• Tidak ada hasil yang ditemukan

Daftar Harga Rumah Blok H Type L 8

N/A
N/A
Protected

Academic year: 2021

Membagikan "Daftar Harga Rumah Blok H Type L 8"

Copied!
6
0
0

Teks penuh

(1)

1.057

 2  Oct  2014

230

Tunai  Keras

KPR

Tunai  Bertahap

No  

Unit Dimensi  Tanah LT  (m2)

LB  (m2)

Harga  (Rp)

Pelunasan  Bulan  ke-­‐1 Akad  Kredit  Bulan  ke-­‐6 6  bulan

1

H12

8  x  16

128

230

 

3,700,000,000

               

2,960,000,000

                 

3,128,720,000

       

3,066,560,000

2

H15

8  x  16

128

230

 

3,700,000,000

               

2,960,000,000

                 

3,128,720,000

       

3,066,560,000

3

H17

15  x  16

240

230

 

5,850,000,000

               

4,680,000,000

                 

4,946,760,000

       

4,848,480,000

4

H22

8  x  16

128

230

 

3,700,000,000

               

2,960,000,000

                 

3,128,720,000

       

3,066,560,000

5

H30

11.5  x  16

184

230

 

4,800,000,000

               

3,840,000,000

                 

4,058,880,000

       

3,978,240,000

5000000

Tata  Cara  Pembayaran

15000000

1.065

1.115

Uang  Tanda  Jadi Hari  ke  -­‐  1 Rp.  25  Juta Uang  Tanda  Jadi Hari  ke  -­‐  1 Rp.  25  Juta

DP  1 Hari  ke  -­‐  15 30  %  -­‐  UTJ DP  1 Hari  ke  -­‐  15 15  %  -­‐  UTJ

Pelunasan Hari  ke  -­‐  30 70% DP  2 Hari  ke  -­‐  30 15%

Akad  Kredit Bulan  ke  -­‐  6 70%

Uang  Tanda  Jadi Hari  ke  -­‐  1 Rp.  25  Juta

DP  1 Hari  ke  -­‐  15 15  %  -­‐  UTJ PT.  Sutera  Kharisma  Unggul

DP  2 Hari  ke  -­‐  30 15% Ruko  De  Mansion  Blok  A  no.  18,  Alam  Sutera

Angsuran  3  -­‐  7 Bulan  ke  -­‐  2 70%  /  5  bln Telepon  :  (021)  3044  8383  email  :  info@de-­‐mansion.com

Tunai  Keras  1  Bulan

Tunai  Bertahap  6  Bulan

KPR  :  DP  minimum  30  %,  Akad  Paling  Lama  Bulan  ke-­‐6

Daftar  Harga  Rumah  Blok  H  Type  L  8

Harga  dan  Unit  dapat  berubah  tanpa  pemberitahuan  terlebih   dahulu.  Mohon  konfirmasi  sebelum  membayar  Uang  Tanda  Jadi   ke  pihak  Developer.

(2)

1.126

15000000 1.065 1.115 1.073  2  Oct  2014

Tunai  Keras KPR  1  :  DP  30  % KPR  2  :  DP  30  %  +  20  %

No   Unit Dimensi  Tanah LT  (m2) LB  (m2) Harga  (Rp) Pelunasan  Bulan  ke-­‐1 Akad  Kredit  Bulan  ke-­‐2 Akad  Kredit  Bulan  ke-­‐20 12  Bulan 20  Bulan

1 J1 14  x  18 252 261        6,232,500,000                4,986,000,000                      5,310,090,000                            5,559,390,000    5,349,978,000      5,614,236,000 2 J2 10  x  18 180 248        5,235,000,000                4,188,000,000                      4,460,220,000                            4,669,620,000    4,493,724,000      4,715,688,000 3 J3 10  x  18 180 248        5,235,000,000                4,188,000,000                      4,460,220,000                            4,669,620,000    4,493,724,000      4,715,688,000 4 J11 10  x  18 180 248        5,235,000,000                4,188,000,000                      4,460,220,000                            4,669,620,000    4,493,724,000      4,715,688,000 5 J12 10  x  18 180 248        5,235,000,000                4,188,000,000                      4,460,220,000                            4,669,620,000    4,493,724,000      4,715,688,000 6 J15 14  x  18 252 261        6,232,500,000                4,986,000,000                      5,310,090,000                            5,559,390,000    5,349,978,000      5,614,236,000 7 K1 10  x  20 200 248        5,591,565,650                4,473,252,520                      4,764,013,934                            4,987,676,560    4,799,799,954      5,036,882,338 8 K2 10  x  20 200 248        5,591,565,650                4,473,252,520                      4,764,013,934                            4,987,676,560    4,799,799,954      5,036,882,338 9 K3 10  x  20 200 248        5,591,565,650                4,473,252,520                      4,764,013,934                            4,987,676,560    4,799,799,954      5,036,882,338 10 K5 10  x  20 200 248        5,591,565,650                4,473,252,520                      4,764,013,934                            4,987,676,560    4,799,799,954      5,036,882,338 11 K6 10  x  20 200 248        5,591,565,650                4,473,252,520                      4,764,013,934                            4,987,676,560    4,799,799,954      5,036,882,338 12 K9 10  x  20 200 248        5,591,565,650                4,473,252,520                      4,764,013,934                            4,987,676,560    4,799,799,954      5,036,882,338 13 K10 10  x  20 200 248        5,591,565,650                4,473,252,520                      4,764,013,934                            4,987,676,560    4,799,799,954      5,036,882,338 14 K11 10  x  20 200 248        5,591,565,650                4,473,252,520                      4,764,013,934                            4,987,676,560    4,799,799,954      5,036,882,338 15 K12 10  x  20 200 248        5,591,565,650                4,473,252,520                      4,764,013,934                            4,987,676,560    4,799,799,954      5,036,882,338 16 K15 10  x  20 200 248        5,591,565,650                4,473,252,520                      4,764,013,934                            4,987,676,560    4,799,799,954      5,036,882,338 17 L1 17  x  18 306 315        7,312,500,000                5,850,000,000                      6,230,250,000                            6,522,750,000    6,277,050,000      6,587,100,000 18 L2 10  x  18 180 248        5,235,000,000                4,188,000,000                      4,460,220,000                            4,669,620,000    4,493,724,000      4,715,688,000 19 L3 10  x  18 180 248        5,235,000,000                4,188,000,000                      4,460,220,000                            4,669,620,000    4,493,724,000      4,715,688,000 20 L11 10  x  18 180 248        5,235,000,000                4,188,000,000                      4,460,220,000                            4,669,620,000    4,493,724,000      4,715,688,000 21 L12 10  x  18 180 248        5,235,000,000                4,188,000,000                      4,460,220,000                            4,669,620,000    4,493,724,000      4,715,688,000 22 L15 17  x  18 306 315        7,312,500,000                5,850,000,000                      6,230,250,000                            6,522,750,000    6,277,050,000      6,587,100,000 Tunai  Bertahap

(3)

1.126

15000000 1.065 1.115 1.073  2  Oct  2014

Tunai  Keras KPR  1  :  DP  30  % KPR  2  :  DP  30  %  +  20  %

No   Unit Dimensi  Tanah LT  (m2) LB  (m2) Harga  (Rp) Pelunasan  Bulan  ke-­‐1 Akad  Kredit  Bulan  ke-­‐2 Akad  Kredit  Bulan  ke-­‐20 12  Bulan 20  Bulan

1 I1 11.5  x  16 184 230        4,800,000,000                3,840,000,000                      4,089,600,000                            4,281,600,000    4,120,320,000      4,323,840,000 2 I2 8  x  16 128 230        3,700,000,000                2,960,000,000                      3,152,400,000                            3,300,400,000    3,176,080,000      3,332,960,000 3 I3 8  x  16 128 230        3,700,000,000                2,960,000,000                      3,152,400,000                            3,300,400,000    3,176,080,000      3,332,960,000 4 I5 8  x  16 128 230        3,700,000,000                2,960,000,000                      3,152,400,000                            3,300,400,000    3,176,080,000      3,332,960,000 5 I6 8  x  16 128 230        3,700,000,000                2,960,000,000                      3,152,400,000                            3,300,400,000    3,176,080,000      3,332,960,000 6 I7 8  x  16 128 230        3,700,000,000                2,960,000,000                      3,152,400,000                            3,300,400,000    3,176,080,000      3,332,960,000 7 I8 8  x  16 128 230        3,700,000,000                2,960,000,000                      3,152,400,000                            3,300,400,000    3,176,080,000      3,332,960,000 8 I9 8  x  16 128 230        3,700,000,000                2,960,000,000                      3,152,400,000                            3,300,400,000    3,176,080,000      3,332,960,000 9 I10 8  x  16 128 230        3,700,000,000                2,960,000,000                      3,152,400,000                            3,300,400,000    3,176,080,000      3,332,960,000 10 I11 8  x  16 128 230        3,700,000,000                2,960,000,000                      3,152,400,000                            3,300,400,000    3,176,080,000      3,332,960,000 11 I12 11.5  x  16 184 230        4,800,000,000                3,840,000,000                      4,089,600,000                            4,281,600,000    4,120,320,000      4,323,840,000 12 I15 15  x  17.1 257 236        6,187,500,000                4,950,000,000                      5,271,750,000                            5,519,250,000    5,311,350,000      5,573,700,000 13 I16 8  x  17.1 137 236        3,937,500,000                3,150,000,000                      3,354,750,000                            3,512,250,000    3,379,950,000      3,546,900,000 14 I17 8  x  17.1 137 236        3,937,500,000                3,150,000,000                      3,354,750,000                            3,512,250,000    3,379,950,000      3,546,900,000 15 I18 8  x  17.1 137 236        3,937,500,000                3,150,000,000                      3,354,750,000                            3,512,250,000    3,379,950,000      3,546,900,000 16 I19 8  x  17.1 137 236        3,937,500,000                3,150,000,000                      3,354,750,000                            3,512,250,000    3,379,950,000      3,546,900,000 17 I20 8  x  17.1 137 236        3,937,500,000                3,150,000,000                      3,354,750,000                            3,512,250,000    3,379,950,000      3,546,900,000 18 I21 8  x  17.1 137 236        3,937,500,000                3,150,000,000                      3,354,750,000                            3,512,250,000    3,379,950,000      3,546,900,000 19 I22 8  x  17.1 137 236        3,937,500,000                3,150,000,000                      3,354,750,000                            3,512,250,000    3,379,950,000      3,546,900,000 20 I23 8  x  17.1 137 236        3,937,500,000                3,150,000,000                      3,354,750,000                            3,512,250,000    3,379,950,000      3,546,900,000 21 I25 8  x  17.1 137 236        3,937,500,000                3,150,000,000                      3,354,750,000                            3,512,250,000    3,379,950,000      3,546,900,000 22 I26 8  x  17.1 137 236        3,937,500,000                3,150,000,000                      3,354,750,000                            3,512,250,000    3,379,950,000      3,546,900,000 23 I27 8  x  17.1 137 236        3,937,500,000                3,150,000,000                      3,354,750,000                            3,512,250,000    3,379,950,000      3,546,900,000 Tunai  Bertahap

(4)

Tata  Cara  Pembayaran

Tunai  Keras  1  Bulan

Uang  Tanda  Jadi

Hari  ke  -­‐  1

Rp.  25  Juta

Uang  Tanda  Jadi Hari  ke  -­‐  1

Rp.  25  Juta

DP  1

Hari  ke  -­‐  14

30  %  -­‐  UTJ

DP  1

Hari  ke  -­‐  15 15  %  -­‐  UTJ

Pelunasan

Hari  ke  -­‐  28

70%

DP  2

Hari  ke  -­‐  30

15%

Angsuran  3  -­‐  13 Bulan  ke  -­‐  2 70%  /  11  bulan

Uang  Tanda  Jadi

Hari  ke  -­‐  1

Rp.  25  Juta

DP  1

Hari  ke  -­‐  15

15  %  -­‐  UTJ

DP  2

Hari  ke  -­‐  30

15%

Uang  Tanda  Jadi Hari  ke  -­‐  1

Rp.  25  Juta

Akad  Kredit

Bulan  ke  -­‐  2

70%

DP  1

Hari  ke  -­‐  15 15  %  -­‐  UTJ

DP  2

Hari  ke  -­‐  30

15%

Angsuran  3  -­‐  21 Bulan  ke  -­‐  2 70%  /  19  bulan

Uang  Tanda  Jadi

Hari  ke  -­‐  1

Rp.  25  Juta

DP  1

Hari  ke  -­‐  15

15  %  -­‐  UTJ

DP  2

Hari  ke  -­‐  30

15%

Angsuran  3  -­‐  20

Bulan  ke  -­‐  2

20%  /  18  bulan

PT.  Sutera  Kharisma  Unggul

Akad  Kredit

Bulan  ke-­‐20

50%

Ruko  De  Mansion  Blok  A  no.  18,  Alam  Sutera

Telepon  :  (021)  3044  8383  email  :  info@de-­‐mansion.com

KPR  1  :  DP  30  %,  Akad  Bulan  ke-­‐2

KPR  2  :  DP  30  %  +  20  %,  Akad  Bulan  ke-­‐20

Tunai  Bertahap  12  Bulan

Tunai  Bertahap  20  Bulan

Harga  dan  Unit  dapat  berubah  tanpa  pemberitahuan  terlebih   dahulu.  Mohon  konfirmasi  sebelum  membayar  Uang  Tanda  Jadi  ke   pihak  Developer.

(5)

 

Frequently  Asked  Questions  (F.A.Q)  

1. Berapa  total  luas  lahan  De  Mansion  ?  

Total  luas  lahan  De  Mansion  adalah  sekitar  70.000  m2  (7  hektar)  

 

2. Ada  berapa  unit  rumah  di  De  Mansion  ?    85  unit  rumah  dengan  type  L  8,  L  10  dan  L  12.    

3. Siapa  Developer  De  Mansion  ?  

PT.   Sutera   Kharisma   Unggul,   telah   memiliki   tanah   di   Alam   Sutera   sejak   26   tahun   yang   lalu.   Lahan   yang  saat  ini  jadi  proyek  De  Mansion  adalah  hasil  tukar  guling  dengan  developer  Alam  Sutera  untuk   dijadikan  akses  masuk  tol  dari  /  ke  Jakarta.  

 

4. Bagaimana  izin  proyek  De  Mansion  ?  

Izin  dari  Alam  Sutera,  Izin  Lokasi,  SIPPT,  IMB  telah  dimiliki  semua  oleh  De  Mansion,  sedangkan  proses   pemecahan  sertipikat  sedang  dalam  proses.  

 

5. Apakah  Developer  De  Mansion  pernah  membangun  proyek  lain    ?  

De  Mansion  adalah  proyek  perdana  dan  karena  proyek  pertama,  maka  dikerjakan  dengan  sungguh  –   sungguh   untuk   membuktikan   kepada   publik   terhadap   desain,   kualitas   mutu   pembangunan   dan   waktu   serah   terima   yang   tepat  untuk   menjaga   nama   baik   developer.   Silahkan   datang   ke   lokasi   De   Mansion  dan  lihat  sendiri  kualitas  rumah  yang  sedang  dibangun.  Pemilihan  bahan  bangunan  seperti   keramik,  warna  cat  dan  sebagainya  dilakukan  oleh  Owner  sendiri.  

 

6. Kapan   serah   terima   dilakukan   dan   apabila   terjadi   keterlambatan   dalam   serah   terima   unit,   apakah   developer  akan  dikenakan  sanksi  denda  ?  

Serah   terima   akan   dilakukan   maksimal   20   bulan   sejak   penandatanganan   PPJB.   Apabila   developer   terlambat   dalam   melakukan   serah,   akan   dikenakan   sanksi   denda   yang   diatur   dalam   PPJB.   Khusus   blok  H,  diperkirakan  selesai  Maret  2015.  

 

7. Berapa  harga  tanah  dan  harga  bangunan  di  De  Mansion  ?  

Harga  tanah  rata  –  rata  sekitar  Rp.  14,2  juta  di  luar  ppn.  Harga  bangunan  untuk  L  8  sekitar  Rp.3,75   juta  /m2  sedangkan  untuk  L  10  dan  L  12  sekitar  Rp.  5  juta  /  m2.  

 

8. Berapa  perkiraan  harga  Iuran  Pengelolaan  Keamanan  Lingkungan  (IPKL)  ?  

Sekitar  Rp.  350  ribu  untuk  L  8,  Rp.  450  ribu  untuk  L  10  dan  Rp.  550  ribu  untuk  L  12.    

9. Bagaimana  sistem  keamanan  De  Mansion  ?  

De  Mansion  adalah  cluster  exclusive  dengan  pengamanan  24  jam,  baik  melalui  CCTV  yang  dipasang  di   berbagai  penjuru  kompleks  dan  juga  beberapa  regu  satpam  yang  bertugas.  

(6)

 

10. Bagaimana  dengan  jaringan  air,  listrik,  telepon,  internet  dan  TV  kabel  di  De  Mansion  ?  

De  Mansion  menggunakan  saluran  air  yang  terpadu  dengan  developer  Alam  Sutera.  Untuk  jaringan   listrik  menggunakan  jaringan  bawah  tanah  sehingga  terlihat  rapi,  tidak  ada  tiang  /  kabel  melintang  di   jalan  atau  depan  rumah.  Untuk  internet,  telepon  dan  TV  kabel  menggunakan  jaringan  fiber  optik  dari   NetCiti.  

 

11. Bagaimana  dengan  status  surat  kepemilikan  ?  Berapa  lama  jadinya  ?  

Untuk  status  kepemilikan  saat  Akad  Jual  Beli  adalah  Sertipikat  HGB  (Hak  Guna  Bangunan)  dan  dapat   langsung   ditingkatkan   menjadi   SHM   (Sertipikat   Hak   MIlik)   atas   nama   pembeli   masing   –   masing.   Proses   pemecahan   sertipikat   dilakukan   oleh   Badan   Pertanahan   Nasional   (BPN)   bukan   oleh   developer,   sehingga   tidak   bisa   dijanjikan   secara   pasti   waktunya,   namun   diperkirakan   sekitar   1   -­‐   2   tahun  setelah  serah  terima.  

 

12. Apakah  ada  fasilitas  olah  raga  seperti  kolam  renang    ?  

Fasilitas   olah   raga   akan   menjadi   satu   dengan   fasilitas   apartemen   nantinya   seperti   kolam   renang,   gym,  taman  bermain.  

 

13. Bagaimana  cara  pembayarannya  ?  

1. Cash  keras  dalam  waktu  1  bulan   2. Cash  bertahap  12  bulan  dan  20  bulan  

3. KPR  dengan  DP  30  %  dan  50  %  (sesuai  ketentuan  Bank  Indonesia).       Tahapan  pembayaran  tercantum  dengan  jelas  di  Price  List.  

14. Bank  apa  saja  yang  kerja  sama    ?  

Bank  yang  kerja  sama  saat  ini  adalah    

1. Bank  Mandiri  (9,75  %  fixed  1  tahun,  10,75  %  fixed  2  tahun)   2. NISP  (8,88  %  fixed  1  tahun,  10,69  %  fixed  2  tahun)  

 

15. Apakah  boleh  Ganti  Nama  atau  Alih  Hak  ?  Berapa  biayanya  ?  

Ganti  Nama  Gratis,  hanya  diperbolehkan  untuk  nama  yang  ada  dalam  1  Kartu  Keluarga  Asli  (Suami-­‐ Istri-­‐Anak)  dan  selama  belum  tanda  tangan  PPJB.  

DP  <  30  %  :  Tidak  boleh  Pengalihan  Hak  

DP  >  30%  &  sudah  tanda  tangan  PPJB  :  5%  +  2%    

16. Apakah  ada  pengembangan  berikutnya  ?  

Ya,   De   Mansion   masih   membebaskan   lahan   lagi   dan   akan   segera   dibangun   Apartemen,   F&B   area,   Office  &  Hotel.  

 

17. Apakah  bisa  pilih  unit  langsung  ?  

Ya,  khusus  blok  H  bisa  pilih  unit  langsung  dengan  memasukkan  Uang  Tanda  Jadi  (UTJ)  Rp.  25  juta.   Sedangkan   untuk   blok   I,J,K,L   mohon   memasukkan   Tanda   Minat   Rp.   5   juta   untuk   mendapatkan   Nomor   Urut   Prioritas   (NUP)   dan   dapat   memilih   unit   langsung   tanpa   diundi   hari   Sabtu,   25   Oktober   2014  jam  10  pagi  di  Grand  Ballroom,  Hotel  Mercure,  Alam  Sutera.  Ada  Hadiah  Langsung  “Diamond  &   Gold”  khusus  bagi  pembeli  De  Mansion  di  acara  ini.  

Referensi

Dokumen terkait

paling banyak dilakukan oleh sekolah adalah praktikum pengukuran, pengenalan alat-alat optik dan hukum Ohm, sedangkan judul-judul yang lain keterlaksanaannya masih

Dari contoh goro-goro tersebut dapat ditarik tafsir bahwa yang membuat teater memiliki potensi menghibur bukan hanya karena di dalamnya banyak kelucuan.. Tetapi

Swasembada pangan umumnya merupakan capaian peningkatan ketersediaan pangan dengan wilayah nasional, sedangkan ketahanan pangan lebih mengutamakan akses setiap individu

Pejabat Yang Berwenang di lingkungan KKKS yang ditunjuk sebagai pelaksana/penanggungjawab Kepabeanan dapat mengajukan permohonan perubahan RIB kepada DJMGB dengan tembusan

Dihasilkan rancangan progressive hybrid tool untuk komponen support berdasarkan hasil tahapan perancangan yang telah dilakukan, meliputi analisa fix blank, optimasi

Adapun batasan masalah dalam penelitian ini yaitu: (1) subjek penelitian yang digunakan dalam penelitian ini hanya terbatas pada peserta didik kelas VIII

Porsi jasa terhadap pendapatan meningkat drastis di kuartal pertama sesuai dengan perubahan visi perseroan untuk tidak hanya menjadi produsen precast, tapi juga menjadi