DAFTAR PUSTAKA
1) Djiteng Marsudi. Operasi Sistem Tenaga Listrik. Balai Penerbit & Humas
ISTN, Jakarta, 1990.
2) Hartono, “Simulasi Probabilitas Produksi Sistem Tenaga Metode Segmentasi
Dibandingkan Metode Fungsi Energi Ekuivalen”. Pascasarjana UI, 2005.
3) Billington, R., Power System Reliability Evaluation, Gordon and breach
science publishers, New York, 1970.
4) Garver, L.L., 1996. ” Effective Load Carrying Capability of Generating
Units ”. IEEE transaction on power apparatus and system, vol.pas-85, no.8 pp,
Agustus 1966 .
5) Booth. R.R, “Power System Simulation Model Based on Probability Analysis”,
IEEE Trans., PAS-91, pp. 62-69, 1972.
6) Rau, N.S., Toy, P., and Schenk, K.F., “Expected Energy Production Cost by
the Method of Moments”, IEEE Trans., PAS-99, pp. 1908-1917, 1980.
7) Stremel, J. P. and Rau, N. S., “The Cumulant Method of Calculating LOLP,”
to be presented at 1979 IEEE Summer Meetings.
8) Booth, R.R., “Optimal Generation Planning Considering Uncertainty”, IEEE
Trans. PAS-91 No.1., pp. 84-90, 1972.
9) La Ode Muh. Abdul Wahid, “Perbandingan Biaya Pembangkit Listrik di
LAMPIRAN A
DATA PERHITUNGAN PENAMBAHAN
KAPASITAS PEMBANGKIT UNTUK
LAMPIRAN A
DATA PERHITUNGAN PENAMBAHAN KAPASITAS
PEMBANGKIT UNTUK BEBAN PUNCAK HARI SABTU
Kondisi awal :
LOLP terhadap beban puncak
UE terhadap beban puncak
Tahun
Beban Puncak
Reserve
LOLP
UE(KW)
2007 3637 3107
1.50E-03
8.7113
2008 3905 2839
0.0035
21.0823
2009 4217 2527
0.0341
1.30E+02
2010 4428 2316
0.0723
3.89E+02
2011 4649 2095
0.1111
8.45E+02
2012 4881 1863
0.3721
1.90E+03
2013 5125 1619
1.4408
6.73E+03
2014 5381 1363
2.8773
1.94E+04
2015 5650 1094
5.6626
4.32E+04
2016 5933 811
22.9028
1.27E+05
Perhitungan penambahan kapasitas pembangkit tiap tahun:
Beban Pertumbuhan Beban c*/m FOR c/m unit rating Perubahan m m
baru LOLP LOLP1
2007 3637 - - - - - - 1.50E-03 1.50E-03 2008 3905 268 - - - 0.0035 0.0035 2009 4217 312 - - - 0.0341 0.0341 2010 4428 211 - - - 0.0723 0.0723 2011 4649 221 - - - 0.1111 0.1111 2012 4881 232 - - - 248.41 0.3721 0.3721 2013 5125 244 0.98 0.02 0.35 86.94 1.738892 250.15 1.4408 0.979
2014 5381 256 1.02 0.03 1.07 267.7 7.579608 257.73 2.8773 0.9823 2015 5650 269 1.04 0.03 1.09 281.2 8.041229 265.77 5.6626 0.9816 2016 5933 283 1.06 0.03 1.11 293.4 8.411713 274.18 22.9028 0.9813
Total penambahan kapasitas 929.31
Tahun Beban Puncak Kap Terpasang Tambahan Unit FOR Reserve LOLP UE(MWH)
2007 3637 6745 - - 3108 1.50E-03 8.7113 2008 3905 6745 - - 2840 0.0035 21.0823 2009 4217 6745 - - 2528 0.0341 1.30E+02 2010 4428 6745 - - 2317 0.0806 3.89E+02 2011 4649 6745 - - 2096 0.1653 8.45E+02 2012 4881 6745 - - 1864 0.8094 1.90E+03 2013 5125 6832 87 0.03 1707 0.8171 4.27E+03 2014 5381 7100 268 0.03 1719 0.8428 4.42E+03 2015 5650 7381 281 0.03 1731 0.8685 4.51E+03 2016 5933 7674 293 0.03 1741 0.889 4.63E+03
Kondisi setelah penambahan beban tiap tahun:
Perhitungan penambahan kapasitas pembangkit tiap 2 tahun:
Beban Pertumbuhan Beban c*/m FOR c/m unit rating Perubahan m m baru LOLP awal LOLP 2007 3637 - - - - - - 1.50E-03 1.50E-03 2008 3905 268 - - - 0.0035 0.0035 2009 4217 312 - - - 0.0341 0.0341 2010 4428 211 - - - 0.0723 0.0723 2011 4649 221 - - - 0.1111 0.1111 2012 4881 232 - - - 248.41 0.3721 0.3721 2013 5125 500 2.01 0.03 1.4 347.8 10.43335 258.85 1.4408 0.2176 2014 5381 - - - - - - 2.8773 0.9723 2015 5650 552 2.13 0.05 2.3 595.3 29.12024 29.12 5.6626 0.266 2016 5933 - - - - - - 22.9028 0.9794Total penambahan kapasitas 943.2
Tahun Beban Puncak Kap Terpasang Tambahan Unit FOR Reserve LOLP UE(MWH)
2007 3637 6745 - - 3108 1.50E-03 8.7113 2008 3905 6745 - - 2840 0.0035 21.0823 2009 4217 6745 - - 2528 0.0341 1.30E+02 2010 4428 6745 - - 2317 0.0806 3.89E+02 2011 4649 6745 - - 2096 0.1653 8.45E+02 2012 4881 6745 - - 1864 0.8094 1.90E+03 2013 5125 7093 348 0.03 1968 0.8171 1.36E+03 2014 5381 7093 - - 1712 0.8428 4.46E+03 2015 5650 7688 595 0.05 2038 0.8685 1.71E+03 2016 5933 7688 - - 1755 0.889 5.21E+03
Kondisi setelah penambahan beban tiap 2 tahun:
LAMPIRAN B
DATA PERHITUNGAN PENAMBAHAN
KAPASITAS PEMBANGKIT UNTUK
LAMPIRAN B
DATA PERHITUNGAN PENAMBAHAN KAPASITAS
PEMBANGKIT UNTUK BEBAN PUNCAK HARI MINGGU
Kondisi awal :
LOLP terhadap beban puncak
UE terhadap beban puncak
Tahun Beban
Puncak
Reserve LOLP UE(KW)
2007
3480 3264
4.19E-04 1.8553
2008
3737 3007
0.0012 6.1613
2009
4036 2708
0.0056 2.38E+01
2010
4238 2506
0.0157 7.26E+01
2011
4450 2294
0.0305 1.79E+02
2012
4673 2071
0.0767 4.22E+02
2013
4907 1837
0.2543 1.19E+03
2014
5152 1592
0.6462 3.81E+03
2015
5410 1334
1.2108 8.93E+03
2016
5681 1063
4.1045 2.26E+04
Perhitungan penambahan kapasitas pembangkit tiap tahun:
Beban Pertumbuhan Beban c*/m FOR c/m unit rating Perubahan m mbaru LOLP LOLP1
2007 3480 - - - - - - 4.19E-04 4.19E-04 2008 3737 257 - - - 0.0012 0.0012 2009 4036 299 - - - 0.0056 0.0056 2010 4238 202 - - - 0.0157 0.0157 2011 4450 212 - - - 0.0305 0.0305 2012 4673 223 - - - 0.0767 0.0767 2013 4907 234 - - - 0.2543 0.2543 2014 5152 245 - - - 248.41 0.6462 0.6462 2015 5410 258 1.04 0.02 0.3 75 1.242066 249.66 1.2108 0.982 2016 5681 271 1.09 0.02 1.13 282.4 5.392554 255.05 4.1045 0.993
Total penambahan kapasitas 356.9
Tahun Beban Puncak Kap Terpasang Tambahan Unit FOR Reserve LOLP UE(MWH)
2007 3480 6745 - - 3265 4.19E-04 8.7113 2008 3737 6745 - - 3008 0.0012 21.0823 2009 4036 6745 - - 2709 0.0056 1.30E+02 2010 4238 6745 - - 2507 0.0157 3.89E+02 2011 4450 6745 - - 2295 0.0305 8.45E+02 2012 4673 6745 - - 2072 0.0767 1.90E+03 2013 4907 6745 - - 1838 0.2543 4.01E+03 2014 5152 6745 - - 1593 0.6462 4.09E+03 2015 5410 6820 75 - 1410 0.982 7.35E+03 2016 5681 7102 282 - 1421 0.993 7.60E+03
Kondisi setelah penambahan beban tiap tahun:
Perhitungan penambahan kapasitas pembangkit tiap 2 tahun:
Beban Pertumbuhan Beban c*/m FOR c/m unit rating Perubahan m mbaru LOLP LOLP1
2007 3480 - - - 4.19E-04 4.19E-04 2008 3737 257 - - - 0.0012 0.0012 2009 4036 299 - - - 0.0056 0.0056 2010 4238 202 - - - 0.0157 0.0157 2011 4450 212 - - - 0.0305 0.0305 2012 4673 223 - - - 0.0767 0.0767 2013 4907 234 - - - 0.2543 0.2543 2014 5152 245 - - - 248.41 0.6462 0.6462 2015 5410 529 2.13 0.03 1.5 373 10.43335 258.85 1.2108 0.5331 2016 5681 - - - - - - 4.1045 0.9602
Total penambahan kapasitas 373 Tahun Beban Puncak Kap Terpasang Tambahan Unit FOR Reserve LOLP UE(MWH)
2007 3480 6745 - - 3265 4.19E-04 8.7113 2008 3737 6745 - - 3008 0.0012 21.0823 2009 4036 6745 - - 2709 0.0056 1.30E+02 2010 4238 6745 - - 2507 0.0157 3.89E+02 2011 4450 6745 - - 2295 0.0305 8.45E+02 2012 4673 6745 - - 2072 0.0767 1.90E+03 2013 4907 6745 - - 1838 0.2543 4.01E+03 2014 5152 6745 - - 1593 0.6462 4.09E+03 2015 5410 7118 373 0.03 1708 0.5331 2.64E+03 2016 5681 7118 - - 1437 0.9602 7.19E+03