• Tidak ada hasil yang ditemukan

S KOM 1001127 Abstract

N/A
N/A
Protected

Academic year: 2017

Membagikan "S KOM 1001127 Abstract"

Copied!
2
0
0

Teks penuh

(1)

iv Dian Novita Retnani, 2016

PENERAPAN CRITICAL PATH METHOD (CPM) PADA PROYEK BIMBINGAN SKRIPSI Universitas Pendidikan Indonesia | repository.upi.edu| perpustakaan.upi.edu

PENERAPAN

CRITICAL PATH METHOD

(CPM)

PADA PROYEK BIMBINGAN SKRIPSI

ABSTRAK

Skripsi adalah istilah yang digunakan di Indonesia untuk mengilustrasikan suatu karya

tulis ilmiah berupa paparan tulisan hasil penelitian sarjana S1 yang membahas suatu

permasalahan/fenomena dalam bidang ilmu tertentu dengan menggunakan kaidah-kaidah yang

berlaku. Dalam pembuatan skripsi, kegiatan skripsi dapat dikaitkan dengan manajemen proyek.

Dari proses perencanaan hingga pengendalian proyek bimbingan skripsi merupakan kegiatan

yang penting. Keberhasilan atau kegagalan dari suatu proyek dapat disebabkan perencanaan

yang tidak matang serta pengendalian yang kurang efektif, sehingga kegiatan proyek tidak

efisien. Hal tersebut dikarenakan manajemen proyek yang tidak dikontrol dengan baik, yang

akan mengakibatkan keterlambatan, dan menurunnya kualitas. Untuk membantu

mengendalikan proyek skripsi tersebut dikembangkan sistem manajemen proyek yang

bertujuan untuk mengendalikan penjadwalan kegiatan selama kegiatan bimbingan skripsi

berlangsung. Sistem ini mengimplementasikan sebuah metode perencanaan dan pengendalian

proyek – proyek yang paling banyak digunakan diantara semua sistem yang memakai prinsip

pembentukan jaringan, yaitu Metode Critical Path Method (CPM). CPM dapat digunakan

untuk mengatur waktu penyelesaian proyek dengan lebih efisien dan efektif. Sistem

manajemen proyek bimbingan skripsi ini mengambil data kegiatan bimbingan skripsi

mahasiswa Departemen Ilmu Komputer, FPMIPA UPI yang sedang mengontrak skripsi. Hasil

dari uji sistem terhadap 29 mahasiswa didapatkan 22 data mahasiswa yang melakukan kegiatan

skripsi tepat waktu atau sesuai target dan 7 mahasiswa yang melakukan kegiatan skripsi tidak

sesuai dengan target.

Kata kunci : Skripsi, Manajemen Proyek, Critical Path Method, Sistem Manajemen Proyek

(2)

v Dian Novita Retnani, 2016

PENERAPAN CRITICAL PATH METHOD (CPM) PADA PROYEK BIMBINGAN SKRIPSI Universitas Pendidikan Indonesia | repository.upi.edu| perpustakaan.upi.edu

IMPLEMENTATION OF

CRITICAL PATH METHOD

(

CPM

)

FOR SKRIPSI GUIDANCE PROJECT

ABSTRACT

skripsi is a term used in indonesia to illustrate a scientific paper which is explain a research

that discuss an issue or phenomenon in a specific discipline by using the rules that apply in a

scholar S1. From the proccess of planning to control of the guidance of skripsi projects is a

important task. success or failure of a project can be caused by inadequate planning and

ineffective control, so that the project activity is not efficient. That is because project

management is not well controlled, that would lead to delays, and decreased quality. To help

control the skripsi project developed system management project which purposes to control

scheduling of activities for skripsi guidance activities ongoing. This system implements a

method of planning and controlling the projects which is the most widely used among all

systems using the principle of formation of the network, namely the method is Critical Path

Method (CPM). CPM can be used to manage the project completion time more efficiently and

effectively. Project management system of this skripsi guidance retrieve data student skripsi

guidance activities of the Department of Computer Science, FPMIPA UPI. Result of the system

test to the 29 students obtained data, 22 students conducting thesis on time or on target and 7

students conducting thesis is not on target.

Keyword : Skripsi, Project Management, Critical Path Method, Project management system of

Referensi

Dokumen terkait

Analisis Perhitungan Manual Critical Path Method

Selama ini, proses pengolahan data untuk menentukan prioritas penerima layanan konseling siswa di SMP Laboratorium UPI masih dilakukan secara terpisah berdasarkan

Dengan menggunakan Critical Path Method (CPM) proses perencanaan seluruh kegiatan yang harus diselesaikan dalam proyek akan lebih

Critical Path Method / CPM adalah suatu rangkaian item pekerjaan dalam suatu proyek yang menjadi bagian kritis atas terselesainya proyek secara keseluruhan.. Ini

Critical Path Method (CPM) Melalui program Microsoft Project 2013 pada proyek Rehabilitasi Gedung Man 1 Samarinda yang sebelumnya pada proyek ini tidak ada

EVALUASI PENJADWALAN PROYEK DENGAN MENGGUNAKAN METODE CPM CRITICAL PATH METHODE PADA PROYEK PEMBANGUNAN MALL SUZUYA JLN.KARYA WISATA MEDAN JOHOR Ananda Wilson Simanungkalit1,

Perbandingan Penjadwalan Proyek dengan Metode PDM Precedence Diagram Method & CPM Critical Path Method Studi Kasus: Lanjutan Pembangunan Proyek Gedung SD Islamic Center Samarinda..

Analisis Perencanaan dan Pengendalian Proyek Pembangunan Infrastruktur Jalan Dengan Menggunakan Metode Critical Path Method CPM Studi Kasus: Proyek Jalan Tol Semarang- Demak... Analisis