4 Kolom Beton Bertulang Praktis 3.50 m3 4,813,755.00 16,848,142.50
5 Tangga beton 5.80 m3 4,935,461.00 28,625,673.80
408,425,366.44
IV Pekerjaan Pasangan
1 Pasangan batu bata 1: 4 5.92 m2 154,040.00 911,916.80
2 Plesteran 1 : 4 11.84 m2 32,313.00 382,585.92
3 Plesteran beton 1 : 4 105.00 m2 48,658.40 5,109,132.00 4 Pasangan batu bata 1 : 6 46.51 m2 149,600.00 6,957,896.00
5 Plesteran 1 : 6 93.02 m2 30,664.20 2,852,383.88
6 Sponengan 1:2 26.30 m' 14,035.00 369,120.50
16,583,035.10
V Pekerjaan Kusen Dan Penggantung
1 Kusen Pintu Almunium 66.36 m' 86,334.10 5,729,130.88 2 Pasang daun Pintu Kaca Rangka Almunium 107.50 m2 223,443.00 24,020,122.50 3 Kusen jendela alumunium 78.30 m' 223,443.00 17,495,586.90 4 Kusen Bouven alumunium 15.70 m' 86,334.10 1,355,445.37 5 Kusen pintu km mandi 28.10 m' 86,334.00 2,425,985.40
6 Partisi 161.50 m' 86,334.00 13,942,941.00
7 Beton duk 2.00 bh Taksir 3,500.00 7,000.00
64,976,212.05
VI Pekerjaan Langit-Langit
1 Pasang rangka plafond holow pipe 191.10 m2 61,700.00 11,790,870.00 2 Pasang gypsumboard 120x240 cm tebal 9 mm 191.10 m2 28,340.00 5,415,774.00 3 Pasang list profil gypsum 69.00 m' 10,000.00 690,000.00
17,896,644.00
VII Pekerjaan elektrikal
1 Pasang titik lampu 57.00 titik Taksir 110,000.00 6,270,000.00 2 Pasang saklar ganda 6.00 bh Taksir 20,000.00 120,000.00 3 Pasang saklar tunggal 13.00 bh Taksir 10,000.00 130,000.00 4 Pasang stop kontak in 12.00 bh Taksir 50,000.00 600,000.00 5 Pasang lampu SL 18 Watt 28.00 bh Taksir 25,000.00 700,000.00 6 Pasang lampu TKO 2x18 Watt armatur inbow 26.00 bh Taksir 125,000.00 3,250,000.00 7 Pasang Box panel 1.00 bh Taksir 500,000.00 500,000.00
11,570,000.00
VIII Pekerjaan Lantai
1 Pasang lantai keramik 40X40 cm 175.20 m2 183,901.00 32,219,455.20 2 Pasang lantai keramik 20X20m 44.57 m2 126,525.00 5,639,219.25
37,858,674.45
VIIII Pekerjaan Pengecatan
1 Pengecatan dinding 104.86 m2 10,423.00 1,092,955.78 2 Pemasangan ACP 209.10 m2 Taksir 450,000.00 94,095,000.00
95,187,955.78
JUMLAH 2 783,737,691.49
3 PEKERJAAN LANTAI 2
I Pekerjaan Struktur Lantai 2
1 Kolom Beton Bertulang Struktur 5.24 m3 6,882,221.00 36,062,838.04
2 Ringbalk Struktur 21.56 m3 3,662,900.00 78,972,124.00
3 Balok Latiu 15x20 cm 0.98 m3 3,764,316.67 3,689,030.34
4 Konsol Beton 15x25 cm 1.53 m3 3,764,316.67 5,759,404.51
5 Plat lantai 18.88 m3 2,553,346.67 48,207,185.13
6 Plat Leuvel 0.97 m3 2,016,788.00 1,956,284.36
7 Tangga Kanopi 1.35 m3 2,553,346.67 3,447,018.00
178,093,884.38
II Pekerjaan Pasangan
1 Pasangan batu bata 1: 4 23.24 m2 154,040.00 3,579,889.60
2 Plesteran 1 : 4 46.48 m2 32,313.00 1,501,908.24
3 Plesteran beton 1:4 82.56 m2 48,658.40 4,017,237.50
4 Pasangan batu bata 1 : 6 215.28 m2 149,600.00 32,205,888.00
5 Plesteran 1 : 6 444.10 m2 30,664.20 13,617,971.22
6 Sponengan 1:2 77.66 m' 14,035.00 1,089,958.10
7 Pasang handrealing besi tempa 10.24 m2 350,000.00 3,584,000.00
59,596,852.66
III Pekerjaan Kusen Dan Penggantung
1 Kusen Pintu Almunium 66.36 m' 86,334.10 5,729,130.88 2 Pasang daun Pintu Kaca Rangka Almunium 107.50 m2 223,443.00 24,020,122.50 3 Kusen jendela alumunium 78.30 m' 223,443.00 17,495,586.90 4 Kusen Bouven alumunium 15.70 m' 86,334.10 1,355,445.37