4 Kolom Beton Bertulang Praktis 3.50 m3 4,813,755.00 16,848,142.50

5 Tangga beton 5.80 m3 4,935,461.00 28,625,673.80

408,425,366.44

IV Pekerjaan Pasangan

1 Pasangan batu bata 1: 4 5.92 m2 154,040.00 911,916.80

2 Plesteran 1 : 4 11.84 m2 32,313.00 382,585.92

3 Plesteran beton 1 : 4 105.00 m2 48,658.40 5,109,132.00 4 Pasangan batu bata 1 : 6 46.51 m2 149,600.00 6,957,896.00

5 Plesteran 1 : 6 93.02 m2 30,664.20 2,852,383.88

6 Sponengan 1:2 26.30 m' 14,035.00 369,120.50

16,583,035.10

V Pekerjaan Kusen Dan Penggantung

1 Kusen Pintu Almunium 66.36 m' 86,334.10 5,729,130.88 2 Pasang daun Pintu Kaca Rangka Almunium 107.50 m2 223,443.00 24,020,122.50 3 Kusen jendela alumunium 78.30 m' 223,443.00 17,495,586.90 4 Kusen Bouven alumunium 15.70 m' 86,334.10 1,355,445.37 5 Kusen pintu km mandi 28.10 m' 86,334.00 2,425,985.40

(3)

6 Partisi 161.50 m' 86,334.00 13,942,941.00

7 Beton duk 2.00 bh Taksir 3,500.00 7,000.00

64,976,212.05

VI Pekerjaan Langit-Langit

1 Pasang rangka plafond holow pipe 191.10 m2 61,700.00 11,790,870.00 2 Pasang gypsumboard 120x240 cm tebal 9 mm 191.10 m2 28,340.00 5,415,774.00 3 Pasang list profil gypsum 69.00 m' 10,000.00 690,000.00

17,896,644.00

VII Pekerjaan elektrikal

1 Pasang titik lampu 57.00 titik Taksir 110,000.00 6,270,000.00 2 Pasang saklar ganda 6.00 bh Taksir 20,000.00 120,000.00 3 Pasang saklar tunggal 13.00 bh Taksir 10,000.00 130,000.00 4 Pasang stop kontak in 12.00 bh Taksir 50,000.00 600,000.00 5 Pasang lampu SL 18 Watt 28.00 bh Taksir 25,000.00 700,000.00 6 Pasang lampu TKO 2x18 Watt armatur inbow 26.00 bh Taksir 125,000.00 3,250,000.00 7 Pasang Box panel 1.00 bh Taksir 500,000.00 500,000.00

11,570,000.00

VIII Pekerjaan Lantai

1 Pasang lantai keramik 40X40 cm 175.20 m2 183,901.00 32,219,455.20 2 Pasang lantai keramik 20X20m 44.57 m2 126,525.00 5,639,219.25

37,858,674.45

VIIII Pekerjaan Pengecatan

1 Pengecatan dinding 104.86 m2 10,423.00 1,092,955.78 2 Pemasangan ACP 209.10 m2 Taksir 450,000.00 94,095,000.00

95,187,955.78

JUMLAH 2 783,737,691.49

(4)

3 PEKERJAAN LANTAI 2

I Pekerjaan Struktur Lantai 2

1 Kolom Beton Bertulang Struktur 5.24 m3 6,882,221.00 36,062,838.04

2 Ringbalk Struktur 21.56 m3 3,662,900.00 78,972,124.00

3 Balok Latiu 15x20 cm 0.98 m3 3,764,316.67 3,689,030.34

4 Konsol Beton 15x25 cm 1.53 m3 3,764,316.67 5,759,404.51

5 Plat lantai 18.88 m3 2,553,346.67 48,207,185.13

6 Plat Leuvel 0.97 m3 2,016,788.00 1,956,284.36

7 Tangga Kanopi 1.35 m3 2,553,346.67 3,447,018.00

178,093,884.38

II Pekerjaan Pasangan

1 Pasangan batu bata 1: 4 23.24 m2 154,040.00 3,579,889.60

2 Plesteran 1 : 4 46.48 m2 32,313.00 1,501,908.24

3 Plesteran beton 1:4 82.56 m2 48,658.40 4,017,237.50

4 Pasangan batu bata 1 : 6 215.28 m2 149,600.00 32,205,888.00

5 Plesteran 1 : 6 444.10 m2 30,664.20 13,617,971.22

6 Sponengan 1:2 77.66 m' 14,035.00 1,089,958.10

7 Pasang handrealing besi tempa 10.24 m2 350,000.00 3,584,000.00

59,596,852.66

III Pekerjaan Kusen Dan Penggantung

1 Kusen Pintu Almunium 66.36 m' 86,334.10 5,729,130.88 2 Pasang daun Pintu Kaca Rangka Almunium 107.50 m2 223,443.00 24,020,122.50 3 Kusen jendela alumunium 78.30 m' 223,443.00 17,495,586.90 4 Kusen Bouven alumunium 15.70 m' 86,334.10 1,355,445.37

(5)
(6)

Referensi

Dokumen terkait

Berdasarkan hasil observasi perkembangan bahasa anak kelompok A Taman Kanak-Kanak Aisyiyah Cekel Karangturi Gondangrejo Karanganyar belum berkembang secara baik,

pertama , tidak ada Filsafat Timur sebelum Suhrawardi menciptakan Filsafat Iluminasi. Filsafat Iluminasi tidak boleh dianggap “Timur” dalam pengertian kultural

PENGARUH KOMITMEN SOSIAL TERHADAP WATAK KEWARGANEGARAAN SISWA DI KOMPLEK SDN SUKAGALIH BARAT KOTA BANDUNG.. Universitas Pendidikan Indonesia | repository.upi.edu |

Dalam penelitian ini akan dilakukan suatu studi tentang tingkat pelayanan bus DAMRI dilihat dari sisi penyedia (supply), yaitu menyangkut aspek (variabel) kinerja angkutan umum

Reports that the introduction of local management of schools (LMS) was one of the main features of the Educa- tion Reform

Pendahuluan (Definisi dan konsep dasar regresi dan korelasi); Regresi linier sederhana (OLS, Anova, pengujian model, prediksi); Regresi linier berganda (pendekatan matriks, OLS

Mampu menentukan rancangan sampling (pengambilan sampel) yang sesuai untuk suatu penelitian, meliputi : rancangan sampling, penentuan ukuran sampel sesuai dengan parameter yang diduga

Pendahuluan (ruang lingkup mata kuliah, klasifikasi dan aplikasi metode peramalan), Trend Analysis , Regresi Linear Berganda, Dummy Variable, Calendar Variation , Metode Naif, Moving