(1)

KEGIATAN : REHAB./PEMEL. JARINGAN IRIGASI

PEKERJAAN : REHABILITASI JARINGAN IRIGASI D.I MENDENG (DAK/DAU)

LOKASI : KEC. BOLAANG

I.

272.285.856,92 253.429.186,79 237.087.860,51

1

Bongkaran Pasangan Lama (Man)

M

3

32,35

345.400,00

11.173.690,00

345.400,00

11.173.690,00

299.200,00

9.679.120,00 2

M

3

318,24

87.219,34

27.756.681,23

71.714,51

22.822.425,66

118.470,00

37.701.892,80 3

M

3

198,79

988.757,22

196.555.047,76

937.703,80

186.406.138,40

791.636,56

157.369.431,76 4

M

2

124,80

51.634,17

6.443.943,79

51.129,10

6.380.911,68

45.157,42

5.635.646,02 5

M

2

120,50

69.665,97

8.394.749,39

68.679,60

8.275.891,80

60.767,96

7.322.539,18 6

M

3

0,15

5.244.965,00

786.744,75

5.134.195,00

770.129,25

4.528.205,00

679.230,75 7

Pintu besi pengatur (Penguras) B = 1.00 M

Bh

1,00

11.550.000,00

11.550.000,00

11.550.000,00

11.550.000,00

10.450.000,00

10.450.000,00 8

Pintu besi pengatur (Intek) B = 0.80 M

Bh

1,00

9.625.000,00

9.625.000,00

6.050.000,00

6.050.000,00

8.250.000,00

8.250.000,00

II.

PEKERJAAN SALURAN

60.324.433,79 63.202.237,07 48.969.152,09

1

Galian Tanah Biasa (Man)

M

3

19,65

60.087,50

1.180.934,00

345.400,00

6.788.343,71

51.700,00

1.016.089,66 2

Pasangan Batu Kali Sp. 1 : 4

M

3

51,44

988.757,22

50.861.671,40

937.703,80

48.235.483,47

791.636,56

40.721.784,65 3

Siaran Sp. 1 : 2

M

2

61,24

51.634,17

3.162.076,26

51.129,10

3.131.146,08

45.157,42

2.765.440,40 4

Plesteran Sp 1 : 3

M

2

73,49

69.665,97

5.119.752,14

68.679,60

5.047.263,80

60.767,96

4.465.837,38

III.

PEKERJAAN BANGUNAN BOX (2 Bh)

11.784.079,34 12.924.848,23 9.597.746,21

1

Galian Tanah Biasa (Man)

M

3

5,80

60.087,50

348.507,50

345.400,00

2.003.320,00

51.700,00

299.860,00 2

Pasangan Batu Kali Sp. 1 : 4

M

3

9,58

988.757,22

9.472.294,17

937.703,80

8.983.202,40

791.636,56

7.583.878,24 3

Siaran Sp. 1 : 2

M

2

12,59

51.634,17

650.074,14

51.129,10

643.715,37

45.157,42

568.531,92 4

Plesteran Sp 1 : 3

M

2

18,85

69.665,97

1.313.203,53

68.679,60

1.294.610,46

60.767,96

1.145.476,05

Jumlah 344.394.370,06 329.556.272,10 295.654.758,81

PPN 10% 34.439.437,01 32.955.627,21 29.565.475,88

JUMLAH + PPN 378.833.807,06 362.511.899,31 325.220.234,69

Dibulatkan

378.833.000,00 362.511.000,00 325.220.000,00

Penawaran :

362.510.500,00 325.220.000,00

Selisih Koreksi 500,00

-TABEL KOREKSI ARITMATIK

PEKERJAAN BENDUNG (1 Bh)

PEKERJAAN KONSTRUKSI

Galian Tanah Berbatu (Alat)

Pasangan Batu Kali Sp. 1 : 4

Siaran Sp. 1 : 2

Plesteran Sp 1 : 3

Cor beton Bertulang Sp. 1 : 2 : 3 ( 110 Kg + bekesting )

CV. SUMBER ABADI

Harga Satuan (Rupiah) No. Mata

Pemba- yaran

Uraian Satuan Kuantitas

HPS CV. DEBRYAN JAYA

Harga Satuan (Rupiah)

Jumlah Harga-harga

(Rupiah)

Harga Satuan (Rupiah)

Jumlah Harga-harga

(Rupiah)

Jumlah Harga-harga

[image:1.1008.108.790.76.455.2]
(2)

240.731.382,48 246.696.388,88 219.187.430,77 246.630.827,66

-

299.200,00

9.679.120,00

67.160,00

2.172.626,00

237.600,00

7.686.360,00

303.600,00

9.821.460,00

-

125.435,00

39.918.434,40

63.381,26

20.170.452,18

83.050,00

26.429.832,00

126.720,00

40.327.372,80

-

792.390,72

157.519.351,23

962.984,70

191.431.728,51

775.592,18

154.179.969,46

813.312,72

161.678.435,61

-

45.717,54

5.705.548,99

58.951,99

7.357.208,35

39.444,19

4.922.634,91

46.009,04

5.741.928,19

-

61.728,92

7.438.334,86

77.430,19

9.330.337,90

54.562,09

6.574.731,85

62.162,32

7.490.559,56

-

4.470.620,00

670.593,00

1.226.906,25

184.035,94

4.626.017,00

693.902,55

4.473.810,00

671.071,50

-

11.000.000,00

11.000.000,00

9.900.000,00

9.900.000,00

11.550.000,00

11.550.000,00

11.550.000,00

11.550.000,00

-

8.800.000,00

8.800.000,00

6.150.000,00

6.150.000,00

7.150.000,00

7.150.000,00

9.350.000,00

9.350.000,00

49.112.868,78 60.156.431,38 47.110.882,84 50.244.203,22

-

51.700,00

1.016.089,66

67.160,00

1.319.933,88

40.150,00

789.090,91

51.975,00

1.021.494,40

-

792.390,72

40.760.578,64

962.984,70

49.535.932,97

775.592,18

39.896.461,74

813.312,72

41.836.806,32

-

45.717,54

2.799.742,15

58.951,99

3.610.219,87

39.444,19

2.415.562,20

46.009,04

2.817.593,61

-

61.728,92

4.536.458,33

77.430,19

5.690.344,66

54.562,09

4.009.767,99

62.162,32

4.568.308,90

9.630.137,07 11.816.686,06 9.188.140,83 9.844.004,40

-

51.700,00

299.860,00

67.160,00

389.528,00

40.150,00

232.870,00

51.975,00

301.455,00

-

792.390,72

7.591.103,10

962.984,70

9.225.393,43

775.592,18

7.430.173,08

813.312,72

7.791.535,86

-

45.717,54

575.583,83

58.951,99

742.205,55

39.444,19

496.602,35

46.009,04

579.253,81

-

61.728,92

1.163.590,14

77.430,19

1.459.559,08

54.562,09

1.028.495,40

62.162,32

1.171.759,73

299.474.388,33

318.669.506,32 275.486.454,44 306.719.035,28

29.947.438,83

31.866.950,63 27.548.645,44 30.671.903,53

329.421.827,16

350.536.456,96 303.035.099,88 337.390.938,81

329.421.000,00

350.536.000,00 303.035.000,00 337.390.000,00

329.390.000,00

350.536.000,00 303.030.000,00 337.390.000,00

31.000,00

- 5.000,00

-Lolak, Juni 2014

POKJA JASA KONSTRUKSI

CV. PELANGI

Harga Satuan (Rupiah)

Jumlah Harga-harga

(Rupiah) CV. KARUNIKA

Harga Satuan (Rupiah)

Jumlah Harga-harga

(Rupiah) CV. TOMBOLISIK

Harga Satuan (Rupiah)

Jumlah Harga-harga

(Rupiah)

CV. NIRWANA KARYA CV. TANEL

Harga Satuan (Rupiah)

Jumlah Harga-harga

(Rupiah)

Harga Satuan (Rupiah)

Jumlah Harga-harga

Gambar

TABEL KOREKSI ARITMATIK

Referensi

Dokumen terkait

Peserta diharapkan membawa semua Dokumen Asli atau Rekaman yang telah dilegalisir oleh pihak yang berwenang yang sesuai dengan data kualifikasi yang telah di Upload pada

Dalam rangka Tindak Lanjut Hasil Pemeriksaan Badan Pemeriksa Keuangan Republik Indonesia (BPK RI) Perwakilan Provinsi DKI Jakarta atas Belanja Daerah pada Dinas Pertamanan dan

It seems like the children have lost their freedom to play safely outside by themselves and with their friends. Instead we now have very controlled environments of driving your child

Dalam rangka tindak lanjut Hasil Pemeriksaan Badan Pemeriksa Keuangan Republik Indonesia Perwakilan Provinsi DKI Jakarta atas Belanja Daerah pada Dinas Pertamanan dan Pemakaman

Setelah diadakan pemeriksaan dan evaluasi secara seksama sesuai dengan ketentuan yang berlaku terhadap seluruh dokumen penawaran yang masuk, dengan ini Pokja Pengadaan

Setelah diadakan pemeriksaan dan evaluasi secara seksama sesuai dengan ketentuan yang berlaku terhadap seluruh dokumen penawaran yang masuk, dengan ini Pokja Pengadaan

Dalam rangka tindak lanjut Hasil Pemeriksaan Badan Pemeriksa Keuangan Republik Indonesia Perwakilan Provinsi DKI Jakarta atas Belanja Daerah pad a Dinas Pertamanan dan

Kepala Badan Pengelola Keuangan dan Aset Oaerah Provinsi OKI Jakarta agar menyusun peraturan dan Standar Operasional Prosedur (SOP) yang diperlukan untuk penerapan akuntansi