KEGIATAN : REHAB./PEMEL. JARINGAN IRIGASI
PEKERJAAN : REHABILITASI JARINGAN IRIGASI D.I MENDENG (DAK/DAU)
LOKASI : KEC. BOLAANG
I.
272.285.856,92 253.429.186,79 237.087.860,511
Bongkaran Pasangan Lama (Man)
M
332,35
345.400,00
11.173.690,00345.400,00
11.173.690,00299.200,00
9.679.120,00 2M
3318,24
87.219,34
27.756.681,2371.714,51
22.822.425,66118.470,00
37.701.892,80 3M
3198,79
988.757,22
196.555.047,76937.703,80
186.406.138,40791.636,56
157.369.431,76 4M
2124,80
51.634,17
6.443.943,7951.129,10
6.380.911,6845.157,42
5.635.646,02 5M
2120,50
69.665,97
8.394.749,3968.679,60
8.275.891,8060.767,96
7.322.539,18 6M
30,15
5.244.965,00
786.744,755.134.195,00
770.129,254.528.205,00
679.230,75 7Pintu besi pengatur (Penguras) B = 1.00 M
Bh
1,00
11.550.000,00
11.550.000,0011.550.000,00
11.550.000,0010.450.000,00
10.450.000,00 8Pintu besi pengatur (Intek) B = 0.80 M
Bh
1,00
9.625.000,00
9.625.000,006.050.000,00
6.050.000,008.250.000,00
8.250.000,00II.
PEKERJAAN SALURAN
60.324.433,79 63.202.237,07 48.969.152,091
Galian Tanah Biasa (Man)
M
319,65
60.087,50
1.180.934,00345.400,00
6.788.343,7151.700,00
1.016.089,66 2Pasangan Batu Kali Sp. 1 : 4
M
351,44
988.757,22
50.861.671,40937.703,80
48.235.483,47791.636,56
40.721.784,65 3Siaran Sp. 1 : 2
M
261,24
51.634,17
3.162.076,2651.129,10
3.131.146,0845.157,42
2.765.440,40 4Plesteran Sp 1 : 3
M
273,49
69.665,97
5.119.752,1468.679,60
5.047.263,8060.767,96
4.465.837,38III.
PEKERJAAN BANGUNAN BOX (2 Bh)
11.784.079,34 12.924.848,23 9.597.746,211
Galian Tanah Biasa (Man)
M
35,80
60.087,50
348.507,50345.400,00
2.003.320,0051.700,00
299.860,00 2Pasangan Batu Kali Sp. 1 : 4
M
39,58
988.757,22
9.472.294,17937.703,80
8.983.202,40791.636,56
7.583.878,24 3Siaran Sp. 1 : 2
M
212,59
51.634,17
650.074,1451.129,10
643.715,3745.157,42
568.531,92 4Plesteran Sp 1 : 3
M
218,85
69.665,97
1.313.203,5368.679,60
1.294.610,4660.767,96
1.145.476,05Jumlah 344.394.370,06 329.556.272,10 295.654.758,81
PPN 10% 34.439.437,01 32.955.627,21 29.565.475,88
JUMLAH + PPN 378.833.807,06 362.511.899,31 325.220.234,69
Dibulatkan
378.833.000,00 362.511.000,00 325.220.000,00Penawaran :
362.510.500,00 325.220.000,00Selisih Koreksi 500,00
-TABEL KOREKSI ARITMATIK
PEKERJAAN BENDUNG (1 Bh)
PEKERJAAN KONSTRUKSI
Galian Tanah Berbatu (Alat)
Pasangan Batu Kali Sp. 1 : 4
Siaran Sp. 1 : 2
Plesteran Sp 1 : 3
Cor beton Bertulang Sp. 1 : 2 : 3 ( 110 Kg + bekesting )
CV. SUMBER ABADI
Harga Satuan (Rupiah) No. Mata
Pemba- yaran
Uraian Satuan Kuantitas
HPS CV. DEBRYAN JAYA
Harga Satuan (Rupiah)
Jumlah Harga-harga
(Rupiah)
Harga Satuan (Rupiah)
Jumlah Harga-harga
(Rupiah)
Jumlah Harga-harga
[image:1.1008.108.790.76.455.2]
240.731.382,48 246.696.388,88 219.187.430,77 246.630.827,66
-
299.200,00
9.679.120,0067.160,00
2.172.626,00237.600,00
7.686.360,00303.600,00
9.821.460,00-
125.435,00
39.918.434,4063.381,26
20.170.452,1883.050,00
26.429.832,00126.720,00
40.327.372,80-
792.390,72
157.519.351,23962.984,70
191.431.728,51775.592,18
154.179.969,46813.312,72
161.678.435,61-
45.717,54
5.705.548,9958.951,99
7.357.208,3539.444,19
4.922.634,9146.009,04
5.741.928,19-
61.728,92
7.438.334,8677.430,19
9.330.337,9054.562,09
6.574.731,8562.162,32
7.490.559,56-
4.470.620,00
670.593,001.226.906,25
184.035,944.626.017,00
693.902,554.473.810,00
671.071,50-
11.000.000,00
11.000.000,009.900.000,00
9.900.000,0011.550.000,00
11.550.000,0011.550.000,00
11.550.000,00-
8.800.000,00
8.800.000,006.150.000,00
6.150.000,007.150.000,00
7.150.000,009.350.000,00
9.350.000,00
49.112.868,78 60.156.431,38 47.110.882,84 50.244.203,22
-
51.700,00
1.016.089,6667.160,00
1.319.933,8840.150,00
789.090,9151.975,00
1.021.494,40-
792.390,72
40.760.578,64962.984,70
49.535.932,97775.592,18
39.896.461,74813.312,72
41.836.806,32-
45.717,54
2.799.742,1558.951,99
3.610.219,8739.444,19
2.415.562,2046.009,04
2.817.593,61-
61.728,92
4.536.458,3377.430,19
5.690.344,6654.562,09
4.009.767,9962.162,32
4.568.308,90
9.630.137,07 11.816.686,06 9.188.140,83 9.844.004,40
-
51.700,00
299.860,0067.160,00
389.528,0040.150,00
232.870,0051.975,00
301.455,00-
792.390,72
7.591.103,10962.984,70
9.225.393,43775.592,18
7.430.173,08813.312,72
7.791.535,86-
45.717,54
575.583,8358.951,99
742.205,5539.444,19
496.602,3546.009,04
579.253,81-
61.728,92
1.163.590,1477.430,19
1.459.559,0854.562,09
1.028.495,4062.162,32
1.171.759,73299.474.388,33
318.669.506,32 275.486.454,44 306.719.035,28
29.947.438,83
31.866.950,63 27.548.645,44 30.671.903,53
329.421.827,16
350.536.456,96 303.035.099,88 337.390.938,81
329.421.000,00
350.536.000,00 303.035.000,00 337.390.000,00
329.390.000,00
350.536.000,00 303.030.000,00 337.390.000,00
31.000,00
- 5.000,00
-Lolak, Juni 2014
POKJA JASA KONSTRUKSI
CV. PELANGI
Harga Satuan (Rupiah)
Jumlah Harga-harga
(Rupiah) CV. KARUNIKA
Harga Satuan (Rupiah)
Jumlah Harga-harga
(Rupiah) CV. TOMBOLISIK
Harga Satuan (Rupiah)
Jumlah Harga-harga
(Rupiah)
CV. NIRWANA KARYA CV. TANEL
Harga Satuan (Rupiah)
Jumlah Harga-harga
(Rupiah)
Harga Satuan (Rupiah)
Jumlah Harga-harga