PEMBANGUNAN GEDUNG KANTOR PERTANAHAN KOTA SURAKARTA - Diponegoro University | Institutional Repository (UNDIP-IR)

N/A
N/A
Protected

Academic year: 2017

Membagikan "PEMBANGUNAN GEDUNG KANTOR PERTANAHAN KOTA SURAKARTA - Diponegoro University | Institutional Repository (UNDIP-IR)"

Copied!
6
0
0

Teks penuh

(1)
(2)

4 Kolom Beton Bertulang Praktis 3.50 m3 4,813,755.00 16,848,142.50

5 Tangga beton 5.80 m3 4,935,461.00 28,625,673.80

408,425,366.44

IV Pekerjaan Pasangan

1 Pasangan batu bata 1: 4 5.92 m2 154,040.00 911,916.80

2 Plesteran 1 : 4 11.84 m2 32,313.00 382,585.92

3 Plesteran beton 1 : 4 105.00 m2 48,658.40 5,109,132.00 4 Pasangan batu bata 1 : 6 46.51 m2 149,600.00 6,957,896.00

5 Plesteran 1 : 6 93.02 m2 30,664.20 2,852,383.88

6 Sponengan 1:2 26.30 m' 14,035.00 369,120.50

16,583,035.10

V Pekerjaan Kusen Dan Penggantung

1 Kusen Pintu Almunium 66.36 m' 86,334.10 5,729,130.88 2 Pasang daun Pintu Kaca Rangka Almunium 107.50 m2 223,443.00 24,020,122.50 3 Kusen jendela alumunium 78.30 m' 223,443.00 17,495,586.90 4 Kusen Bouven alumunium 15.70 m' 86,334.10 1,355,445.37 5 Kusen pintu km mandi 28.10 m' 86,334.00 2,425,985.40

(3)

6 Partisi 161.50 m' 86,334.00 13,942,941.00

7 Beton duk 2.00 bh Taksir 3,500.00 7,000.00

64,976,212.05

VI Pekerjaan Langit-Langit

1 Pasang rangka plafond holow pipe 191.10 m2 61,700.00 11,790,870.00 2 Pasang gypsumboard 120x240 cm tebal 9 mm 191.10 m2 28,340.00 5,415,774.00 3 Pasang list profil gypsum 69.00 m' 10,000.00 690,000.00

17,896,644.00

VII Pekerjaan elektrikal

1 Pasang titik lampu 57.00 titik Taksir 110,000.00 6,270,000.00 2 Pasang saklar ganda 6.00 bh Taksir 20,000.00 120,000.00 3 Pasang saklar tunggal 13.00 bh Taksir 10,000.00 130,000.00 4 Pasang stop kontak in 12.00 bh Taksir 50,000.00 600,000.00 5 Pasang lampu SL 18 Watt 28.00 bh Taksir 25,000.00 700,000.00 6 Pasang lampu TKO 2x18 Watt armatur inbow 26.00 bh Taksir 125,000.00 3,250,000.00 7 Pasang Box panel 1.00 bh Taksir 500,000.00 500,000.00

11,570,000.00

VIII Pekerjaan Lantai

1 Pasang lantai keramik 40X40 cm 175.20 m2 183,901.00 32,219,455.20 2 Pasang lantai keramik 20X20m 44.57 m2 126,525.00 5,639,219.25

37,858,674.45

VIIII Pekerjaan Pengecatan

1 Pengecatan dinding 104.86 m2 10,423.00 1,092,955.78 2 Pemasangan ACP 209.10 m2 Taksir 450,000.00 94,095,000.00

95,187,955.78

JUMLAH 2 783,737,691.49

(4)

3 PEKERJAAN LANTAI 2

I Pekerjaan Struktur Lantai 2

1 Kolom Beton Bertulang Struktur 5.24 m3 6,882,221.00 36,062,838.04

2 Ringbalk Struktur 21.56 m3 3,662,900.00 78,972,124.00

3 Balok Latiu 15x20 cm 0.98 m3 3,764,316.67 3,689,030.34

4 Konsol Beton 15x25 cm 1.53 m3 3,764,316.67 5,759,404.51

5 Plat lantai 18.88 m3 2,553,346.67 48,207,185.13

6 Plat Leuvel 0.97 m3 2,016,788.00 1,956,284.36

7 Tangga Kanopi 1.35 m3 2,553,346.67 3,447,018.00

178,093,884.38

II Pekerjaan Pasangan

1 Pasangan batu bata 1: 4 23.24 m2 154,040.00 3,579,889.60

2 Plesteran 1 : 4 46.48 m2 32,313.00 1,501,908.24

3 Plesteran beton 1:4 82.56 m2 48,658.40 4,017,237.50

4 Pasangan batu bata 1 : 6 215.28 m2 149,600.00 32,205,888.00

5 Plesteran 1 : 6 444.10 m2 30,664.20 13,617,971.22

6 Sponengan 1:2 77.66 m' 14,035.00 1,089,958.10

7 Pasang handrealing besi tempa 10.24 m2 350,000.00 3,584,000.00

59,596,852.66

III Pekerjaan Kusen Dan Penggantung

1 Kusen Pintu Almunium 66.36 m' 86,334.10 5,729,130.88 2 Pasang daun Pintu Kaca Rangka Almunium 107.50 m2 223,443.00 24,020,122.50 3 Kusen jendela alumunium 78.30 m' 223,443.00 17,495,586.90 4 Kusen Bouven alumunium 15.70 m' 86,334.10 1,355,445.37

(5)
(6)

Referensi

Dokumen terkait

PENGARUH KOMITMEN SOSIAL TERHADAP WATAK KEWARGANEGARAAN SISWA DI KOMPLEK SDN SUKAGALIH BARAT KOTA BANDUNG.. Universitas Pendidikan Indonesia | repository.upi.edu |

Dalam penelitian ini akan dilakukan suatu studi tentang tingkat pelayanan bus DAMRI dilihat dari sisi penyedia (supply), yaitu menyangkut aspek (variabel) kinerja angkutan umum

pertama , tidak ada Filsafat Timur sebelum Suhrawardi menciptakan Filsafat Iluminasi. Filsafat Iluminasi tidak boleh dianggap “Timur” dalam pengertian kultural

Berdasarkan hasil observasi perkembangan bahasa anak kelompok A Taman Kanak-Kanak Aisyiyah Cekel Karangturi Gondangrejo Karanganyar belum berkembang secara baik,

Reports that the introduction of local management of schools (LMS) was one of the main features of the Educa- tion Reform

Pendahuluan (Definisi dan konsep dasar regresi dan korelasi); Regresi linier sederhana (OLS, Anova, pengujian model, prediksi); Regresi linier berganda (pendekatan matriks, OLS

Mampu menentukan rancangan sampling (pengambilan sampel) yang sesuai untuk suatu penelitian, meliputi : rancangan sampling, penentuan ukuran sampel sesuai dengan parameter yang diduga

Pendahuluan (ruang lingkup mata kuliah, klasifikasi dan aplikasi metode peramalan), Trend Analysis , Regresi Linear Berganda, Dummy Variable, Calendar Variation , Metode Naif, Moving