35,000.00 35,000.00 35,000.00
6.0000 hari Pekerja 27,500.00 165,000.00 165,000.00
0.1000 hari Kepala tukang 40,000.00 4,000.00 4,000.00
6.2500 galon Cat tembok 50,000.00 312,500.00 312,500.00
204,000.00 312,500.00 516,500.00
23 (2K.6+K.23)
0.7000 hari Tukang cat 35,000.00 24,500.00 24,500.00
0.0700 hari Kepala tukang 40,000.00 2,800.00 2,800.00
0.5000 hari Pekerja 27,500.00 13,750.00 13,750.00
0.0250 hari Mandor 45,000.00 1,125.00 1,125.00
Pekerjaan Plafond Kisi-kisi Lanan + Rangka
F.37.a/ m2
Pekerjaan Listplank/ Tumbukan Kasau dari Ulin
F.21/ m2
F.16/ m2
Pekerjaan Besi Siku, Besi C + termasuk Las-lasan
Pekerjaan Besi Plat + termasuk Las-lasan
Pekerjaan Atap Genteng Metal Multi Colour type Prima tebal 0,4 mm
H.9/ m2
100 m2 Cat Dinding/ Plafond
(minimal 2 x atau rata)
No. Uraian Pekerjaan Analisa/ Satuan Upah Rp. Bahan Rp. Jumlah Rp. 2.6000 kg Cat kilap 10,000.00 26,000.00 26,000.00
0.5000 ltr Minyak cat (tener b) 5,000.00 2,500.00 2,500.00
1.0000 lbr Amplas 3,500.00 3,500.00 3,500.00
42,175.00 32,000.00 74,175.00
24 G.53.b
1.0000 hari Tukang cat 35,000.00 35,000.00 35,000.00
6.0000 hari Pekerja 27,500.00 165,000.00 165,000.00
0.1000 hari Kepala tukang 40,000.00 4,000.00 4,000.00
6.2500 galon Cat tembok 50,000.00 312,500.00 312,500.00
204,000.00 312,500.00 516,500.00 25
1.0000 m2 Keramik 40,000.00 40,000.00 40,000.00
0.1740 zak Semen (50 kg) 44,000.00 7,656.00 7,656.00
0.0230 m3 Pasir pasang 55,000.00 1,265.00 1,265.00
0.0250 hari Kepala tukang 40,000.00 1,000.00 1,000.00
0.2500 hari Tukang batu 35,000.00 8,750.00 8,750.00
0.5000 hari Pekerja 27,500.00 13,750.00 13,750.00 0.0250 hari Mandor 45,000.00 1,125.00 1,125.00 24,625.00 48,921.00 73,546.00 26 1.0000 m2 Keramik 35,000.00 35,000.00 35,000.00 0.1740 zak Semen (50 kg) 44,000.00 7,656.00 7,656.00 0.0230 m3 Pasir pasang 55,000.00 1,265.00 1,265.00
0.0250 hari Kepala tukang 40,000.00 1,000.00 1,000.00
0.2500 hari Tukang batu 35,000.00 8,750.00 8,750.00
0.5000 hari Pekerja 27,500.00 13,750.00 13,750.00 0.0250 hari Mandor 45,000.00 1,125.00 1,125.00 24,625.00 43,921.00 68,546.00 27 1.0000 m2 Keramik 30,000.00 30,000.00 30,000.00 0.1740 zak Semen (50 kg) 44,000.00 7,656.00 7,656.00 0.0230 m3 Pasir pasang 55,000.00 1,265.00 1,265.00
0.0250 hari Kepala tukang 40,000.00 1,000.00 1,000.00
0.2500 hari Tukang batu 35,000.00 8,750.00 8,750.00
0.5000 hari Pekerja 27,500.00 13,750.00 13,750.00 0.0250 hari Mandor 45,000.00 1,125.00 1,125.00 24,625.00 38,921.00 63,546.00 Pekerjaan Beton 28 217,500.00 382,200.00 599,700.00 G.3/4-12 tulangan 200 kg 900,000.00 1,350,000.00 2,250,000.00 364,500.00 416,000.00 780,500.00 1,482,000.00 2,148,200.00 3,630,200.00 29 217,500.00 382,200.00 599,700.00 G.3/4-12 tulangan 290 kg 1,305,000.00 1,957,500.00 3,262,500.00 364,500.00 416,000.00 780,500.00 1,887,000.00 2,755,700.00 4,642,700.00 30 217,500.00 382,200.00 599,700.00 G.3/4-12 tulangan 160 kg 720,000.00 1,080,000.00 1,800,000.00 364,500.00 416,000.00 780,500.00 1,302,000.00 1,878,200.00 3,180,200.00 31 217,500.00 382,200.00 599,700.00 G.3/4-12 tulangan 210 kg 945,000.00 1,417,500.00 2,362,500.00 364,500.00 416,000.00 780,500.00 1,527,000.00 2,215,700.00 3,742,700.00 32
100 m2 Cat Tembok Luar Dalam
Beton setara Danacryl (minimal 2 x atau rata)
Pasangan Ubin Keramik 40 x 40 Anti Slip
G.72/ m2
Pasangan Ubin Keramik 40 x 40 type Rocktile
G.72.a/ m2
Pasangan Ubin Keramik 20 x 25 dan Dinding Keramik 20 x 25
G.72.b/ m2
Beton Bertulang Poer, camp. 1 : 2 : 3 untuk 200 kg
G.sup I./ m3
G.41/ m3
F.8/10 m2 Cetakan/ Bongkaran
Beton Bertulang Sloof 25/40, camp. 1 : 2 : 3 untuk 290 kg
G.sup I./ m3
G.41/ m3
F.8/10 m2 Cetakan/ Bongkaran
Beton Bertulang Sloof 40/60 di Atas Lantai Dasar, camp. 1 : 2 : 3 untuk 160 kg
G.sup I./ m3
G.41/ m3
F.8/10 m2 Cetakan/ Bongkaran
Beton Bertulang Kolom, camp. 1 : 2 : 3 untuk 210 kg
G.sup I./ m3
G.41/ m3
F.8/10 m2 Cetakan/ Bongkaran
Beton Bertulang Balok/ Ring Balok, camp. 1 : 2 : 3 untuk 170 kg
No. Uraian Pekerjaan Analisa/ Satuan Upah Rp. Bahan Rp. Jumlah Rp. 217,500.00 382,200.00 599,700.00 G.3/4-12 tulangan 190 kg 855,000.00 1,282,500.00 2,137,500.00 364,500.00 416,000.00 780,500.00 1,437,000.00 2,080,700.00 3,517,700.00 33 217,500.00 382,200.00 599,700.00 G.3/4-12 tulangan 170 kg 765,000.00 1,147,500.00 1,912,500.00 364,500.00 416,000.00 780,500.00 1,347,000.00 1,945,700.00 3,292,700.00 34 217,500.00 382,200.00 599,700.00 G.3/4-12 tulangan 215 kg 967,500.00 1,451,250.00 2,418,750.00 364,500.00 416,000.00 780,500.00 1,549,500.00 2,249,450.00 3,798,950.00 35 217,500.00 382,200.00 599,700.00 G.3/4-12 tulangan 185 kg 832,500.00 1,248,750.00 2,081,250.00 364,500.00 416,000.00 780,500.00 1,414,500.00 2,046,950.00 3,461,450.00 36 217,500.00 382,200.00 599,700.00 G.3/4-12 tulangan 100 kg 450,000.00 675,000.00 1,125,000.00 364,500.00 416,000.00 780,500.00 1,032,000.00 1,473,200.00 2,505,200.00 37 217,500.00 382,200.00 599,700.00 G.3/4-12 tulangan 170 kg 765,000.00 1,147,500.00 1,912,500.00 364,500.00 416,000.00 780,500.00 1,347,000.00 1,945,700.00 3,292,700.00 38 217,500.00 382,200.00 599,700.00 G.3/4-12 tulangan 75 kg 337,500.00 506,250.00 843,750.00 364,500.00 416,000.00 780,500.00 919,500.00 1,304,450.00 2,223,950.00 39 217,500.00 382,200.00 599,700.00 G.3/4-12 tulangan 185 kg 832,500.00 1,248,750.00 2,081,250.00 364,500.00 416,000.00 780,500.00 1,414,500.00 2,046,950.00 3,461,450.00 40 217,500.00 382,200.00 599,700.00 G.3/4-12 tulangan 40 kg 180,000.00 270,000.00 450,000.00 364,500.00 416,000.00 780,500.00 762,000.00 1,068,200.00 1,830,200.00 Beton Bertulang Balok/ Ring
Balok, camp. 1 : 2 : 3 untuk 170
kg G.41/ m
3
F.8/10 m2 Cetakan/ Bongkaran
Beton Bertulang Balok Lantai 40/60, camp. 1 : 2 : 3 untuk 170 kg
G.sup I./ m3
G.41/ m3
F.8/10 m2 Cetakan/ Bongkaran
Beton Bertulang Balok Lantai 25/40, camp. 1 : 2 : 3 untuk 215 kg
G.sup I./ m3
G.41/ m3
F.8/10 m2 Cetakan/ Bongkaran
Beton Bertulang Plat Lantai 1 & 2, Plat Tangga, bordes, camp. 1 : 2 : 3 untuk 185 kg
G.sup I./ m3
G.41/ m3
F.8/10 m2 Cetakan/ Bongkaran
Beton Bertulang Plat Daag, Listplank Sunshiding, Anak Tangga, camp. 1 : 2 : 3 untuk 100 kg
G.sup I./ m3
G.41/ m3
F.8/10 m2 Cetakan/ Bongkaran
Beton Bertulang Kolom 15/15, Balok 10/13, camp. 1 : 2 : 3 untuk 170 kg
G.sup I./ m3
G.41/ m3
F.8/10 m2 Cetakan/ Bongkaran
Beton Bertulang Shaft Talang, camp. 1 : 2 : 3 untuk 75 kg
G.sup I./ m3
G.41/ m3
F.8/10 m2 Cetakan/ Bongkaran
Beton Bertulang Plat Tangga, camp. 1 : 2 : 3 untuk 185 kg
G.sup I./ m3
G.41/ m3
F.8/10 m2 Cetakan/ Bongkaran
Beton Bertulang Anak Tangga, camp. 1 : 2 : 3 untuk 40 kg
G.sup I./ m3
G.41/ m3
DAFTAR HARGA UPAH & BAHAN
Unit Kerja
: Dinas Kimpraswil Kota Banjarbaru
Kegiatan
: Pembangunan Gedung/ Kantor Kota Banjarbaru
Pekerjaan
: Pembangunan Gedung DPRD Kota Banjarbaru
No. Paket
: 01 (satu)
Lokasi
: Banjarbaru
No.
Uraian
Satuan
Harga Satuan
I Upah
1 Pekerja
hari
27,500.00
2 Mandor
hari
45,000.00
3 Tukang kayu
hari
35,000.00
4 Tukang batu
hari
35,000.00
5 Tukang cat
hari
35,000.00
6 Tukang besi
hari
35,000.00
7 Tukang dempul
hari
35,000.00
8 Tukang plitur
hari
35,000.00
9 Kepala tukang
hari
40,000.00
II Bahan
1 Tanah urug
25,000.00
2 Pasir urug
35,000.00
3 Pasir pasang
55,000.00
4 Semen (50 kg)
zak
44,000.00
5 Kerikil
65,000.00
6 Batu bata
bh
350.00
7 Batu kali
65,000.00
8 Keramik 20x25
30,000.00
9 Keramik 20x20 (permukaan kasar)
30,000.00
10 Keramik 45x45
40,000.00
11 Keramik 40x40 type Rocktile warna
35,000.00
12 Besi beton
kg
6,000.00
13 Kawat beton
kg
7,500.00
14 Kayu bekisting (kelas 3)
950,000.00
15 Paku
kg
9,000.00
16 Kayu ulin
2,000,000.00
17 Papan ulin
2,000,000.00
18 Kayu lanan
1,200,000.00
19 Papan lanan
1,200,000.00
20 Gifsum 9 mm
lbr
45,000.00
21 Paku sirap
kg
9,000.00
22 Besi profil
kg
10,000.00
23 Besi plat
kg
9,000.00
24 Cat tembok setara danacryl
5 kg
50,000.00
25 Cat tembok setara danabrite
5 kg
50,000.00
26 Cat kilap setara dulux
kg
10,000.00
27 Minyak cat (tener b)
ltr
5,000.00
28 Amplas
lbr
3,500.00
29 Atap metal multi colour type prima 0,40 mm
-
30 Nok setara metal warna
m'
-
31 Kayu galam diameter 8-10 pj 5 m
bj
5,000.00
32 Galam perancah pj 2 m
bj
1,500.00
33 Atap polycarbonet
-
m
3m
3m
3m
3m
3m
2m
2m
2m
2m
3m
3m
3m
3m
3m
2m
2No.
Uraian
Satuan
Harga Satuan
34 Kuda-kuda/ rangka atap baja ringan
15,000.00
35 Kaca ryben 5 mm
50,000.00
36 Kaca stopsol
-
37 Kusen alluminium
m'
-
38 Kunci tanam 2 slag setara seis
buah
-
39 Espagnolite tanam terpasang
buah
-
40 Engsel pintu kuningan 4"
set
8,000.00
41 Engsel jendela kuningan 3"
set
7,500.00
42 Papan gifsum tebal 9 mm
lbr
45,000.00
43 Gerendel jendela
buah
5,000.00
44 Kaitan angin kuningan
buah
4,500.00
45 Kunci tanam + pegangan
set
-
46 Pegangan jendela
buah
4,000.00
47 Closet duduk keramik
buah
-
48 Urinoir keramik
buah
-
49 Kran air setara sun ei
buah
-
50 FD
buah
-
51 Wastafel lengkap
buah
-
Banjarmasin, 05 Juni 2006
PT. Adiquatro Elektrikindo Perkasa
Djunaidi Limbong
Direktur