KEGIATAN
: PENATAAN HALAMAN GEDUNG KANTOR
PEKERJAAN
: PENATAAN HALAMAN KANTOR BAPPEDA - PMS KAB. BOLMONG
PLOKASI
: KABUPATEN BOLAANG MONGONDOW
TAHUN ANGGARAN
: 2013
I. PEKERJAAN PERSIAPAN 6.575.000,00 4.215.000,00 6.020.000,00 1.175.000,00 7.100.000,00
1 Papan Nama Proyek 1,00 Ls 300.000,00 300.000,00 215.000,00 215.000,00 270.000,00 270.000,00 225.000,00 225.000,00 600.000,00 600.000,00 2 Pengukuran/Pasang Patok Batas Lahan (pakai alat water pass/theodolite) 1,00 Ls 750.000,00 750.000,00 500.000,00 500.000,00 750.000,00 750.000,00 500.000,00 500.000,00 2.000.000,00 2.000.000,00 3 Mobilisasi / Demobilisasi Alat Berat 1,00 Ls 5.525.000,00 5.525.000,00 3.500.000,00 3.500.000,00 5.000.000,00 5.000.000,00 450.000,00 450.000,00 4.500.000,00 4.500.000,00
II. PEKERJAAN TANAH 108.357.915,65 40.388.962,82 40.641.676,82 40.394.979,82 45.926.218,80
1 Galian Tanah Pondasi (manual) 43,76 M3 51.700,00 2.262.392,00 29.287,50 1.281.621,00 35.062,50 1.534.335,00 29.425,00 1.287.638,00 51.700,00 2.262.392,00
2 Urugan tanah pilihan dipadatkan (menggunakan alat berat) 402,58 M3 263.536,73 106.095.523,65 97.141,79 39.107.341,82 97.141,79 39.107.341,82 97.141,79 39.107.341,82 108.460,00 43.663.826,80
III. PEKERJAAN PASANGAN BATU DAN PAVING BLOK 373.125.814,02 339.856.381,95 359.854.899,94 349.986.717,43 375.162.676,94
1 Pasang pondasi batu kali, Sp 1 : 4 56,89 M3 737.088,00 41.931.462,14 658.652,50 37.470.740,73 675.977,50 38.456.359,98 659.065,00 37.494.207,85 870.936,00 49.547.549,04
2 Pasang Cansteen beton 15 x 25 x 50 cm K - 300 878,78 M1 111.174,56 97.697.977,43 19.041,51 16.732.913,81 19.399,01 17.047.070,51 19.049,76 16.740.163,58 115.720,00 101.692.421,60
3 Pasang Paving Blok K. 300 (21 cm x 10,5 cm x 8 cm ) 1.292,85 M2 151.855,00 196.325.736,75 193.490,00 250.153.546,50 207.020,00 267.645.807,00 201.272,50 260.215.151,63 147.928,00 191.248.714,80 4 Coor beton, camp. 1 : 3 : 5 (beton umpak) 0,80 M3 741.065,60 592.852,48 647.597,50 518.078,00 666.627,50 533.302,00 648.037,50 518.430,00 935.227,15 748.181,72 5 Coor rabat beton, camp. 1 : 3 : 5 (disamping kantor) 13,34 M3 741.065,60 9.888.038,30 647.597,50 8.638.950,65 666.627,50 8.892.810,85 648.037,50 8.644.820,25 935.227,15 12.475.930,18 6 Coor beton plat T = 10 cm, camp.1 : 2 : 3 (duicker penutup saluran) 0,39 M3 4.278.142,85 1.662.058,50 1.006.417,50 392.502,83 1.039.417,50 405.372,83 1.011.917,50 394.647,83 960.980,90 374.782,55 7 Pembuatan saluran air hujan 162,60 M1 153.921,82 25.027.688,42 159.591,94 25.949.649,44 165.277,84 26.874.176,78 159.774,27 25.979.296,30 117.313,02 19.075.097,05
IV. PEKERJAAN GORONG - GORONG 8.582.238,24 7.587.319,40 7.773.639,78 7.591.716,60 11.244.472,01
1 Galian tanah 2,16 M3 51.700,00 111.672,00 29.287,50 63.261,00 35.062,50 75.735,00 29.425,00 63.558,00 51.700,00 111.672,00
2 Pasang pondasi batu kali 4,43 M3 737.088,00 3.263.825,66 658.652,50 2.917.830,58 675.977,50 2.994.580,33 659.065,00 2.919.657,95 870.936,00 3.858.246,48
3 Plesteran pasangan batu, Sp. 1 : 3 10,08 M2 51.222,40 516.321,79 46.457,18 468.288,37 49.922,18 503.215,57 46.539,68 469.119,97 59.222,90 596.966,83
4 Coor beton balok 20 x 30 cm, camp. 1 : 2 : 3 (besi 92,781 kg/ M3 + bekisting) 0,43 M3 2.909.876,90 1.257.066,82 3.311.155,36 1.423.796,80 3.379.595,18 1.453.225,93 3.312.763,20 1.424.488,18 4.087.121,59 1.757.462,28
5 Coor beton plat T - 15 cm, camp. 1 : 2 : 3 (besi 141,77 Kg/M3 + bekisting) 0,86 M3 3.973.787,01 3.433.351,97 3.155.979,82 2.714.142,65 3.194.049,95 2.746.882,96 3.156.851,74 2.714.892,50 5.721.074,90 4.920.124,41
TABEL KOREKSI ARITMATIK
No. Mata Pemba- yaran
Uraian Kuantitas Satuan
HPS CV. SINAR MOLI JAYA CV. PUTRA TOTABUAN CV. POGOGUL JAYA CV. FITRAH ABADI
Harga Satuan (Rupiah)
Jumlah Harga-harga
(Rupiah)
Harga Satuan (Rupiah)
Jumlah Harga-harga
(Rupiah)
Harga Satuan (Rupiah)
Jumlah Harga-harga
(Rupiah)
Harga Satuan (Rupiah)
Jumlah Harga-harga
(Rupiah)
Harga Satuan (Rupiah)
Jumlah Harga-harga
No. Mata Pemba- yaran
Uraian Kuantitas Satuan
HPS CV. SINAR MOLI JAYA CV. PUTRA TOTABUAN CV. POGOGUL JAYA CV. FITRAH ABADI
Harga Satuan (Rupiah)
Jumlah Harga-harga
(Rupiah)
Harga Satuan (Rupiah)
Jumlah Harga-harga
(Rupiah)
Harga Satuan (Rupiah)
Jumlah Harga-harga
(Rupiah)
Harga Satuan (Rupiah)
Jumlah Harga-harga
(Rupiah)
Harga Satuan (Rupiah)
Jumlah Harga-harga
(Rupiah)
V. PEKERJAAN LAIN - LAIN 3.359.032,16 3.928.539,50 4.507.612,50 3.286.111,00 9.067.087,61
1 Timbrisan kerikil disekitar beton umpak 0,52 M3 203.000,00 104.545,00 213.537,50 111.039,50 216.562,50 112.612,50 213.675,00 111.111,00 301.372,50 156.713,70
2 Pembuatan penutup saluran (Besi siku L 50,50,5 + besi beton Ø 12 mm) 4,70 M1 160.529,18 754.487,16 325.000,00 1.527.500,00 350.000,00 1.645.000,00 250.000,00 1.175.000,00 1.036.356,15 4.870.873,91
3 Administrasi / dokumentasi 1,00 Ls 1.750.000,00 1.750.000,00 1.200.000,00 1.200.000,00 1.500.000,00 1.500.000,00 1.000.000,00 1.000.000,00 1.539.500,00 1.539.500,00 4 Pembesihan Akhir 1,00 Ls 750.000,00 750.000,00 1.090.000,00 1.090.000,00 1.250.000,00 1.250.000,00 1.000.000,00 1.000.000,00 2.500.000,00 2.500.000,00
Jumlah 500.000.000,07 395.976.203,67 418.797.829,05 402.434.524,85 448.500.455,36
PPN 10% 50.000.000,01 39.597.620,37 41.879.782,90 40.243.452,48 44.850.045,54
JUMLAH + PPN 550.000.000,08 435.573.824,04 460.677.611,95 442.677.977,33 493.350.500,89
Dibulatkan 550.000.000,00 435.573.000,00 460.677.000,00 442.677.000,00 493.350.000,00
Penawaran : 550.000.000,00 435.573.000,00 460.677.000,00 442.677.000,00 437.250.000,00
KEGIATAN
: PENATAAN HALAMAN GEDUNG KANTOR
III. PEKERJAAN PASANGAN BATU DAN PAVING BLOK 373.125.814,02